Biskra 460 MW SCPP_Algeria

Post on 21-Feb-2017

32 views 3 download

Transcript of Biskra 460 MW SCPP_Algeria

Biskra 460 MW SCGT Project / Erection Works of GTG Units 20 & BOP - Biskra, ALGERIA

Owner : SONELGAZ / SPE - CEEG EPC Contractor : HANWHA E&C Corporation, South Korea Subcontractor : YOUKAIS BETA TEK E&C SPA Date of Completion : August 2016 Description of work : GTG (Gas Turbine Generator) Unit 20 & BOP

- Siemens SGT5 - 4000F(7) Gas Turbine (GT) Mechanical, Piping, Electrical & Instrument Works

- FO/RW/PW/WW Piping and Pumps Erection - Two (2) 130/30 ton Gantry Cranes Erection- BOP, WTP and FGS- HVAC and Communication Works, - All Buildings Structural Steel Works,

4

- Siemens SGEN5 - 1000A 261 MVA Generator (GTG) Mechanical, Piping, Electrical & Instrument Works