PV - Catapult WP4: Building integrated PV Michiel van Schalkwijk, Ecofys Stuart Brannigan, EPIA.

16
PV - Catapult WP4: Building integrated PV Michiel van Schalkwijk, Ecofys Stuart Brannigan, EPIA

Transcript of PV - Catapult WP4: Building integrated PV Michiel van Schalkwijk, Ecofys Stuart Brannigan, EPIA.

Page 1: PV - Catapult WP4: Building integrated PV Michiel van Schalkwijk, Ecofys Stuart Brannigan, EPIA.

PV - Catapult

WP4: Building integrated PV

Michiel van Schalkwijk, EcofysStuart Brannigan, EPIA

Page 2: PV - Catapult WP4: Building integrated PV Michiel van Schalkwijk, Ecofys Stuart Brannigan, EPIA.

PV catapult – WP 4 - BIPV

Ecofys bvProf. Dr. K. BlokDrs. K.StapDr. F. Bisschop

Legal : L. Deckers ( Lic.Bedr. Jur.)

Econcern bvDr. A.J.M. van WijkDrs. C.J. van der LeunIr. J.A.M. BakenIr.. D. Berkhout

Ecoventures bvDrs. C.J. van der Leun

Econergy International GmbHIr. J. Van Laarhoven

Ecostream bvIr. B. de Wit

Personnel : Y. van Dijk

Controller : C. Kort

Marketing : Drs. M. Lammers

Office Mngt : I. Hanasbei

Ecofys GmbHGermanyIr. F.P.H. Wouters

3E nv BelgiumIr. G.E.V.J. Palmers

Ecofys Sp. z o.o.PolandDr. M. Szweykowska

Ecofys ltdUKDrs. K.Stap

Ecofys SpainMr. A. Laiz

Ecofys KölnIr. F.P.H. Wouters

Ecofys NürnbergDr. J. Harnisch

ICT and Computational

Drs. L. Ramaekers

Econergy International bvIr. J. Van Laarhoven

Ecofys BerlinDr. K. Burges

Page 3: PV - Catapult WP4: Building integrated PV Michiel van Schalkwijk, Ecofys Stuart Brannigan, EPIA.

PV catapult – WP 4 - BIPV

Quick recap…why BIPV?

• (Potentially) low BOS costs• (In principle) best use of existing

mounting and grid infrastructure• (Without subsidy influence) best value

of electricity is at the point of use• Integration with Home Energy System

Page 4: PV - Catapult WP4: Building integrated PV Michiel van Schalkwijk, Ecofys Stuart Brannigan, EPIA.

PV catapult – WP 4 - BIPV

How to use these potential strengths?

• Improving BIPV products:– Economy– Looks

• Improving ‘regulatory framework’• Improving positioning of BIPV:

– energy production vs energy saving

Page 5: PV - Catapult WP4: Building integrated PV Michiel van Schalkwijk, Ecofys Stuart Brannigan, EPIA.

PV catapult – WP 4 - BIPV

WP 5 – BIPV - Objectives

• Create perspectives for market development in the construction sector

• Make BIPV more visible and comprehensive to the big public

• ‘Mandatory measures’ for PV installations to the new buildings

• Revision of the EU Directive for buildings by including RES

Page 6: PV - Catapult WP4: Building integrated PV Michiel van Schalkwijk, Ecofys Stuart Brannigan, EPIA.

PV catapult – WP 4 - BIPV

WP 5 – BIPV – Description of work (1/3)

Task 1. Preparation of product development initiatives by liaising PV and construction companies

Activities: finding interested parties from both sides, by organising workshops and/or individual approach

Target: preparation of 3 Craft proposals, 2 FP6 proposals (= 5 new developments started)

Page 7: PV - Catapult WP4: Building integrated PV Michiel van Schalkwijk, Ecofys Stuart Brannigan, EPIA.

PV catapult – WP 4 - BIPV

BIPV market growth

0

50

100

150

200

250

300

350

400

450

1990

1993

1996

1997

1998

1999

2000

2001

Mar

ket

volu

me

(MW

p)

Grid-connectedresidential/commercial

Total

Page 8: PV - Catapult WP4: Building integrated PV Michiel van Schalkwijk, Ecofys Stuart Brannigan, EPIA.

PV catapult – WP 4 - BIPV

What are important developments in the current market?

• Addressing consumer (end-user)market• Improve ‘energy system product’

– price– looks, aesthetics– quality, guarantee of yield– maintenancegain confidence

• Increase scale

Page 9: PV - Catapult WP4: Building integrated PV Michiel van Schalkwijk, Ecofys Stuart Brannigan, EPIA.

PV catapult – WP 4 - BIPV

Page 10: PV - Catapult WP4: Building integrated PV Michiel van Schalkwijk, Ecofys Stuart Brannigan, EPIA.

PV catapult – WP 4 - BIPV

Page 11: PV - Catapult WP4: Building integrated PV Michiel van Schalkwijk, Ecofys Stuart Brannigan, EPIA.

PV catapult – WP 4 - BIPV

Unisole (Pride)

Page 12: PV - Catapult WP4: Building integrated PV Michiel van Schalkwijk, Ecofys Stuart Brannigan, EPIA.

PV catapult – WP 4 - BIPV

WP 5 – BIPV – Description of work (2/3)

Task 2. Preparation of proposal for role of energy production in CPD or EPBD

Activities: determination of route to improve CPD or EPBD

Target: lobby started by end of project

Page 13: PV - Catapult WP4: Building integrated PV Michiel van Schalkwijk, Ecofys Stuart Brannigan, EPIA.

PV catapult – WP 4 - BIPV

Integration with energy design

Page 14: PV - Catapult WP4: Building integrated PV Michiel van Schalkwijk, Ecofys Stuart Brannigan, EPIA.

PV catapult – WP 4 - BIPV

WP 5 – BIPV – Description of work (3/3)

Task 3. Standardisation for BIPV

Activities: Start-up of CEN TC or WG (possibly under TC 128 “roofing materials”) for EU standard on product quality

Targets: Start-up end of year one, including scope and participants,overview of existing national standards (e.g Dutch NVN 7250) for PV and/or thermal solar energy

Page 15: PV - Catapult WP4: Building integrated PV Michiel van Schalkwijk, Ecofys Stuart Brannigan, EPIA.

PV catapult – WP 4 - BIPV

Example: product testing

Page 16: PV - Catapult WP4: Building integrated PV Michiel van Schalkwijk, Ecofys Stuart Brannigan, EPIA.

PV catapult – WP 4 - BIPV

Budget and participants

• Budget: € 150.000

• Participants (proposal):– Ecofys, EPIA, Estif (core)– ‘selected members’ for preparative work– All members invited to participate in

workshops or TC’s