Biskra 460 MW SCPP_Algeria
1
Biskra 460 MW SCGT Project / Erection Works of GTG Units 20 & BOP - Biskra, ALGERIA Owner : SONELGAZ / SPE - CEEG EPC Contractor : HANWHA E&C Corporation, South Korea Subcontractor : YOUKAIS BETA TEK E&C SPA Date of Completion : August 2016 Description of work : GTG (Gas Turbine Generator) Unit 20 & BOP - Siemens SGT5 - 4000F(7) Gas Turbine (GT) Mechanical, Piping, Electrical & Instrument Works - FO/RW/PW/WW Piping and Pumps Erection - Two (2) 130/30 ton Gantry Cranes Erection - BOP, WTP and FGS - HVAC and Communication Works, - All Buildings Structural Steel Works, 4 - Siemens SGEN5 - 1000A 261 MVA Generator (GTG) Mechanical, Piping, Electrical & Instrument Works
-
Upload
erdal-berkay -
Category
Documents
-
view
32 -
download
3
Transcript of Biskra 460 MW SCPP_Algeria
Biskra 460 MW SCGT Project / Erection Works of GTG Units 20 & BOP - Biskra, ALGERIA
Owner : SONELGAZ / SPE - CEEG EPC Contractor : HANWHA E&C Corporation, South Korea Subcontractor : YOUKAIS BETA TEK E&C SPA Date of Completion : August 2016 Description of work : GTG (Gas Turbine Generator) Unit 20 & BOP
- Siemens SGT5 - 4000F(7) Gas Turbine (GT) Mechanical, Piping, Electrical & Instrument Works
- FO/RW/PW/WW Piping and Pumps Erection - Two (2) 130/30 ton Gantry Cranes Erection- BOP, WTP and FGS- HVAC and Communication Works, - All Buildings Structural Steel Works,
4
- Siemens SGEN5 - 1000A 261 MVA Generator (GTG) Mechanical, Piping, Electrical & Instrument Works