Serge van Dam Rijkswaterstaat - c-its-korridor.dec-its-korridor.de/data/pdf/170619 Strasbourg...

14
Serge van Dam Rijkswaterstaat Update The Netherlands June 2017 Cooperative ITS Corridor – Joint Deployment

Transcript of Serge van Dam Rijkswaterstaat - c-its-korridor.dec-its-korridor.de/data/pdf/170619 Strasbourg...

Page 1: Serge van Dam Rijkswaterstaat - c-its-korridor.dec-its-korridor.de/data/pdf/170619 Strasbourg vanDam.pdfRijkswaterstaat SPIN PVD MTM2 Flister Flister-button o r FlisVis SPIN r RWW

SergevanDamRijkswaterstaat

UpdateTheNetherlands June2017

CooperativeITSCorridor–JointDeployment

Page 2: Serge van Dam Rijkswaterstaat - c-its-korridor.dec-its-korridor.de/data/pdf/170619 Strasbourg vanDam.pdfRijkswaterstaat SPIN PVD MTM2 Flister Flister-button o r FlisVis SPIN r RWW

– 2 –

TheNetherlands – summary status

221.06.17 Fußzeile

Contents• Flashback2015• Developments so farinsummary• Pre-deployments• Lessons learned• Challenges• Planningand stepsahead

Page 3: Serge van Dam Rijkswaterstaat - c-its-korridor.dec-its-korridor.de/data/pdf/170619 Strasbourg vanDam.pdfRijkswaterstaat SPIN PVD MTM2 Flister Flister-button o r FlisVis SPIN r RWW

• 2013– 2015Draftingspecs.PrototypingonA16withRWWandHMI

• 2016– 2017Executing4pre-deploymentsontypicallocations.CorridorProfile,Systemspecifications,PlacementGuidelines

• 2017– 2019Finalizingspecificationsbyadditionaltests,accelerationthroughInterCorTESTFESTs,PrepareforNationwidedeployment

TheNetherlands– ThePhases

321.06.17 Fußzeile

Focusonreallifeusescases.

Learningbydoingandaccelerationbytimeboxing.

Page 4: Serge van Dam Rijkswaterstaat - c-its-korridor.dec-its-korridor.de/data/pdf/170619 Strasbourg vanDam.pdfRijkswaterstaat SPIN PVD MTM2 Flister Flister-button o r FlisVis SPIN r RWW

– 4 –

Corridor test track

21.06.17 Fußzeile

ThemotorwayA16nearthemainportRotterdamprovidesabasisforreallifetestingandcontributestostandardized,interoperable,andfuture-orientedcooperativeITSservices

– AgoodbasisforITSG5development– Hybridsetup(G5– 4G/5G)possible– Complexroadconfiguration(tunnel)– Heavytrafficconditions– Humanfactorsconsidered– Placingguidelinestovalidate– OntheTen-TCorenetwork

Page 5: Serge van Dam Rijkswaterstaat - c-its-korridor.dec-its-korridor.de/data/pdf/170619 Strasbourg vanDam.pdfRijkswaterstaat SPIN PVD MTM2 Flister Flister-button o r FlisVis SPIN r RWW

– 5 –

Pre-deployments use cases

521.06.17 Fußzeile

4typical 4road configurations:

A: A16 DutchFixed solutionB: A58 Third partyinfrastructureC: A2 Innovation TrafficCentreD: A67 Portablesolution(trailers)

Page 6: Serge van Dam Rijkswaterstaat - c-its-korridor.dec-its-korridor.de/data/pdf/170619 Strasbourg vanDam.pdfRijkswaterstaat SPIN PVD MTM2 Flister Flister-button o r FlisVis SPIN r RWW

– 6 –

Pre-deployments use cases

621.06.17 Fußzeile

[1]Eco MTMsolution

[2]3rdpartyInfra

[3]Process

[4]Eco portablesolution

Pre-deploymenthighways Questions to answer

1) Validation oftheMTMbased solution2) Crossborder/international comptability3) Cost scenarios roll out

4)Use caseonshockwaveinfrastructure

5)ImpactonRWSprocesses6)ImpactPVD,securityand privacy

7)Validation nonMTM-based soultion8)Crossborder/international compatibility9)Cost scearios roll out

Focusreallifeuse cases

RWW PVD

CRW

IVS

PVD

RWW

PVDCRW

IVS

RWWCRW

A67A2

A58

A16

Page 7: Serge van Dam Rijkswaterstaat - c-its-korridor.dec-its-korridor.de/data/pdf/170619 Strasbourg vanDam.pdfRijkswaterstaat SPIN PVD MTM2 Flister Flister-button o r FlisVis SPIN r RWW

– 7 –

SystemconfigurationCRW

721.06.17 Fußzeile

RSU

NNV/VICnet

RWW(DENMorIVI

OBU

Wifi-P

DENMorIVI

RoaduserHMI

Roaduser

PVD(CAM)

CAMmessag

e

Rijkswaterstaat

SPIN

PVD

MTM2

FlisterFlister-button

FlisVisRoad

inspecto

r

SPIN

Ope

rator

RWW

AutomaticRWW

NDW

CUMTM2

Page 8: Serge van Dam Rijkswaterstaat - c-its-korridor.dec-its-korridor.de/data/pdf/170619 Strasbourg vanDam.pdfRijkswaterstaat SPIN PVD MTM2 Flister Flister-button o r FlisVis SPIN r RWW

– 8 –

Predeployment 1and TESTFEST

821.06.17 Fußzeile

Page 9: Serge van Dam Rijkswaterstaat - c-its-korridor.dec-its-korridor.de/data/pdf/170619 Strasbourg vanDam.pdfRijkswaterstaat SPIN PVD MTM2 Flister Flister-button o r FlisVis SPIN r RWW

– 9 –

Development,tests and finalizing

921.06.17 Fußzeile

Geerlaan

� � � � �

X X X X

X X X Ô

X X Ô 70 70

X Ô 70 70 70

Ô 90 90 90 90

90 90 90 90

25,200

34,178m

34,440n

34,832m

36,070

37,680

38,730

32,396

32,933

31,290

29,370

28,315

26,480

Trailer

Scenario (4)Hard Shoulder

Page 10: Serge van Dam Rijkswaterstaat - c-its-korridor.dec-its-korridor.de/data/pdf/170619 Strasbourg vanDam.pdfRijkswaterstaat SPIN PVD MTM2 Flister Flister-button o r FlisVis SPIN r RWW

– 10 –

Challenges

1021.06.17 Fußzeile

Fromseveralpre-deployments• Eventpositionfromtrailerstillcomplex• DefiningthebestusecaseforPVD• DENMandIVIdeliveredsimultaneously• Internationalprofilingapainstakingjob• HumanFactorsa(OEM)challenge• DevelopmentofRSUPlacementGuideline

Page 11: Serge van Dam Rijkswaterstaat - c-its-korridor.dec-its-korridor.de/data/pdf/170619 Strasbourg vanDam.pdfRijkswaterstaat SPIN PVD MTM2 Flister Flister-button o r FlisVis SPIN r RWW

1122maart2017

Leukhooraldietechniek,maarwatvindjijernouvanquahumanfactors?

Appropriateinformationintimewitheffectivecontent?

Expectations?Usable for all use cases

Actionorinformative?

Relevantfor me?

Urgencyisleadingfor typeand contentofinformation

Humanfactors

Page 12: Serge van Dam Rijkswaterstaat - c-its-korridor.dec-its-korridor.de/data/pdf/170619 Strasbourg vanDam.pdfRijkswaterstaat SPIN PVD MTM2 Flister Flister-button o r FlisVis SPIN r RWW

– 12 –

Steps ahead (-2019)

1221.06.17 Fußzeile

• Anticipate the availability of wifi-P equipped OEM vehicles => Prepare for roll-out!

• Execute several diverse development iterations by participating in international events together with industry partners:

• 7.17 InterCor TESTFEST ITS-G5 (NL)• 8.17 Probebetrieb Hessen (D)• 1.18 InterCor TESTFEST Hybride (UK)• 1.18 Concorda ITS-G5 Roadtest Amsterdam (NL)• 4.18 InterCor TESTFEST PKI (F)• 5.18 Pilot Ops InterCor (Rotterdam-Antwerpen)

• Finalize roll out plan and cost models

The Focus will be on interoperability and service consistency (ITS-G5-cellulair)

Page 13: Serge van Dam Rijkswaterstaat - c-its-korridor.dec-its-korridor.de/data/pdf/170619 Strasbourg vanDam.pdfRijkswaterstaat SPIN PVD MTM2 Flister Flister-button o r FlisVis SPIN r RWW

– 13 –

Planning

1321.06.17 Fußzeile

Page 14: Serge van Dam Rijkswaterstaat - c-its-korridor.dec-its-korridor.de/data/pdf/170619 Strasbourg vanDam.pdfRijkswaterstaat SPIN PVD MTM2 Flister Flister-button o r FlisVis SPIN r RWW

Suggestions or Questions?

Thank you for your kind attention

Projectoffice Cooperative ITSCorridorc/oK&SGmbHProjektmanagement

Dr.AndreasKreutzerFon+49(241)1601959,Fax+49(241)1601963,[email protected]

Projectlead Cooperative ITSCorridorFederalMinistryofTransportandDigitalInfrastructure

Dipl.-Ing.KonstantinSauerRobert-Schuman-Platz1,53175Bonn

[email protected]

Suggestions or Questions?

Thank you for your kind attention