Post on 10-Aug-2020
De BIM wekker looptafKoen Bogaert - ROCKFON
Gladsaxe Company House, DenmarkROCKFON Tropic
ACOUSTIC
COMFORT
FIRE
PERFORMANCE
HUMIDITY
RESISTANCE
LIGHT
REFLECTION
HYGIENEENVIRONMENT CLEANING
Aqua Lublin, PolandROCKFON Sonar
SDU, Odense, DenmarkROCKFON Mono Acoustic
Disruption waves
1990+
Music
Photography
Video rental
…
2000+
Television
Hospitality
…
2010+
Retail
Healthcare
Automotive
Telco
FMCG
Finance
…
2020
There’s no safe haven anymore…
• St. Gallen klooster plan• 819-826 AD• 112 cm x 77,5 cm• 50 gebouwen• 330 beschrijvingen• Schaal 1:160• Lichtinval
Filippo
Brunelleschi
1377
1400 1800 2017
1907 1965 2017
”It’s cheaper to buy a $35,000 robotic arm than it is to hire
an employee who’s inefficient making $15 an hour… bagging French fries”
Ed Rensi, Fmr. McDonald's USA CEO
Concept
Program
Design
Analysis
Documentation
Fabrication
Construction
LogisticsOperationDemolition
Renovation
"The challenge for building materials companies is that the person with the most power to
choose a product, has the least knowledge."
David Leslie, RWC, Director of Technical Services & Product Management at Polyguard Products
owner architectgeneral
contractorsub contractor distributor manufacturer
10%10%
30%
50%
80%
100%
Decision making power
Product knowledge
80%
50%
40%
30% 30%
5%
Primary motivation
Performance Reputation Value Labor cost Margin Scale
Mark Mitchell - Whizard Strategy
owner architectgeneral
contractorsub contractor distributor manufacturer
10%10%
30%
50%
80%
100%
Decision making power
Product knowledge
80%
50%
40%
30% 30%
5%
Primary motivation
Performance Reputation Value Labor cost Margin Scale
Mark Mitchell - Whizard Strategy
Who wants to be the guinea pig?
unique characteristics - complex client context
• Multiple stakeholders with diverse interests/needs
• Project business and on-siteconstruction
• High industry fragmentation
• Low profitability and capitalization
• Highly cyclical and volatilebusiness
• Unstable workforce
• Immature project definition and technical assessment
• Over-preference for lowest price bid
• Conservative clients
• Increased risk transfer to contractors
• Complexity of contracts and dispute resolution
Source: World Economic Forum; The Boston Consulting Group
unique characteristics - complex client context
• Multiple stakeholders with diverse interests/needs
• Project business and on-siteconstruction
• High industry fragmentation
• Low profitability and capitalization
• Highly cyclical and volatilebusiness
• Unstable workforce
• Immature project definition and technical assessment
• Over-preference for lowest price bid
• Conservative clients
• Increased risk transfer to contractors
• Complexity of contracts and dispute resolution
Source: World Economic Forum; The Boston Consulting Group
Source: World Economic Forum; The Boston Consulting Group
Construction in our society6% global GDP
5-10% worldwide employment25-40% global carbon emissions
LARGEST consumer of raw materialsVs.
+200K daily in urban areas, neededaffordable & healthy housing
1400 1800 2017
Source: World Economic Forum; The Boston Consulting Group
Walk the talk
Walk the talk
Walk the talk
Walk the BIM talk
Walk the BIM talk
3D drawing Product information Links to extra info
Updated by ROCKFON
http://www.jorislaarman.com/work/mx3d-bridge/
Walk the BIM talk
Vragen?
Koen BogaertMarketing Platform Manager
koen.bogaert@rockfon.com