INFSO-RI-508833 Enabling Grids for E-sciencE www.eu-egee.org SEEGRID SLA Ioannis Liabotis <iliaboti at grnet.gr> Ognjen Prnjat <oprjat at grnet.gr> Kostas Koumantaros <kkoum at grnet.gr>

description

SEEGRID SLA. Ioannis Liabotis Ognjen Prnjat Kostas Koumantaros . SLA. Hardware and connectivity criteria Level of support Level of expertise VO support Conformance to Operational Metrics. - PowerPoint PPT Presentation

Transcript of SEEGRID SLA

Page 1: SEEGRID SLA

INFSO-RI-508833

Enabling Grids for E-sciencE

www.eu-egee.org

SEEGRID SLA

Ioannis Liabotis <iliaboti at grnet.gr>

Ognjen Prnjat <oprjat at grnet.gr>

Kostas Koumantaros <kkoum at grnet.gr>

Page 2: SEEGRID SLA

ARM 8, Athens Nov 2006 2

Enabling Grids for E-sciencE

INFSO-RI-508833

SLA

• Hardware and connectivity criteria • Level of support • Level of expertise • VO support • Conformance to Operational Metrics

Page 3: SEEGRID SLA

ARM 8, Athens Nov 2006 3

Enabling Grids for E-sciencE

INFSO-RI-508833

SLA - Hardware and connectivity criteria

• The cluster must not have less than 4 CPUs. Service nodes should be extra.

• Site must have enough connectivity to pass SFTs and GSTAT stats.

• Site must have enough connectivity to support the SEEGRID VO and its applications.

• Service nodes (CE, SE, Site BDII etc) must have sufficient computational and storage resources to support normal operation of these services.

Page 4: SEEGRID SLA

ARM 8, Athens Nov 2006 4

Enabling Grids for E-sciencE

INFSO-RI-508833

SLA - Level of support

• One dedicated site administrator who will also take role of security administrator.

• The name and contact details of the site administrator has to be provided.

• Minimum 9-5 weekday support. • Availability to react to major security incidents that

might affect the whole infrastructure during weekends and holidays.

• Responding to operational tickets within next working day

• Reporting to the country GIM at regular basis (monthly reports?)

Page 5: SEEGRID SLA

ARM 8, Athens Nov 2006 5

Enabling Grids for E-sciencE

INFSO-RI-508833

SLA - Level of expertise

• 1 experienced site admin

• 1 experienced network support person, or a direct link to network support / network operations center

• 1 security-oriented person to be available for advice any time

• Names and contact details (e-mail) of the above people should be available to SEEGRID partners.

Page 6: SEEGRID SLA

ARM 8, Athens Nov 2006 6

Enabling Grids for E-sciencE

INFSO-RI-508833

SLA - VO support

• Site needs to deliver to the SEEGRID VO

• Not conflicting with the existing the NGI.

• Support for SEE-GRID VO and OPS role

Page 7: SEEGRID SLA

ARM 8, Athens Nov 2006 7

Enabling Grids for E-sciencE

INFSO-RI-508833

SLA - Conformance to Operational Metrics

• Site Availability (Quality Metric)– Sites must have 90% availability during uptime in a

given quarter (3months) This metric is calculated as follows: If a site has degraded performance during a given day (>50% of the SFTs fail) then site is considered down for that day.

• Site declared Downtime– Sites must not be in downtime for more that 10% of

the time in a given quarter (3 months) except for reasons out of sites responsibility negotiated with country GIMs.

Page 8: SEEGRID SLA

ARM 8, Athens Nov 2006 8

Enabling Grids for E-sciencE

INFSO-RI-508833

SLA Enforcement

• SLA should be signed by sites – not a strict legal document

• Site that fail the obligations will be discussed at next PSC

• Country rep is responsible for enforcement.– If he GIM does not do that WP3 leader should do that.– suspension of site from SEEGRID infra might be decided.

• Monitoring via SEEGRID monitoring tools and helpdesk• Duration: From the signature to the end of the project.• Site can be Temporarily suspended by SEEGRID for

security reasons.

Page 9: SEEGRID SLA

ARM 8, Athens Nov 2006 9

Enabling Grids for E-sciencE

INFSO-RI-508833

Who signs

• The legal representative responsible of the department of the institution that hosts the site.