PV - Catapult WP4: Building integrated PV Michiel van Schalkwijk, Ecofys Stuart Brannigan, EPIA.
-
Upload
zachary-surls -
Category
Documents
-
view
218 -
download
1
Transcript of PV - Catapult WP4: Building integrated PV Michiel van Schalkwijk, Ecofys Stuart Brannigan, EPIA.
PV - Catapult
WP4: Building integrated PV
Michiel van Schalkwijk, EcofysStuart Brannigan, EPIA
PV catapult – WP 4 - BIPV
Ecofys bvProf. Dr. K. BlokDrs. K.StapDr. F. Bisschop
Legal : L. Deckers ( Lic.Bedr. Jur.)
Econcern bvDr. A.J.M. van WijkDrs. C.J. van der LeunIr. J.A.M. BakenIr.. D. Berkhout
Ecoventures bvDrs. C.J. van der Leun
Econergy International GmbHIr. J. Van Laarhoven
Ecostream bvIr. B. de Wit
Personnel : Y. van Dijk
Controller : C. Kort
Marketing : Drs. M. Lammers
Office Mngt : I. Hanasbei
Ecofys GmbHGermanyIr. F.P.H. Wouters
3E nv BelgiumIr. G.E.V.J. Palmers
Ecofys Sp. z o.o.PolandDr. M. Szweykowska
Ecofys ltdUKDrs. K.Stap
Ecofys SpainMr. A. Laiz
Ecofys KölnIr. F.P.H. Wouters
Ecofys NürnbergDr. J. Harnisch
ICT and Computational
Drs. L. Ramaekers
Econergy International bvIr. J. Van Laarhoven
Ecofys BerlinDr. K. Burges
PV catapult – WP 4 - BIPV
Quick recap…why BIPV?
• (Potentially) low BOS costs• (In principle) best use of existing
mounting and grid infrastructure• (Without subsidy influence) best value
of electricity is at the point of use• Integration with Home Energy System
PV catapult – WP 4 - BIPV
How to use these potential strengths?
• Improving BIPV products:– Economy– Looks
• Improving ‘regulatory framework’• Improving positioning of BIPV:
– energy production vs energy saving
PV catapult – WP 4 - BIPV
WP 5 – BIPV - Objectives
• Create perspectives for market development in the construction sector
• Make BIPV more visible and comprehensive to the big public
• ‘Mandatory measures’ for PV installations to the new buildings
• Revision of the EU Directive for buildings by including RES
PV catapult – WP 4 - BIPV
WP 5 – BIPV – Description of work (1/3)
Task 1. Preparation of product development initiatives by liaising PV and construction companies
Activities: finding interested parties from both sides, by organising workshops and/or individual approach
Target: preparation of 3 Craft proposals, 2 FP6 proposals (= 5 new developments started)
PV catapult – WP 4 - BIPV
BIPV market growth
0
50
100
150
200
250
300
350
400
450
1990
1993
1996
1997
1998
1999
2000
2001
Mar
ket
volu
me
(MW
p)
Grid-connectedresidential/commercial
Total
PV catapult – WP 4 - BIPV
What are important developments in the current market?
• Addressing consumer (end-user)market• Improve ‘energy system product’
– price– looks, aesthetics– quality, guarantee of yield– maintenancegain confidence
• Increase scale
PV catapult – WP 4 - BIPV
PV catapult – WP 4 - BIPV
PV catapult – WP 4 - BIPV
Unisole (Pride)
PV catapult – WP 4 - BIPV
WP 5 – BIPV – Description of work (2/3)
Task 2. Preparation of proposal for role of energy production in CPD or EPBD
Activities: determination of route to improve CPD or EPBD
Target: lobby started by end of project
PV catapult – WP 4 - BIPV
Integration with energy design
PV catapult – WP 4 - BIPV
WP 5 – BIPV – Description of work (3/3)
Task 3. Standardisation for BIPV
Activities: Start-up of CEN TC or WG (possibly under TC 128 “roofing materials”) for EU standard on product quality
Targets: Start-up end of year one, including scope and participants,overview of existing national standards (e.g Dutch NVN 7250) for PV and/or thermal solar energy
PV catapult – WP 4 - BIPV
Example: product testing
PV catapult – WP 4 - BIPV
Budget and participants
• Budget: € 150.000
• Participants (proposal):– Ecofys, EPIA, Estif (core)– ‘selected members’ for preparative work– All members invited to participate in
workshops or TC’s