3 DMF will join PR during 8 March 2016. Plan for … MOU/daily [email protected],...

2
From: Akaruchai Nochaiwong [email protected] Subject: Daily Operation update on R&D S1 Electromagnetic survey for Waterflood Monitoring in Tap Reat Area: 7 March 2016 Date: March 8, 2016 at 7:50 AM To: Somporn Rassadanukul [email protected], Geerati Pombunmee [email protected], Phathompat Boonyasaknanon [email protected], Sumeth Anantasate [email protected], Panumat Yoosin [email protected], Udom Arayatanon [email protected], Chiradet Khachamart [email protected], Angkana Sriwantaneeyakul [email protected], Saovajit Nanruksa [email protected], Worravit Tragunveerayut [email protected], Nontapong Panudulkitti [email protected], Prapun Sooksawat [email protected] Cc: Chalermkiat Tongtaow [email protected], Piya Sukhumpanumet [email protected], Chayong Borisuitsawat [email protected], Kanok Intharawijitr [email protected], Nopadon Chinabutr [email protected], Supakorn Krisadasima [email protected], Tawee Limsoontorn [email protected], Suwit Pabchanda [email protected], Phanachit Dhanasin [email protected], Sutus Preuksjamas [email protected], Songkram Noikongdee [email protected], Patchara Chacharoen [email protected], Piti Akrapipatkul [email protected], Poonsawat Prachukbunchong [email protected], Padsakorn Suwanruji [email protected], Sarawut Uparawanna [email protected], Panlop Limsakul [email protected], Chalong Jaruwattanasakul [email protected], Alisara Ngamlurdwongsakul [email protected], Inthira Kongbua [email protected], Kurt Strack ([email protected]) [email protected], Sophon Jumras [email protected], Anupong Kongsub [email protected], Ing-orn Soisuwan [email protected], Patcharin Kaewkert [email protected], Natthaya Piyapongpan [email protected], GGS-O Staff [email protected] Dear All, Please see below for daily operation update: Site preparation - Fence complete - Preparation of electrical work is in progress. - Trench digging is about 80% complete (1600m). Cable wire lay out is in progress. - Security guards are on location. - Fuel line connection is in progress. - Recording room and storage room preparation is in progress. Equipment mobilization - EM equipment , Wire (5000m), HDPE (5000m) and Generators at site PR / CSR / DMF - 3 DMF will join PR during 8 March 2016. - Plan to have public communication on 8 March 2016 SSHE - Wire deviation complete - Generators deviation is complete - PTW for Site preparation, trench digging and lifting work were endorsed by S1 construction team and GGS/O (as area owner) - Set up Sound baseline measurement complete for 3 days measurement. - Plan for HSE audit on 10 Mar 2016. - HSE statistic: No HSE issue yet. Personnel - K. Phathompat B. arrived at site. - Kurt Strack arrived at site. - K. Panumat Y. will arrive on Tuesday. Drilling program - PERF program for TRT-E will be around April 2016. Best regards, Akaruchai N.

Transcript of 3 DMF will join PR during 8 March 2016. Plan for … MOU/daily [email protected],...

Page 1: 3 DMF will join PR during 8 March 2016. Plan for … MOU/daily reports...AngkanaS@pttep.com, Saovajit Nanruksa SaovajitN@pttep.com, Worravit Tragunveerayut WorravitT@pttep.com, Nontapong

From: Akaruchai Nochaiwong [email protected]: Daily Operation update on R&D S1 Electromagnetic survey for Waterflood Monitoring in Tap Reat Area: 7 March 2016

Date: March 8, 2016 at 7:50 AMTo: Somporn Rassadanukul [email protected], Geerati Pombunmee [email protected], Phathompat Boonyasaknanon

[email protected], Sumeth Anantasate [email protected], Panumat Yoosin [email protected],Udom Arayatanon [email protected], Chiradet Khachamart [email protected], Angkana [email protected], Saovajit Nanruksa [email protected], Worravit Tragunveerayut [email protected],Nontapong Panudulkitti [email protected], Prapun Sooksawat [email protected]

Cc: Chalermkiat Tongtaow [email protected], Piya Sukhumpanumet [email protected], Chayong [email protected], Kanok Intharawijitr [email protected], Nopadon Chinabutr [email protected],Supakorn Krisadasima [email protected], Tawee Limsoontorn [email protected], Suwit [email protected], Phanachit Dhanasin [email protected], Sutus Preuksjamas [email protected],Songkram Noikongdee [email protected], Patchara Chacharoen [email protected], Piti [email protected], Poonsawat Prachukbunchong [email protected], Padsakorn Suwanruji [email protected],Sarawut Uparawanna [email protected], Panlop Limsakul [email protected], Chalong [email protected], Alisara Ngamlurdwongsakul [email protected], Inthira Kongbua [email protected],Kurt Strack ([email protected]) [email protected], Sophon Jumras [email protected], Anupong [email protected], Ing-orn Soisuwan [email protected], Patcharin Kaewkert [email protected],Natthaya Piyapongpan [email protected], GGS-O Staff [email protected]

Dear All, Please see below for daily operation update: Site preparation

- Fence complete- Preparation of electrical work is in progress.- Trench digging is about 80% complete (1600m). Cable wire lay out is in progress.- Security guards are on location.- Fuel line connection is in progress.- Recording room and storage room preparation is in progress.

Equipment mobilization

- EM equipment , Wire (5000m), HDPE (5000m) and Generators at site PR / CSR / DMF

- 3 DMF will join PR during 8 March 2016.- Plan to have public communication on 8 March 2016

SSHE

- Wire deviation complete- Generators deviation is complete- PTW for Site preparation, trench digging and lifting work were endorsed by S1

construction team and GGS/O (as area owner)- Set up Sound baseline measurement complete for 3 days measurement.- Plan for HSE audit on 10 Mar 2016.- HSE statistic: No HSE issue yet.

Personnel

- K. Phathompat B. arrived at site.- Kurt Strack arrived at site.- K. Panumat Y. will arrive on Tuesday.

Drilling program

- PERF program for TRT-E will be around April 2016. Best regards,Akaruchai N.

Page 2: 3 DMF will join PR during 8 March 2016. Plan for … MOU/daily reports...AngkanaS@pttep.com, Saovajit Nanruksa SaovajitN@pttep.com, Worravit Tragunveerayut WorravitT@pttep.com, Nontapong

ELECTRONIC MAIL DISCLAIMER:The electronic transmission, information and any attached documents contained in this e-mail are confidential, proprietaryto the sender, and are intended only for the person or entity to which it is addressed. If you have received this electronictransmission in error, please immediately notify the sender and delete or destroy the original electronic transmission andany attached documents from your system without copying it, disclosure or distribution or the taking of any actionconcerning the contents of this electronic transmission or any attachments. Any review, distribution, copying,retransmitting, dissemination, disclosure or use of this electronic transmission or any part of it in any form for any purposewhatsoever is strictly prohibited and subject to liability and legal claim. Please be aware that electronic transmissioncannot be guaranteed to be secure or error free as information could be intercepted, corrupted, lost, destroyed, arrive lateor incomplete, or contain viruses. The sender therefore does not accept liability for any errors or omissions in the contentsof this message which arise as a result of electronic transmission. If verification is required please request a hard copyversion.