SISTEM INFORMASI PENGELOLAAN PERMINTAAN MATERIAL ...
Transcript of SISTEM INFORMASI PENGELOLAAN PERMINTAAN MATERIAL ...
TUGAS AKHIR
SISTEM INFORMASI PENGELOLAAN PERMINTAAN
MATERIAL KONSTRUKSI PROYEK KALISOGO-WARU
GAS DISTRIBUTION PIPELINE PADA KANTOR PROYEK
PT. JFE ENGINEERING CORPORATION INDONESIA
NANDA SUBA MERISKA PUTRI
081310113008
PROGRAM STUDI D3 SISTEM INFORMASI
DEPARTEMEN TEKNIK
FAKULTAS VOKASI
UNIVERSITAS AIRLANGGA
2016
ADLN - PERPUSTAKAAN UNIVERSITAS AIRLANGGA
Tugas Akhir Sistem Informasi Pengelolaan ... Nanda Suba Meriska P
Scanned by CamScanner
ADLN - PERPUSTAKAAN UNIVERSITAS AIRLANGGA
Tugas Akhir Sistem Informasi Pengelolaan ... Nanda Suba Meriska P
Scanned by CamScanner
ADLN - PERPUSTAKAAN UNIVERSITAS AIRLANGGA
Tugas Akhir Sistem Informasi Pengelolaan ... Nanda Suba Meriska P
Scanned by CamScanner
ADLN - PERPUSTAKAAN UNIVERSITAS AIRLANGGA
Tugas Akhir Sistem Informasi Pengelolaan ... Nanda Suba Meriska P
iv
PEDOMAN PENGGUNAAN TUGAS AKHIR
Naskah Tugas Akhir ini tidak dipublikasikan, namun tersedia di
perpustakaan dalam lingkungan Universitas Airlangga. Diperkenankan untuk
dipakai sebagai referensi kepustakaan, tetapi pengutipan seijin penulis dan harus
menyebutkan sumbernya sesuai kebiasaan ilmiah.
Dokumen Tugas Akhir ini merupakan hak milik Universitas
Airlangga.
ADLN - PERPUSTAKAAN UNIVERSITAS AIRLANGGA
Tugas Akhir Sistem Informasi Pengelolaan ... Nanda Suba Meriska P
v
KATA PENGANTAR
Segala puji syukur terlimpah ke hadirat Allah SWT yang telah memberikan
rahmat dan hidayah-Nya sehingga penulis dapat menyelesaikan Laporan Tugas
Akhir Informasi dengan judul “ SISTEM INFORMASI PENGELOLAAN
PERMINTAAN MATERIAL KONSTRUKSI PROYEK KALISOGO-
WARU GAS DISTRIBUTION PIPELINE PADA KANTOR PROYEK PT.
JFE ENGINEERING CORPORATION INDONESIA ”.
Dalam Laporan Tugas Akhir ini, penulis mencoba membuat sistem yang
memudahkan transaksi proses bisnis dan membuat tampilan yang mudah untuk
digunakan oleh pihak PT. JFE Engineering Corporation Indonesia. Penulis
mengucapkan banyak terima kasih kepada Dosen Pembimbing I dan II, yakni Ibu
Dra. Rini Semiati, M.Si dan Ibu Army Justitia, S.Kom, M.kom. serta semua pihak
yang telah membantu penulis agar dapat terlaksana dan terselesaikannya Laporan
Tugas Akhir ini.
Meskipun masih banyak kekurangan dalam penulisan dan pembuatan
Laporan Tugas Akhir ini, besar harapan Penulis agar isi dari Laporan Tugas
Akhir ini dapat bermanfaat bagi kita semua. Kritik dan saran yang membangun
sangat diharapkan untuk pembuatan laporan selanjutnya agar menjadi lebih baik.
Surabaya, Agustus 2016
Penyusun,
Nanda Suba Meriska Putri
ADLN - PERPUSTAKAAN UNIVERSITAS AIRLANGGA
Tugas Akhir Sistem Informasi Pengelolaan ... Nanda Suba Meriska P
vi
UCAPAN TERIMA KASIH
Syukur Alhamdulillah penulis curahkan kehadirat Allah SWT karena
hanya dengan rahmat dan hidayah-Nya, sehingga penulisan Tugas Akhir dengan
judul SISTEM INFORMASI PENGELOLAAN PERMINTAAN MATERIAL
KONSTRUKSI PROYEK KALISOGO-WARU GAS DISTRIBUTION
PIPELINE PADA KANTOR PROYEK PT. JFE ENGINEERING
CORPORATION INDONESIA ini dapat diselesaikan dengan baik.
Dalam pelaksanaan dan penyusunan Tugas Akhir ini, penulis banyak
menemukan kendala dan atas bantuan dari berbagai pihak, akhirnya laporan ini
bisa diselesaikan. Maka tidak lupa penulis mengucapkan terima kasih yang
sebesar-besarnya kepada :
1. Allah SWT, yang Maha mengatur segala sesuatunya, termasuk mengatur
hati dan segala kondisi dalam proses penulisan Proyek Sistem Informasi ini.
2. Kedua orang tua, Ibuk-e Fitri Dwi Irawati dan Bapak-e Slamet Sunyoto
yang telah memberikan dukungan lahir dan batin bagi penulis, sehingga
penulis dapat menyelesaikan laporan dan proses pendidikan dengan baik.
3. Novta Tiara Zidane Putra, my little brother. Terima kasih untuk segala
kepedulian dan semangat yang selalu diberikan kepada penulis. Allah knows
how much i love you.
ADLN - PERPUSTAKAAN UNIVERSITAS AIRLANGGA
Tugas Akhir Sistem Informasi Pengelolaan ... Nanda Suba Meriska P
vii
4. Dra. Rini Semiati, M.Si selaku dosen pembimbing pertama yang dengan
sabar telah banyak memberi inspirasi, motivasi, saran dan kritik yang sangat
berarti untuk penulis.
5. Army Justitia, S.Kom, M.kom. selaku dosen pembimbing kedua yang turut
berperan membimbing penulis dengan sabar dan telah memberikan
motivasi, saran dan kritik membangun sehingga Tugas Akhir ini dapat
terselesaikan dengan baik
6. Ir. Dyah Herawatie, M.Si. selaku dosen wali yang turut berperan
membimbing penulis sehingga Tugas Akhir ini dapat terselesaikan dengan
baik.
7. Endah Purwanti, S.Si, M.Kom selaku Ketua Program Studi Diploma 3
Sistem Informasi, Fakultas Vokasi Universitas Airlangga Surabaya. Terima
kasih atas bantuannya selama masa perkuliahan.
8. Bapak Meta Widyasmara selaku Manajer Konstruksi pada PT. JFE
Engineering Corporation Indonesia yang telah bersedia memberikan tempat
untuk menulis laporan Tugas Akhir dan telah memberikan informasi
mengenai proses, prosedur, dan permasalahan yang terjadi pada proses
pengelolaan material konstruksi untuk proyek Kalisogo-Waru Gas
Distribution Pipeline pada kantor proyek PT. JFE Engineering Corporation
Indonesia.
ADLN - PERPUSTAKAAN UNIVERSITAS AIRLANGGA
Tugas Akhir Sistem Informasi Pengelolaan ... Nanda Suba Meriska P
viii
9. Seluruh bapak dan ibu dosen D3 SI. Terima kasih atas semua ilmu yang
diberikan dengan ikhlas dan penuh manfaat bagi penulis.
10. Teman-teman Diploma 3 Sistem Informasi angkatan 2013 .Terima kasih
atas kekompakan dan kebersamaan kalian yang telah memberikan semangat,
saran dan bantuan kepada penulis untuk menyelesaikan Tugas Akhir ini.
11. Kakak-kakak tingkat Diploma 3 Sistem Informasi yang telah berperan
banyak, telah menyediakan waktu luang, dan membagi ilmunya untuk
membantu penulis menyelesaikan Tugas Akhir ini. Terimakasih banyak.
12. Seluruh anggota keluarga yang telah membantu dan siap sedia memberikan
semangat serta bahu sandaran bagi penulis untuk terus semangat
menyelesaikan Tugas Akhir ini.
13. Bapak dan ibu karyawan di Fakultas Sains dan Teknologi yang selalu siap
membantu.
14. Semua pihak yang telah membantu dalam penyelesaian Tugas Akhir ini
yang tidak bisa penulis sebutkan satu persatu.
Penulis menyadari bahwa laporan ini masih jauh dari kesempurnaan, oleh
karena itu saran dan kritik yang bersifat membangun sangat diharapkan. Semoga
semua pemikiran yang tertuang dalam laporan ini dapat bermanfaat bagi penulis
pada khusunya dan pembaca pada umumnya.
Penyusun,
Nanda Suba Meriska Putri
ADLN - PERPUSTAKAAN UNIVERSITAS AIRLANGGA
Tugas Akhir Sistem Informasi Pengelolaan ... Nanda Suba Meriska P
ix
Nanda Suba Meriska Putri, 2016, Sistem Informasi Pengelolaan
Permintaan Material Konstruksi Proyek Kalisogo-Waru Gas Distribution
Pipeline Pada Kantor Proyek PT. JFE Engineering Corporation Indonesia. Tugas
Akhir ini dibawah bimbingan Dra. Rini Semiati, M.Si dan Army Justitia, S.Kom,
M.kom. Program Studi Diploma Tiga Sistem Informasi, Fakultas Vokasi,
Universitas Airlangga.
ABSTRAK
PT. JFE Engineering Corporation Indonesia adalah perusahaan terkemuka yang
bergerak dibidang rekayasa teknik, pengadaan dan konstruksi yang mampu melaksanakan
proyek besar di Indonesia. Permasalahan yang dialami oleh PT. JFE Engineering
Corporation Indonesia berada pada kantor proyek dimana belum efektifnya proses
permintaan material konstruksi proyek ke kantor pusat. Tujuan dari Tugas Akhir ini
adalah membuat Sistem Informasi Pengelolaan Permintaan Material Konstruksi Proyek
Kalisogo-Waru Gas Distribution Pipeline Pada Kantor Proyek PT. JFE Engineering
Corporation Indonesia yang mencakup 9 proses, meliputi proses permintaan material
konstruksi proyek, proses persyaratan dokumen vendor, proses list persyaratan dokumen
vendor, proses persyaratan inspeksi, proses proforma daftar kemasan, proses daftar
penyimpangan, proses dokumen pengiriman, proses dokumen terlampir, proses generate
laporan.
Sistem Informasi Pengelolaan Permintaan Material Konstruksi Proyek Kalisogo-
Waru Gas Distribution Pipeline Pada Kantor Proyek PT. JFE Engineering Corporation
Indonesia dibangun melalui empat tahapan. Tahap pertama adalah mengidentifikasi
proses saat ini yang dijelaskan pada diagram docflow kemudian merumuskan
permasalahan yang terjadi yang digambarkan dengan diagram fishbone sehingga dapat
menganalisa kebutuhan yang berkaitan dengan proses-proses tersebut untuk mendesain
sistem dan database. Tahap kedua adalah mendesain database, proses yang dilakukan
adalah membuat Conceptual Data Model (CDM) yang terdiri dari 23 entitas, kemudian
di-generate ke Physical Data Model (PDM) yang terdiri dari 24 tabel. Sedangkan desain
proses digambarkan dengan hierarchy chart dan Data Flow Diagram (DFD)
menghasilkan lima proses besar. Tahap ketiga adalah mendesain form input dan output.
Tahap terakhir adalah mengimplementasikan desain input dan output sistem yang telah
didesain ke dalam program dengan menggunakan bahasa pemrograman berbasis web
kemudian melakukan uji coba sistem dimulai dari proses login, proses pengelolaan data
master, proses pemesanan, proses Check-In, proses Check-Out, proses pembatalan
pemesanan, proses pengelolaan data kamar, dan proses Generate Laporan.
Berdasarkan hasil implementasi dan uji coba sistem, Sistem Informasi Pengelolaan
Permintaan Material Konstruksi Proyek Kalisogo-Waru Gas Distribution Pipeline Pada
Kantor Proyek PT. JFE Engineering Corporation Indonesia yang dibuat telah sesuai
dengan kebutuhan fungsional pada proses bisnis PT. JFE Engineering Corporation
Indonesia yaitu dapat menangani beberapa proses bisnis secara efisien dan dapat
menampilkan laporan secara tepat.
Kata kunci : Sistem Informasi, Permintaan Material Konstruksi, JFEEI
ADLN - PERPUSTAKAAN UNIVERSITAS AIRLANGGA
Tugas Akhir Sistem Informasi Pengelolaan ... Nanda Suba Meriska P
x
Nanda Suba Meriska Putri, 2016, The Information System of Construction
Material Request Management of Kalisogo-Waru Gas Distribution Pipeline at
Project Office of PT. JFE Engineering Corporation Indonesia. This Final Project
is under guidance of Dra. Rini Semiati, M.Si and Army Justitia, S.Kom, M.kom.
DiplomaThree of Information System Study Program, Faculty of Vocational,
Universitas Airlangga.
ABSTRACT
PT. JFE Engineering Corporation Indonesia is a leading company that engaged in
an engineering fields, procurement, and construction that able to control the big project in
Indonesia. The occured problems on this company are focused on the office itself where
the project of construction material request has not been effective to the central office.
The purpose of this final project is to create The Information System of Construction
Material Request Management of Kalisogo-Waru Gas Distribution Pipeline at Project
Office of PT. JFE Engineering Corporation Indonesia which has nine process, such as
the request process of material construction project, the process of document
requirements from the vendor, the process of document requirement listing from the
vendor, the process of inspection requirement, the process of packaging list performance,
the process of deviation list, the process of document sending, the process of attached
document, and the process of generate reports.
The Information System of Construction Material Request Management of
Kalisogo-Waru Gas Distribution Pipeline at Project Office of PT. JFE Engineering
Corporation Indonesia was built in four steps. The first step is identifying the current
process that described in the docflow diagram, then formulate the occured problems that
illustrated by fishbone diagrams so as to analyze the necessary which related on those
process to design the system and the database. The second step is designing the database.
The process is to create the Conceptual Data Model (CDM) that concist of 23 entities,
then generate it to Physical Data Model (PDM) that consist of 24 tables. Meanwhile the
design process is illustrated by hierarchy chart and Data Flow Diagram (DFD) which
produce five big process. The third step is designing the input and output form. The last
step is implementating the input and output system that already designed to the program
using web programming language, and then doing the trial system that started from login
process, master data management process, booking process, check-in process, check-out
process, cancelled booking process, room data management process, and generate report
process.
Based on the implementation results and trial sytem, The Information System of
Construction Material Request Management of Kalisogo-Waru Gas Distribution Pipeline
at Project Office of PT. JFE Engineering Corporation Indonesia which already created
are exactly same as the functional necessary on the business process of PT. JFE
Engineering Corporation Indonesia, that compatible to do some of business process
effeciently and able to display the reports properly.
Keywords : Information System, Construction Material Request, JFEEI
ADLN - PERPUSTAKAAN UNIVERSITAS AIRLANGGA
Tugas Akhir Sistem Informasi Pengelolaan ... Nanda Suba Meriska P
xi
DAFTAR ISI
Halaman
TUGAS AKHIR ....................................................................................................... i
HALAMAN JUDUL ................................................................................................ i
TUGAS AKHIR ....................................................................................................... i
HALAMAN PERNYATAAN ................................................................................ ii
LEMBAR PENGESAHAN NASKAH .................................................................. iii
PEDOMAN PENGGUNAAN TUGAS AKHIR ................................................... iv
KATA PENGANTAR ............................................................................................. v
UCAPAN TERIMA KASIH .................................................................................. vi
ABSTRAK ............................................................................................................. ix
DAFTAR ISI .......................................................................................................... xi
DAFTAR TABEL ................................................................................................ xiv
DAFTAR GAMBAR .......................................................................................... xvii
BAB I PENDAHULUAN ........................................................................................ 1
1.1 Latar Belakang ....................................................................................... 1
1.2 Rumusan Masalah .................................................................................. 3
1.3 Tujuan dan Manfaat ............................................................................... 3
1.4 Batasan Masalah..................................................................................... 5
ADLN - PERPUSTAKAAN UNIVERSITAS AIRLANGGA
Tugas Akhir Sistem Informasi Pengelolaan ... Nanda Suba Meriska P
xii
BAB II ANALISA KEBUTUHAN ......................................................................... 6
2.1 Metode Analisa Kebutuhan .................................................................... 6
2.2 Analisa Permasalahan .......................................................................... 21
2.3 Sistem Kerja Saat Ini ............................................................................ 23
2.4 Bagian Yang Terlibat ........................................................................... 23
2.5 Proses Kerja ......................................................................................... 25
2.6 Prosedur Kerja ...................................................................................... 25
2.7 Kebutuhan Fungsional Sistem Baru ..................................................... 30
BAB III .................................................................................................................. 33
DESAIN SISTEM .................................................................................................. 33
3.1 Sistem Kerja Baru ................................................................................ 33
3.2 Proses Kerja Baru ................................................................................. 41
3.3 Desain Database .................................................................................. 57
3.4 Struktur Tabel....................................................................................... 74
3.5 Desain Input dan Output ...................................................................... 87
BAB IV ................................................................................................................ 121
IMPLEMENTASI DAN UJI COBA ................................................................... 121
4.1 Implementasi Sistem .......................................................................... 121
4.2 Uji Coba ............................................................................................. 150
ADLN - PERPUSTAKAAN UNIVERSITAS AIRLANGGA
Tugas Akhir Sistem Informasi Pengelolaan ... Nanda Suba Meriska P
xiii
BAB V KESIMPULAN DAN SARAN .............................................................. 180
5.1 Kesimpulan .......................................................................................... 180
5.2 Saran ................................................................................................... 181
DAFTAR PUSTAKA .......................................................................................... 182
ADLN - PERPUSTAKAAN UNIVERSITAS AIRLANGGA
Tugas Akhir Sistem Informasi Pengelolaan ... Nanda Suba Meriska P
xiv
DAFTAR TABEL
Judul Tabel Halaman
Tabel 2. 1 Tabel Simbol-Simbol Document Flow Diagram ................................... 9
Tabel 2. 2 Tabel Simbol – Simbol Data low Diagram (DFD) .............................. 10
Tabel 2. 3 Tabel Simbol – Simbol Conceptual Data Model ................................. 11
Tabel 2. 4 Tabel Simbol – Simbol Kardinalitas CDM. ......................................... 12
Tabel 2. 5 Tabel Kardinalitas Satu ke Satu ........................................................... 12
Tabel 2. 6 Tabel Kardinalitas Satu ke Banyak ...................................................... 13
Tabel 2. 7 Tabel Kardinalitas Banyak ke Satu ...................................................... 14
Tabel 2. 8 Tabel Kardinalitas Banyak ke Banyak ................................................. 14
Tabel 3. 1 Tabel Obyek dalam PDM .................................................................... 72
Tabel 3. 2 Struktur Tabel Karyawan ..................................................................... 74
Tabel 3. 3 Struktur Tabel Jabatan ......................................................................... 75
Tabel 3. 4 Struktur Tabel Departement ................................................................. 75
Tabel 3. 5 Struktur Tabel Vendor ......................................................................... 76
Tabel 3. 6 Struktur Tabel Material Konstruksi ..................................................... 76
Tabel 3. 7 Struktur Tabel Persyaratan Dokumen Vendor ..................................... 77
Tabel 3. 8 Struktur Tabel List Persyaratan Dokumen Vendor .............................. 77
Tabel 3. 9 Struktur Tabel Jenis Inspeksi ............................................................... 78
ADLN - PERPUSTAKAAN UNIVERSITAS AIRLANGGA
Tugas Akhir Sistem Informasi Pengelolaan ... Nanda Suba Meriska P
xv
Tabel 3. 10 Struktur Tabel Kebutuhan Inspeksi.................................................... 78
Tabel 3. 11 Struktur Tabel Jenis Dokumen ........................................................... 79
Tabel 3. 12 Struktur Tabel Status Permintaan ...................................................... 79
Tabel 3. 13 Struktur Tabel Permintaan Material Konstruksi Proyek .................... 80
Tabel 3. 14 Struktur Tabel Proforma .................................................................... 80
Tabel 3. 15 Struktur Tabel Daftar Penyimpangan ................................................ 81
Tabel 3. 16 Struktur Tabel Dokumen Pengiriman ................................................ 82
Tabel 3. 17 Struktur Tabel Detail Kebutuhan Inspeksi ......................................... 82
Tabel 3. 18 Struktur Tabel Detail Proforma Daftar Kemasan .............................. 83
Tabel 3. 19 Struktur Tabel Detail Material Menyimpang ..................................... 84
Tabel 3. 20 Struktur Tabel Detail Dokumen Pengiriman ..................................... 84
Tabel 3. 21 Struktur Tabel Detail Status ............................................................... 85
Tabel 3. 22 Struktur Tabel Detail Permintaan Material ........................................ 85
Tabel 3. 23 Struktur Tabel Dokumen Terlampir ................................................... 86
Tabel 3. 24 Struktur Tabel Verifikasi Permintaan Material Konstruksi Proyek ... 87
Tabel 3. 25 Tabel Komponen Input Output .......................................................... 88
Tabel 4.1. Pengujian Proses login ....................................................................... 151
Tabel 4.2 Pengujian Proses Pengelolaan Data .................................................... 153
Tabel 4.3 Hasil Pengujian Proses Permintaan Material Konstruksi ................... 156
ADLN - PERPUSTAKAAN UNIVERSITAS AIRLANGGA
Tugas Akhir Sistem Informasi Pengelolaan ... Nanda Suba Meriska P
xvi
Tabel 4.4 Hasil Pengujian Proses List Persyaratan Dokumen Vendor ............... 158
Tabel 4.5 Hasil Pengujian Proses Tabel Persyaratan Inspeksi ............................ 160
Tabel 4.6 Hasil Pengujian Proses Proforma Daftar Kemasan............................. 163
Tabel 4.7 Hasil Pengujian Proses Daftar Penyimpangan .................................... 166
Tabel 4.8 Hasil Pengujian Proses Dokumen Pengiriman.................................... 168
Tabel 4.9 Hasil Pengujian Proses Dokumen Terlampir ...................................... 170
Tabel 4.10 Hasil Pengujian Proses Verifikasi Checked Permintaan Material
Konstruksi Proyek ............................................................................................... 173
Tabel 4.11 Hasil Pengujian Proses Verifikasi Approved Permintaan Material
Konstruksi Proyek ............................................................................................... 175
Tabel 4.12 Hasil Pengujian Proses Cetak Permintaan Material Konstruksi Proyek
............................................................................................................................. 177
ADLN - PERPUSTAKAAN UNIVERSITAS AIRLANGGA
Tugas Akhir Sistem Informasi Pengelolaan ... Nanda Suba Meriska P
xvii
DAFTAR GAMBAR
Judul Gambar Halaman
Gambar 2. 1 Contoh Struktur Diagram Jenjang ....................................................... 8
Gambar 2. 2 Struktur Umum Diagram Fishbone ................................................... 17
Gambar 2. 3 Struktur Organisasi PT. JFE Engineering Corporation Indonesia .... 23
Gambar 2. 4 Document Flow Proses Permintaan Material Konstruksi ................. 28
Gambar 2. 5 Fishbone Sistem Informasi Pengelolaan Permintaan Material
Konstruksi Proyek Kalisogo-Waru Gas Distribution Pipeline PT. JFE Engineering
Corporation Indonesia. ........................................................................................... 30
Gambar 3.1 Diagram Jenjang Sistem Informasi Pengelolaan Permintaan Material
Konstruksi Proyek pada PT. JFE Engineering Corporation Indonesia .................. 43
Gambar 3.2 Context Diagram Sistem Informasi Pengelolaan Permintaan Material
Konstruksi PT. JFE Engineering Corporation Indonesia ....................................... 46
Gambar 3.3 DFD level 0 Sistem Informasi Pengelolaan Permintaan Material
Konstruksi Proyek PT. JFE Engineering Corporation Indonesia .......................... 48
Gambar 3.4 DFD level 1 Proses Permintaan Material Konstruksi Proyek Sistem
Informasi Pengelolaan Permintaan Material Konstruksi Proyek PT. JFE
Engineering Corporation Indonesia. ...................................................................... 49
ADLN - PERPUSTAKAAN UNIVERSITAS AIRLANGGA
Tugas Akhir Sistem Informasi Pengelolaan ... Nanda Suba Meriska P
xviii
Gambar 3.5 DFD level 1 Proses Pengelolaan Persyaratan Dokumen Vendor
Sistem Informasi Pengelolaan Permintaan Material Konstruksi Proyek PT. JFE
Engineering Corporation Indonesia. ...................................................................... 50
Gambar 3.6 DFD level 1 Proses Pengelolaan List Persyaratan Dokumen Vendor
Sistem Informasi Pengelolaan Permintaan Material Konstruksi Proyek PT. JFE
Engineering Corporation Indonesia. ...................................................................... 51
Gambar 3.7 DFD level 1 Proses Pengelolaan Kebutuhan Inspeksi Sistem
Informasi Pengelolaan Permintaan Material Konstruksi Proyek PT. JFE
Engineering Corporation Indonesia. ...................................................................... 52
Gambar 3.8 DFD level 1 Proses Pengelolaan Proforma Daftar Kemasan Sistem
Informasi Pengelolaan Permintaan Material Konstruksi Proyek PT. JFE
Engineering Corporation Indonesia. ...................................................................... 53
Gambar 3.9 DFD level 1 Proses Pengelolaan Daftar Penyimpangan Sistem
Informasi Pengelolaan Permintaan Material Konstruksi Proyek PT. JFE
Engineering Corporation Indonesia. ...................................................................... 54
Gambar 3.10 DFD level 1 Proses Pengelolaan Dokumen Pengiriman Sistem
Informasi Pengelolaan Permintaan Material Konstruksi Proyek PT. JFE
Engineering Corporation Indonesia. ...................................................................... 55
Gambar 3.11 DFD level 1 Proses Pengelolaan Dokumen Terlampir Sistem
Informasi Pengelolaan Permintaan Material Konstruksi Proyek PT. JFE
Engineering Corporation Indonesia. ...................................................................... 56
ADLN - PERPUSTAKAAN UNIVERSITAS AIRLANGGA
Tugas Akhir Sistem Informasi Pengelolaan ... Nanda Suba Meriska P
xix
Gambar 3.12 DFD level 1 Pengelolaan Pembuatan Laporan Sistem Informasi
Pengelolaan Permintaan Material Konstruksi Proyek PT. JFE Engineering
Corporation Indonesia ............................................................................................ 57
Gambar 3.13 Diagram CDM Sistem Informasi Pengelolaan Permintaan Material
Konstruksi Proyek Kalisogo-Waru Gas Distribution Pipeline Pada Kantor Poyek
PT. JFE Engineering Corporation Indonesia. ........................................................ 59
Gambar 3.14 Diagram PDM Sistem Informasi Pengelolaan Permintaan Material
Konstruksi Kalisogo-Waru Gas Distribution Pipeline Pada Kantor Poyek PT. JFE
Engineering Corporation Indonesia ....................................................................... 73
Gambar 3.15 Desain Form Login .......................................................................... 90
Gambar 3.16 Desain Form Input Data Karyawan ................................................. 91
Gambar 3.17 Desain Form Tampil Data Karyawan .............................................. 91
Gambar 3.18 Desain Form Input Data Master Departemen .................................. 92
Gambar 3.19 Desain Form Tampil Data Master Departemen ............................... 92
Gambar 3.20 Desain Form Input Data Master Jabatan .......................................... 93
Gambar 3.21 Desain Form Tampil Data Master Jabatan ....................................... 93
Gambar 3.22 Desain Form Input Data Master Status Permintaan ......................... 95
Gambar 3.23 Desain Form Tampil Data Master Status Permintaan ...................... 95
Gambar 3.24 Desain Form Input Data Master Material Konstruksi ...................... 96
Gambar 3.25 Desain Form Tampil Data Master Material Konstruksi................... 96
ADLN - PERPUSTAKAAN UNIVERSITAS AIRLANGGA
Tugas Akhir Sistem Informasi Pengelolaan ... Nanda Suba Meriska P
xx
Gambar 3.26 Desain Form Input Data Master Jenis Inspeksi ............................... 97
Gambar 3.27 Desain Form Tampil Data Master Jenis Inspeksi ............................ 97
Gambar 3.28 Desain Form Input Data Master Jenis Dokumen ............................. 98
Gambar 3.29 Desain Form Tampil Data Master Jenis Dokumen .......................... 99
Gambar 3.30 Desain Form Input Data Master Vendor ........................................ 100
Gambar 3.33 Desain Form Master Persyaratan Inspeksi ..................................... 101
Gambar 3.34 Desain Form Transaksi Permintaan Material Konstruksi Proyek .. 103
Gambar 3.35 Desain Form Transaksi List Persyaratan Dokumen Vendor .......... 104
Gambar 3.36 Desain Form Transaksi Tabel Persyaratan Inspeksi ...................... 105
Gambar 3.37 Desain Form Transaksi Proforma Daftar Kemasan ....................... 106
Gambar 3.38 Desain Form Transaksi Daftar Penyimpangan .............................. 107
Gambar 3.39 Desain Form Transaksi Pengiriman Dokumen .............................. 108
Gambar 3.40 Desain Form Transaksi Dokumen Terlampir ................................ 109
Gambar 3.41 Desain Output Dokumen Permintaan Material Konstruksi Proyek111
Gambar 3.42 Desain Output Dokumen Item List ................................................ 112
Gambar 3.43 Desain Output Dokumen Revision Notes ....................................... 113
Gambar 3.44 Desain Output Dokumen MTO ...................................................... 113
Gambar 3.45 Desain Output Persyaratan Dokumen Vendor ............................... 114
Gambar 3.46 Desain Output List Persyaratan Dokumen Vendor ........................ 115
ADLN - PERPUSTAKAAN UNIVERSITAS AIRLANGGA
Tugas Akhir Sistem Informasi Pengelolaan ... Nanda Suba Meriska P
xxi
Gambar 3.47 Desain Output Dokumen Persyaratan Inspeksi .............................. 115
Gambar 3.48 Desain Output Tabel Persyaratan Inspeksi..................................... 116
Gambar 3.49 Desain Output Dokumen Proforma Daftar Kemasan ..................... 117
Gambar 3.50 Desain Output Dokumen Daftar Penyimpangan ............................ 117
Gambar 3.51 Desain Output Dokumen Pengiriman ............................................ 118
Gambar 3.52 Desain Output Dokumen Terlampir ............................................... 119
Gambar 3.53 Desain Laporan Permintaan Material Konstruksi Proyek .............. 120
Gambar 4.1 Activity Diagram login ..................................................................... 122
Gambar 4.3 Activity Diagram Permintaan Material Konstruksi Proyek.............. 123
Gambar 4.4 Activity Diagram List Persyaratan Dokumen Vendor...................... 124
Gambar 4.5 Activity Diagram Tabel Persyaratan Inspeksi .................................. 125
Gambar 4.6 Activity Diagram Proforma Daftar Kemasan ................................... 126
Gambar 4.7 Activity Diagram Daftar Penyimpangan .......................................... 127
Gambar 4.8 Activity Diagram Dokumen Pengiriman .......................................... 128
Gambar 4.9 Activity Diagram Dokumen Terlampir ............................................ 129
Gambar 4.10 Activity Diagram Laporan Permintaan Material Konstruksi Proyek130
Gambar 4.11 Bagan Alir Login ............................................................................ 131
Gambar 4.12 Bagan Alir Halaman Supervisor Construction .............................. 132
Gambar 4.13 Bagan Alir Halaman Manajer Proyek ............................................ 133
ADLN - PERPUSTAKAAN UNIVERSITAS AIRLANGGA
Tugas Akhir Sistem Informasi Pengelolaan ... Nanda Suba Meriska P
xxii
Gambar 4.14 Bagan Alir Halaman Direktur Proyek ............................................ 134
Gambar 4.15 Bagan Alir Halaman Divisi Procurement ...................................... 134
Gambar 4.16 Bagan Alir Pengelolaan Data ......................................................... 136
Gambar 4.17 Bagan Alir Permintaan Material Konstruksi Proyek...................... 138
Gambar 4.18 Bagan Alir List Persyaratan Dokumen Vendor.............................. 139
Gambar 4.19 Bagan Alir Tabel Persyaratan Inspeksi .......................................... 140
Gambar 4.20 Bagan Alir Proforma Daftar Kemasan. .......................................... 141
Gambar 4.21 Bagan Alir Daftar Penyimpangan .................................................. 142
Gambar 4.22 Bagan Alir Dokumen Pengiriman .................................................. 143
Gambar 4.23 Bagan Alir Dokumen Terlampir ................................................... 144
Gambar 4.24 Bagan Alir Verifikasi Checked Permintaan Material Konstruksi
Proyek .................................................................................................................. 146
Gambar 4.25 Bagan Alir Verifikasi Approved Permintaan Material Konstruksi
Proyek .................................................................................................................. 147
Gambar 4.26 Bagan Alir Cetak Permintaan Material Konstruksi Proyek .......... 149
Gambar 4.27 Fotur login ...................................................................................... 150
Gambar 4.28 Form Tampil Data Master .............................................................. 152
Gambar 4.29 Form Tambah Data Master ............................................................ 152
Gambar 4.30 Form Update Data Master ............................................................. 153
ADLN - PERPUSTAKAAN UNIVERSITAS AIRLANGGA
Tugas Akhir Sistem Informasi Pengelolaan ... Nanda Suba Meriska P
xxiii
Gambar 4.31 Form Input Permintaan Material Konstruksi Proyek ..................... 155
Gambar 4.32 Form Input List Persyaratan Dokumen Vendor ............................. 158
Gambar 4.33 Form Input Tabel Persyaratan Inspeksi ......................................... 160
Gambar 4.34 Form Input Proforma Daftar Kemasan .......................................... 162
Gambar 4.35 Form Input Daftar Penyimpang ..................................................... 165
Gambar 4.36 Form Input Dokumen Pengiriman ................................................. 167
Gambar 4.37 Form Input Dokumen Terlampir .................................................... 169
Gambar 4.38 Form Verifikasi Checked Permintaan Material Konstruksi Proyek172
Gambar 4.39 Form Verifkasi Approved Permintaan Material Konstruksi Proyek174
Gambar 4.40 Form Verifkasi Approved Permintaan Material Konstruksi Proyek176
ADLN - PERPUSTAKAAN UNIVERSITAS AIRLANGGA
Tugas Akhir Sistem Informasi Pengelolaan ... Nanda Suba Meriska P