Project DescriptionDesign NormsDesign ProcessObstaclesAccomplishmentsUpdated DesignQuestions
Project Background
Project Description
Vertellus Specialties Inc. Maker of Mouthwash and Gum
FlavorImprove Employee Safety
Manual to Automatic Lifting of Barrels
Less Strenuous More Efficient
Design a Machine to Lift and Pour Fiber Drums Pour Powdered Chemicals into
Reactors
Design Norms
Transparency Easy to Understand and Operate Donated Parts are for Profit End
UserTrust
Improved Employee Safety Task Efficiency Operation Safety
Design Process
Iterative Frame Design to Optimize for Strength and Weight
Research and Consult with Hydraulics Experts
Obstacles
Overcome Explosion Proof Electrical System Mystery Machine Change in Consultants Minimize Cost
Future Frame Construction Electrical System
Accomplishments
Acquired Obsolete MachineMade Machine OperationalDesigned and Tested Several
Models on the ComputerDesigned Hydraulic System
Current System
Upgraded System
Updated DesignSimple Tilting Frame
Salvaged Hydraulic Cylinder, Pump, Motor, Electrical System
Bidirectional Hydraulic Upgrade
Manual Directional Valve
Over-center Valve