    Grid-connected PV installation

    Best practice guidelines

    1AuSES PV Installation Best Practice Workshop

  • 8/7/2019 PV Best Practice

    2/31

    Why best practice?

    AS/NZS mandate minimum requirements

    Best practices go above and beyond and

    include non-technical aspects

    Improve the quality/reputation of the PV

    industry

    Some best practices may be included in

    new versions of AS/NZS

    2AuSES PV Installation Best Practice Workshop

  • 8/7/2019 PV Best Practice

    3/31

    Before installation

    Visit customers site before preparing

    quote, dont use satellite imagery

    Watch out for shading

    Solar Pathfinder, SunEye, mobile phone apps,

    visual estimate

    Plan cable routes, inverter location, panel

    layout Minimize effect of shading

    AuSES PV Installation Best Practice Workshop 3

  • 8/7/2019 PV Best Practice

    4/31

    Before installation

    Watch out for meter box upgrades

    Give a firm quote, no hidden costs

    Give a timeline to installation and stick to

    it

    Assist with regulatory approvals

    Grid connection, planning, RECs

    AuSES PV Installation Best Practice Workshop 4

  • 8/7/2019 PV Best Practice

    5/31

    Before installation

    Give an accurate estimated energy yield

    (in writing)

    PVSyst

    RETScreen

    Manual calculations using BOM or NASA or

    the ASRDH

    AuSES PV Installation Best Practice Workshop 5

  • 8/7/2019 PV Best Practice

    6/31

    Before installation

    AuSES PV Installation Best Practice Workshop 6

    Azimuth

    -90 -60 -30 0 30 60 90

    Inclination

    0 90% 90% 90% 90% 90% 90% 90%

    15 88% 93% 96% 98% 96% 93% 88%

    30 83% 92% 98% 100% 98% 92% 83%

    45 77% 88% 95% 97% 95% 88% 77%

    60 69% 80% 87% 90% 87% 80% 69%

    75 60% 70% 77% 78% 77% 70% 60%

    90 51% 59% 63% 63% 63% 59% 51%

  • 8/7/2019 PV Best Practice

    7/31

    Health and Safety

    AuSES PV Installation Best Practice Workshop 7

  • 8/7/2019 PV Best Practice

    8/31

    Health and Safety

    AuSES PV Installation Best Practice Workshop 8

  • 8/7/2019 PV Best Practice

    9/31

    PV modules

    AuSES PV Installation Best Practice Workshop 9

  • 8/7/2019 PV Best Practice

    10/31

    PV modules

    AuSES PV Installation Best Practice Workshop 10

  • 8/7/2019 PV Best Practice

    11/31

    PV modules

    AuSES PV Installation Best Practice Workshop 11

  • 8/7/2019 PV Best Practice

    12/31

    PV modules

    AuSES PV Installation Best Practice Workshop 12

  • 8/7/2019 PV Best Practice

    13/31

    A note on fuses

    Overcurrent protection may be requiredwhen multiple stings are connected in

    parallel

    AS/NZS 5033:2005 provides sizingrequirements for overcurrent protection

    AS/NZS 5033:2005 does notprovide

    mandatory trip times for protection

    AuSES PV Installation Best Practice Workshop 13

  • 8/7/2019 PV Best Practice

    14/31

    A note on fuses

    IEC 61730.2 tests modules to withstand135% of the maximum series fuse rating

    for 2 hours

    => size overcurrent protection so that it

    does not trip under normal operation, but

    trips within 2 hours of an overcurrentsituation. Look at fuse/MCB

    manufacturers datasheets.

    AuSES PV Installation Best Practice Workshop 14

  • 8/7/2019 PV Best Practice

    15/31

    A note on fuses

    AuSES PV Installation Best Practice Workshop 15

  • 8/7/2019 PV Best Practice

    16/31

    Polarized DC circuit breakers

    Pay attention to thedirection of current

    Generally speaking,

    the PV array goes inthe terminals marked

    + and

    Check wiring withmanufacturer

    AuSES PV Installation Best Practice Workshop 16

  • 8/7/2019 PV Best Practice

    17/31

    DC cabling

    AuSES PV Installation Best Practice Workshop 17

  • 8/7/2019 PV Best Practice

    18/31

    DC cabling

    AuSES PV Installation Best Practice Workshop 18

  • 8/7/2019 PV Best Practice

    19/31

    DC cabling

    AuSES PV Installation Best Practice Workshop 19

  • 8/7/2019 PV Best Practice

    20/31

    DC cabling

    AuSES PV Installation Best Practice Workshop 20

  • 8/7/2019 PV Best Practice

    21/31

    DC cabling

    AuSES PV Installation Best Practice Workshop 21

  • 8/7/2019 PV Best Practice

    22/31

    Inverters - good

    AuSES PV Installation Best Practice Workshop 22

  • 8/7/2019 PV Best Practice

    23/31

    Inverters - good

    AuSES PV Installation Best Practice Workshop 23

  • 8/7/2019 PV Best Practice

    24/31

    Inverters - better

    AuSES PV Installation Best Practice Workshop 24

  • 8/7/2019 PV Best Practice

    25/31

    Inverters - best

    AuSES PV Installation Best Practice Workshop 25

  • 8/7/2019 PV Best Practice

    26/31

    Inverters - best

    AuSES PV Installation Best Practice Workshop 26

  • 8/7/2019 PV Best Practice

    27/31

    Labelling and documentation

    AuSES PV Installation Best Practice Workshop 27

  • 8/7/2019 PV Best Practice

    28/31

    Labelling and documentation

    AuSES PV Installation Best Practice Workshop 28

  • 8/7/2019 PV Best Practice

    29/31

    Labelling and documentation

    Documentation should be given tocustomer after installation is complete:

    Overall working of system

    Data sheets and handbooks (PV modules,inverters, mounting rails)

    List of equipment supplied, with serial

    numbers

    Wiring diagrams and string layout

    AuSES PV Installation Best Practice Workshop 29

  • 8/7/2019 PV Best Practice

    30/31

    Labelling and documentation

    Commissioning sheet and installation checklist

    Expected annual yield

    Warranty certificates and manufacturers

    contact details Maintenance procedures, shutdown

    procedure, alarms installed and action

    required.

    AuSES PV Installation Best Practice Workshop 30