EPBD Implementation in The Netherlandsepbd-ca.eu/wp-content/uploads/2018/08/CA-EPBD-IV-The... ·...

16
EPBD Implementation in The Netherlands Status in December 2016 AUTHOR Hans van Eck, Netherlands Enterprise Agency (RVO) NATIONAL WEBSITES www.rvo.nl, www.energielabelvoorwoningen.nl, www.zoekuwenergielabel.nl, www.energielabel.nl, www.rvo.nl/actueel/nieuws/stand-van-zaken-webapplicatie-energielabelvoorwoningennl, www.rvo.nl/initiatieven/overzicht/27008, www.energiebesparendoejenu.nl www.rvo.nl/onderwerpen/duurzaam-ondernemen/gebouwen/energieneutraal-bouwen/publicaties, www.rijksoverheid.nl/onderwerpen/energielabel-woningen-en-gebouwen, www.verbeteruwhuis.nl 1. Introduction The EPC system in The Netherlands has been implemented since 2008 and so far more than 3.5 million EPCs (> 50% of the total building stock) have been registered. In December 2012, the government decided to implement a new, much more consumer-friendly system for owners of residences. This new system was developed in 2013 and 2014, and has been operational since January 2015. Legislation for the new labelling system became effective on 1 January 2015 1 . Changes in the accreditation system for experts for the new EPC for residential buildings were also implemented in January 2015. In September 2013, a national Energy Agreement (“Energie Akkoord”) was signed by more than 40 market participants and other stakeholders. The targets for energy efficiency improvements and the use of RES in buildings in this agreement are in line with the requirements of the EPBD. Under this agreement, it is foreseen that by 2020 The Netherlands will: improve 300,000 existing residences by two energy efficiency classes on the energy label; renovate the social housing building stock to the level of energy class B (on average); improve 80% of the private rental houses to a minimum of energy class C. After 2020, newly-built houses have to reach the NZEB standard. The signatures of many key organisations endorsing these objectives are clear evidence that there is broad support for the market uptake of an energy-efficient and energy-neutral building environment in the future of The Netherlands.

Transcript of EPBD Implementation in The Netherlandsepbd-ca.eu/wp-content/uploads/2018/08/CA-EPBD-IV-The... ·...

Page 1: EPBD Implementation in The Netherlandsepbd-ca.eu/wp-content/uploads/2018/08/CA-EPBD-IV-The... · 2019-04-10 · Implementation of the EPBD in The Netherlands Status in December 2016

EPBD Implementation in

The Netherlands S t a t u s i n D e c e m b e r 2 0 1 6

AUTHOR

Hans van Eck, Netherlands Enterprise Agency (RVO)

NATIONAL WEBSITES

www.rvo.nl, www.energielabelvoorwoningen.nl, www.zoekuwenergielabel.nl, www.energielabel.nl, www.rvo.nl/actueel/nieuws/stand-van-zaken-webapplicatie-energielabelvoorwoningennl, www.rvo.nl/initiatieven/overzicht/27008, www.energiebesparendoejenu.nl www.rvo.nl/onderwerpen/duurzaam-ondernemen/gebouwen/energieneutraal-bouwen/publicaties, www.rijksoverheid.nl/onderwerpen/energielabel-woningen-en-gebouwen, www.verbeteruwhuis.nl

1. Introduction

The EPC system in The Netherlands has been implemented since 2008 and so far more than 3.5 million

EPCs (> 50% of the total building stock) have been registered. In December 2012, the government decided

to implement a new, much more consumer-friendly system for owners of residences. This new system was

developed in 2013 and 2014, and has been operational since January 2015. Legislation for the new labelling

system became effective on 1 January 20151. Changes in the accreditation system for experts for the new

EPC for residential buildings were also implemented in January 2015.

In September 2013, a national Energy Agreement (“Energie Akkoord”) was signed by more than 40 market

participants and other stakeholders. The targets for energy efficiency improvements and the use of RES in

buildings in this agreement are in line with the requirements of the EPBD. Under this agreement, it is

foreseen that by 2020 The Netherlands will:

• improve 300,000 existing residences by two energy efficiency classes on the energy label;

• renovate the social housing building stock to the level of energy class B (on average);

• improve 80% of the private rental houses to a minimum of energy class C.

After 2020, newly-built houses have to reach the NZEB standard. The signatures of many key organisations

endorsing these objectives are clear evidence that there is broad support for the market uptake of an

energy-efficient and energy-neutral building environment in the future of The Netherlands.

Page 2: EPBD Implementation in The Netherlandsepbd-ca.eu/wp-content/uploads/2018/08/CA-EPBD-IV-The... · 2019-04-10 · Implementation of the EPBD in The Netherlands Status in December 2016

Implementing the Energy Performance of Buildings Directive 2018

2

2. Current Status of Implementation of the EPBD

2.I. Energy performance requirements: NEW BUILDINGS

Energy performance requirements have been in place for new buildings in The Netherlands since 1995.

They are updated on a regular basis, moving towards NZEB targets by 2020 (Figure 1).

The change towards more demanding requirements took place as a result of so-called “tightening studies”.

These studies included an analysis of the market penetration of energy efficiency measures, renewable

energy applications and energy-efficient heating and cooling generators. They also took into account the

cost-effectiveness of these measures and their impact on indoor climate and occupant satisfaction. The

tightening studies were carried out by consulting companies and were supervised by the Dutch Agency for

Enterprises (RVO) on behalf of the Ministry of the Interior (BZK). During the studies, all stakeholders were

informed about the results and could comment on them, to ensure that practical experiences with energy

saving measures were taken into account2.

Figure 1. Change over time of the energy performance coefficient in new buildings as an indication of the

improvement of the overall energetic quality of buildings (future plans are not included because the energy

performance coefficient will no longer be used as an indicator for NZEB).

2.I.i. Progress and current status of new buildings

The Energy Performance Standards (EPN), established in 1995, were replaced in July 2012 by a new

standard, the Energy Performance Standard for Buildings (EPG) that replaced both the existing residential

and non-residential standards.

The main requirement for the energy performance of new buildings is the energy performance coefficient

(in Dutch the “energieprestatiecoefficient'), setting minimum energy performance (MEP) for new buildings.

This indicator is based on the estimated total primary energy consumption of a building based on a series

Page 3: EPBD Implementation in The Netherlandsepbd-ca.eu/wp-content/uploads/2018/08/CA-EPBD-IV-The... · 2019-04-10 · Implementation of the EPBD in The Netherlands Status in December 2016

Implementation of the EPBD in The Netherlands Status in December 2016

3

of indicators, e.g., heating, ventilation and lighting, adjusted to the useful floor area and the renewable

energy produced by the building. This indicates the building energy performance in MJ/m2.

The calculation of the energy performance coefficient is mandatory for all new buildings and for large

renovations in houses and offices.

The energy performance coefficient calculation is part of the building permit application. A project

developer has to demonstrate full compliance with the energy performance requirements to receive a

building permit for a new building or a major renovation. Permits are checked and issued by local

municipalities before construction.

Monitoring and enforcement is carried out by the regional environmental services. These are separate

entities to reinforce regulation on behalf of the municipalities. These entities are part of the Dutch

provinces.

Municipalities are responsible for compliance checking during construction. In case of non-compliance,

they issue a “cease-work” order that remains valid until the requirements are met. As such, there are no

financial penalties. Buildings that do not comply do not get built, and if builders deviate, construction is

ceased until it is in line with the permit.

Every year, a sample is drawn by the RVO to check if all permits are in line with the legal requirements. If

the permits are not in line with the legal requirements, the RVO will report this to the municipalities who

will take legal action.

Energy Performance Calculation Method in The Netherlands

The energy calculation method for new and existing buildings is defined in Standard NEN 7120 that is in

line with the CEN standards. This calculation of the primary energy consumption of a building is based on

monthly climate data that is adjusted for physical processes with a shorter timeframe, e.g., solar gains and

heat accumulation. The calculation of the thermal quality of the building envelope includes thermal

bridges, ventilation and air infiltration, hot water use, efficiency of heat and cold generators, renewable

energy used both in and near the building, and the contribution of passive energy, lighting and day-

lighting. Shading caused by the building itself is included in these calculations. Shading by other buildings is

not taken into account.

More information: http://www.rvo.nl/onderwerpen/duurzaam-ondernemen/gebouwen/wetten-en-

regels-gebouwen/energieprestatie-epc/bepalingsmethode

The quotient of a building’s calculated annual primary energy needs to the allowed primary energy

performance provides the energy performance coefficient (Table 1).

Page 4: EPBD Implementation in The Netherlandsepbd-ca.eu/wp-content/uploads/2018/08/CA-EPBD-IV-The... · 2019-04-10 · Implementation of the EPBD in The Netherlands Status in December 2016

Implementing the Energy Performance of Buildings Directive 2018

4

Building Typology Required maximum values for the energy performance

coefficient (new buildings)

Day-care centres 1.1

Prisons 1.0

Healthcare buildings with bed area (hospitals) 1.8

Healthcare buildings (other than with bed

area)

0.8

Office buildings 0.8

Accommodation in lodging structure (hotels) 1.0

Accommodation not in lodging structure

(conference facilities)

1.4

Educational buildings 0.7

Sports buildings 0.9

Retail buildings 1.7

Residential buildings 0.4

Mobile homes 1.3

Table 1. Required maximum energy performance coefficients for new buildings since 1 January 2015 and,

after cost-optimal studies, for non-residential buildings since 1 July 2015.

For residential buildings an energy performance coefficient of 0.4 means approximately

50 - 65 kWh/m2.year.

2.I.ii. Format of national transposition and implementation of existing regulations

Since the oil crisis in the 1970s, The Netherlands applied minimum requirements for the thermal quality of

the building envelope. In 2011 and 2012, a study has been carried out, to establish cost-optimal minimum

requirements for existing buildings. These requirements came into effect in 2013-2014. The minimum

requirements for individual building components are listed in Table 2 for major renovations (25%

envelope), and in Table 3 for minor renovations.

Minimum requirements for the thermal quality of the building envelope by 1 January 2015 for new

buildings and major renovation (> 25% envelope).

Roofs R-value ≥ 6 m2.K/W

Floors R-value ≥ 3.5 m2.K/W

Façades R-value ≥ 4.5 m2.K/W

Transparent façade sections U-value < 65 W/m2.K

Individual structure U-value < 2.2 W/m2.K

Table 2. Minimum requirements for building components for new buildings and major renovations.

Page 5: EPBD Implementation in The Netherlandsepbd-ca.eu/wp-content/uploads/2018/08/CA-EPBD-IV-The... · 2019-04-10 · Implementation of the EPBD in The Netherlands Status in December 2016

Implementation of the EPBD in The Netherlands Status in December 2016

5

Roofs R-value ≥ 2 m2.K/W

Floors R-value ≥ 2.5 m2.K/W

Façades R-value ≥ 1.3 m2.K/W

Transparent façade sections U-value < 2.2 W/m2.K

Table 3. Minimum requirements for building components for minor renovations.

2.I.iii. Action plan for progression to NZEB for new buildings

The energy performance coefficient has been tightened on 1 January 2015, as an intermediate step to

reach the NZEB level. The next step will be to specify the demands on primary energy consumption and the

share of renewable energy up to the NZEB level. In March 2015, a first proposal for these requirements for

new buildings was shared with stakeholders (Table 4) and sent for adoption by the parliament in July 2015.

The triple NZEB requirements are referred to in the Netherlands as the Trias Energetica and graphically

shown as in Figure 2.

Figure 2. Trias Energetica.

Building Typology Energy-need

[kWh/m2.year]

Primary energy-

use**

[kWh/m2.year]

Share of

renewable

energy**

[%]

Residential 25* 25 50

Office / healthcare with no bed area /

assembly / sport / retail / prisons / lodges

50*** 25 50

Healthcare with bed area 65 120 50

Schools 50 60 50

*Studio < 50 m2 dependent on further research

**Buildings > 5 floors dependent on further research

***Buildings < 50 m2 dependent on further research

Table 4. Proposed requirement for NZEB.

Page 6: EPBD Implementation in The Netherlandsepbd-ca.eu/wp-content/uploads/2018/08/CA-EPBD-IV-The... · 2019-04-10 · Implementation of the EPBD in The Netherlands Status in December 2016

Implementing the Energy Performance of Buildings Directive 2018

6

The study on the cost-optimality, in accordance with Article 5 of the EPBD, is planned for 2018. On the basis

of this study, the requirements may still undergo some minor changes.

The Dutch government supports a programme from intermediary organisations, such as “NEPROM”

(organisation of project developers) and “Bouwend Nederland” (organisation of builders), aimed at

preparing the market players for increased demands to reach the NZEB level for new buildings.

In 2016, these intermediary organisations started a new programme under the name “ZEN” (i.e., “very

energy-efficient new buildings”) to prepare the market players for tightening of the NZEB requirements in

2020.

RVO maintains a database with NZEB examples already constructed.3

In 2014, the RVO carried out studies of the top 30 energy-efficient homes and the top 15 energy-efficient

schools and offices. Some of them already met the requirements for the proposed definition of NZEB. A

complete overview of the number of existing NZEB in The Netherlands is not yet available. Monitoring of

this programme started in 2016. The number of NZEB will gradually increase to 100% after the

implementation of the legislation regarding these buildings as per 1 January 2021.

2.I.iv. Requirements for systems and / or building components for new buildings

No requirements exist in The Netherlands for separate energy efficiency measures for technical building

systems. Instead, the total building has to reach a level of efficiency, indicated by the energy performance

coefficient. This way, builders and developers are given the freedom to choose the most cost-efficient

solution as regards the envelope and the technical building system of that particular building. This

approach gives freedom in the design and stimulates technical innovation. Products that are not yet

integrated into the official calculation method are tested to establish the performance that leads to

inclusion in the method. An independent commission of experts has to approve the results of the test

before official publication.

This concerns the performance of systems and products in the area of heating, hot water, AC, and large

ventilation systems.

On top of the energy performance coefficient for the total building, there are also mandatory minimum

requirements for building elements in new buildings. Those are similar to the demands for existing

buildings undergoing major renovation (Table 2).

2.II. Energy performance requirements: EXISTING BUILDINGS

Similar to new buildings, major renovations are required to have a building permit that meets minimum

requirements for building components, e.g., the R-value of walls, roof and floor, and the U-value of

windows and doors. A renovation is considered to be major when more than 25% of the building envelope

will be renovated. The calculation of the energy performance coefficient is also mandatory for large

renovations in houses and offices (see also section 2.I.i).

For minor renovations, there are only minimum requirements for the R-value of walls, roof and floor, and

U-value of windows and doors. In such cases, no energy performance calculation or building permit is

required. The requirements for the individual building components are listed in section 2.I.i.

Page 7: EPBD Implementation in The Netherlandsepbd-ca.eu/wp-content/uploads/2018/08/CA-EPBD-IV-The... · 2019-04-10 · Implementation of the EPBD in The Netherlands Status in December 2016

Implementation of the EPBD in The Netherlands Status in December 2016

7

2.II.i. Progress and current status of existing buildings

The Dutch strategy for the renovation of buildings is based on the Energy Agreement signed in 2013,

endorsed by around 40 parties, public and private, with strong ambitions, goals, intentions and agreements

regarding energy saving in many areas in The Netherlands. By the end of 2016, the Cabinet presented the

Energy Agenda. Herein, the requirements for the long term are set to 2050. The Energy Agenda will have a

major impact on the renovation strategy for buildings.

The point of departure of the Energy Agreement is that building owners – i.e., housing corporations,

citizens, companies, institutions and governments - have self-interest in and take responsibility for energy

saving, but need support. A coordinated effort by the government, municipalities, contractors, builders,

installation companies, banks, building owners and landlords is necessary. A combination of information-

sharing and awareness-raising, with care and funding support has been chosen as the most effective

measure to increase support. In 2016, it was decided to phase out offices and rented houses with an

energy label worse than label C and a contractual agreement was made with energy suppliers, installers

and network administrators.

For the longer term, the Energy Agenda has described the strategy to achieve CO2 neutral low temperature

heating in the Netherlands by 2050. The gradual reduction of the use of natural gas in the built

environment is a decision with major consequences. The elaboration of strategies will take place at regional

level, as alternatives to space heating in the built environment may differ at regional and local level. Energy

savings will be part of these regional strategies.

At the signing of the Energy Agreement in 2013, a guarantee committee has been set up to monitor

compliance and understand the results of the Energy Agreement. The ‘Borgingscommissie’ Committee

ensures that the agreed measures are taken, and that this agreement does not remain an intention. In this

context, the National Energy Explorations (NEV) were published in 2014, 2015 and 2016. The National

Energy Explorations, conducted annually, analyse the Dutch energy economy and outline plausible future

developments in established and planned policies. The measures of the Energy Agreement for Sustainable

Growth are included in these analyses.

Based on the results in the National Energy Exploration 2015, an intensification package with measures was

adopted in spring 2016, of which the label C obligation for offices is the most important for energy saving in

the built environment.

The impact of this intensification package in the built environment is estimated at 10.0 PJ in 2020 (range

6.7 - 27.7 PJ) (Energy Enhancement Package, ECN 2016). The National Energy Exploration 2016 has not yet

included all the measures of this intensification package because they have not yet been dealt with in a

concrete way. Based on established policies and the intended (sufficiently concrete) policy, the final energy

saving in the built environment is estimated at 27 PJ per year (range 13-43 PJ).

In the autumn of 2016, additional measures were agreed, among which was the obligation to phase out

rental housing with a label worse than label C. This measure gives about 5 PJ additional energy savings

compared to the NEV 2016. A task agreement (“covenant”) was undertaken between energy suppliers,

installers, network administrators and the government to trigger an energy saving market and achieve a

savings goal of 10 PJ by 2020.

The Ministry of the Interior (BZK) started the three-year national activation campaign “Save energy now” in

October 2016. This campaign aims to encourage private homeowners to save energy in their own homes by

raising the urgency and removing common questions and concerns. The target group includes all

homeowners with a label C or worse. In addition to commercials on radio and television, there is also a

Page 8: EPBD Implementation in The Netherlandsepbd-ca.eu/wp-content/uploads/2018/08/CA-EPBD-IV-The... · 2019-04-10 · Implementation of the EPBD in The Netherlands Status in December 2016

Implementing the Energy Performance of Buildings Directive 2018

8

campaign website, where homeowners can ask questions, view measures and subsidy opportunities, and

refer to municipal energy information centers and suppliers of products and services.

On 1 September 2016, a subsidy scheme for energy-saving of own houses was published. A total budget of

60 million € was made available to homeowners who carry out at least two major insulation measures. For

an integral, highly energy-efficient package (the insulation package belonging to a “zero-energy-bill house”),

a further 4,000 € bonus can be made available. Subsidies are also available for energy advice and the

creation of a green multi-annual maintenance programme for building owner associations (VVE’s).

2.II.ii. Plans to improve the existing building stock

A number of measures are foreseen in the near future, to stimulate energy efficiency in the built

environment. The focus is on the application of alternative high-efficiency systems during major

renovations. Extra attention will be given to enlarge the economic value of the EPC during the selling and

buying process of houses and buildings. Also, the market for energy efficiency will be further developed.

The development of a national renovation programme focused on large-scale neighbourhoods is currently

in full swing with special attention on the development of neighbourhoods with renewable energy systems

not requiring natural gas as an energy source.

The Dutch government supports two relevant initiatives, the “Energiesprong4” and the

“Stroomversnelling”5, with 45 million € grant. “Energiesprong” (energy jump) is an initiative that aims to

reach very energy-efficient renovations in both the private and social housing sector. From the yearly

report “Energiesprong 2014”, nearly 130 zero-energy-bill houses have been realised in 2014.

“Stroomversnelling” (acceleration) aims to renovate 111,000 social housing buildings and 50,000 privately-

owned houses to the level of the net zero-energy bill by the year 2021.

Laws and legislation are adapted to enable owners to get a refund (EPV “Energiepresetatievergoeding”)

from tenants for having reduced their energy bill through investments in energy efficiency and/or on-site

energy production, thus consuming only as much energy as is generated over the course of the year. This

solves the problem of the split incentive, in which the costs of energy efficiency measures are the

responsibility of the building investor or owner, whereas the benefits of a lower energy bill go exclusively to

the tenants.

2.II.iii. Regulation of system performance, distinct from whole building

performance

(see Tables 2 and 3 in section I.ii)

2.II.iv. Encouragement of intelligent metering

Following a positively evaluated national cost-benefit analysis and a small-scale experience phase, the

Dutch parliament agreed in 2014 to introduce a smart gas and electricity meter in all homes and small

businesses by 2020. The distribution system operators are responsible for offering smart meters, for

granting access to the metering data to the energy supplier, and for collecting and validating the metering

data for other third parties upon customer request. The highest benefits associated with the smart meter

rollout appear to go to the customer, as the advantages of energy savings and efficiency improvements in

Page 9: EPBD Implementation in The Netherlandsepbd-ca.eu/wp-content/uploads/2018/08/CA-EPBD-IV-The... · 2019-04-10 · Implementation of the EPBD in The Netherlands Status in December 2016

Implementation of the EPBD in The Netherlands Status in December 2016

9

the market largely benefit the customer (Figure 3 for electricity). Therefore, part of the rollout strategy is to

encourage the consumer to opt for a smart meter with detailed meter readings, and to use it as efficiently

as possible. Furthermore, the smart meters are considered a significant contributor to a future smart grid

system.

Figure 3. Share of main benefits associated with electricity smart metering rollout.

2.II.v. Financial instruments and incentives for existing buildings

Measures currently running at the end of 2016 are:

1. “SDE+”: a subsidy scheme for investments in renewable energy systems such as geothermal systems

and bio-based installations;

2. “EIA”: a tax reduction for investments in innovative sustainable energy systems based on an EPC

indicator;

3. possibilities for an extra mortgage for private investment in extreme energy efficiency measures (zero

energy bills) up to a maximum of 25,000 €;

4. “National Energy saving Fund” (NEF): cheap loans for energy saving measures for private owners

(300 million €);

5. “STEP”: a subsidy scheme for social housing corporations for investment in energy efficiency

(400 million €) based on EPC improvements;

6. “Funds for the Energy Saving Rental Sector” (FEH): cheap loans for extreme energy efficient renovations

(75 million €);

7. “Energie Prestatie Vergoeding”: social housing corporations that rent houses or apartments with a

“zero-energy-bill house” can oblige the occupants to pay a contribution to the energy investments; this

overcomes the barrier of the split incentive;

8. “SEEH”: a subsidy scheme for investments in energy saving measures for private owners (65 million €).

Page 10: EPBD Implementation in The Netherlandsepbd-ca.eu/wp-content/uploads/2018/08/CA-EPBD-IV-The... · 2019-04-10 · Implementation of the EPBD in The Netherlands Status in December 2016

Implementing the Energy Performance of Buildings Directive 2018

10

2.II.vi. Information campaigns / complementary policies

Between January and March 2015, 4.5 million home owners that did not have an EPC received a letter with

a temporary energy label for their home. The intention of this initiative was to make them aware of the

energy performance of their property and the opportunities to improve it, as well as of their obligation to

have a definitive EPC when selling or renting their house. The latter obligation was also communicated

through social media and other national and regional public channels. Municipalities developed additional

awareness campaigns and organised local information desks.

A new national campaign focusing on how to make homes more energy-efficient started in 2016. The

slogan and figurative mark (Figure 4.) ensure recognisability in the different campaign expressions.

The “Saving energy now” campaign will run until 2018. The first phase will focus on improving home

insulation in the private owned sector. Later, the focus of the campaign will shift to, e.g., other energy-

saving measures or specific target groups.

The Association of Dutch Municipalities (“Vereniging van Nederlandse Gemeenten”6) regionally and locally

supports the campaign with the so-called Energy Centres. The Energy Centres offer homeowners the

possibility of personal advice on energy saving measures, and assistance in finding a suitable building

company.

Figure 4. National “Saving energy now” campaign.

2.III. Energy Performance Certificate requirements

The EPC system has been in place since 2008 and more than 3.5 million EPCs (> 50% total building stock;

residential, commercial and public buildings) have been registered under this legislation.

2.III.i. Progress and current status on sale or rental of buildings and EPCs

In the period between 1 January 2015 and 30 November 2016, 991,311 labels, based on the new EPC, were

issued (including sales and rented properties).

Table 6 shows the transaction rates of residential buildings (houses), with or without EPC, in 2015 and

2016. These include the new EPCs as well as the Energy Index Report (EI).

Labels

residential buildings

New EPC EI (Energy Index report) Total

Total 2015 286,763 186,607 473,370

Total 2016 237,819 280,122 517,941

Total 2015&2016 524,582 466,729 991,311

Table 5. Labels issued over the period between 1 January 2015 and 30 November 2016

Page 11: EPBD Implementation in The Netherlandsepbd-ca.eu/wp-content/uploads/2018/08/CA-EPBD-IV-The... · 2019-04-10 · Implementation of the EPBD in The Netherlands Status in December 2016

Implementation of the EPBD in The Netherlands Status in December 2016

11

2016

Labels

residential

buildings

Transactions

sale

(with or without

requirement* of

EPC)

Transactions

sales with

requirement of

EPC

Transactions sales

with requirement

of EPC, without

EPC

% Transactions sales

with requirement of

EPC, with EPC

%

January 16,945 15,584 2,656 17% 12,928 83%

February 21,022 19,475 2,680 14% 16,795 86%

March 22,422 20,443 3,319 16% 17,124 84%

April 21,705 19,690 3,025 15% 16,665 85%

May 22,068 19,849 2,546 13% 17,303 87%

June 25,565 22,005 3,050 14% 18,955 86%

July 26,342 23,904 2,971 12% 20,933 88%

August 26,295 24,338 2,625 11% 21,713 89%

September 28,457 25,942 3,091 12% 22,851 88%

October 22,843 20,696 2,523 12% 18,173 88%

November 24,615 22,255 2,839 13% 19,416 87%

December 37,846 33,306 4,539 14% 28,767 86%

Total

transactions 2016 296,125 267,487 35,864 13% 231,623 87%

2015

Labels

residential

buildings

Transactions

sale

(with or without

requirement of

EPC)

Transactions

sales with

requirement of

EPC

Transactions sales

with requirement

of EPC, without

EPC

% Transactions sales

with requirement of

EPC, with EPC

%

January 14,112 13,516 5,156 38% 8,360 62%

February 14,886 14,384 4,458 31% 9,926 69%

March 17,367 16,791 4,509 27% 12,282 73%

April 20,626 19,673 5,330 27% 14,343 73%

May 16,403 16,006 4,494 28% 11,512 72%

June 18,878 18,418 4,964 27% 13,454 73%

July 27,174 26,648 5,505 21% 21,143 79%

August 18,788 18,466 3,753 20% 14,713 80%

September 20,395 19,732 3,728 19% 16,004 81%

October 21,574 19,738 3,283 17% 16,455 83%

November 25,159 23,587 3,221 14% 20,366 86%

December 33,537 30,286 6,390 21% 23,896 79%

Total

transactions 2015 248,899 237,245 54,791 23% 182,454 77%

* Some transactions do not have an EPC requirement, for instance monumental buildings or the transaction of a piece of land.

Tables 6a and 6b. Transaction rates of residential buildings (houses), with or without EPC, in 2015 and 2016.

Page 12: EPBD Implementation in The Netherlandsepbd-ca.eu/wp-content/uploads/2018/08/CA-EPBD-IV-The... · 2019-04-10 · Implementation of the EPBD in The Netherlands Status in December 2016

Implementing the Energy Performance of Buildings Directive 2018

12

According to data collected by the Land Registry and Mapping Agency (“Kadaster”)7, at the beginning of

2016, 83% of houses with an EPC requirement had an EPC at the moment of sale. This had risen to 86% at

the end of 2016. A study in 2015, carried out among housing corporations, revealed slightly higher

compliance rates for rented buildings than for sold ones.

The presence of the label is checked by the “Inspectie voor de leefomgeving en Transport” (IL&T, the

National Governmental Inspection Authority8) of the Ministry for Infrastructure and the Environment.

2.III.ii. Quality Assurance of EPCs

Since 1 January 2015, experts for residential buildings (“Erkend Deskundige Energielabel Woningbouw”)

must meet the requirements of the former system or pass a new simplified exam. The exam is organised by

“SVMNIVO”9, the exam centre for the real estate industry. In addition, experts must follow a training course

from RVO.nl to learn how to operate the web tool on the RVO website10.

Checks and sanctioning is part of the new system that is operational since 1 January 2015 and carried out

by the IL&T.

In 2016, 1,571 EPCs were checked by the IL&T. In 77 EPCs, the IL&T found errors in the input data. More

than 95% of the EPCs were correct. Recognised experts in whose EPCs errors have been detected will be

checked again in early 2017.

If this non-compliance situation is repeated, the specific experts will lose their license and will be excluded

from activities related to EPCs.

2.III.iii. Progress and current status of EPCs on public and large buildings visited by the public

The obligation to display the label has been mandatory since 2008. In 2015, 1,183 public buildings

(municipality, province and government buildings) were identified, and 584 of them were checked by the

IL&T. 245 of these buildings had not yet displayed their energy label. Another 380 public buildings were

inspected in 2016.

The IL&T can give owners of such buildings a financial penalty in case of non-compliance. To date, several

owners of public buildings have received a warning of non-compliance with the requirement for public

display of the EPC. They are given a 6 months period to become compliant and will be checked again after

this period.

2.III.iv. Implementation of mandatory advertising requirement – status

The presence of the label in advertising is checked by the IL&T.

Of all houses sold in The Netherlands, 80% are advertised on the website of the real estate chain, “Funda”.

The remaining 20% are sold through other agencies or means, in most cases without an advertisement. On

the “Funda” website, the preliminary EPC is presently shown in 100% of the cases, along with the

characteristics of the property. Only 18% of the advertisements show the final label. The obligation to

publish the final label is only mandatory if an EPC already exists. In many cases, house owners have not

registered their final EPC when the advertisement is published. This explains the relatively low number of

final labels.

Page 13: EPBD Implementation in The Netherlandsepbd-ca.eu/wp-content/uploads/2018/08/CA-EPBD-IV-The... · 2019-04-10 · Implementation of the EPBD in The Netherlands Status in December 2016

Implementation of the EPBD in The Netherlands Status in December 2016

13

2.IV. Inspection requirements – heating systems, air conditioning

In The Netherlands, mandatory inspections are in place for gas-fired heating systems with more than 100

kW, and for non-gas-fired heating systems with more than 20 kW heating capacity. This obligation is

regulated in the “Activiteitenbesluit Stookinstallaties” (Activities Decree and Activities Regulations)11. For

gas-fired heating systems between 20 kW and 100 kW, The Netherlands has opted for an alternative

approach: since gas-fired systems between 20 and 100 kW are used for heating in more than 5 million

homes (over 90% of the existing housing stock), The Netherlands has opted for a system of voluntary

inspection and maintenance, combined with energy-saving advice for these systems.

2.IV.i. Report on equivalence of model A and B for Heating Systems

There is no description of main justifications available at this moment.

2.IV.ii. Progress and current status on heating systems

The proportion of systems with regular maintenance is already high, at approximately 90% in 2011, but it

has decreased in recent years, partly as a result of the economic crisis. Moreover, the quality of the

performed maintenance and inspections varies. For these reasons, in collaboration with the Installer

branch, a new quality label was developed and put on the market in 2015 called “OK-CV”12. Regular

maintenance under “OK-CV” is combined with an inspection and savings advice.

A communication and marketing campaign among contractors was conducted in 2014 (Figure 5).

From 2015, licenses to carry out the maintenance and inspections under the quality label are issued to

contractors. The government supports the further development and communication of “OK-CV”.

The quality of the assessment is checked by the “OK-CV” organisation that has developed a database with

all results of inspections. If inspectors fail to meet the “OK-CV” standards, they lose their license.

Figure 5. Campaign brochure OK-CV

Page 14: EPBD Implementation in The Netherlandsepbd-ca.eu/wp-content/uploads/2018/08/CA-EPBD-IV-The... · 2019-04-10 · Implementation of the EPBD in The Netherlands Status in December 2016

Implementing the Energy Performance of Buildings Directive 2018

14

2.IV.iii. Progress and current status on AC systems

There has been a mandatory inspections regime for AC systems in place since 1 December 2013. This

comprises a mandatory inspection for systems larger than 12 kW. Private homes are excluded from this

regime because there are very few such systems in houses.

2.IV.iv. Enforcement and impact assessment of inspections

Enforcement and penalties

The “Activiteitenbesluit” includes regulations for inspection and maintenance of gas-fired heating systems

above 100 kW and non-gas-fired heating systems above 20 kW (Activities Decree, Article 3.7, paragraph 4,

3.10p and Activities Regulations, Article 3.7m)13. The periodic inspection ensures safe operation as well as

optimum combustion and energy-efficient functioning. The risks of air pollution (CO, NOx, SO2, particulate

matter and CxHy), explosion and energy waste are addressed. An inspection includes checking the system

for the supply of fuel and combustion air, the exhaustion of combustion gases and the adjustment for

combustion efficiency (Activities Regulations, Article 3.7, paragraph 3). The holder of the combustion plant

shall keep the final report available for the authority.

The IL&T carries out random checks to verify that the mandatory inspection has been performed. Owners

who have not had an inspection performed, currently get a 6-months period for doing so. If they fail to

meet the requirement within this timeframe, they can get a fine of up to 20,250 €.

Accredited inspectors have to take a new exam every 5 years. If they fail, they will be removed from the

RVO database. Inspection figures for 2014-2015 are not available.

Quality control of inspection reports

The “Stichting Certificering Inspectie en Onderhoud Stookinstallaties” (SCIOS)14 inspectors record their

findings in the inspection report. The supervisor of the competent authority (usually municipalities) checks

if inspections have taken place and if reports are available. The municipalities can access the SCIOS

database, where all inspections are recorded via a secure web application.

The IL&T also carries out random checks to determine if the inspection reports meet the requirements. If a

report does not live up to quality standards, the owner will get a formal notification from the IL&T stating

that they have 6 weeks to acquire a new, improved inspection report. If owners do not comply, they will be

placed in default and they will be fined as if they had not had an inspection performed in the first place, at

a maximum of 20,250 €.

Impact assessment. Costs and benefits

No data available at this stage.

Page 15: EPBD Implementation in The Netherlandsepbd-ca.eu/wp-content/uploads/2018/08/CA-EPBD-IV-The... · 2019-04-10 · Implementation of the EPBD in The Netherlands Status in December 2016

Implementation of the EPBD in The Netherlands Status in December 2016

15

3. A success story in EPBD implementation

The introduction of the new energy performance label in The Netherlands has changed the landscape of

the Dutch built environment. While the previous label was merely technical and expensive and suffered

resistance among the Dutch population, the new simplified label has empowered citizens to directly

influence their energy use. The practical advice has given building owners concrete steps for improvement.

The new label has become a marketing tool instead of a technical process. It is motivating for owners to

improve the energy level of their houses and get a new label. A good level is perceived as an indicator for

good quality and an added value. This is also recognised by banks and other financial institutions and has

influenced mortgaging. Banks are investigating if they can offer lower interest rates for better energy

performance labels since 2016. The label has supported builders and installers in their pursuit of energy

efficiency as a new or renewed market. New market offers have sprung up from different companies that

offer integral solutions for homeowners and buildings to upgrade their label. The long-term experience of

Dutch professionals with integral solutions contributes to an increased demand. The voluntary agreement

of the partners in the “Energieakkoord”15 (Energy Accord) gives a central place to improvements of the

label as a vehicle to reach the 2020 objectives16. This broad support has contributed to higher investments

in energy efficiency and renewable energy.

The results of the simplified web-based approach in the first year, since its introduction in January 2015,

are:

• 4.5 million houses got a letter with information about their EPC and a personal pre-setting in the EPC

web tool17;

• over 2,000 trained qualified experts, of which over 850 working with the web tool;

• costs are kept low because of competition, with an average of 25 € per EPC;

• over 800,000 individual log-ins;

• over 950,000 registered new EPCs since January 2015 and over 3.5 million EPCs in total (> 50% total

building stock; residential, commercial and public buildings).

4. Conclusions, future plans

In general, The Netherlands has implemented the EPBD.

For the near future, a number of measures is foreseen to stimulate energy efficiency improvements in the

built environment. The focus is on the application of alternative high efficiency systems during major

renovations. Extra attention will be given to enlarge the economic value of the label during the selling and

buying process of houses and buildings. Also, the market for energy efficiency will be further developed.

Financial support measures running at the end of 2016 are:

1. SDE+”: a subsidy scheme for investments in renewable energy systems such as geothermal systems and

bio-based installations;

2. “EIA”: a tax reduction for investments in innovative sustainable energy systems based on an EPC

indicator;

3. possibilities for an extra mortgage for private investment in extreme energy efficiency measures (zero

energy bills) up to a maximum of 25,000 €;

Page 16: EPBD Implementation in The Netherlandsepbd-ca.eu/wp-content/uploads/2018/08/CA-EPBD-IV-The... · 2019-04-10 · Implementation of the EPBD in The Netherlands Status in December 2016

Implementing the Energy Performance of Buildings Directive 2018

16

4. “National Energy saving Fund” (NEF): cheap loans for energy saving measures for private owners (300

million €);

5. “STEP”: a subsidy scheme for social housing corporations for investment in energy efficiency (400

million €) based on EPC improvements;

6. “Funds for the Energy Saving Rental Sector” (FEH): cheap loans for extreme energy efficient renovations

(75 million €);

7. “Energie Prestatie Vergoeding”: social housing corporations that rent houses or apartments with a

“zero energy bill” can oblige the occupants to pay a contribution to the energy investments; this

overcomes the barrier of the split incentive;

8. “SEEH”: a subsidy scheme for investments in energy saving measures for private owners (65 million €).

Endnotes

1. wetten.overheid.nl/BWBR0020921/2017-01-01

2. www.rvo.nl/onderwerpen/duurzaam-ondernemen/gebouwen/wetten-en-regels-gebouwen/energieprestatie-beng

3. www.rvo.nl/initiatieven/overzicht/27008

4. www.energiesprong.nl

5. http://stroomversnelling.nl

6. https://vng.nl/

7. www.kadaster.nl/

8. www.ilent.nl

9. www.svmnivo.nl

10. www.energielabelvoorwoningen.nl/?cookieCheck=true

11. www.ondernemersplein.nl/regel/stookinstallaties

12. www.ok-cv.nl

13. www.rvo.nl/deskundigen/overzicht/27045

14. www.scios.nl

15. www.energieakkoordser.nl

16. http://afsprakengestart.energieakkoordser.nl/public/result

17. www.energielabelvoorwoningen.nl/?cookieCheck=true

The sole responsibility for the content of this publication lies with the authors. It does not necessarily reflect the views of

the European Commission. Neither the EASME nor the European Commission are responsible for any use that may be

made of the information contained therein.

This project has received funding from the European

Union's Horizon 2020 research and innovation

programme under grant agreement Nº 692447.

under grant agreement Nº 692447.