S BI INFRA M ANAGEM ENT SOL UTIONS PV T. LTD. STATE …...Vijay Sa 55,Sahy Near Sta AHMED can be do...

86
S SBIIM THE S PART TENDER NAME ADDRE DATE 55 S TATE BAN MS INVITE WORKS O SBI APPR A: TECHN R SUBMITT SS CONSULT ,SAHYADR BI INFRA M NK OF IND LALD TENDERS OF SARDA ROVED EM CATEG NICAL BID TED BY : VIJA TING ARCH G RI APPART MANAGEM IA, 3 RD FLO DARWAJA, S ON BEHA ARGADH BR MPANELLE GORY – E1 : : : AR A R . VIJ AY SAHIJW HITECT. EN GOVT. APP TMENT, NE AHMEDA 1 SE MENT SOL OOR, LOCA , AHMEDA ALF OF SB RANCH (00 FROM ED ELECT 1,E2 ,E3, E RCHITECT: JAY SAHIJ WANI &ASS NGINEERS PROVAL VA EAR STADI ABAD – 380 EAL & SIGNA UTIONS PV AL HEAD O BAD-38000 I FOR PRO 060064), D TRICAL CO E4 & E5 ON WANI SOCIATES S,INTERIOR ALUERS UM CIRCL 0 009 ATURE OF VT. LTD. OFFICE, B 01 OPOSED E DIST. JUNA ONTRACTO NLY S R DESIGN E. NAVRA CONTRACT BHADRA, LECTRICA AGADH ORS UNDE ERS & NGPURA, TOR AL ER

Transcript of S BI INFRA M ANAGEM ENT SOL UTIONS PV T. LTD. STATE …...Vijay Sa 55,Sahy Near Sta AHMED can be do...

Page 1: S BI INFRA M ANAGEM ENT SOL UTIONS PV T. LTD. STATE …...Vijay Sa 55,Sahy Near Sta AHMED can be do It shall be r l and finan alified. tractor sh the numb itions othe to be with IMS

S

SBIIM

THE S

PART – TENDERNAME ADDRE DATE

55

STATE BAN

MS INVITE WORKS O

SBI APPR

– A: TECHN

R SUBMITT

SS

CONSULT

,SAHYADR

BI INFRA MNK OF IND

LALD

TENDERSOF SARDA

ROVED EMCATEG

NICAL BID

TED BY:

VIJATING ARCH

GRI APPART

MANAGEMIA, 3RD FLO

DARWAJA,

S ON BEHAARGADH BR

MPANELLEGORY – E1

:

:

:

AR

A R . VIJAY SAHIJWHITECT. EN

GOVT. APPTMENT, NE

AHMEDA

1 SE

MENT SOLOOR, LOCA, AHMEDA

ALF OF SBRANCH (00

FROM

ED ELECT1,E2 ,E3, E

RCHITECT:

JAY SAHIJWANI &ASSNGINEERS

PROVAL VAEAR STADI

ABAD – 380

EAL & SIGNA

UTIONS PVAL HEAD OBAD-38000

I FOR PRO060064), D

TRICAL COE4 & E5 ON

WANI SOCIATESS,INTERIORALUERS UM CIRCL

0 009

ATURE OF

VT. LTD. OFFICE, B01

OPOSED EDIST. JUNA

ONTRACTONLY

S R DESIGN

E. NAVRA

CONTRACT

BHADRA,

LECTRICAAGADH

ORS UNDE

ERS &

NGPURA,

TOR

AL

ER

Page 2: S BI INFRA M ANAGEM ENT SOL UTIONS PV T. LTD. STATE …...Vijay Sa 55,Sahy Near Sta AHMED can be do It shall be r l and finan alified. tractor sh the numb itions othe to be with IMS

SBIIMS Ahmedaunder ap The SBIto quote The deta

S.No.

1.

2.

3.

4.

5.

6.

7.

8.

9.

on behalf abad inviteppropriate c

I Empanelle for this te

ails of tende

Descriptio

Name of w

Nature of W

Time allow

Application

Earnest M

Initial Secu

Total Secu

Start anddownloadidocumentswebsite Last dasubmissioEMD and sealed coin sealed c

N

of SBI thres tenders category (E

ed contracnder.

er are as u

on

work

Work

wed for com

n Fees

Money Depo

urity Depos

urity deposi

d end dang of s from

te & timn of TechniApplicationver-A & Prcover-B

NOTICE IN

rough its Ain two bid

E1 & ABOV

tors who r

nder:

ProBra

Ele

mpletion (45acc RsParSBSoAh

osit RsDe180tendrapay

sit 2%

it 5%

ate fortenderBank’s

10.und

me for ical bid,

n fess in rice Bid

27.

2 SE

VITING TE

Architect M system fro

VE) for the c

receives NI

oposed Elecanch ( 0060

ectrical work

5 days) 1 Mceptance o

. 1,000/- (Trt-A by wayI in favolutions Pmedabad.4,000/- (Fomand Draf0 Days fromnder) from awn in favyable at Ju

% of contrac

% of the fina.07.2018 tder<Link>p

.07.2018 by

EAL & SIGNA

ENDERS

M/s.Vijay Saom the SB

captioned w

IT from Ar

ctrical work0064) Dist.

k

Months 15 Dof work ord

To be depoy of Deman

our of SBPvt. Ltd

our Thousft / Pay Ordm the last dany sched

vour of Staunagadh. ct amount in

al bill amounto 26.07.2

procuremen

y 03.00 PM

ATURE OF

ahijwani &BI Empanelwork.

rchitect ar

ks of Sarda Junagadh

Days from der.

osited alongnd Draft /SBI Infra . and

and only) der (Valid fdate of submduled Natioate Bank

ncluding EM

nt including2018 at wnt news.

M

CONTRACT

& Associatlled contrac

re only ent

argadh

date of

g with TendSelf chequeManagemepayable

by meansfor a periodmission of t

onalized Baof India a

MD

g ISD. www.sbi.co

TOR

tes , ctors

titled

der e ofent

at

s of d of the ank and

o.in

Page 3: S BI INFRA M ANAGEM ENT SOL UTIONS PV T. LTD. STATE …...Vijay Sa 55,Sahy Near Sta AHMED can be do It shall be r l and finan alified. tractor sh the numb itions othe to be with IMS

19. The Part

a. Fb. Nc. Bd. Se. B

fea

f. B(R

Part B-

Both the Mention

10.

11.

12.

13.

14.

15.

16.

17.

18.

contractor A- Technic

Forwarding NIT cum draBill of quantSet of all draBanker cheqee (Non reft Ahmedab

Banker cheqRefundable

Financial b

e covers shned

Address abid (hard EMD & ApPrice Bid has to be sDate and Technical SBIIMS, address mNo.10 Date & submissioindicative Date & timonline indiDate & timauction Liquidated

Defects lia

Validity of

Value of In

shall submcal bid coveletter.

aft tender stities stampeawings stamque/ DD of fundable) fabad. que/ DD of e) favoring S

bid cover sh

hall be kept in

at which Tecopy) alo

pplication Fin sealed

submitted time of opebid & Price

Circle mentioned

time n of price bid.

me for opencative price

me for e-rev

d Damages

ability period

offer

nterim Certi

mit the tendeer shall con

tamped anded and signmped and sRs. 1,000/-

avoring SBI

Rs. 4,000/-State Bank

hall contain

in a large c

echnicalng withFees &d cover

CirSBThiAH

ening ofe Bid at

Officeat Sr.

27

foronline

No

ning of e bid.

NA

erse NA

0.5ma

d 12

90

ificate FulSuc

3 SE

er in two bidtain the foll

d signed onned on eacsigned. - (Rupees o Infra Mana

- (Rupees Fof India, pa

the Price b

cover and itPara

rcle Head &I Infra Manird Floor, S

HMEDABAD

7.07.2018 a

t applicable

A

A.

50% of conax. 5% of co

Months fro

days from

ll and Finccessful co

EAL & SIGNA

d system kelowing docu

n each papeh paper.

one thousaagement So

Four Thousayable at J

bid only.

t shall be s

& Vice Presiagement SBI, LHO, B

D-380001

at 03:30 PM

e

tract amouontract valuom the date

the date of

nal Paymeompletion of

ATURE OF

ept in sepauments:

er.

nd only) asolutions Pv

sand only) aJunagadh.

end to the a10

ident (Civil)Solutions Pvhadra, Lald

M

unt per weeue or final b of Virtual C

f opening of

nt Will bef Work.

CONTRACT

rate covers

s an applicat Ltd, payab

as EMD

address asab

), vt. Ltd. darwaja

eks subjectill value.Completion

f Price-bid

e Done af

TOR

s.

ation ble

s bove.

t to

fter

Page 4: S BI INFRA M ANAGEM ENT SOL UTIONS PV T. LTD. STATE …...Vijay Sa 55,Sahy Near Sta AHMED can be do It shall be r l and finan alified. tractor sh the numb itions othe to be with IMS

2

2

2

2

2

2

2

20. Tenders

News>. technicabe disqu

21. The conensuring

22. No condwill have

23. The SBIor in pashall be

24. Tenderssuch ten

25. In case opened

26. SBIIMS and no c Yours F For: Ar. VijayVijay Sa55,SahyNear Sta AHMED

s can be doIt shall be r

al and finanualified.

ntractor shg the numb

ditions othee to be with

IIMS reservrt without aentertained

s received wnders shall

the date oon the nex

has the rigcorrespond

aithfully,

y Sahijwani ahijwani & Ayadri Apartmadium CirclDABAD-380

ownloaded fresponsibili

ncial bid are

hall sign aer and seq

er than menhdrawn befo

ve their righassigning ad in this reg

without EMnot be allow

of opening t working d

ght to acceence shall

Associates,ment, le, Navrang0009

from the baity of the coe properly

nd stamp uence of al

ntioned in tore opening

hts to accepany reason(gard.

MD and Appwed to part

of tendersay at the sa

pt / reject abe entertai

gpura

4 SE

ank’s websiontractor tobound sepa

each pagll pages.

the tender g of the pric

pt or reject (s) for doin

plication Feticipate in th

s is declareame time.

any / all tenned in this

EAL & SIGNA

itewww.sb arrange anarately. Te

e of the t

will be conce-bid.

any or all thg so and n

ees shall bhe online pr

ed as a ho

nders withoregard.

ATURE OF

i.co.in(link)nd ensure tnders in loo

tender doc

nsidered, an

he tenders,no claim / c

be summaririce bidding

oliday, the

out assignin

CONTRACT

) <Procuremthat all pageose pages

cument the

nd if given

, either in wcorresponde

ily rejectedg process.

tenders wi

ng any rea

TOR

ment es of may

ereby

they

whole ence

and

ill be

sons

Page 5: S BI INFRA M ANAGEM ENT SOL UTIONS PV T. LTD. STATE …...Vijay Sa 55,Sahy Near Sta AHMED can be do It shall be r l and finan alified. tractor sh the numb itions othe to be with IMS

To, The CircCircle OSBI InfraAhmeda Dear Sir Having eto the wexaminethe requexecute attachedspecificatender, Conditiorespects

Descrip

Earnest

Percentadeducteto be retTime alWorks fdate ofhandinglater)to c I/We havamount Should Iagree thLtd.

cle Head & Office, a Managemabad- 38000

r,

examined tworks specied the site uisite inform

the worksd Schedulations, desthe Article

ons of Conts in accorda

ption of wo

t Money

age, if any,ed from Billstained llowed for from fourtef written over of thcommence

ve depositeas EarnestI / We fail tohat this sum

VP (Civil),

ment Solutio01.

the drawingified in the of the work

mation relas specified e of Quaign, drawin

es of Agretract and wance with s

ork

to be s and total a

completioeenth day order or e site (whi the work

ed a sum oft Money wito execute t

m shall be fo

FOR

ons Pvt. Ltd

gs, specificamemorand

ks specifiedting theretoin the said

antities anngs and insement, Sp

with such msuch conditi

MEMPBRofNof

amount 10Tva

n of theafter thedate of

chever is

4

f Rs.4,000/th the Statehe Contracorfeited by m

5 SE

RM TENDER

d.,

ation, desigdum hereind in the saido as affectd memorand in accostructions i

pecial Condmaterials as

ions so far

MORANDUMroposed Elranch,(006

Rs. 4,000.00f Demand D

Nationalizedf India and 0 % from Rotal 5% of calue includi45 days

/- (Four Thoe Bank of Inct when callme/us to SB

EAL & SIGNA

R

gn and schenafter set od memoranting the tenndum at thordance inn writing reditions, Sch

are providas they ma

M ectrical wo0064) Dist.0 - (Four TDraft / Pay d Bank draw

payable at Running Billcontract aming EMD &

ousand onndia which ied upon toBI Infra Ma

ATURE OF

edule of quout and havndum and hnder, I/We he rates men all respeferred to ihedule of

ded for by, ay be applic

rks of Sard.Junagadh

Thousand oOrder from

wn in favouJunagadh.s, subject t

mount or acInitial Secu

nly) of the is not to be do so I/ W

anagement

CONTRACT

uantities relaving visitedhaving acquhereby offeentioned in

pects with in conditionQuantities and in all o

cable.

dagadh

only) by mem any schedur of State B. to maximumctual Final Burity Depos

total tenderar any inter

We do herebSolutions P

TOR

ating and uired er to n the

the ns of

and other

eans duled Bank

m Bill it.

r rest.

by Pvt.

Page 6: S BI INFRA M ANAGEM ENT SOL UTIONS PV T. LTD. STATE …...Vijay Sa 55,Sahy Near Sta AHMED can be do It shall be r l and finan alified. tractor sh the numb itions othe to be with IMS

1

1) Our Bank

ii) The nam

ii) Name of

Or (Name o

(Certifie

Yours fa

Signatu

Signatur

i)

i

kers are: i)

mes of partn

f the partne

of person h

d true copy

aithfully,

ure of Contr

re and addr

ners of our

er of the firm

aving Powe

y of the Pow

ractors.

resses of W

firm are: i)

m Authorize

er of Attorn

wer of Attor

Witnesses

6 SE

ed to sign

ey to sign t

rney should

EAL & SIGNA

the Contrac

d be attache

ATURE OF

ct.)

ed)

CONTRACT

TOR

Page 7: S BI INFRA M ANAGEM ENT SOL UTIONS PV T. LTD. STATE …...Vijay Sa 55,Sahy Near Sta AHMED can be do It shall be r l and finan alified. tractor sh the numb itions othe to be with IMS

Articles of______Of IndiaAsst. GeRBO-4 (Bwhich e________called tthe othe WHEREABANK O The workdescribinArchitec ANDWHBUSINESSSpecificbehalf o AND WHset forthContraccorrespotill the areferred attachespecificarates thebecomethere un NOW IT 1. In co

mansaid descthe t

(On non-juof A

____________, a body, c

eneral ManBAO), 3rd Flexpressions ___________he “Contra

er part.

AS the BaF INDIA, REG

k, and has ng the wor

cts.

EREAS for thS OFFICE, ations and

of the partie

HEREAS theh herein andct, specificondences eaward of w to as “the

ed hereto, tation and erein set fore payable nder (herein

IS HEREBY A

onsiderationner set fortconditions

cribed in theerms and c

Audicial StamAgreement___________

corporate cnager (Admloor, Opp. shall incl(name & a

actor” whic

ank is dGIONAL BU

caused draks to be pre

he said, ELEJUNAGAD

the Schedes hereto.

e Contractod Schedule

cations etcexchanged

work, both e said condhe works shincluded inrth amountthere unde

nafter referr

AGREED AS

n of the sah in the sai execute ae said specconditions c

ARTICLES mp Paper of made ___________onstituted u

min), State Bahuddin Cude its su

address of cch expressio

desirous ofUSINESS OFF

awings, speepared by

ECTRIFICATIDH : ELEdule of item

or has agree of Items ac contained by or betletters includitions” , dhown uponn the scheting to the ser arrived ared to as “t

FOLLOWS

aid contracd condition

and complcifications acontained i

7 SE

OF AGREf Rs. 500/- this____

____________under the SBank Of In

College, Juuccessors acontractor)on shall inc

f executingFICE, JUNAG

ecifications,M/s.Vijay

ION WORK ECTRIFICATI

ms quantitie

eed to execand quantitd in the ween the pusive, (all o

details of wn the said ddule of itesum as therat or such othe said con

ct amount ns, the conlete the wo

and the schn the said c

EAL & SIGNA

EEMENT or as per la______________________State Bank Ondia, Regiounagadh heand assign)__________clude the s

g ELECTRIFGADH

, and schey Sahijwan

for STATE BION WORKes etc, have

cute upon,ties, Genertendered parties fromof which a

which are drawings anms and qurein arrivedother sum ntract amo

to be paitractor shaork shown

hedule of iteconditions

ATURE OF

atest Govt. _________________ betweOf India Aconal Adminereinafter c

ns of the ____________successors

FICATION W

edule of qni & Assoc

BANK OF INK Terms e been sig

, subject toral & Speciadocument

m the submre collectiv

described ind/or descruantities at d at or such

as shall beount”)

d at the tiall upon and

in the saidems and qu

CONTRACT

Rules) _______ een State B

ct and havinnistrative Ofcalled the one part

____ hereinand assign

WORK for S

uantities etciates , the

NDIA, REGIO & Conditned by an

o the condial Conditiots including

mission of tevely hereinn the scheribed in the the respec other sum

ecome pay

ime and ind subject tod drawings uantities, a

TOR

day Bank ng its ffice, Bank and

after ns of

STATE

tc. e

ONAL tions, d on

itions ns of g all

ender after

edule said ctive shall

yable

n the o the and s per

Page 8: S BI INFRA M ANAGEM ENT SOL UTIONS PV T. LTD. STATE …...Vijay Sa 55,Sahy Near Sta AHMED can be do It shall be r l and finan alified. tractor sh the numb itions othe to be with IMS

2. The B

shall cond

3. The A

Assopurpbe nsubsedisreexpre

4. The s

TendQuathereconsrespeagre

The pcontcarryREGI

5. As p

quanand

6. The Bworkcarrie

7. (a) T

wwabt

Bank shall p become ditions.

Architects iociates a

pose of this nominated equently agard or ovessed in wr

said generder, specificntities), Core to, contasidered as ectively ab

eements on

plans, agretract. This y out the wONAL BUSIN

per the scontities at theProbable q

Bank reservk by addinged out with

The Contrawhich will whether broand which by the specthe contrac

pay the Copayable,

in the said rchitects, contract fo for that p

appointed ver rule aniting by the

ral conditiocations, Gurresponden

ained in the forming p

bide by, su their part r

eements ancontract is

work in respeNESS OFFIC

ope describe rates con

quantities o

ves to itself g to or om

hout prejud

actors repre enable thought by th will ensure cifications act work.

ontractor that the tim

condition In the eveor whatevepurpose byas Archite

ny previouse Architects

on, Special uarantee, Innces, Lettere tenderedpart of thbmit themrespectively

d documes neither a ect of ELEC

CE, JUNAGA

bed and tontained in tr as provide

the rights omitting any

ice to this c

esent that hem to enshe contrac that the cand will sup

8 SE

he said conme and in

shall meanent of their er reason, sy the Bankects unders decisions s for the tim

condition,nstruction tor of Accept documen

his Agreemselves to thy in the said

ents mentionfixed Lump

CTRIFICATIOADH

o be paid he Schedued in the sa

of altering items of w

contract.

they havesure prope

ctors or suppcontractor wpervise the d

EAL & SIGNA

ntract amo the mann

n the said Mceasing to

such other k, providedr this cont

or approvme being.

, technical o Tenderertance, Agrets/said con

ment, and he said cod condition

ned hereinp Sum conN WORK fo

for accordle of Rates

aid conditio

the specifiwork or hav

e experienr qualitplied by thewill carry ouday to day

ATURE OF

ount, or sucner specifie

M/s. Vijayo be the Ar

person or d always tract shall

vals or dire

drawings, r’s Price Beements anditions sha

the partieonditions ans contained

shall form ntract but isr STATE BAN

ding to ac and / or n

on.

cations andving portion

nce and cty check one Bank to tut proper te

y working an

CONTRACT

ch other sumed in the

y Sahijwarchitects fopersons as that no pebe entitlections give

Notice Invid (Schedund Append

all be read es hereto nd performd therein.

the basis os a contracNK OF INDIA

ctual measegotiated r

d nature ons of the s

ompetent n the matethe contracests as reqund executio

TOR

m as said

ni & r the shall erson d to

en or

viting ule of dices and shall

m the

of this ct to A. AT

sured rates

f the ame

staff erials, ctors, uired on of

Page 9: S BI INFRA M ANAGEM ENT SOL UTIONS PV T. LTD. STATE …...Vijay Sa 55,Sahy Near Sta AHMED can be do It shall be r l and finan alified. tractor sh the numb itions othe to be with IMS

(b)

(c)

(d)

8. Time s

agreposseOrdeentireexten

1. A

B

2. Aa

3. Th

u IN WITNEthese Prthe Con IN WITNauthorizhereunttwo dupabove w

If the contdifficulty into report tsuspend thcontractor The contrabut will pobligationsclauses (a)

The contrathe entire wthe terms contract q

shall be coees to comession of ther as provide work witnsion of tim

All paymenusiness Offi

Any disputeaccordance

he contentnderstood

ESS WHEREOresents andntractor is a

ESS WHERzed officiato and theplicates hewritten (If c

tractors han supervisionthe matter hat portion rs will abide

actors are aperiodicallys under th) and (b) ab

actors covework on coand cond

quality and

onsidered ammence thhe site or froded for in ththin 6 (six)

me.

ts by the Bice, RBO-4,

e arising ue with the s

ts of this a by the con

OF the Band two duplic

Partnership

EOF the Baal and the e said dupereof to becontracto

ave any don of the da in writing of the work

e by the dire

aware thaty supervisee instructiobove.

enant and wompletion wditions condescription

as the essenhe work onom the fourhe said con months s

Bank unde JUNAGAD

nder this Atipulation la

agreement ntractor.

nk and the cates hereop Firm or an

ank has secontractolicates have executer is a Com

9 SE

oubt abouty to day wforthwith t

k about whections give

t the Bank e and theons given

warrant thawill be in cotained in

n.

nce of this n the day teenth daynditions whsubject nev

r this contrH

Agreementaid down in

have bee

Contractoof the day an Individual

et its handsor has causve /has ca

ed on its bempany).

EAL & SIGNA

t the qualitwork it shall bto the Banhich difficulten by the B

will not give contracto

to him pe

at completeonformity wthe said c

contract a on which y after the dhichever is lvertheless

ract will be

t shall be n the gener

en read by

or have setand year fi).

s to these sed its comaused thesehalf, the d

ATURE OF

ty of the mbe duty of k and for ty is experie

Bank.

ve day-to-dor has to

eriodically a

ed items of with the speconditions

and the con he is instr

day of issueater and toto the pro

e made on

referred toral conditio

y the contr

their resperst herein a

presents thmmon sease presentday and y

CONTRACT

materials orthe contrathe time benced, and

day superv perform and under

work as weecifications and will b

ntractor heructed to

e of formal Wo completeovisions for

nly at Regi

o arbitratioons of contr

ractor and

ective handabove writte

hrough its al to be affts and the year first he

TOR

r any ctors

being d the

vision their

r sub

ell as and

be of

ereby take Work e the r the

ional

on in ract.

fully

ds to en (If

duly fixed said erein

Page 10: S BI INFRA M ANAGEM ENT SOL UTIONS PV T. LTD. STATE …...Vijay Sa 55,Sahy Near Sta AHMED can be do It shall be r l and finan alified. tractor sh the numb itions othe to be with IMS

Signatur________SIGNED By the hand DesIn prese 1. Address 2. Address (Witness

SContracor by du (1) Address (2) Address (Witness THE COpursuan_______Clause SIGNED (1) _____ (2) _____ 1) _Address (2)

re clause: ____________AND DELIV

hand of Shrsignation) nce of ____

_____ ______

_______

______s)

IGNED ANctor is a Pauly authori

__________ __________

__________ __________

s)

OMMON Snt to the ____ ( If should tal

AND DELIV____________

____________

___________ __________

__________

_____ ERED

ri --------------

____________

________________________

___________

___________

ND DELIVartnership ized perso

________________________

________________________

SEAL OF resolutiothe Cont

ly with the

ERED by ___________

___________

________________________

____________

-----Asst. Ge

___________

______________________

___________

____________

VERED by Firm or an

on on beha

__________ __________

__________ __________

_________n By Boa

tractor sige sealing cl

____________

____________

_________ __________

__________

10 SE

eneral Man

___________

________________________

____________

___________

_______ individua

alf of all pa

_________ard of Di

gns under lause in th

_

_

EAL & SIGN

ager , of St

______

_______ ______

______

_________

___________l , should b

artners)

__________rectors atits comm

he Articles

NATURE OF

tate Bank O

__________be signed

___was het the Mee

mon seal, of Associa

CONTRAC

Of India (N

________(If by all part

ereinto affeting heldthe Signa

ation)

TOR

ame

the tners

fixed d on ature

Page 11: S BI INFRA M ANAGEM ENT SOL UTIONS PV T. LTD. STATE …...Vijay Sa 55,Sahy Near Sta AHMED can be do It shall be r l and finan alified. tractor sh the numb itions othe to be with IMS

Address (Witness

S

Contracor Indiv (1) Address (2) Address (Witness

__________s)

IGNED ANctor has siidual)

__________ __________

__________ __________

s)

___________

ND DELIVgned by t

_______________________

_______________________

___________

VERED by the hand o

__________ ___________

__________ ___________

11 SE

_______of Power o

EAL & SIGN

___________of Attorney

NATURE OF

__________y , whethe

CONTRAC

________(If er a Comp

TOR

the pany

Page 12: S BI INFRA M ANAGEM ENT SOL UTIONS PV T. LTD. STATE …...Vijay Sa 55,Sahy Near Sta AHMED can be do It shall be r l and finan alified. tractor sh the numb itions othe to be with IMS

1.0

1.1

2.0

2.1

2.2

2.3

2.4

INSTRU Scope o Sealed Tand behBranch ( Site and The prop

Tender The wotender c

InstructGeneralSpecial AdditionDrawingPriced b The aboone anoorder giv

a) Price Bid

b) Addition

c) Technic

d) Drawing

e) Special

f) General

g) Instruct Completthe web The tend

UCTIONS T

of work

Tenders ahalf of SBI /(0060064)

d its locatio

posed work

document

rk has to consisting o

tions to tenl conditioncondition

nal Specifigs bid A

ove documother but inven below; d

nal Specifica

al specifica

gs

conditions

conditions

tions to Ten

te set of tesite www.s

der docume

TO THE TE

are invited / SBIIMSPLDist. Junag

on

k is to be ca

ts

be carried of the follow

nderers ns of Contrs of Contraications

ents shall n case of a

ations

ations

of contract

of contract

nderers

nder documbi.co.in

ents are no

SECNDERERS

by M/s. ViL for the wogadh

arried out a

out strictlywing docum

ract act

be taken ambiguities

t

ments inclu

ot transferab

12 SE

CTION – 1S

jay Sahijwork of Propo

at Sardarga

y accordingents and th

as complemor discrepa

ding relativ

ble.

EAL & SIGN

wani & Assosed Electr

dh Branch

g to the cohe most wo

mentary anancies, sha

ve drawings

NATURE OF

sociates, Arical works

Dist. Junag

onditions strkmen like

d mutuallyall take pre

s can be do

CONTRAC

Ahmedabadfor Sardarg

gadh

tipulated inmanner.

explanatoecedence in

ownloaded

TOR

d for gadh

n the

ry of n the

from

Page 13: S BI INFRA M ANAGEM ENT SOL UTIONS PV T. LTD. STATE …...Vijay Sa 55,Sahy Near Sta AHMED can be do It shall be r l and finan alified. tractor sh the numb itions othe to be with IMS

3.0

3.1

4.0

4.1

4.2

4.3

4.4

4.5

5.0

Site Vis The teninformatand enterequestecommunlaw andregulatioof any o Earnest The tendThousaDays froBank dra EMD in accomp No inter EMD of EMD of

Initial S The sucvalue lewithin a 5.1 Secu Total sein the fobe dedurespectiv10% till T50% of tcertifyingthe defe

sit:

derer musttion and daer into a coed satisfy nication facd order sons etc; Thr all the fac

t Money:

derers are nd only)

om the lastawn in favo

any other anied by th

est will be p

unsuccess

successful

ecurity Dep

ccessful teness EMD by

period of 7

urity Depo

curity deporm of Initial

ucted from tve running Total Secuthe Total Seg the virtua

ects liability

t obtain himta that mayontract for himself re

cilities, the cituation, ce tenderer

ctors while s

requested by means

t date of suour of Stat

form other he EMD in a

paid on the

sful tendere

tenderer w

posit:

nderer will hy means o

7 days of ac

osit:

osit shall bel Security Dthe runningaccount birity Depositecurity Dep

al completioperiod as s

mself on hiy be requirethe satisfac

egarding thcharacter q

climatic conwill be fully

submitting

to submit ts of Demaubmission ote Bank of

than as spaccordance

e EMD.

r will be ref

will be retain

have to subof DD drawcceptance o

e 5% of conDeposit (ISD account bill i.e., dedut (TSD) incposit shall bon. The balaspecified in

13 SE

is own resped for the pctory perfo

he availabilquality and nditions loy responsibhis tender.

he Earnestand Draft/Pof the tendIndia and

pecified aboe with claus

funded with

ned as a pa

bmit a sum wn in favourof tender.

ntract valueD) which incill of the woction from eluding ISD

be paid to thance 50% w the contra

EAL & SIGN

ponsibility aurpose of frmance of lity of watquantity of

ocal authorble for cons

t Money of Pay Order(er) from anpayable at

ove will note 4.1 above

hin 30 days

art of securi

equivalentr of SBIIMS

. Out of thiscludes the

ork at the raeach runninreaches to he contractwould be pact.

NATURE OF

and his owfilling this tethe work. Ter, power,f the materrities requsidering the

Rs 4,000/-(Valid for any schedulet Junagadh

t be accepte shall be r

of award o

ity deposit.

t to 2% of aS Payable

s 2% of conEMD. Bala

ate of 10% ong bill acco5% of cont on the basaid to the co

CONTRAC

wn expenseender documThe tender transport ials, labourirement, t

e financial e

- (Rupees Fa period of ed Nationah.

ted. Tenderejected.

of Contract.

accepted teat Ahmeda

ntract valuence 3% shaof the

ount will betract value.sis of architontractors a

TOR

es all ment rer is

and r, the raffic

effect

Four f 180 alized

r not

ender abad

e is all

@ The ect’s after

Page 14: S BI INFRA M ANAGEM ENT SOL UTIONS PV T. LTD. STATE …...Vijay Sa 55,Sahy Near Sta AHMED can be do It shall be r l and finan alified. tractor sh the numb itions othe to be with IMS

5.2 Add In case project cequivaleof contraFDR / Bof work work in at libertyits sole d No interthe defHoweve

5.3 SignThe sucagreemeof intimaof the tesuccessnot. 6.0 ComTime isaccordaof work. 7.0 ValidTendersdate of eor makeprejudic 8.0 LiquThe liqucontract 9.0 Rate 9.0.1 In The ten

ditional Sec

L-1 biddecost), the bent to differact. Such A

Bank’s guaraASD will btime or as y to recoverdiscretion.

est shall beect liability er, interest

ning of conccessful teent and conation of accenders by tsful tendere

mpletion Pes essence nce with th

dity of tends shall remae-reverse a

es modificate to any oth

uidated Damuidated damt value.

e and price

case of itederers sha

curity Depo

r quotes aank may asence of est

ASD could antee as pe

be returned per tender r the dues f

e paid to theperiod of oon FDR fo

ntract Docuenderer shanditions of ceptance ofthe Bank wer whether

eriod: of the co

he terms of

der: ain valid a

auction. If thtions in his/her right or

mages: mages sha

es:

em rate tenall quote th

osit:

bnormally sk such bidtimated cosbe in the joer format ato the conspecificatio

from ASD o

e amount reone year fror additional

uments: all be boucontract attf the tender

will constitutsuch form

ontract. Thcontract wi

nd open fohe tenderer/her originaremedy the

all be 0.50%

nder: eir rates fo

14 SE

low rates dder to depost vis-à-visoint name opproved by

ntractor. In on or leaveor to forfeit

etained by om the datel security de

und to imptached herr by the Bate a bindinal agreeme

he work shithin a perio

or acceptanr withdraws

al offer whice Bank sha

% per wee

or individua

EAL & SIGN

(i.e. 10% oosit additioL-1quoted

of the Banky the Bank. case contra

e the job incsuch ASD

the Bank a virtual comeposit will b

plement theewith within

ank. Howevg agreemeent is subs

hould be cod of 45 da

nce for a pes his/her offch are not aall be at libe

ek subject

al items bot

NATURE OF

or more, bnal securityamount fo

k and biddeOn succes

actor fails tcomplete, tas the case

as Security mpletion cerbe received

e contract n 15 days f

ver, the writent betweensequently e

completed ays from the

eriod of 90fer during tacceptable erty forfeit th

to a maxi

th in words

CONTRAC

elow estimy deposit (Ar due fulfillm

er in the forssful completo completethe bank we may be w

Deposit forrtificate (VC

d by the bid

by signingfrom the retten acceptan the Bankentered in t

in all rese date of aw

0 days fromhe value peto Bank withe EMD.

mum of 5%

s and figur

TOR

mated ASD) ment rm of etion e the ill be

within

r CC). der.

g an ceipt ance

k and to or

spect ward

m the eriod thout

% of

re. In

Page 15: S BI INFRA M ANAGEM ENT SOL UTIONS PV T. LTD. STATE …...Vijay Sa 55,Sahy Near Sta AHMED can be do It shall be r l and finan alified. tractor sh the numb itions othe to be with IMS

case of in wordspaid for the requamount will goveThe tencase thenot be cThe tenchangedwould beThe tenddiscrepaSBIIMS Each pawriting sEach pa The ratelabours

The SBIentrust project wclaim / c

SIGNAT

discrepancs will prevathat item w

uisite total calculated

ern and thederers neee tenderersconsidered dderers sho

d the tendee paid accoderer shouancy is obs

age of the shall be dulyage shall be

e quoted ss, taxes etc

IIMS reservthe work inwithin its scorresponde

TURE OF T

cy between il. If no rate

when it is exis given. Infrom multi amount wi

ed not quots quote theduring execould not chers would ordingly. uld not chanerved he s

BOQ shall y attested be totaled an

shall be fic. except G

ve their righn phases o

sole discretence shall b

THE CONTR

the rate que is quotedxecuted. Th

n case of dplication ofill be correcte their rateir rates for cution. hange the be evaluat

nge or modhould imme

be signedby him. nd the grand

rm and shG.S.T, whic

hts to accepor may drotion withoutbe entertain

RACTOR W

15 SE

uoted in wo for a partiche amount

discrepancyf unit rate acted. es for whicsuch items

units as spted as per

dify or deleediately bri

by the aut

d total shall

hall includeh shall be

pt any tendop the partt assigningned in this r

WITH SEAL

EAL & SIGN

ords and figcular item tof each ite

y between tand the qu

ch no quans those rate

pecified in the origina

ete the descng to the k

thorized pe

l be given.

e all costspayable /

ders, either scope of

g any reasoregard.

L

NATURE OF

ures, the uthe contrac

em shall bethe unit ratantity the u

tities have es will be i

the tenderal unit and

cription of knowledge o

erson and c

s, allowancreimburse

in whole owork at an

on(s) for do

CONTRAC

nit rate quactor shall noe calculatedte and theunit rate qu

been givegnored and

r. If any und the contra

the item. Ifof the Arch

cutting or

ces, materd at actual

r in part orny stage ofoing so an

TOR

antity ot be d and

total uoted

n. In d will

nit is actor

f any itect/

over

rials, l

may f the d no

Page 16: S BI INFRA M ANAGEM ENT SOL UTIONS PV T. LTD. STATE …...Vijay Sa 55,Sahy Near Sta AHMED can be do It shall be r l and finan alified. tractor sh the numb itions othe to be with IMS

1.0 Def“Contracformal aand theconditiontime by to form o In the chave the 1.0.1 ‘SManageBhadra, success 1.0.2 ‘AArchitec 1.0.3 ‘Srepresencontract 1.0.4 ‘Tincorporindividuaindividua The exdescriptincludeskinds to the cont 1.0.5 ‘E 1.0.6 ‘DEngineeas may the entirthere tocontaine

finitions:- ct means thagreement e contractons, the spethe Architeone contrac

contract thee meaning

SBIIMS’ sement Serv

Laldarwajsors and as

Architects/ cts & Interio

Site Enginentative for tors.

The Contrarate not, unal or the cal or firms o

pression ‘wion in the “S

s materialsbe provide

tractor unde

Engineer’ s

Drawings’ ser and referbe issued bre work as o or deduced.

GENER

he documenexecuted b

or, togetherecificationsects / Bank ct and shall

e following hereby resp

hall meanices Providja, Ahmedsigns.

Consultanor Designers

eer’ shall mday-to-day

actor’ shadertaking tcomposingof company

works’ or Scope of w, apparatus

ed, the obliger the contr

hall mean t

shall mean r red to in tby the Engstipulated itions there

RAL COND

nts formingbetween SBr with the , designs, and all the

l be comple

expressionpectively as

n SBI Infrder-PMS) habad-3800

nts’ shall ms, Ahmeda

ean an Eny supervis

ll mean the works a the firm

y.

‘work’ shawork” and/ors, equipmegations of thract.

the represe

the drawingthe specificineer fromn the letter

e from as

16 SE

DITIONS OF

g the tenderBI Infra Ma

documentdrawings a

ese documeementary to

ns shall, unssigned to t

ra Managaving its C01 and in

mean M/sbad.

gineer appsion of wo

the individnd shall incor compan

all mean tr to be execent, temporhe contract

entative of th

gs preparedcations andtime to tim

r of acceptamay be m

EAL & SIGN

F CONTRA

r and the anagement s referred and instrucents taken o one anoth

nless the cothem.

ement Soircle Officecludes the

s Vijay Sa

ointed by tork and to

ual or firmclude legalny and the

the permacuted in accrary suppoor hereund

he Architec

d by the Ard any modife Contract

ance of tenmade under

NATURE OF

ACT

cceptance Solutions Pthere in i

ctions issuetogether sh

her.

ontext othe

olutions Pv at Third F

e client’s r

ahijwani &

he SBIIMSgive instr

m or compersonal re

e permitted

anent or tecordance w

orts, fittingser and wor

ct/consultan

rchitects anfications ofvalue shalder subjectr the provid

CONTRAC

thereof andPvt. Ltd. (cincluding ted from timhall be dee

erwise requ

vt. Ltd.(Prloor, SBI, Lrepresentat

& Associa

S at site as ructions to

mpany wheepresentativd assignee

emporary with the cons and thingrk to be don

nt.

nd issued byf such drawl mean valut such addide herein

TOR

d the lient) hese

me to emed

uires,

roject LHO, tives,

ates,

their o the

ether ve of

es of

work ntract gs of ne by

y the wings ue of tions after

Page 17: S BI INFRA M ANAGEM ENT SOL UTIONS PV T. LTD. STATE …...Vijay Sa 55,Sahy Near Sta AHMED can be do It shall be r l and finan alified. tractor sh the numb itions othe to be with IMS

1.0.7 SmodificaArchitec 1.0.8 “1.0.9 “1.0.10 respectiv 1.1.11 “SProject, 1.1.12 Tto as JPissue insArchitecexecutio i) Vice Pii) SBIIMiii) Conce CLAUSE1.0 TotaTotal SeRetentio

1.1 EarnThe tendform of on any Sin the unsuccetaken whis tendacceptaenter intfails to c 1.2 InitiaThe amform of deposite

Specificationations therct/Consultan

“Month” me“Week” me“Day” meavely.

SBIIMS’s Eas nomina

The followinPC) for assstructions o

cts Site Enon of the pro

President –MS Engineeerned partn

E al Security ecurity depoon Money

nest Moneyderer shall Demand drScheduled required fo

essful tendeithout intereder at anynce by the to a formal commence

al Securityount of ISDDD/Fixed

ed within 15

ns’ shall mreof as mnt.

eans calendans seven ans a cale

Engineer” sted by the C

ng shall conessing andor directionsgineer / Poject.

– Circle Heaer (Civil andner of the A

Deposit osit compris

y Deposit-furnish EM

raft or bankBank. No torm. No inerer shall beest. The EM

y time the SBIIMS oragreemen

the comme

y Deposit (D shall be 2Deposit Re5 days from

mean the may time

dar month.consecutiv

endar day

shall meanCircle Head

nstitute the d reviewing s from timeMC and o

ad of SBIIMd Electrical)Architects an

se of Earne

MD of Rs. 4kers chequeender shallnterest shae refundedMD shall st

period whr after it is ant or fails toence the wo

lSD) 2% of acceeceipt (FDR

m the date o

17 SE

specificatioto time b

e days. beginning

The Civil/d and Vice

Joint Projethe progre

e to time forother consu

MS ) in-charge nd their Re

est Money D

4,000/- (Rue drawn in l be considall be paidsoon after

tand absoluhen he is accepted b

o pay the inork within th

epted valueR) drawn oof acceptan

EAL & SIGN

ons referrebe furnishe

and endin

/Electrical EPresident,

ect Commitess of the wr being obsultants / co

of the Projesident Arch

Deposit, Ini

upees Foufavour of Sered unlessd on this r the decisioutely forfeitrequired t

by the SBIIMnitial securihe stipulate

e of tender on any schece of tende

NATURE OF

ed to in thed or app

g at 00 H

Engineer inSBIIMS, Ah

ttee (hereinwork on theserved and ontractors e

ect hitect Memb

tial security

r ThousanSBI payables the EMD EMD. The

on to awardted if the teto keep hiMS , the coty deposit a

ed time.

r including teduled Baner.

CONTRAC

he tender proved by

rs and 24

n-charge ofhmedabad

n under refee project anfollowed by

engaged in

ber.

y deposit an

nd only) ine at Junagais so depoe EMD ofd the contraenderer revis tender oontractor faas stipulate

the EMD innk and sha

TOR

and the

Hrs

f the

erred nd to y the n the

nd

n the adh., sited f the act is okes open ils to ed or

n the all be

Page 18: S BI INFRA M ANAGEM ENT SOL UTIONS PV T. LTD. STATE …...Vijay Sa 55,Sahy Near Sta AHMED can be do It shall be r l and finan alified. tractor sh the numb itions othe to be with IMS

1.3 ADDIn case project cequivaleof contraFDR / Bof work work in at libertyits sole d No interdefect liHoweve 1.4 ReteBesidesmoney svalue ofdeposit the concontractArchitecthe contprovidedcondition 2.0 LangThe lang 3.0 ErroIn casedimensiofollowing

i) Betwebe adop

ii) Betwecorrespo

DITIONAL SL-1 bidde

cost), the bent to differeact. Such A

Bank’s guaraASD will btime or as y to recoverdiscretion.

est shall beiability peri

er, interest o

ention Mon the SD asshall be def work donei.e. ISD plutract valuetor withoutct/consultantractors withd the contrans of contra

guage: guage in wh

ors, omissie of errorsons on theg order sha

een scaled pted.

een the wronding one

SECURITYr quotes aank may asence of est

ASD could antee as pe

be returned per tender r the dues f

e paid to theiod of one on FDR for

ney: deposited

educted frome by the conus EMD plue. The 50% any inter

nt. The balahout interesactor has sact includin

hich the co

ions and ds, omissione drawings

all apply.

and writte

ritten or shin the spec

Y DEPOSITbnormallysk such bidtimated cosbe in the joer format ato the conspecificatiofrom ASD o

e amount ryear fromadditional s

by the conm the runnntractor andus Retentio% of the torest on issance 50% ost within fiftsatisfactorilyg site clear

ntract docu

iscrepancns and/ os or betwe

n dimensio

hown descrcification th

18 SE

/ PERFORlow rates

dder to depost vis-à-vis oint name opproved by

ntractor. In on or leaveor to forfeit

etained by the date security de

ntractor in thing accound claimed i

on Money sotal securitsue of Virof the total teen days ay attended rance.

uments sha

ies: r disagree

een the dr

on (or desc

ription or dhe former sh

EAL & SIGN

RMANCE G(i.e. 10% oosit additioL-1 quotedof the Banky the Bank. case contra the job in such ASD

the Bank avirtual composit will be

he above snt bill at then each bill

shall both toty deposit rtual Compsecurity de

after the ento all defec

ll be drawn

ement betwrawings an

cription) on

dimensions hall be take

NATURE OF

GUARANTEor more, bnal security amount fo

k and biddeOn succes

actor fails tcomplete, tas the case

as Security mpletion cee received

said mannee rate of 10provided thogether noshall be rpletion cereposit shall d of defectcts in acco

shall be in

ween writted specifica

a drawing,

in the draen as correc

CONTRAC

EE elow estimy deposit (A

or due fulfillmer in the forssful completo completethe bank we may be w

Deposit forertificate (Vby the bidd

r, the Rete0% of the ghe total sect exceed 5efunded tortificate bybe refunde

s liability perdance with

n English.

en and scations etc.,

, the latter

awings andct.

TOR

mated ASD) ment rm of etion e the

will be within

r the VCC). der.

ntion gross curity % of

o the y the ed to eriod h the

caled , the

shall

d the

Page 19: S BI INFRA M ANAGEM ENT SOL UTIONS PV T. LTD. STATE …...Vijay Sa 55,Sahy Near Sta AHMED can be do It shall be r l and finan alified. tractor sh the numb itions othe to be with IMS

iii) Betweof quant

a) In casshall pre

b) Betwetaken as 4.0 ScoThe constrictly aBank to the direinstructioreferencmodificasubstitutand/or sContractexecutioengaged 5.0 i) LeWithin tdirectly contractper the between ii) ContrOn recesuccessthere of 6.0 OwnAll drawArchitecother wo 7.0 DetaThe SBadditionthe wordocume

een writtentities of the

se of differevail. een the dups correct.

pe of Workntractor shaaccordance

be commuctions of thons, detailces to as Aation of the tion work. Aspecificationtor and any

on of any wd the re upo

etter of Acche validity or through tor as giventerms of th

n the SBIIM

ract Agreeeipt of intimsful tendere

shall sign a

nership of wings, specict / consultaork.

ailed drawiIIMS throual instructiork. All sucnts, true de

descriptionsame item

rence betw

plicate / su

k: all carryout

e with this cunicated thhe SBIIMSls directionArchitect’s design, qu

Any discrepns. The remy substitutiowork execuon.

ceptance: period of tthe archite

n in the tendhe tender.

MS and the c

ment: mation of ther shall be an agreeme

drawings: fications anants are th

ings and ingh its arch

ons by meach drawingevelopment

n of the ite, the forme

een rates w

bsequent c

t completecontract anrough the a

S from timens and ex

/ consultauality or quapancy in thmoval fromon of any outed by him

the tender ect by regisder to enterThe letter contractor.

he acceptabound to

ent in a non

nd copies thhe propertie

nstructionshitects / coans of drawgs and ints thereof a

19 SE

em in the spr shall be a

written in f

copies of th

and mainnd with the architect/co

e to time isxplanationsant’s instrucantity of ane drawingsthe site of

other materm. The dism

the SBIIMstered post r into a Conof accepta

ance of tenimplementn-judicial st

hereof furnies of the S

s: onsultants sings or othe

nstructions and reasona

EAL & SIGN

pecificationadopted:

figures and

he tender, t

tain the sadirections

onsultant. Tssue furthe which arctions in ry work or t

s or betweef any materrials therefomissal from

S shall issor otherwis

ntract for thance shall

nder from tthe contraamp paper

ished by thSBIIMS The

shall furniserwise neceshall be

ably inferab

NATURE OF

ns and desc

words, the

he original

aid work inof and to

The architeer drawingsre here afregard to the addition

en BOQ anrial broughtore the remm the work

sue a letterse depositie executionconstitute

the SBIIMSact and withr of appropr

e SBIIMS /ey are not

sh with reaessary for tconsistent

ble there.

CONTRAC

criptions in

e rate in w

tender sha

n every resthe satisfact/consulta

s and / or wfter collecthe variatio

n or omissiond / or drawt thereon by

moval and/ok of any pe

r of acceptang at the on of the woa bind con

S /Architecthin fifteenriate value.

/ SBI througto be use

sonable prthe executiot with con

TOR

bills

words

all be

spect ction

ant at write tively on or on or wings y the or re- erson

ance of the rk as

ntract

t the days

gh its d on

roper on of ntract

Page 20: S BI INFRA M ANAGEM ENT SOL UTIONS PV T. LTD. STATE …...Vijay Sa 55,Sahy Near Sta AHMED can be do It shall be r l and finan alified. tractor sh the numb itions othe to be with IMS

The wodetailed various through 7(a) CopTwo cophanded

8.0 LiquIf the coto compcontractof delayunder ththe ratecontract 9.0 MateUnless labour, wrequiredspecifiedquality. his empin the wunsatisfaimmedia 10.0 PerPermits contractregulatioobservenotify thcontractmeet allarising t 11.0 SetThe consetting oalignme

rk shall beprogramm

activities othe archite

pies of agrpies of agrover to the

uidated damontractor faiplete the woted or exten, he may b

he law to the of 0.50%t value.

erials, Appor otherwiswater, pow

d for the sad all materThe contraloyees andwork assigactory by tately.

rmits, Lawand licens

tor at his owons, laws, s any discrhe SBIIMStor perform the costs here from.

tting out Wntractor shaout of the snt of all pa

e executedme schedulon receipt

ect/consulta

reement: reement due contractor

mages: ils to maintaork and clended date e called up

he SBIIMS o of the co

pliances anse specifie

wer, tools, etisfactory eials shall b

actor shall ad shall not egned to hithe SBIIMS

ws and Regses requirewn expensand ordinarepancy be

S in writings any act, arising the

Work: all set out tame and fo

arts thereof

d in confore indicatinof the wor

ant

uly signed rs.

ain the requear the site or complet

pon withouton account

ontract valu

nd Employd the contequipment execution ae new andat all times employ on m. Workm

S /Architect/

gulations:d for the ees. The coances rulesetween the g under inwhich is a

e reform an

the work anor the corref and get it

20 SE

rmity thereg therein trk order an

by both the

uired progrincluding v

ion, withouprejudice t

t of such brue which s

yees: tractor shatransportatnd complet both workenforce stthe work a

man whose / consultan

execution oontractor shs, applicabdrawings a

ntimation oagainst thed shall inde

nd shall beectness of tt approved

EAL & SIGN

with andthe date ond submit

e parties w

ress in termvacating tht justificatioto any othereach to paubject to a

ll provide ation and antion of the

kmanship arict disciplin

any unfit pework or

nt he shall

of the workhall give noble to the cand specifiof the Arce law, rulesemnify the

e responsibhe positionby the arc

NATURE OF

the contraf start andthe same

with the dra

ms of clauseeir office o

on in suppor right of re

ay a liquidata maximum

and pay fony other fawork. Unlend materiane and goorson or anybehavior ibe remove

k shall be ootices and ccontract. Ifcations, hehitect/ Con

s and regulSBIIMS an

le for the tns, levels, dchitect / co

CONTRAC

actor prepad completio

to the SB

awings sha

e 6.0 of GOon or beforeort of the caemedy avaited damage

m of 5% of

or all mateacilities thatss or otherls shall be

od order amyone not sks found to

ed from the

obtained bycomply withf the contrae shall promnsultant. Iflations heny legal ac

rue and pedimensions,onsultant be

TOR

are a on of BIIMS

all be

OC or e the ause lable es at f the

rials, t are rwise best

mong killed o be e site

y the h the actor mptly f the shall tions

erfect , and efore

Page 21: S BI INFRA M ANAGEM ENT SOL UTIONS PV T. LTD. STATE …...Vijay Sa 55,Sahy Near Sta AHMED can be do It shall be r l and finan alified. tractor sh the numb itions othe to be with IMS

proceedprogressarchitectexpense 12.0 ProThe condamagewith conbeyond He shalcontractworks alaws andor adjacclause aSBIIMS 13.0 InsThe SBIhave frewhere mevery fainspectiounless a/Consultat any tialso be Vigilanc 14.0 AssThe whonot direcany partthrough responsprogress 15.0 QuAll matecontractfrom timmanufac

ding with thes of the wot / consulta

es rectify su

otection ofntractor shae and shall ntract. He shis control

l take adeqtor shall taknd shall cod building ccent to his at his own cand the ori

spection ofIIMS / Archee access tmaterials aracility to theon and exauthorized btant exceptme. The prinspected

e commiss

signment aole of work ctly entrustt or share t

the Archibility of ths.

uality of maerials and wt and in ac

me to time cture or fa

e work. If arks, irrespe

ant the contuch error, if

f works andall continuoprotect the

shall make gand due to

quate careke all precaomply with codes to pre

place of wcost. The poiginal policy

f work: itect / Consto the workre lying or fe SBIIMS/Aamination by the SBIIt the represroposed wo

by the Chion.

and subletincluded in

t and engagthere of or itect and

he contracto

aterials, woworkmansh

ccordance wto such tes

abrication o

at any time ective of thetractor shaf so, require

d propertyously maine SBI’s progood any s

o his fault or

and stepsautions for all applicabevent accidwork. Theolicy may by may be lo

sultant or thk site and /from where

Architect/conand test oMS/ Archite

sentative ofork either duhief Technic

tting: n the contrage or indireinterest theno undert

or from ac

orkmanshihip shall bewith Architests as the or on the

21 SE

any error ine fact that tll be respo

ed to satisfa

y: ntain adequperties from

such damagr negligenc

s for protecsafety and ble provisio

dents, or injcontractor

be taken in odged with t

heir represe/ or to the they are onsultant anof the mateect f Public auturing its concal Examin

act shall beectly transfeerein withotaking sha

ctive & sup

p &Test: e best of thect/consultaarchitect/csite or an

EAL & SIGN

n this respethe layout hnsible for taction of the

uate protecm injury or ge, injury, loe.

ction of theprotections

ons of Govuries to pershall takejoint namesthe SBIIMS

entatives shworkshop,

obtained and their reprerials and

thorities shanstruction sner’s Organ

executed ter, assign out the writt

all relieve perintenden

he respectiant instructonsultant mn approved

NATURE OF

ect shall aphad been athe same ae SBIIMS

ction. of allloss arisingoss, except

e adjacent s of his emt. and locarsons or proinsurance

s of the conS

hall at all refactories, d the contrresentativeworkmansh

all be allowstage or its nization a w

the contracor underlet en consentthe contrace of the

ve kinds dtions and smay direct d testing l

CONTRAC

ppear duringpproved by

ad shall his

his work g in connet due to ca

properties. mployees onal bodies’ saoperty on acovers as

ntractor and

easonable tor other plractor shall s necessarhip. No pe

wed on the wcompletion

wing of Ce

tor and hethe contra

t of the SBactor fromwork durin

escribed inshall be suat the placaboratory.

TOR

g the y, the

own

from ction uses

The n the afety

about s per d the

imes aces give

ry for erson

work n can entral

shall act or BIIMS

the ng its

n the bject ce of

The

Page 22: S BI INFRA M ANAGEM ENT SOL UTIONS PV T. LTD. STATE …...Vijay Sa 55,Sahy Near Sta AHMED can be do It shall be r l and finan alified. tractor sh the numb itions othe to be with IMS

contractas are npart of required

ii) Sam All sampsuppliedused ardetailed Architechimself meet witin writingand instthe signsite officArchitecmight ocother dimanufacequipme

iii) CostThe cost provided

iv) CostIf any tesa) If soparticulaConsultaor the papprove

16.0 ObNo claimconsequaffectinginformatthe entir 17.0 CoThe con

tor shall pronormally reqwork befor

d by the arc

mples: ples of adeqd by the core of such

literature / ct/consultanthat the math the requg by the artallation of ed by the A

ce until the ct/Consultanccur in apprscrepanciecturers andent etc. sha

t of tests: of making

d for in the

ts of tests st is orderedo intended arized, or tant to be ca

place of maed laborator

btaining infm by the uent upon g the execution or the fre responsi

ntractor’s ntractor sha

ovide suchquired for ere in corpo

chitect/cons

quate numontractor w

nature thatest certific

nt before suaterial / eqirement of rchitect/conthe particu

Architect / Ccompletion

nt shall takroving the s

es inadequad such otheall be to the

any test shspecificatio

not providd by the Arcby or pro

though so arried out b

anufacture ory, then the

formation rcontractorfailure on

ution of the failure to obbility for the

superintenall give nece

assistanceexamining moration in tsultant.

bers, size, ithout any

at samples cate of the ubmitting thuipment fotender spe

nsultant theular materiaConsultant n of the woke reasonabsamples foracy in furn

er aspects c account of

hall be bornon or BOQ.

ded for: chitect/ Convided for ointended o

by an indepor fabricatio cost of suc

related to er for additi

his part towork nor a

btain correce fulfillment

ndence: essary pers

22 SE

e, instrumemeasuring the work f

shades & extra chargcannot be

same shallhe sample/

or which hecification. O

e contractoral / equipm

for identificork for inspeble time to r reasons onishing samcausing delf the contra

ne by the co

nsultant whor (in the or providedpendent peon of the mch test shal

execution ional paymo obtain coany misundct informati of contract

sonal supe

EAL & SIGN

ents, machisampling a

for testing

pattern as ges. If certe presented be provide/literature t is submitt

Only when r shall procent. The acation and ection / comapprove th

of its not memples of belay on the a

actor.

ontractor if

hich is eithecases abo

d for but oerson at anymaterials tell be borne

of work: ment shall orrect infor

derstandingon relieve ht.

rintendence

NATURE OF

nery, laborand testing as may be

per specifictain items pd or prepa

ed to the sahe contracting the samthe sample

ceed with thpproved sashall be ke

mparison ahe sample. eeting the sest qualitieapproval of

such test is

er ove mentioordered by y place othsted or anyby the cont

be entertarmation as

g or the obthim from a

e during th

CONTRAC

r, and mateany materie selected

cations shaproposed t

ared at theatisfaction otor shall sample / literaes are approhe procuremamples shaept on recoat any time.

Any delayspecificationes from vaf the mater

s intended b

oned) is nothe Archit

her than they Governmtractor.

ained whic to any mtaining incony risks or

e execution

TOR

erials ial or and

all be to be e site of the atisfy ature oved ment all by ord at The

y that ns or rious

rials /

by or

ot so ect /

e site ment /

ch is matter orrect

from

n the

Page 23: S BI INFRA M ANAGEM ENT SOL UTIONS PV T. LTD. STATE …...Vijay Sa 55,Sahy Near Sta AHMED can be do It shall be r l and finan alified. tractor sh the numb itions othe to be with IMS

works athe expi 18.0 QuThe bill preparedquantitieitem to amounts 19.0 WoThe Arcrequiresquantity calculatiSuch mdetail inmeasureentered sign all recordedrepresenattend omeasureAll authmeasure 20.0 VarNo alterthe contprogressor any. AConsultawithin seomit fromany worany devcontractthe valudeterminfrom the 21.0 ValNo claim

nd as long,ry of the de

uantities: of quantitied in accores. The rateany extent

s of prime c

orks to be chitect/Cons the work

represention and to f

measuremen the specifements witin the meathe pages

d in token ntatives. Noor neglect ements recorized extrement.

riations: ration, omistract. In cass of works Alteration inant shall gieven days m as the crk extra to oviation fromt drawings ue of suchned by the e contract v

luation of Vm for an ex

, thereafterefects liabili

es (BOQ) urdance wite quoted sht. The enticost and pro

measured:sultant mato be meatative to afurnish all pnts shall befications. Tth the contasurement b

of the meof his acceo over writior omit to

corded by thra work, om

ssion or varse the SBIIto make ann the kind oive notice tof giving s

case may bor make any

m any of thewithout pre

h extras, aArchitect /

alue, as the

Variationsxtra shall b

r, as the Arcty period, s

unless or oth the Indhall remainre amountovision sum

: ay from timsured and

assist the particulars oe taken in

The represetractor’s rebook. The ceasurementeptance. Alngs shall bo depute hhe represemissions a

riation ordeMS/ Architny alteratioor quality ofthereof in wsuch oral inbe in accordy alteratione provisionevious consalterations, / Consultane case may

: be allowed

23 SE

chitect/Constated heret

otherwise stian Standa valid for v

t paid undems, if any, s

me to timethe contraArchitect i

or to give alaccordanc

entative of epresentativcontractor ot book in wl the correce made inhis representative of thnd all varia

red in writinect / Consun in, or addf the materiwriting to thnstructions dance with

ns or additios of the cosent in writadditions

nt and the sybe.

unless it s

EAL & SIGN

nsultant mato.

tated shall ard Metho

variation of er Clause shall be exc

intimate tactor shall fin taking sll assistancce with thethe Architeve and theor his authowhich the mctions shalthe M bookentative to he Architecations mad

ng by the Aultant thinksditions to oials to be uhe contractthe contracsuch but t

ons to or omontract, stipting of the or omissiosame shall

shall have

NATURE OF

y consider

be deemedd of Measquantity ag19, 20 her

cluded.

to the conforthwith atsuch mease required

e Mode of ect / Consue measuremorized repremeasuremel be duly ak should the

take meact/consultande shall be

Architect/cos proper atr omission sed thereintor shall coct shall altethe contracmissions fropulations, sArchitect/

ons shall in be added

been exec

CONTRAC

necessary

d to have bsurements gainst indivreof as we

ntractor thattend or sesurements by any of thmeasurem

ultant shall ments shaesentativeents have battested by e contractoasurementsnt shall be e included

nsultant vitt any duringfrom the w

n, the Architonfirm in wrer to, add tctor shall noom the workspecificationConsultantn all casesto or dedu

cuted unde

TOR

until

been and

idual ell as

at he nd a and

hem. ments

take ll be shall been both

or not s the final. such

iates g the

works tect / riting o, or ot do ks or ns or t and s be ucted

r the

Page 24: S BI INFRA M ANAGEM ENT SOL UTIONS PV T. LTD. STATE …...Vijay Sa 55,Sahy Near Sta AHMED can be do It shall be r l and finan alified. tractor sh the numb itions othe to be with IMS

authoritymentionin accor (i) The nwhere sthe work(ii) Ratepriced B The net providedWorks aClause ‘ Where conditionremaininreceipt ointends claimed in his opWhere allowed stated tprovidedArchitecverificatiwhich th It is furtderived analysisequipmeoverhea 22.0 FinThe meamonths 23.0 VirOn succof the complet

y of the Ared. Any sudance with

net rates orsuch extra wk price heres for all item

BOQ.

prices of thd if omissioare carried o‘c’ hereund

the extra wns as aforeng items orof the letterto charge fand the Ar

pinion are reextra workday work phen in accd that in eitct/Consultanions to the

he work has

ther clarifiefrom the

s worked onent and waads and pro

nal measurasurement of the virtua

rtual Compcessful comSBIIMS, ted the satis

rchitect / Cuch extra is

the followi

r prices in twork is of sein. ms, wherev

he original tns do not vout, otherwer.

works are esaid or wr works arer of acceptfor such iterchitect/coneasonable k cannot bprices at thcordance wther case, nt) the worArchitect /c

s been exec

ed that for tender, the

n the ‘markastages etcofit. Such ite

rement: and valuatal completio

pletion Cermpletion of ehe contracsfaction of t

Consultant ws herein refeng provisio

he contractsimilar char

ver possible

tender shalvary the con

wise the pric

not of simhere the o

e carried ouance informms of work

nsultant shaand propere properly

he net rateswith the locvouchers srkman’s naconsultant acuted.

all such ae Contractket rate basc. plus 15%ems shall, n

ion in respeon of the w

rtificate (VCentire workctor shall the SBIIMS

24 SE

with the coerred to asns.

t shall deteracter and

e should be

l determinenditions undces for the s

milar charaomissions vut, then them the Archk, duly suppall fix such rr, based on

measureds stated in tcal day wospecifying tame and mat or before

authorizedor shall su

sis for mate% towards not be eligib

ect of the cwork.

CC): ks covered ensure tha

S:

EAL & SIGN

oncurrence s authorized

ermine the vexecuted u

derived ou

e the value der which asame shall

acter and/ovary the co contractoritect/ consuported by arate or pricethe market

d or valuedthe tender,

ork rates athe daily timmaterials ee the end of

extra itemubmit rateserial, labour

establishmble for esca

contract sha

by the contat the foll

NATURE OF

of the SBd extra and

valuation ofunder simila

ut of the rate

of the itemsany remainibe valued

or executedonditions unr shall withiultant of thenalysis of tes as in thet rate. d the cont of the BOnd wages me (and if mployed bf the week f

s where ras duly supr hire / runn

ment chargealation.

all be comp

tract to the owing wor

CONTRAC

BIIMS as hed shall be m

f the extra ar condition

es given in

s omitted, ng items ofunder sub-

d under sinder whichn 7 days oe rate whiche rate or r

e circumsta

tractor shaOQ or, if no

for the disrequired by

be deliveredfollowing th

ates cannopported byning chargees, contrac

leted within

full satisfarks have b

TOR

erein made

work ns as

the

f

milar any

of the ch he rates nces

ll be ot, so strict; y the d for hat in

ot be rate

es of ctor’s

n two

ction been

Page 25: S BI INFRA M ANAGEM ENT SOL UTIONS PV T. LTD. STATE …...Vijay Sa 55,Sahy Near Sta AHMED can be do It shall be r l and finan alified. tractor sh the numb itions othe to be with IMS

Clear thequipme Demolisincludingbrought not inco Removethe SBII Shall puby the S Shall ha All defeArchitec Upon thentitled Relativeshall witissue a VThis isscontractliability nconstrucrespect

24.0 WoThe SBIthe site desire toonly allocontractexecutiocarried ocontract 25.0 InsWithout shall insdamage

he site of aent and ma

sh, dismantg labour shupon or errporated in

e all rubbishMS and sh

ut the SBIIMSBIIMS

and over the

ects / impects to the fu

he satisfactto apply to

e to which tthin fourteeVCC in res

suance of tor liabilitienor shall thction as a wof or work a

ork by otheIIMS / Archfor executioo have carrow but alsotor howeveon of such wout in sucht.

surance of limiting his

sure in thees from wh

all scaffoldchinery.

le and remheds/campsrected at ththe perma

h, debris etall clear, le

MS in undis

e work in a

erfections hll satisfactio

tory fulfillmo the Archthe comple

en (14) dayspect of the a VCC shs under thhe issuancewaiver of aat the site a

er agencieshitect / conson of any wried out by o extend r

er shall nowork excep

h manner a

works: s obligation

e joint namatever cau

ding, wiring

ove the cos and consthe site or annent works

tc. from theevel and dre

sputed custo

peaceful m

have been on of SBIIM

ent by thehitect / conetion certifics of the recwork for wall not be

he contracte of VCC i

any right or and in respe

s: sultant resework not inc

other persreasonable ot be requipt by specias not to im

ns and reses of the se arising

25 SE

g, pipes, su

ntractor’s structions anny land allo

s.

e site and tess, compa

ody and po

manner to th

attended aMS

e contractornsultant is cate has beceipt of thehich the VCwithout pr

t including in respect r claim of thect of which

erves the rigcluded in thons simultafacilities fo

ired to proal arrangem

mpede the p

sponsibilitieSBIIMS Another than

EAL & SIGN

urplus mat

site office, tnd other iteotted to the

the land alct the site a

ossession o

he SBIIMS

and rectifie

r as statedsatisfied ofeen soughtapplication

CC has apprejudice to the contraof the worhe SBIIMSh the VCC

ghts to usehe scope ofaneously anor the exeovide anyment with thprogress of

es under thnd the con the excep

NATURE OF

erials, con

emporary wms and thin

e contractor

lotted to thas required

of the site a

ed as poin

d above, thf the compt, the Archin for compleplied.

the SBIIMactor’s liabks or workagainst thhas been is

premises af this contrand the contcution of splant or m

he SBI. Sucf the works

he contracttractor aga

pted risks,

CONTRAC

tractor’s la

works, strucngs whatsor by the SB

he contracto by the SBI

and all land

nted out by

he contractpletion of wtect/ consuetion certific

MS’s rights ility for de

k at any site contractssued.

and any poact which it tractor shasuch work.material forch work sha

included in

t the contraainst all losfor which h

TOR

abour

cture oever BIIMS

or by IIMS

allot

y the

tor is work. ultant cate,

and fects te be tor in

ortion may ll not The

r the all be n the

actor ss of he is

Page 26: S BI INFRA M ANAGEM ENT SOL UTIONS PV T. LTD. STATE …...Vijay Sa 55,Sahy Near Sta AHMED can be do It shall be r l and finan alified. tractor sh the numb itions othe to be with IMS

responscontractduring tprior to occasionpurpose The Woor such in the wo The conreplacem Such inswhich arequiredpaymen 26.0 DaThe conthe SBI materialconsequproceedrelation a) The pb) The rthrough c) Injurieexecutiod) InjurieSBIIMS contractexpensecontribuas may SBIIMS,for the d 27.0 CoThe concosts, c

ible under tor are covehe period othe commened by the

e of complyi

rks for the additional sorks at thei

nstructional ment value

surance shpproval sh

d produce tot of the cur

mage to pentractor shaagainst all or physica

uence of thdings, damathereto exc

permanent uright of SBIany lands.

es or damaon or maintees or dama

their agetor or for ores in respeted to by tbe just an

, their empdamage or i

ntractor tontractor shaharges and

the terms ered for theof maintenencement ocontractor

ing with his

time beingsum as mar replacem

plant and of such co

all be effecall not be uo the Architrrent premiu

ersons andall, except ilosses and

al damage he executioages, costscept any co

use or occuIIMS to exe

ages to peenance of tage to persnts, emplor in respect ect thereof he contract

nd equitableloyees, or ainjury.

o indemnifyall indemnifd expenses

of contrace period stance for loof the perioin the cou

s obligations

executed tay be specifent value.

other thingnstructiona

cted with anunreasonabtect / consuums.

d propertyif and so fad claims in to any pro

on and mas, charges

ompensation

upation of laecute the w

ersons or pthe works insons or prooyees or o

of any claior in relatiotor, his sere having reagents or o

y SBIIMS:fy the SBII

s in respect

26 SE

ct and in sipulated I c

oss or damod of maintrse of anys under cla

to the estimfied togethe

s brought oal plant and

n insurer ably withheldultant the p

y: ar as the corespect of

operty whatintenance and expen

n of damag

and by or aworks or an

properties wn accordanoperty resuother contrms, proceeon thereto rvants or agegard to thother emplo

MS against of the mat

EAL & SIGN

uch a manclause of G

mage arisingtenance anoperationsuse.

mated curreer with the

on to the siother thing

nd in termsd and the olicy if insu

ontract proinjuries or dtsoever whof the wornses whatsges for or w

any part theny part ther

which are ce with the

ulting fromactors not edings, damor where t

gents such he extent ooyees, or a

st all claimstters referre

NATURE OF

nner that thGCC and arg from a cand for any l

carried ou

ent Contracmaterials fo

te by the cgs.

s approvedcontractor

urance and

vides otherdamages toich may ar

rks and agsoever in r

with respect

ereof. reof on, ov

unavoidabcontract. any act orbeing em

mages, costthe injury opart of the

of the respoagents or ot

s, proceeded to in the

CONTRAC

he SBIIMSre also covause, occuoss or damt by him fo

ct value theor incorpora

contractor to

by the SBshall whenthe receipt

rwise indemo any persorise out of ainst all cl

respect of to:

ver, under,

le result of

r neglect omployed by

ts, chargesor damage e compensaonsibility other contrac

ings, damae provision

TOR

and vered urring mage or the

ereof, ation

o the

BIIMS never ts for

mnify on or or in aims or in

in or

f the

f the y the s and

was ation f the ctors

ages, sub-

Page 27: S BI INFRA M ANAGEM ENT SOL UTIONS PV T. LTD. STATE …...Vijay Sa 55,Sahy Near Sta AHMED can be do It shall be r l and finan alified. tractor sh the numb itions othe to be with IMS

clause 2 28.0 CoThe conaction, cany allegrespect made unthe contat his othere froinfringemresult of 29.0 ThiBefore cobligatioliability fpropertySBIIMS,contractthereof. 30.0 MinSuch inswhich abelow. Tthe polipremiumThe minoccurrencontractoccurren 31.0 AcThe SBpayable other peexcept aagents, against against thereof o

26.0 of this

ntractor’s ntractor shclaim, or prged patent to any articnder or acttractor shalwn expens

om, providement of thef an order p

ird Party Incommencinons and refor any ma

y including , by or arist, otherwise

nimum amsurance sh

approval shThe contraccy or polic

ms. nimum insunce with thtor will paynces alway

cident or IIIMS Shallat law in re

erson in than accidenor employall such dall claims,

or in relatio

clause.

superintenall fully indroceeding ror design r

cle or part tion broughl be immed

ses to settled that the ce patent or passed by th

nsurance: ng the execesponsibilitiaterial or p

that of SBsing out of e than due

ount of Thall be affec

hall not be ctor shall, wcies of ins

rance covehe numbery additionas.

njury to wo not be liaespect or inhe employmnt or injury yees. The cdamages a

proceedinon thereto.

ndence: demnify anrelating to rights and sthereof inc

ht against Sdiately notifie any dispcontractor sdesign or

he Architec

cution of thes under

physical daBIIMS, or t

the executo the mat

hird Party Icted with anreasonably

whenever surance co

er for physicr of occurral premium

orkman: able for ornconsequenment of thresulting f

contractorand compegs, costs,

27 SE

nd keep ininfringemeshall pay a

cluded in thSBIIMS in ried thereof

pute or to cshall not beany allege

ct / consulta

he work thclause 25.mage, lossto any pers

ution of thetters referre

nsurance:n insurer ay withheld required, p

over and re

cal propertrences limi

m necessary

in respectnce of anye contractofrom any ashall indem

ensation, scharges a

EAL & SIGN

ndemnified nt or use ony royaltiese contract.respect of sand the co

conduct ane liable to ind patent or

ant in this b

he contracto.0 of GCCs, or injury son, includ

e works ored to in the

nd in termsand for at

produce to eceipts for

y, injury, anited to fouy to make

t to any daccident oor or any

act or defaumnify and save and end expens

NATURE OF

the SBIIMof any pates which ma In the evesuch matte

ontractor shy litigation

ndemnify thr design rigehalf.

or but withC shall insu

which mading any emin the carr

e provision

s approvedt least the the. Architer payment

nd death isur. After eae insurance

amages orr injury to asub-contrault of the Skeep indemexcept as es whatsoe

CONTRAC

MS against ent or desigay be payabent of any cers as aforehall be at lib

that may ahe SBIIMS ight is the d

hout limitingure agains

ay occur tomployee ofrying out o to clause

by the SBamount st

ect / consuof the cu

s Rs.5 Lakhach occurree valid for

r compensaany workmeactor, saveSBIIMS or mnified SBaforesaid,

ever in res

TOR

any gn or ble in claim esaid berty, arise if the direct

g his t his any f the f the 25.0

BIIMS tated ultant rrent

h per ence four

ation en or

and their

BIIMS and

spect

Page 28: S BI INFRA M ANAGEM ENT SOL UTIONS PV T. LTD. STATE …...Vijay Sa 55,Sahy Near Sta AHMED can be do It shall be r l and finan alified. tractor sh the numb itions othe to be with IMS

32.0 InsThe conDuring tshall, whreceipt fpersonsaforesaiinsured indemnifproducethe paym 33.0 ReIf the coother insand in apay suctime dedwhich mcontract Without such decontractSBIIMS shall upopolicy tadestroyeof such to any fuof the m 34.0 CoThe dateby the S 35.0 TimTime is entire wcommenThe conwork. Howork is c

surance agntractor shathe whole ohen requirefor paymen employedd under thagainst thefied under

e to the Arcment of the

medy on contractor fasurance wh

any such cah premium duct the ammay becomtor.

prejudice tefault, the etor the amo

And whichon settleme

aken under ed or damadamage shurther paym

materials or

mmenceme of comme

SBIIMS

me for comessence o

work shall ncement. Ifntractor shaowever, thecompleted

gainst accidall insure agof the time ed, producent of the cd by any shis sub-clae liability in

the policychitect /con

current pre

contractor’ils to effecthich he maase the SBI

or premiummount so p

me due to

to the otheemployer sount of any h are payaent by the Ithis clause

aged. In thishall be paidment in resgoods dest

ment of Woencement o

mpletion: of the contr

be compf required inall completee completioas per the t

dents etc. gainst such

that any pe to the arcurrent premsub-contrac

ause shalln respect oy but the cnsultant wheemium.

s failure tot and keep ay be requiIIMS may ems as may paid by the

the contra

ers rights ofshall be ent

damages cable by thensurer of a

e, proceed ws event all td to the conpect of thetroyed or da

rks: of the work

ract and shpleted withn the contre certain pon date shaterms of the

28 SE

to workmeliability witersons are

chitect / conmium. Provctor the cobe satisfief such pers

contractor sen such po

o insure: in force theired to effeeffect and kbe necessSBIIMS as

actor, or re

f the SBIIMtitled to decosts, char contractorny claim mwith due dithe moniesntractor and expendituramaged.

will be reck

hall be stricin a perio

ract or as dortions of wall be reckoe contract.

EAL & SIGN

en: h an insure

e employednsultant sucvided alwayontractor’s ed if the ssons in sucshall requirolicy of insu

e insuranceect under thkeep in forcary for thats aforesaidecover the

MS against educt fromges, and otrs under thade againsligence to r

s received fd the Contrre incurred

koned from

ctly observod of 45 directed by work beforeoned as the

NATURE OF

er approvedby him on

ch policy ofys that, in obligation

sub-contracch manner re such suurance and

e referred the terms oce any sucht purpose ad from any

same as

contractorany sums ther expen

his clause. st the insurerebuild or rfrom the Insractor shallfor rebuild

the date of

ed by the days fromthe Architee completioe date by w

CONTRAC

d by the SBn the worksf insurancerespect ofto insured

ctor shall that SBIIM

ub-contractod the receip

to above orf contract,

h insuranceand from tim

amount dudebt from

s. In respepayable to

ses paid byThe contra

er pursuantrepair the wsurer in resl not be en

ding or repa

f award of l

contractor. m the datect / consuon of the ewhich the w

TOR

IIMS s and e and f any d as have

MS is or to pt for

r any then

e and me to ue or

m the

ect of o the y the actor t to a

works spect titled

airing

letter

The e of ltant.

entire whole

Page 29: S BI INFRA M ANAGEM ENT SOL UTIONS PV T. LTD. STATE …...Vijay Sa 55,Sahy Near Sta AHMED can be do It shall be r l and finan alified. tractor sh the numb itions othe to be with IMS

36.0 ExtIf, in thecontrol oSBIIMS the termwork or date of cThroughscheduledetail antheir rectime. Wextendein excesprovisionFurther complet 37.0 RatWhole omanner conductprogressconsultatime or such steso as communfulfilling out of su 38.0 WoSubject shall savpermissabsolutewhich cathe provbecomeand quaapprova All work

tension of e opinion of of the contrto grant a

ms of contraif the compcompletion h the Archited time annd his justcommendat

While grantid time whicss of originn of liquidathe contracion irrespec

te of progrof the mater

and speeded in a mas of the woant too Slow

extended eps as consto comple

nications froobligations

uch directio

ork during to any pro

ve as hereion in writin

ely necessaase the convisions of ts essential

ality of the pal of the Arc

at night af

time: the Archite

ractor, the fair and re

act. If the copletion of was stipulatetect’ Consud while apification if tions to theng extensich will quanal stipulateated damagct shall remctive wheth

ress: rials, plant d of executianner to theork or any pw to ensurtime for cosidered nec

ete the woom the Archs under theons.

nights andovision to thin providedng of the Aary for the ntractor shathe clause l to carry bpart of the chitect / con

fter obtainin

ect/consultaArchitect/co

easonable eontractor n

work is likelyed in the coultant in wrplying for ean’, for the SBIIMS inon of timelify for levyed period

ges as statemain in forcher the exte

and labourion and mae satisfactiopart thereof e the compompletion tcessary byorks by thhitect / con contract n

d holidayshe contraryd be carriedArchitect/con

saving of all immediashall not

by rotary orworks bein

nsultant at n

ng approval

29 SE

ant, the woronsultant mextension oeeds an exy to be delaontract, theriting at leaextension oe delays. Tn the prescre the contry of liquidatand duly sed under cce even fo

ension is gra

to be provaintenance on of the Abe at any

pletion of ththe Architey the Architehe prescribsultant neitor he will b

: y containedd on duringnsultant, salife or propately advisebe applica

r double shng technicano extra cos

l from comp

EAL & SIGN

rk be delaymay submitof time for cxtension of ayed for ane contractorast 30 Daysof time he sThe architeribed formaractor shaled damagesanctionedclause 10.0r the periodanted or no

ided by theof the work

Architect/contime be in the whole oct/consultaect / consubed time ther shall rebe entitled t

d in the cong the night ave when tperty or fore the Architable in the hifts in ordelly requiredst to the SB

petent auth

NATURE OF

ed for reas a recommcompletion time for thy reasons br shall applys before thshall furnis

ect/consultaat for grantil be inform

es. For the extension

0 shall becod beyond t

ot.

e contractorks are to bnsultant shthe opinionof the worknt shall the

ultant to expor extendeelieve. The to raise any

ntract no por on holidhe work is

r the safetytect / consucase of a

er to achievd / continueBIIMS.

horities sha

CONTRAC

ons beyondmendation to

of work ase completiobeyond they to the SBhe expiry oh the reaso

ant shall sung extensio

med the pebalance peof time by

ome applicathe due da

r and the me of a kindould the ra

n the. Architk the prescre re uponpedite proged time. Scontractor y claims ar

permanent ways withouunavoidab

y of the woultant. Howany work wve the proged with the

ll be carried

TOR

d the o the s per on of e due IIMS f the on in ubmit on of eriod eriod y the able. te of

mode, d and ate of tect / ribed take

gress Such from

rising

work ut the ble or ork in wever which gress prior

d out

Page 30: S BI INFRA M ANAGEM ENT SOL UTIONS PV T. LTD. STATE …...Vijay Sa 55,Sahy Near Sta AHMED can be do It shall be r l and finan alified. tractor sh the numb itions othe to be with IMS

without u 39.0 NoIf at anythe scoppart of tthat effecontractever onexecutioclosure Providedactually surplus and thenshall hapurchas In case contractwhich wdeductiothe cont 40.0 SusThe con(whose works oconsideror endan a) On acb) For pthe contc) For saThe conextent nconsultai)If the sThe consuspens 41.0 Act

unreasonab

compensay time after pe of work the work to ect to the ctor shall ha account o

on of the Wof the whol

d that the cand bonafas a resultn taken ba

ave in suche price or a

of such sttor to storewere originon for claimtractor and

spension ontractor shdecision shr any part r necessarynger the sa

ccount any roper exec

tractor, or afety of the

ntractor shanecessary aant. uspension

ntractor shasion. No co

tion when

ble noise a

ation or reacceptancfor any reabe carried

contractor aave no claimof any profWork fully e or part of

contractor sfide brought of the aback by the c

h cases thea local curre

tores havines, credit shnally issuedms on accou

in this resp

of work: all, on rechall be finathe offer suy so as not

afety thereo

default on cution of the

e works or pall, during suand carry o

is ordered all be entitlempensation

the whole

nd disturba

estrictions e of the ten

ason whatsd out. The Aand the conm to any pfit or advabut whichf the work.

shall be paht to the siandonmentcontractor,e option ofent rate wh

ng been isshall be givd to the cunt of any

pect the dec

eipt of theal and binduch time ant to cause

of for any of

the part of e works or

part thereofuch suspenout the inst

for reasonsed to an extn whatsoev

security d

30 SE

ance.

of work: nder SBIIMoever and Architect / cntractor shapayment of antage whic

he did not

id the charte of the wt, curtailmeprovided h

f taking oveichever is l

sued from en to him

contractor deterioratiocision of Arc

e order in wing on the nd in suchany damagf following r

the contracpart thereo

f. nsion, propetructions gi

s (b) and (ctension of tiver shall be

deposit is f

EAL & SIGN

MS shall dechence not consultant all act accocompensa

ch he might derive in

rges on thework by thent of the w

however thaer all or aness.

SBIIMS stat the rateafter takin

on or damachitect / co

writing of tcontractor)manner as

ge or injuryreasons:

ctor, or of for reaso

erly protectiven in that

c) in sub-paime equal tpaid on thi

forfeited:

NATURE OF

cide to abarequired thshall give n

ordingly in tation or othht have deconsequen

e cartage oe contracto

work or any at the Archny such m

tores and res not exceg into con

age while innsultant sh

the Archite) suspend s Architect/y to the wor

ons other t

t and securt behalf by

ra (i) aboveto the perios account.

CONTRAC

andon or redhe whole ornotice in wthe matter.erwise wha

erived fromnce of the

nly of mater and rendportion the

itect/Consuaterials at

returned byeeding thosnsideration n the custodall be final.

ect / consuthe progres/consultantrk already d

than the de

re the worksy the Archit

e: od of every

TOR

duce r any riting The at so

m the fore

erials dered ereof ultant their

y the se at

and dy of

ultant ss of may

done

efault

s the tect /

such

Page 31: S BI INFRA M ANAGEM ENT SOL UTIONS PV T. LTD. STATE …...Vijay Sa 55,Sahy Near Sta AHMED can be do It shall be r l and finan alified. tractor sh the numb itions othe to be with IMS

In any chave resecurity following To rescArchitecdeposit To emplpart of thsuch labconclusiall respehad beearchitectcontract To meaunexecucase anypaid to tof whichconclusito him bproceed In the evhave nopurchasadvanceof the cthe contfor actuahave cethereof, 42.0 OwIf the coadjustedcompulsOfficial unable satisfact

case in whiendered him

deposit thg course as

cind the coct / consultof the contr

loy labour phe work, debour and mive against ects in the sen carried t /consultantor.

asure up thuted, out ofy expensesthe original h excess thive) shall bby SBIIMS ds of sale th

vent of anyo claim to ced or proc

es on accouontract andtractor shalally performrtified in wrand he sha

wner’s righontractor bed an insolvsory windinAssignee owithin sevetion of the

ch under amself liablehe Architecs they may

ontract (of wtant shall bractor shall

paid by theebiting the

materials asthe contra

same mannout by the nt as to the

he work off his handss which macontractor,

he certificate borne byunder the

hereof, or su

y of above ccompensatiocured any unt of, or wd incase thl not be en

med under triting the peall only bee

t to termineing an indvent or beng up volunof the liquien days af

Architect

any clause e to pay cct / consultadeem best

which rescbe conclusi

be forfeited

e SBIIMS acontractors worked octor) and cner and at contractor

e value of w

f the contr, and to givy be incurre, if the whotes in writin

y original cocontract o

ufficient pa

courses beon for anymaterial or

with a view te contracttitled to recthis contracerformance

en titled to b

nate the coividual or a

eing an incntarily or sdator in sufter notice / Consulta

31 SE

or clauses compensatant shall hsuited to th

cission notiive evidencd and be ab

and to suppwith the co

out by the Acrediting himthe same m

r under thework done

ractor, and ve it to anoed in excesle work hadng of the Aontractor anr otherwisert thereof.

eing adopteloss sustair entered ito the execshall be re

cover or to ct, unless, ae of such wbe paid the

ontract: a firm commcorporated subject to tuch acts oto him to

ant that he

EAL & SIGN

of this conion amoun

have the pohe interest

ce in writince) and in bsolutely at

ply materialsost of the laArchitect /m with the vmanner ande terms of

shall be fin

to take sother contrass of the sud been exeArchitects / nd may bee, or from h

ed by the Sned by himnto any en

cution of theescind undebe paid any

and until thework and the

value so ce

mit any ‘Actcompany

the supervf insolvencdo so, to

e is able to

NATURE OF

ntract, the Cnting to theower to adof the SBIIM

ng to the which cas

t the dispos

s to carry obour and mconsultant

value of thed at the samthis contranal conclus

uch part thactor to comum which wcuted by hiconsultantdeducted a

his security

BIIMS the m by reasonngagemente work or ther the provy sum or ae Architect e value payertified.

t of insolveshall have

ision of Gocy or windi show to o carry out

CONTRAC

Contractor e whole ofdopt any ofMS:

contractor se the secsal of SBIIM

out the wormaterials cot shall finale work donme rates as

act certificasive agains

hereof as mplete in w

would have bim (The amt shall finalany moneyy deposit o

contractorns of his has or makehe performa

vision aforeny work the/ consultan

yable in res

ncy’ or shae an ordeovt. and ofng up shathe reasont and fulfil

TOR

shall f his f the

by - urity,

MS.

rk, or ost of and

ne, in s if it te of

st the

shall which been

mount and

y due r the

shall aving any ance said, ereto nt will spect

all be r for f the

all be nable l the

Page 32: S BI INFRA M ANAGEM ENT SOL UTIONS PV T. LTD. STATE …...Vijay Sa 55,Sahy Near Sta AHMED can be do It shall be r l and finan alified. tractor sh the numb itions othe to be with IMS

contract Or if theexecutioor on be Or shallthrough paymen has aba has faileconditionSBIIMS has faileprogresshas faileseven d consultaperform performethe conworkmacontraryor the Aseven dthereby and liabcontractby or oconsultaand all por on thworkmeor persomatter ocomplem When tharchitectmaterial

t, and to dye

e contractoon to be issehalf of any

l assign orthe Archit

t due to wh

ndoned the

ed to comns suspendthrough the

ed to proces as woulded to removdays after

that tant under th

all or anyed by the c

ntractor to nship or in

y subject anArchitect / days’ noticeaffecting thilities of thet had not beon behalf oant their agplants, tooke adjoiningn in carryin

ons to the wor thing to pment and fin

he works sht/consultans and plant

e security t

or (whether sued or sha

of the cred

r sublet thitect/Consul

hich may be

e contract; o

mence theded the proe Architect

eed with the enable theve the matewritten notthe said mhese condit of the act

contactor foobserve odefiance of

ny part of thconsultant,e in writinghe powers e contractoreen determof the contents or em

k scaffoldingg lands or rng on and cwork and thprevent or hnishing or u

hall be comt shall givets and shou

herefore if

an individall suffer anyditors of the

is contract ltant or shecome due

or

e works, oogress of t/ consultan

e works wie works to erials from tice from th

materials wetions; or hasts matters or seven daor perform f the SBIIM

he contract., may not g to the cof the SBIIr the whole

mined and atractor. And

mployees mags, materiaroads use tcompleting he contracthinder suchusing the m

mpleted or ae a notice inuld the con

32 SE

so required

ual firm or y payment

e contractor

without thhall chargeto the cont

r has withthe works fnt written no

th such dilbe comple

the site or he SBIIMSere condems neglectedor things b

ays after wrthe same

MS or Archit. Then and withstandin

contractor, MS or the of which s

as if the wod, further tay enter up

als, sheds, the same bthe work o

tor shall noh other contmaterials an

as soon then writing tontractor fail

EAL & SIGN

d by the Arc

r incorporatunder this

r.

he consent or encumtractor there

out any lafor 14 dayotice to proc

igence andeted within to pull dow

S through tmned and d or failed pby this conritten notice

e or has ttect’s / consin any of s

ng any predetermine Architect/chall continurks subseqthe SBIIMSpon and takmachinerieby means oor by engagot in any watractor or otd plant for t

ereafter as the contrato do so w

NATURE OF

chitect /Con

ted Compacontract to

in writing mber this ce under:

awful excuss after recceed, or

d failed to mthe time a

wn and replathe Architerejected by

persistently ntract to bee shall haveo the detrsultant’s ins

said cases tevious waiv

the contraonsultant oue in force aquently had S through ke possess

es lying upoof their ownging any otas interruptther personthe works.

convenientctor to rem

within 14 da

CONTRAC

nsultant.

any) shall sbe attache

of the SBcontract or

se under teiving from

make suchagreed upoace work wct / Consuy the Archto observe

e observed e been giveriment of gstructions tothe SBIIMSver, after gact, but witor the obligaas fully as ibeen execthe Archite

sion of the on the premn employeether contract or do anyns employe

t the SBIIMmove his su

ys after rec

TOR

suffer ed by

BIIMS any

hese m the

due n, or

within ultantitect/

e and and

en to good o the

S and iving thout ation if the cuted ect / work

mises es or ctors

y act, ed for

S Or rplus ceive

Page 33: S BI INFRA M ANAGEM ENT SOL UTIONS PV T. LTD. STATE …...Vijay Sa 55,Sahy Near Sta AHMED can be do It shall be r l and finan alified. tractor sh the numb itions othe to be with IMS

thereof shall, adquestion 43.0 CeThe conconsultapaymenother dualways tworks ocontract The Arcpart thecertificatThe SBconsultaFull andThe finaof virtuawithin a months rates an 44.0 A. SettleExcept meaningmentionany otherelating or theseexecute cancellamention If the corespect or in camade orforthwithSBIIMS,

by him the djust the amn any of the

rtificate ofntractor shaant to the t from SBIIues includithat the issor completitor from his

chitect / conreof is not te make an

BIIMS shalant from tim Final Paym

al bill may bal completioperiod of twfrom the d

nd quantities

ement of Dwhere othe

g of the ed and as er question to the cont

e conditionthe same

ation, termied hereinaf

ontractor coof the workse the conr proposed h give notic, Head Offi

SBIIMS semount realize act of the

f payment:all be entitcontractor

IMS From tng the rete

sue of any ion shall nliability und

nsultant shcarried out

ny correctiol modify t

me to time wment Will bebe submitteon and Arcwo months.date of issus.

Disputes anerwise prospecificatioto the qual, claim, rig

tract, desigs or otherwe whether nation, comfter:

onsiders thaks over andtractor wanto be made

ce in writince, Mumba

ell the samzed by sucSBIIMS inc

led under twithin 10

time to timeention amocertificate b

not have eder clause.

all have pot to their sans requiredthe certificawhile makinge Done afted by contrachitect / co. The SBIIM

ue of certifi

nd Arbitratovided in thons, desiglity of workmght, matter gns, drawingwise concearising du

mpletion or

at he is end above thents to dispue from the cng of his clai and endo

33 SE

e by publicch auction. cidental to t

the certificaworking d

e SBIIMS sount from tby the Archeffect as c

ower to witatisfaction.d previous cate of payg the paymer Successfactor withinonsultant shMS Shall pacate provid

tion: he contracn, drawingmanship oror thing whgs specificaerning the uring the r abandonm

titled to ane amounts ute the valicontractor rlaim, or disorse a copy

EAL & SIGN

cation, and The contrathe sale of t

ates to be days from shall recovethe certificahitect / concertificate o

hhold the cThe Architecertificate.yment as

ment ful complet a period ohall issue tay the amouded there is

t all questgs and inr materials hatsoever inations, estiwork or thprogress oment there

ny extra payadmitted aidity of anyraise any dspute to Thy of the sam

NATURE OF

after due pactor shall hthe materia

issued by the date o

er the statuate of pay

nsultant durof satisfact

certificate ifect/consulta

issued by

ion of Workof one montthe certificaunt within as no disput

tions and dnstructions used on th

n any way amates, insthe executioof the woreof shall be

yment or cs payable b

y deductionispute, the he Senior Vme to the A

CONTRAC

publication,have no rigals etc.

the Architof certificatutory recovement. Provring progrestion relieve

f the work ant may by

y the arch

k. th from theate of paym

a period of tte in respe

disputes toherein be

he work or aarising out tructions oron or failurrk or aftere dealt wit

ompensatioby the Arch

ns or recovecontractorVice PresidArchitect, w

TOR

, and ght to

tect / te to ering vided ss of

e the

or in y any

itect/

date ment three

ect of

o the efore as to of or rders re to r the h as

on in hitect eries shall dent.

within

Page 34: S BI INFRA M ANAGEM ENT SOL UTIONS PV T. LTD. STATE …...Vijay Sa 55,Sahy Near Sta AHMED can be do It shall be r l and finan alified. tractor sh the numb itions othe to be with IMS

30 dayssaid notdetailed raise anby the cthe Sentime as his rightMumbai B. SettleThe Senclaims ndecisionnamely all detail If the cocontractthe conadjudicato have Except wcontractaforesaiarbitratioDeputy the Arbitto whicharbitratovacates appointeperson sby his pr It is a tewith amof arbitra It is alsoChief GarbitratioConcilia

from the dtice shall gcalculation

y claim norcontractor uior Vice Praforesaid.

ts in respec in writing i

ement of Dnior Vice Prnotified by tn of the Srthe M.D. &ls and copie

onciliation tor shall, wncerned M.ate the notifbeen consi

where the t, all disputed and all clon by the SGeneral Matrator so aph the Contor so appo

his officeed in the mshall be enredecessor

erm of this counts claimator.

o a term ofGeneral Maon shall betion Act 19

date of disagive full pans of the amr shall the Sunless noticesident, SBThe Contra

ct of any clan the mann

Disputes anresident, Hethe receipt . V.P., Hea

& C.E.O., Ses of corres

proceedingithin a perio.D. & C.Efied claims idered abso

decision hes or differelaims of theSole Arbitranager ranppointed is tract relate

ointed is un due to amanner afotitled to pror.

contract thamed in resp

f this contraanager as e conducte96 or any o

llowance tharticulars ofmount claim

SBIIMS Pvtce of such cBIIMS, Heaactor shall baim not notner and with

nd Arbitratead Office, of the con

ad Office / SBIIMSPL, Hspondence

gs are termod of 30 da.O. of the falling whic

olutely barr

has becomeences arisine SBIIMS Pator appoink. It will alsa SBIIMS,s in the conable or u

any reasonoresaid byoceed with

at the partypect of each

act that no aforesaid sd in accor

or any acco

34 SE

hereof or thf the claimmed and t. Ltd be in aclaim shallad Office, Mbe deemedtified to thehin the time

tion: Mumbai shtractor maySubmit his

Head Office exchanged

minated withays of term

SBIIMS fch the claimed and wai

e final, binng out of th

Pvt. Ltd shanted by theso be no obOfficer andourse of h

unwilling to whatsoevthe said Mthe referen

y invoking ah dispute a

person othshould act rdance withordance mo

EAL & SIGN

he date of d, groundsthe contracany way liahave been

Mumbai in td to have we Senior Vice aforesaid.

hall give hisy within 30 s claims toe, Mumbai d between

hout settlemination thefor appointms of the coved.

ding and che notified cll be referree M.D. & Cbjection to ad that he hahis duties a

act or rever anotherM.D. & C.Ence from th

arbitration salong with t

her than a as arbitra

h the provisodification o

NATURE OF

deduction oon which i

ctor shall noable in respe

given by ththe manner

waived and ece Presiden.

s decision idays of th

o the concifor conciliahim and the

ment of thereof shall gtment of aontractor s

conclusive claims of thed for adjudC.E.O. and any such aad to deal was SBIIMS,signs his ar sole arbE.O. of thee stage at

shall give athe notice f

person appator. The csions of th

or reenactm

CONTRAC

or recovery.it is basedot be entitleect of any che contractr and withinextinguishent, Head O

n writing one receipt oliating authation alonge SBIIMS

e disputesgive a notican arbitratohall be dee

in terms ohe contractodication thro

who will bppointmentwith the ma, Officer. Ifappointmenitrator sha

e SBIIMS Swhich it wa

a list of dispfor appointm

pointed by conciliation he Arbitratio

ment thereof

TOR

The and

ed to claim tor to n the ed all ffice,

n the of the hority

with

, the ce to or to emed

f the or as ough be of t that atters f the nt or ll be Such as let

putes ment

such and

on & f and

Page 35: S BI INFRA M ANAGEM ENT SOL UTIONS PV T. LTD. STATE …...Vijay Sa 55,Sahy Near Sta AHMED can be do It shall be r l and finan alified. tractor sh the numb itions othe to be with IMS

the rules It is alsobe paid he is a S It is alsothe refetheir stashall be any of publishethe awaarbitratothereof, 45.0 WaThe connothing i) That satisfact ii) The arrangemArchitec iii) In caconnectclause 5

The con

taking wSBIIMS the wateaccidentwells. Hown coson compdirected 46.0 PowThe consystem

s made the

o a term of equally by

SBIIMS Off

o a term ofrence on t

atement of csuch place

the arbitraed, be paid ard (includinor who may

shall be pa

ater supplyntractor shaextra will b

the water tion of the A

contractor ment made

ct / consulta

ase contraion, Bore w

51.0 of this

ntractor shawater for con

The contraer at his ots or dama

He has to ost. He shall pletion of w by the arc

wer supplyntractor shafor driving

re under.

the contraboth the p

icer.

f the contrahe date heclaims ande as may b

ators shall, half and ha

ng the feesy direct to aaid and fix o

y: all make hie paid for t

used by thArchitect /co

shall makee by the cant is unsat

actor is pewell (existindocument f

all construcnstruction pactor has toown cost. Hges caused

obtain necerestore the

work or handhitect /cons

y: all make hplant or m

ct that if anarties. How

act that the e issues no counter st

be fixed by if required

alf by each s, if any ofany by whoor settle the

s own arrahe same. T

he contractonsultant’s

e alternativontractor foisfactory.

rmitted to ng or new)form the fin

ct temporapurposes oo make his He has tod due to coessary appe ground tod over the wsultant.

is own arraachinery fo

35 SE

ny fees arewever, no fe

Arbitrator otice to bottatement ofthe arbitra

d to be paof the partthe arbitra

m and din e amount of

angements This will be

tor shall be.

ve arrangemor procurem

use SBIIM) etc., the nal bill of co

ry well / tunly after obown arranmake nece

onstruction rovals from

o its originawell to the S

angementsor the work

EAL & SIGN

payable toees will be

shall be deth the partif claims. Thtor in his said before ties. The Coator) shall bwhat mannf costs to be

for water subject to t

e fit for con

ments for tment of wa

MS’s sourcSBIIMS Pv

ontractor.

ube well in btaining pergements foessary arraand subse

m local authal condition SBIIMS wit

s for powerk and for lig

NATURE OF

o the Arbitrpayable to

eemed to hes calling

he venue oole discretithe award

ost of the rebe in the dner, such coe so paid.

required fothe followin

nstruction p

the supply ater in the

e of watervt. Ltd will

SBIIMS Prmission in or drawing angementsequent mainhorities, if after wells hout any co

r and suppghting purp

CONTRAC

ator these the arbitra

ave enterethem to su

of the arbitraon. The fee

d is made eference an

discretion oosts or any

or the workg condition

purposes to

of water iopinion of

r i.e. Munirecover as

Pvt. Ltd landwriting fromand distrib. To avoidntenance orequired, aare disma

ompensatio

ply / distribupose at his

TOR

shall ator if

ed on ubmit ation es, if and

nd of f the

y part

k and n.

o the

f the f the

cipal s per

d for m the uting any

of the at his ntled

on as

ution own

Page 36: S BI INFRA M ANAGEM ENT SOL UTIONS PV T. LTD. STATE …...Vijay Sa 55,Sahy Near Sta AHMED can be do It shall be r l and finan alified. tractor sh the numb itions othe to be with IMS

cost, theprices, Hsame in necessa In case point, thcontract 47.0 TreAny treaproperty 48.0 MeUnless othe meato date disagreecorrecto 49.0 MaThe conof work wheneverequired

i)iiiiiv

50.0 ForNeither obligatiohostilitieaccidentany othedelayedthe evenserve a As soonperform the actusupport

e cost of ruHe shall pahis tendere

ary approva

contractor he SBIIMS wtor.

easure trovasure trovey of SBIIMS

ethod of meotherwise m

asurement wrules laid d

ement the dor.

aintenance ntractor sha

and shoulder desired

d by the loca) Regis) Regisi) Regisv) Regis

rce Majeurcontractor

ons if such es revolutiots, fire, storer cause b. However,nt with comnotice, with

n as the cits obligati

ual delay ithereof.

nning and ay all fees aed rates an

al from the a

is permittewill recove

ve etc. , coin or ob

S and shall

easuremenmentioned will be on tdown by thdecision of

of registeall maintain d produce by them. Tal authoritiester for secster for hindster for runnster for labo

re: nor SBIIM

performancn, riots, civrms, floodsbeyond the a notice is

mplete detaihin the shor

ause of foions has bencurred in

maintenancand chargesnd hold theappropriate

ed to use Br as per cla

bject antiqube handed

nt: in the schethe net quahe Bureau the Archite

rs: the followithe same fhe contractes / Govt. frcured advandrance to wning accouour

MS shall bece is prevevil commots, droughts,e reasonabs required toils, to the ortest possib

orce majeueen affecte

such affe

36 SE

ce of the ps required, owner free

e authorities

Bank’s sourause 51.0 o

ue which mover to the

edule of quantities or wof Indian S

ect / consul

ng registersfor inspectitor shall alsrom time tonce work nt bill

e considereented or delion, strikes, earthquakle control oo be given wother partyble period w

re has beeed, shall noected activi

EAL & SIGN

lants are toby the powfrom all su

s, if required

rce of poweof this docu

may be foune bank imm

antities or work producStandards. ltant shall b

s as per thion of SBIIso maintaino time.

ed in defalayed by evs, lockout, ckes or ordinof the partwithin 30 dto the cont

without dela

en removeotify the othty adducin

NATURE OF

o be includewer supply uch costs. Hd.

er supply pument from

nd on the sediately.

in mode ofced in accoIn the eve

be final and

e enclosedMS /Archite

n the record

ult in perfovents such conflagratio

nances or aty affected ays from thtract ,if it is ay.

d the partyher of suchng necessa

CONTRAC

ed in his teand include

He has to o

provided atm the final b

site shall be

f measuremordance witent any dispd binding on

d perform atect / consuds / register

ormance ofas but not

ons, epidemany act of o

or preventhe happenin

not possib

y whose ah cessationary evidenc

TOR

ender e the btain

t one bill of

e the

ment, th up pute/ n the

t site ultant rs as

f the war,

mics, or for ts or ng of ble to

ability and

ce in

Page 37: S BI INFRA M ANAGEM ENT SOL UTIONS PV T. LTD. STATE …...Vijay Sa 55,Sahy Near Sta AHMED can be do It shall be r l and finan alified. tractor sh the numb itions othe to be with IMS

From theaffected 51.0 WaThe rateprovidinarrangemquality dwell / open wSBIIMS The ratepower c The contake powby the arrangemmutuallyconnectpayable the SBII The SBIContractrespons

In caseprovidedand elec 52.0 FacThe conand womake thworkme 53.0 LigThe conthe prop 54.0 Fir

e date of oc.

ater power e quoted bg all the wments for thdrinking wa

well and brwill not be

e quoted inonnections

ntractors fower and wa

contractoments to dy agreed raion for Cofor perma

MS will reim

IIMS as wetor’s to obibility for ob

contractod at one poctricity (com

cilities for ntractor sharkmen incl

he arrangemn to and fro

ghting of wntractor shaper executio

efighting a

ccurrence o

and other by the con

water requihe supply oater for the

ring water bliable to pa

the tenders and shall p

or other tradater connecor Howevedraw the suates betwenstruction nent connemburse the

ll as the Arbtain the rebtaining the

r is permitoint, the SBmbined) from

contractorall make hisuding adeq

ments at hisom site of w

works: all at all timeon and supe

arrangeme

of a case of

r facilities:ntractor shared for theof good quair workers

by means oay any char

r shall inclupay for the

des directlyctions from er, the coupply and peen them. purposes

ections, if ae amount on

rchitect / coequisite Pee same in ti

tted to useBIIMS will rm the bill of

r’s employs own arranquate drinks own cost

work at his o

es provide ervision and

ents:

37 SE

ff or force m

all include e work andality water sIf necessa

of tankers rges in conn

ude the expconsumptio

y appointedthe temporoncerned pay directlyAll municipshall be bany, shall bn production

onsultant shermission frme shall be

e Bank’s srecover @ f contractor

yees: ngement foking watert for transpoown cost.

adequate ad inspectio

EAL & SIGN

majeure obl

all expensd the contrasuitable forary the con

at his own nection with

penses for on charges

d by the Srary water acontractor

y the actuapal chargesorne by thbe initially pn of receipt

hall give all rom the vae of the con

source of 0.50% of

r.

r the housifacilities.

ort where n

and approvn of work.

NATURE OF

ligations of

ses that aactor shall the construtractor has

cost for thh the above

obtaining as

BIIMS shaand power s

shall maal consumps for drain

he contactopaid by thets.

possible asarious authntractor.

water andfinal bill am

ng and weThe contra

necessary f

ved lighting

CONTRAC

the party

are requiredmake his

uction and gs to sink a

he purpose e

and mainta

ll be entitlesupply obtaake their ption chargenage and wor and chae contactor

ssistance tohorities, but

d power sumount for w

lfare of his actor shallfor his staff

as require

TOR

d for own

good tube

The

ining

ed to ained

own es at water arges r and

o the t the

upply water

staff also

f and

ed for

Page 38: S BI INFRA M ANAGEM ENT SOL UTIONS PV T. LTD. STATE …...Vijay Sa 55,Sahy Near Sta AHMED can be do It shall be r l and finan alified. tractor sh the numb itions othe to be with IMS

The conpurposebucketsthese eqand sha Any defiat his owfollowing a) Propb) Workc) Acced) Type

rubbe) Typef) Gene

55.0 SitA site obetweenconveyeto the otsite ordemaintain/consultalike to iconsultaone copsecond 56.0 TemThe congates atpublic arequirembe altercomplet 57.0 SitSite meeshall deapprovefollow u

ntractor shae he shall p, some of quipment sll be proper

iciency in thwn cost andg arrangem

per handlingk operationess for fire-fe, number abish. e, size, numeral housek

e order boorder book n the Archied through ther shall ber book shned and preant as and ssue to th

ant two coppy will be hcopy will be

mporary fentractor shat his cost tond for the p

ment of thered, relocation of the w

e meetingsetings will bpute a sen

ed sub-contup actions.

all provide rovide requwhich are

shall be prorly maintain

he fire safetd, to the ap

ments at his

g, storage as which canfighting equand location

mber and lockeeping.

ook: shall be mitect / Consrecords in t

be deemed hall have meserved by when dem

he contractopies of suchhanded ove retained f

encing/barall provide ao adequatelyproper exec architect/cted and adwork.

s: be held to rior represetractors and

Any addit

suitable aruisite numb

to be alwaovided at sned.

ty or unsafepproval of th

own cost b

and disposan create fireuipment. n of contain

cation of fir

maintained asultant. Anthe site ordto have be

machine nuthe contrac

manded- Anor or the ch instructio

ver to the pfor their rec

rricading:and maintay enclose acution and consultant adopted from

review the ntative alond suppliers tional revie

38 SE

rangement er of fire exays kept filsuitable pro

e conditionshe relevantbut not limit

al of combue hazards.

ners for the

re extinguis

at site for tny communder book. Seen adequaumbered pactor and shy instructiocontractor ns shall beparty againcord.

ain a suitaball boundarisecurity of and regulatm time to t

progress ang with theas required

ew meeting

EAL & SIGN

for firefighxtinguisherslled with saominent an

s shall be c authoritiested the follo

ustible mate

removal of

shers or oth

the purposenication relaSuch a com

tely servedages in tripall be made

on which themay like t

e taken fromnst proper

le temporaies of the sthe work a

tions of loctime as ne

and quality site repres

d to the sitgs shall he

NATURE OF

hting at his s and adeqand and sond easily ac

corrected bys. The controwing:

erials and w

f surplus ma

her tire fight

e of quick ating to themunication

d in terms oplicate ande available e architect/to bring to m the site oacknowled

ry fencing/bite for the p

and in accocal authoritiecessary an

evaluation.sentative ane meetingse held if r

CONTRAC

own cost. quate numbome with wccessible p

y the contraractor make

waste.

aterials and

ting equipm

communicae work ma from one p

of contract Ed shall careto the arch

/consultantthe archit

order bookgment and

barricadingprotection ordance withes. Thesend removed

The contrand other stas and ensurequired by

TOR

This ber of water place

actor e the

d

ment.

ation ay be party Each efully hitect

may ect /

k and d the

g and of the h the shall d on

actor aff of re all y the

Page 39: S BI INFRA M ANAGEM ENT SOL UTIONS PV T. LTD. STATE …...Vijay Sa 55,Sahy Near Sta AHMED can be do It shall be r l and finan alified. tractor sh the numb itions othe to be with IMS

architect

58.0 DisThe conand depresponseffect thother off 59.0 CoThe conspecialisdrawing the work 60.0 DisThe conconsultaarchitect 61.0 As For the ConsultachangesArchitecreturn threquiredout the correctio/ consulcopy du For the dThe conthe SBIIthe archthe appr 62.0 ApThe concost antreatmenThe arcgiven in

t/ consultan

sposal of rntractor shaposit the saibility of th

hat all rubbif-site activit

ntractor tontractor shasts contractand pass o

ks.

splaying thntractor shaant indicatint/consultan

built drawdrawings i

ant will isss have beect / Consultahese copiesd or the codiscrepancons and / otant and rely approved

drawings pntractor will MS / archit

hitect/ consroved draw

proved mantractor shand also apnt, aluminu

chitect/consthe tender

nt.-

refuse: all cart awaame as direhe contractsh arising ties borrow

o verify siteall check antors or otheon the infor

he name ofall put up ang there in t at his own

wings: ssued to th

sue two sen made. Frant. The cos to the arcrrections a

cies to the r attend to

esubmit to hd by him.

repared bymodify the

tect / consuultant for aing to the c

ake: all provide ppoint the m doors anultant mayafter inspe

y all debrisected by theor to obtaiout of contpits has be

e measurend verify aler sub-contrmation wit

f the work:a name boa

the name n cost and r

he contractts of drawrom the ap

ontractor wichitect / Core not propcontractor.discrepanchim for app

the contrae drawing pultant. And approval. Thcontractor.

all materiaspecialize

nd windowsy approve aection of the

39 SE

s, refuse etce architect in from theractor’s acteen properl

ement: l site measractors to eh sufficient

ard of suitaof the projeremove the

tor by the ings to the

pproved drall make the

onsultant foperly markeThe contra

cies either oproval. The

ctor: repared bysubmit twohe architec

als from thed agency s and any oany make /e sample/m

EAL & SIGN

c. arising fr/ consultan

e local auttivities at thy disposed

surements wenable themt promptnes

ble size asect and othe same on c

Architect / e Contractoawings as ie changes mor their apped the archactor will hon copies a architect /

y him whereo copies of ct / consulta

e list of apfor the w

other item / agency w

mockup.

NATURE OF

rom the wont at his owhorities co

he construc off.

whenever rm to preparss as will in

s directed bher details acompletion

Consultanor for the instructed bmade on thproval. In cahitect/Consave to inco

as directed / consultant

ever the chasuch modifant will retu

proved mawaterproofinas specifie

within the a

CONTRAC

ork from thewn cost. It is

ncerned toction site or

requested ore the own sn any way d

by the archas given byof work.

t. The architems for sby the SBIIhese copiesases revisio

sultant will orporated tby the archt will return

anges madfied drawingurn one cop

akes at hisng, anti-terd in the ten

approved lis

TOR

e site s the o the r any

other shop delay

itect/ y the

hitect some MS /

s and on is point hese hitect n one

de by gs to py of

own rmite nder. st as

Page 40: S BI INFRA M ANAGEM ENT SOL UTIONS PV T. LTD. STATE …...Vijay Sa 55,Sahy Near Sta AHMED can be do It shall be r l and finan alified. tractor sh the numb itions othe to be with IMS

63.0 ProThe confor the w 64.0 ExcThe conroyaltiestax, tax equipmeduties, lShall notaxes, dincludedduties, fthe quotnew taxduring tGST wil 65.0 AcThe SBreason. tenderertranspar

66.0 PhThe Concopies ofrom twoduring th In additphotograprogressconsiderentertain 67.0 Saf

1. First aidshall be

2. An injurethe injur

ocurementntractor shawork. All wa

cise duty, ntractor shas, fees, ces

on works ent plant alevies, fees

ot be requireduties, feesd in the quofees, leviested rates an

x or duty orhe currencl be paid ex

ceptance oIIMS shall They are

rs shall havrency would

otographsntractor shof large phoo approvedhe progress

ion to aboaphs alongs of work mr returning ned.

fety Codesd appliancekept in a re

ed person sry necessita

t of materiaall make hisastages and

taxes, leviall pay and

ss or chargecontract e

nd other ths and charged to pay as, levies etoted rates

s etc. if anynd no extrar levy or cecy of contraxtra.

of tender: have the

not to bindve no rightd be mainta

s: all at his o

otographs nd portions os of the wor

ove, the cog with eac

measured athe Bill to th

s: es includingeadily acce

shall be takates hospita

als: s own arrad losses in w

es etc.; d be respoes in respeexcise dutyhings requiges shall b

any additiontc. if any, tand no ext

y, till complea claim on tess or royaact the sam

right to red to acceptt to questioained by the

own expensnot less thaof each buirk or at eve

ontractor shch Runningnd claimedhe contract

g adequateessible place

ken to a pualization.

40 SE

angements weight sha

onsible for ct of the wo

y, and Octrred for the

be to the cnal or extratill complettra amountetion of wothis accoun

alty or Octrome shall be

eject any ot the loweson the actse SBIIMS

se supply tn 25 cm. x lding, at int

ery importan

hall be boug Bill for t therein faitor and no c

e supply of e.

blic hospita

EAL & SIGN

to procure ll be to the

payment oorks includiroi, payablee contact. Acontractor’s amount ontion of wort on this acrk shall be

nt will in anyoi is impose borne by

or all tendest or any tes of the SB

to the Arch20 cm. (10

tervals of nnt stage of c

und to subthe projectling which tclaim for de

f sterilized

al without lo

NATURE OF

all the reqcontractors

of all taxes,ing but not e in respecAll of the a

account an this accourk shall be ccount. Vardeemed to

y case be eed under a the contra

ers withoutender and BIIMS. How

hitects with0” x 8”) of thnot more thconstructio

bmit adequt clearing the Architecelay on this

dressing a

oss of time,

CONTRAC

quired mates account

, duties, lelimited to sct of mate

aforesaid taand the SBunt. Variatio

deemed triation of tao be includeentertainedas statutoryactor. Howe

assigning the tendere

wever adeq

duplicate he works, ta

han one mon.

uate no. ofshowing mct/ SBIIMS account w

and cotton

, in cases w

TOR

erials

evies, sales rials,

axes, IIMS on of o be axes, ed in

d. If a y law ever,

any er or

quate

hard aken

onths

f site major

may will be

wool

when

Page 41: S BI INFRA M ANAGEM ENT SOL UTIONS PV T. LTD. STATE …...Vijay Sa 55,Sahy Near Sta AHMED can be do It shall be r l and finan alified. tractor sh the numb itions othe to be with IMS

3. Suitable

safely be 4. No porta

rails sharunning'engaged

5. The exc

half of tprovided

6. Every op

means twhose m

7. No floor

as to ren 8. Workers

concrete 9 Those e

and glov 10. (i) No p

readyma(ii)Suitable

in the fo 11. Overall

be provi 12 Hoistin

and sup 13. The rop

durable

e and stronge done from

able single all not be s shall not d for holdin

cavated mathe depth od with nece

pening in thto prevent tminimum he

, roof or othnder it unsa

s employede and lime s

engaged inves.

paint contaiade paint.

e face maskrm of spray

s shall be sded to ena

ng machineports shall

pes used inquality and

g scaffolds m the groun

ladder shaless than be more thg ladder.

aterial shall of trench w

essary fenci

he floor of athe fall of peight shall b

her part of tafe.

d on mixingshall be pro

welding w

ining lead o

ks should bey or surface

supplied byble the wor

es and tacbe in perfe

n hoisting od adequate

should be nd.

all be over 30 cm. (c

han 30 cm.

not be plawhichever isng and ligh

a building opersons or mbe one met

the structur

g and handovided with

works shall

or lead prod

e supplied e having lea

y the contrarking painte

kle used inect condition

or lowering strength an

41 SE

provided f

8 meters inclear) and

When a la

ced within s more. Al

hting.

r in a workimaterials bter.

re shall be

dling materprotective

be provide

ducts shall

for use by tad paint dry

actor to the ers to wash

n the worksn.

material ornd free form

EAL & SIGN

for workme

n length. Ththe distancdder is use

1.5 metersl trenches

ing platformy providing

so overload

ial such asfootwear a

d with weld

be used e

the workersy rubbed an

painters anduring ces

s including

r as a meam defects.

NATURE OF

n for all wo

he width bece betweeed an extra

s of the edgand excav

m be providg suitable fe

ded with de

s asphalt, cnd rubber h

ders’ protec

except in th

s when the nd scrapped

nd adequatssation of w

their attac

ans of susp

CONTRAC

orks that ca

etween the n two adjalabour sha

ge of the trevations sha

ed with suitencing or ra

ebris or mat

cement, mohand gloves

ctive eye s

e form of p

paint applied.

te facilities work.

chments an

pension sha

TOR

annot

side acent all be

ench all be

table ailing

terial

ortar, s.

hield

paste

ed

shall

nchor

all be

Page 42: S BI INFRA M ANAGEM ENT SOL UTIONS PV T. LTD. STATE …...Vijay Sa 55,Sahy Near Sta AHMED can be do It shall be r l and finan alified. tractor sh the numb itions othe to be with IMS

1) NamSBIIMS,2) Cons 3) Site A 4) Scope 5)Name

6)Addre

7) Perio

8) EarneThousaDays froBank dra 9) Reten 10) Defe 11) Insu 12) Liqushown invalue. 13) ValuDone aft

me of the , Circle Offiultants

Address e of Work

of the Con

ss of the C

d of Compl

est Money Dnd only) b

om the lastawn in favo

ntion Money

ects Liability

urance to be

uidated damn the tende

ue of Interimfter Success

APPEND

organizatioce, SBI, LH

:A R . Vij M/s Vija : State B Junaga : Propose Dist. Ju

ntractor

Contractor

etion

Deposit by means t date of suour of Stat

y

y Period

e undertake

mages er per week

m Bill(Min.) sful comple

DIX HEREIN

on OfferingHO, Bhadraay Sahijwa

ay SahijwanBank of Indiaadh ed Electricanagadh

of Demanubmission ote Bank of

en by the C

k subject to

etion of Wo

42 SE

N BEFORE

g Contract: a, Laldarwajani ni & Assoa, at Sarda

al works of

:

:

:•:

nd Draft/Paof the tendIndia and

:

:

:Contractor a

:max. 5% o

:rk.

EAL & SIGN

REFERRE

The Circlja, Ahmeda

ciates argadh Bran

Sardargadh

-----------------------------

------------------------------

45 daysIssue ofRs. 4

ay Order (er) from anpayable at

As per c general

Twelve Virtual C

125% oat his cost(C

0.5% oof the contra

Full an

NATURE OF

ED TO

e Head &Vabad-1

nch (006006

h Branch(0

---------------------------------------------

----------------------------------------------

s from the df work orde

4,000/- (R(Valid for any schedulet Junagadh

clause no. Conditions

Months froCompletion

f Contract VContractor’s

of the Coact value o

d Final Pa

CONTRAC

Vice Presid

64) Dist.

060064)

------------ ------------ -------------

------------ ------------- -------------

date of er. Rupees Fa period ofed Nationah.

1.4 of s

om the date.

Value s all risk po

ontract amr actual fina

ayment Wi

TOR

dent.

Four f 180 alized

e of

licy)

mount al bill

ll be

Page 43: S BI INFRA M ANAGEM ENT SOL UTIONS PV T. LTD. STATE …...Vijay Sa 55,Sahy Near Sta AHMED can be do It shall be r l and finan alified. tractor sh the numb itions othe to be with IMS

14) Dateissued topossess 15) Peri

16) Initia 17) Tota 18) Refu comprisshall be only afte 19) Peri 20) Thefor compreceipt oreports e

e of Commeo the Contr

sion of the s

od of Final

al Security

al Security

und of initiasing of EMDrefunded to

er the Defec

od for Hono

e final bill wpletion workof final bill petc. prescri

encement ractor/ or thsite whichev

Measurem

Deposit

Deposit

al Security DD and ISD. o the Contrct Liability P

oring Certif

will be submk and the Bprovided thebed in the t

he day on wver is earlie

ment

Deposit

ractor on coPeriod is ov

ficate

itted by theBill shall be e bills are stender.

43 SE

:which the Coer.

:

: 2% o

: 5%

:ompletion over.

: On

e ContractoCertified w

submitted w

Date:

EAL & SIGN

From thontractor is

2 Month Comple

of the Acce

of the final

50% of of the work

ne Month fo

or within onewithin 3 monwith all pre-r

Signature

NATURE OF

he date of ws instructed

hs from thetion.

epted Value

bill amount

the Securitand balanc

or R.A.Bills

e month of nths from threquisite do

e of Tender

CONTRAC

work order to take

date of Vir

e of the Ten

t including I

ty Deposit ce refunded

the date fixhe date of ocuments/te

er.

TOR

rtual

nder.

ISD.

d

xed

est

Page 44: S BI INFRA M ANAGEM ENT SOL UTIONS PV T. LTD. STATE …...Vijay Sa 55,Sahy Near Sta AHMED can be do It shall be r l and finan alified. tractor sh the numb itions othe to be with IMS

To, The C.HSBI InfraBhadra, Ahmeda Dear Sir PROPOJUNAGA Having eworks sexaminethe requto executhe saidin accorwriting rcontract MEMOR (a) De

(b) Ea

(c) Timwowo

Should tprovisionapplicabthe said

H. &V.P., Cia ManagemLaldarwaja

abad-1

r,

OSED ELECADH

examined tspecified ined the site uisite informute the word memoranrdance in areferred tot and with s

RANDUM

scription of

rnest Mone

me allowed rk from therk order.

this tender ns of the sble or in de

conditions

L

rcle Office,ment Solutioa,

CTRICAL W

he terms &n the memof the work

mation relatks specified

ndum on thll respect w in conditi

such conditi

f work

ey

for comple date of iss

be acceptesaid conditefault thereo.

LETTER O

ons Pvt. Ltd

WORKS OF

& conditionsmorandum ks specifiedting theretod in the sae item rate

with the speons of Tenons so far

PBRofdp

tion of sue of

4p

ed, I/we hetions of Coof to forfeit

44 SE

OF DECLAR

d., Third Flo

F SARDAR

s, drawingshereinafte

d in the saido and affecaid memorae basis menecifications,nder, the aas they ma

Proposed EBranch (00Rs. 4,000.only) by mefrom any drawn in fapayable at J45 days froper tender.

ereby agreeontract annt and pay t

EAL & SIGN

RATION

oor, SBI, LH

RGADH BRA

, specificatier set out d memoran

cting the quandum withntioned in t design, drarticles of

ay be applic

Electrical wo060064) Dis00 - (Rupeans of Dem

scheduledavour of StJunagadh.m the date

e to abide bexed heretto SBIIMS,

NATURE OF

HO,

ANCH ( 00

ions, desigand havin

ndum and huotation, I/Whin the timhe attachedrawings andagreement

cable.

orks of Sarst. Junagapees Fourmand Draftd Nationatate Bank o

of commen

by and fulfilto so far athe amoun

CONTRAC

60064) DIS

n relating tong visited having acquWe hereby me specified scheduled instructiot, condition

rdargadh dh

r Thousant / Pay Ordealized Banof India an

ncement as

ll the termsas they mant mentione

TOR

ST.

o the and

uired offer

ed in e and ns in ns of

nd er nk nd

s

s and y be ed in

Page 45: S BI INFRA M ANAGEM ENT SOL UTIONS PV T. LTD. STATE …...Vijay Sa 55,Sahy Near Sta AHMED can be do It shall be r l and finan alified. tractor sh the numb itions othe to be with IMS

I/we hav(RupeesManageupon to Manage We undetender iInstitute thereforeBank deat any sentrustewithout to Tende We, herprices operiod. Yours fa

Signatur

ve deposites Four T

ement Solutdo so, I/we

ement Solut

erstand than part or wBuilding,

e, undertakeciding to dstage duringed to us in any extra cerers” of th

reby, also uof any of

aithfully,

re of contra

ed DemandThousand tions Pvt. Le hereby ations Pvt. L

at as per terwhole or mStaff Qtrs.

ke that we srop any of g the contra

phases onclaim for pris tender.

undertake tthe materi

actor With S

d Draft / Baonly ) as

Ltd. Should gree that thtd.

rms of this may entrus And Direc

shall not raithe buildingact period.n our apprice escalat

that, we wiial during

Seal

45 SE

anker’s Ches EarnestI/we do fai

his sum sh

tender, thest the workctor’s Bungise any claig/buildingsFurther, we

roved ratesion as prov

ill not raisethe curren

EAL & SIGN

eque / FDRmoney del to executeall be forfe

e SBIIMS mk of variousgalow/Interim/compenfrom the sce also undes and withinvided for in

e any claimncy of con

NATURE OF

R for a sumeposit with e the contra

eited by me

may consides buildingsior work) isation in thcope of worertake to exn the stipuClause 9.0

m for any estract/execu

CONTRAC

m of Rs 4,0the SBI

act when ce/us to SBI

er acceptings proposed n phases.

he eventualrk of this texecute the ulated time 0.1 “Instruc

scalation inution/comple

TOR

00 /- Infra alled Infra

g our (i.e. We,

ity of ender work limit

tions

n the etion

Page 46: S BI INFRA M ANAGEM ENT SOL UTIONS PV T. LTD. STATE …...Vijay Sa 55,Sahy Near Sta AHMED can be do It shall be r l and finan alified. tractor sh the numb itions othe to be with IMS

i.

ii.

iii.

iv.

v.

vi.

vii.

Name of Name of Sr. No. o No. & D Referen Date of W Date of

S.No

Item Desc

1 2 Note: 1.

sa

2. m

f Contracto

f Work

of this Bill:

ate of prev

ce to Agree

Written ord

Completion

cription Uni

3

If part rate should be ia rate.

If ad-hoc pamentioned

PROF

or/ Agency

ious Bill :

ement No.

der to comm

n as per Ag

it Rate (Rs.)

As

Qt

4 5

is allowed fndicated w

ayment is mspecifically

FORMA FOTA

mence :

reement

s per Tender

ty Amount (Rs.) 6

for any itemith reasons

made, it shoy.

46 SE

OR RUNNINABLE - XIII

:

:

:

:

Up Previous RBill Qty Amou

(Rs.)7 8

ms, its for allowin

ould be

EAL & SIGN

NG A/C BIL

to .A.

Up to (Gross)

unt Qty Am(R

9 10

ng such

N

NATURE OF

LL

Date Prese

mount Rs.)

Qty

0 11

Net Value s

CONTRAC

ent Bill R

Amount (Rs.) 12 1

since previobill

TOR

Remarks

13

ous

Page 47: S BI INFRA M ANAGEM ENT SOL UTIONS PV T. LTD. STATE …...Vijay Sa 55,Sahy Near Sta AHMED can be do It shall be r l and finan alified. tractor sh the numb itions othe to be with IMS

The mea

-----------

recorded

No.------

---------Signat

Contract

The wor

satisfact

---------Archite

asurements

------------ w

d at pages

----------------

---------------ture and dator

rk recorded

torily as per

---------------ect

s on the ba

were made h

---------------

------.

----------- ate of

in the abov

r tender dra

-----------

CER

sis of which

have been t

------------ to

-------------Signatu

ARepres

ve-mention

awings, con

Signatu

47 SE

RTIFICATE

h the above

taken jointly

o -------------

---------------ure and datArchitects sentative (S

ned measur

nditions and

--------------ure and dat

EAL & SIGN

E

e entries fo

y on --------

--------------

--------- -te of

Seal)Si

rements ha

d specificat

---------------te of Site En

NATURE OF

r the Runni

----------------

of measure

---------------Signature

ite Enginee

s been don

tions.

------- ngineer

CONTRAC

ng Bill No.-

---- and are

ement book

---------------e and date oer

ne at the sit

TOR

----

e

k

----- of

te

Page 48: S BI INFRA M ANAGEM ENT SOL UTIONS PV T. LTD. STATE …...Vijay Sa 55,Sahy Near Sta AHMED can be do It shall be r l and finan alified. tractor sh the numb itions othe to be with IMS

R/A BILL1.

2.

3.

4.

5.

i)

ii)

iii)

(a)

(b)

iii.

iv.

L NO. Total previou

Total asince PTotal a(C) (A+

PVA onof Steeand lastatem

Total a OBJECSecureR/A

Retentper acamoun

Less a

Balanc

Mobiliz

Outstainteres

To be r

Any othto be re

Any chargecontracstatem

ME

value of us bill (A)

amount of sPrevious Bilamount due+B)

n account oel, Cementabour as dents enclos

amount due

CTIONS: ed Advance

ion money ccepted te

nt Rs.

lready reco

ce to be rec

zation Adva

nding amt) as on da

recovered i

her Departmecovered a

other Dees to be recct (water, pent.

EMORAND

work don

ecured advll (B)

e since Prev

of declaratiot and otherdetailed insed.

e to the Con

e paid in the

on value oenders up

overed

covered

ance, if any

mount (prite

n this bill

mental matas per contr

epartmentalcovered if aower etc.) e

48 S

DUM FOR P

ne since

vance due

vious Bill

on in price r materials separate

ntractor

e previous

of works as p to date

ncipal +

erials cost ract, if any

l service any, as per enclose

EAL & SIGN

PAYMENT

Rs..........

Rs..........

Rs..........

Rs..........

Rs..........

Rs..........

Rs..........

Rs..........

Rs..........

Rs..........

Rs..........

Rs..........

Rs..........

Rs..........

NATURE OF

..............

..............

..............

..............

..............

..............

..............

..............

..............

..............

..............

..............

..............

..............

F CONTRAC

TABLE

CTOR

- XV

Page 49: S BI INFRA M ANAGEM ENT SOL UTIONS PV T. LTD. STATE …...Vijay Sa 55,Sahy Near Sta AHMED can be do It shall be r l and finan alified. tractor sh the numb itions othe to be with IMS

The bill after duepaymen Date:---- The bill after duepaymen Date : -- Signatur This figupaymen Date:---- -----------Signatur

amount to e checking t.

---------------

amount to e test chect for an am

---------------

re of Banks

ures given it -------------

---------------

---------------re of the Ci

i)

ii)

iii)

Rs. ----------of the mea

--------

Rs.----------king of meaount of Rs.

-------------

s/ SBIIMS E

n the Mem---------------

-----

---------- rcle Head &

STATU

Total Amo

Less I.T. P

Less S.T. PNet Payab

-------- (bothasurements

-------certifieasurements..................

Engineer

orandum fo----------------

& VP

UTORY DE

unt due (E)

Payable

Payable ble

49 S

h figures an of work as

ed by Conss of works a.................

or payable h---------------

EDUCTION

)

EAL & SIGN

nd words) hs required a

---------- Signatu with Se

sultants hasas required

has been v--------- (in w

:

NATURE OF

has been scand is recom

----------------ure of Archieal

s been scruand is reco

verified and words and f

Rs. -

Rs. -

Rs. -Rs. -

F CONTRAC

crutinized bmmended fo

----- tect

utinized by ommended

bill passedfigures)

-----------

-----------

----------------------

CTOR

by us or

me for

d for

Page 50: S BI INFRA M ANAGEM ENT SOL UTIONS PV T. LTD. STATE …...Vijay Sa 55,Sahy Near Sta AHMED can be do It shall be r l and finan alified. tractor sh the numb itions othe to be with IMS

All the mapprovedcontractooriginal. 1. SA Special N a) Th and Clie b) Te the dec Co c) As ma

d) The e) Th f) Ma not Co g) Wi com / Co

aterial to bed Brand. Anyor shall subm

MPLES

Notes :

e successfud in consultent / Archite

nderer shoue rates in thecision for ac

onsultants.

far as possianufacturer o

e client / Arc

e RCCB, RC

ke of compot mentioned

onsultant bef

thin a week mponent of aonsultant.

e used shall by deviation fmit samples

: A b m

T r d p

ul tendered wtation with thect / Consulta

uld have to se tender, in

ccepting mak

ible, the sucor it’s author

chitect/ Cons

CBO, MCB a

onents requianywhere, s

fore installat

of work ordeabove-mentio

SPECIFIC

be as per thfrom this shaof material t

After receipt bidder shall,materials he

The owner sregard to thedirected by tprepared / b

will have to she Client / Arant reserve t

specify the liscovering lett

ke specified

ccessful tendrized dealer.

sultant have

and MCB DB

red to be usshall be requion in writing

er, the controned approv

50 S

CATION OF

e specified mall be got appto be used fo

of the bids b, Upon notifie intends to U

hall reserve e Specificatithe Architec

brought for a

supply the mrchitect / Cothe rights to

st of makes ter of separaby tenderer

derer will hav

right to Che

Bs must be o

ed by contrauired to GOTg manner.

ractor shall sved make fo

EAL & SIGN

F MATERIA

make of the proved fromor verificatio

but prior to acation from Use.

the right to on before awt / Owner fopproval with

make of the mnsultant with choose any

considered ate letter encwould be of

ve to place o

eck the Chall

of same mak

actor to comT it Approve

submit the saor the approv

NATURE OF

ALS

materials lis Architect / Ons and Prod

award of the owner subm

evaluate theward of workr various item

hout Any co

materials as hout any exty make out o

in the tendeclosure. Howf client / Arch

order directly

lans of supp

ke.

mplete the insd by Client /

ample of eacval of the Cli

F CONTRAC

st and ISI Owner, the duce Bill in

contract, mit samples o

e sample witk. Samples ams shall be st.

recommendtra cost. of above list.

er while quotwever, the finhitect /

y to the

plier.

stallation, if / Architect/

ch item / ent / Archite

CTOR

of

th as

ded

ing nal

ect

Page 51: S BI INFRA M ANAGEM ENT SOL UTIONS PV T. LTD. STATE …...Vijay Sa 55,Sahy Near Sta AHMED can be do It shall be r l and finan alified. tractor sh the numb itions othe to be with IMS

APPLICA

ABLE STAN

Sr. No.

1)

2)

3)

4)

5) 6)

7)

8)

9)

10)

11) 12)

13)

14)

15)

16)

17)

18)

19)

NDARDS

IS No.

IS:2026-19IS 3639

IS:7886 IS:660

IS:2516-19

IS:335

IS:2705

IS:3155

IS:3236 Pa

IS:373

IS:2099

IS:5621

IS:2544

IS:2629 &

IS:3842

IS:1248-19

IS:3072-19

IS:692

IS:1255

IS:3043

IS:4047-19

977

972

art II

2633

958

975

977

51 S

Des

: Dist Fittin

: Insta

: Spe

: Insu gear

: CT f

: Volta

: Volta

: Bus

: Bus

: Larg

: Insu

: Hot

: Rela

: Mete

: Insta

: HV c

: Insta

: Cod

: HD Volta

EAL & SIGN

scription

ributing transngs and acc

allation of Tr

cification for

ulating oil for r.

for measurin

age (Potenti

age Transfo

bar arrangem

hing

ge Hollow Po

ulators

Dip Galvaniz

ays.

ers (measur

allation of Sw

cable.

allation of HV

de of practice

Air breaker,age not exce

NATURE OF

sformers & f. For P.T.

ransformer.

r AC circuit B

Transforme

ng and protec

al) Transform

rmer.

ment and ma

orcelains

zing

ing).

witch gears.

V cables and

e for earthing

, Switch geaeeding 1000

F CONTRAC

fittings.

Breakers.

rs & sw

ction.

mers.

arking.

d jointing.

g.

ars and fuse Volts.

CTOR

witch

es for

Page 52: S BI INFRA M ANAGEM ENT SOL UTIONS PV T. LTD. STATE …...Vijay Sa 55,Sahy Near Sta AHMED can be do It shall be r l and finan alified. tractor sh the numb itions othe to be with IMS

20)

21)

22)

23)

24)

25)

26)

27)

28)

29)

30)

31)

32)

33)

34)

35)

36)

37)

IS:8106-19

IS:4237-19

IS:2607-19

IS:8623-19

IS:375-196

IS:2147-19

IS:8084-19

IS:2675-19

IS:8828-19

IS:9926-19

IS:1554 (P

IS:3961 (P

IS:2982

IS:8130

IS:3975

IS:5831

IS:1753

IS:4288

966

967

976

977

63

962

972

983

978

981

Part I)

Part II)

52 S

: Selefuse

: for v

: Air-b1000

: Factcont1000

: Marbars

: Cub

: Insu

: Enccuto

exce

: Mini

: Fusefuse

: PVC duty

: Rec

: Copcore

: Conflexi

: Mildarmo

: PVC cabl

: Alum

: PVCalum

EAL & SIGN

ection, instaes upto 650 V

voltage not e

break isolato0 Volts.

tory built asstrol gears fo0 Volts A.C. king and arr

s main conne

bical Boards.

ulated condu

losed distrouts for Voltaeeding 1000

ature Circuit

e wire usedes upto 650V

C insulated ey.

commended

pper conduces.

nductor for ible rods.

steel wirouring cable

C insulation aes.

minum condu

C insulated minum condu

NATURE OF

allation and Volts.

exceeding 10

ors for Voltag

semblies of or voltage up

and 1200 Vrangement oectors and a

ctor rating.

ribution fusage not

Volts.

t Breaker.

in re-wearaVolts.

electric cable

current ratin

ctor in insula

nsulated ele

res, strips es.

and sheath o

uctor for insu

and PVC uctor cables

F CONTRAC

maintenanc

000 Volts.

ge not excee

switch gearspto and incluolts D.C.

of switch geauxiliary wirin

se boards

able type el

es He

g for ca

ated cables

ectric cables

and tapes

of electric

ulated ables.

sheathed of voltage r

CTOR

ce of

eding

s and uding

ar bus ng.

and

ectric

eavy

ables.

s and

s and

s for

.

solid rating

Page 53: S BI INFRA M ANAGEM ENT SOL UTIONS PV T. LTD. STATE …...Vijay Sa 55,Sahy Near Sta AHMED can be do It shall be r l and finan alified. tractor sh the numb itions othe to be with IMS

38)

39)

40)

41)

42)

43)

44)

45)

46)

47)

48)

49)

50)

51)

52)

53)

54)

55)

IS:961

S:732

IS:1646

IS:1653

IS:2667

IS:3480

IS:3837

IS:694

IS:2509

IS:6946

IS:1293

IS:8180

IS:9537-19

IS:3419

IS:3854

IS:6538

IS:2834-19

IS:2208

980

954

53 S

not e

: Rec

: Codinsta650

: Cod(gen

: Rigid

: Fittinwirin

: Flex

: Acceelec

: PVC

: Rigidwirin

: Flexelec

insta

: Thre

: Conand

: Speinsta

: Acceelec

: Swit

: Plug

: Shu

: HRC

EAL & SIGN

exceeding 1

commended

de of pracallation systVolts.

de of practicneral) electric

d steel cond

ngs for rigidng.

xible steel co

essories foctrical wiring.

C insulated c

d non-metang.

xible (playabctrical allation.

ee pin plugs

nductors for flexible code

cification fallation.

essories foctrical wiring.

tches.

gs.

nt Capacitor

cartridge fus

NATURE OF

100 volts.

current ratin

ctice for tem Voltage

ce for fire sacal installatio

uits for elect

d steel cond

onduit for ele

or rigid ste

cables (wires

allic condui

ble) nonmeta

and sockets

insulated es.

for conduit

r non-meta

rs for power

se and links

F CONTRAC

g for Ca

electrical we not excee

afety of Buildon.

trical wi

uits for elec

ctrical wiring

eel conduits

s).

ts for elec

allic conduit

s.

electrical ca

t for elec

llic conduits

systems.

up to 660

CTOR

able.

wiring eding

dings

ring.

ctrical

g.

s for

ctrical

ts for

ables

ctrical

s for

Page 54: S BI INFRA M ANAGEM ENT SOL UTIONS PV T. LTD. STATE …...Vijay Sa 55,Sahy Near Sta AHMED can be do It shall be r l and finan alified. tractor sh the numb itions othe to be with IMS

NOTE :

PLEASE

56)

57)

58)

59)

60)

63)

64)

65)

66)

All codes shall genStandard

E FOLLOW :

a. Indianb. Speciac. Regul

Counc

IS:1913-19

IS:2944-19

IS:3528

IS:3553-19

IS:1239-19

IS:2149-19

IS:9224

IS:2312-19

IS:374-197

and standarnerally followCodes of Pr

n Electricity Aal Attention sations for ecil of insuran

969

981

966

958

970

967

79

rds means thw the Indiaractice in the

Act of 1910 ashould be gilectrical equ

nce Associat

54 S

volts.

: Genfittin

: Codfares

: Wat

: Wat

: Mildpipe

: Lum

: HRCKA.

: Exha

: Clas

he latest whean Standarde absence of

and rules issven to Rule

uipment in bion of India.

EAL & SIGN

neral and sags.

de of practices.

terproof elec

ter tight elect

Steel tubue fitting.

minaries for s

C fuses hav

aust Fan.

ss I Ceiling F

ere not speci codes of

f correspond

ued there unNo. 50. uilding issue

NATURE OF

afety require

e for lighting

tric lighting f

tric lighting fi

lar and oth

street light.

ving rupturin

Fan.

ified otherwispractice or ing Indian St

nder revised

ed by The B

F CONTRAC

ement for lig

g public thor

fittings.

itting.

er wrought

g capacity o

se the instalr relevant Btandards.

up to date.

Bombay Reg

CTOR

ghting

rough

steel

of 90

lation British

gional

Page 55: S BI INFRA M ANAGEM ENT SOL UTIONS PV T. LTD. STATE …...Vijay Sa 55,Sahy Near Sta AHMED can be do It shall be r l and finan alified. tractor sh the numb itions othe to be with IMS

ELECTR D The scopboards - Standard AS PER Distribut DistributioM.S. Boxmade of phosphatarchitect/

Three phshall be s3. indepeinsulated

Conduit krenderedshould be MCB’s shshort circprovided with trip -operatingOFF posto 4 sq.mshrouded Fuses shthan 25 shroudedlag type. DistributioBoard shin accord

Bus bars

RICAL MAT

DISTRIBUTIO

pe of work s

ds :

SCHEDULE

tion Boards

on boards ax with hinge18 SWG stete and powd/consultant.

hase boardssolid tinned cendent neutrd PVC wires

knockouts shd dust and vee detachable

hall have qucuit both onwith inverse

- free mechag handle shasition. Pressumm. aluminumd. Wherever

hall be HRC MVA. Bottle

d. Re-wireab

on boards shall meet withdance with I.S

shall be sui

TERIAL SPE

ON BOARDS

shall cover s

E OF INDIAN

s :

long with theed door suitaeel sheet duder coated to

shall have copper bars ral bars shalbrought to a

hall be providermin proof e.

uick make ann the manuae time therm

anism. In casall be commoure clamp tem or 2.5 sq.MCB isolato

link type re-e type fuse

ble fuse carri

shall have Hh the requireS. standards

table for the

ECIFICATIO

S

supply, insta

N STANDAR

e controlling able for receuly rust inhibo an approve

phase barriewith tappedl be provide terminal stri

ded as requwith necess

nd break nonal and autommal over loase of multi-poon. Breakers

erminals for smm. copper

ors are speci

-wire able wis are not aiers shall be

RC/re-wire aements of ISs.

e incoming sw

55 S

ON

allation testi

RDS, ATTAC

MCB’s/Fuseessed mounbited throughed color of a

ers and a wd holes and cd. All DB’s sip of appropr

ired/shown oary sealing g

n - welding smatic operatd and instanole breakerss must confostranded/soland for high

ified they are

ith necessaracceptable. porcelain. H

able fuses aS 2675 and m

witch rating

EAL & SIGN

ng and com

HED IN THE

e or Isolator nting in wall.h a process adequate mi

wire channel chase headeshall be interriate rating fo

on drawings gaskets. The

self wiping stion. Each pntaneous ov, the trippingorm to BS 3lid conductoher ratings, te without the

ry fuse carrieFuse carrierHRC fuses fo

as shown onmarking arra

and sized fo

NATURE OF

mmissioning

E DOCUMEN

as shown sh Distributionof de-greasicron rating d

on three sided screws. Frnally pre-wior outgoing f

and the entie top and bo

silver alloy copole of the ver current trg must be on871 with facr insertion athe terminalse tripping elem

ers and with r terminals for motor dut

n the schedungement of

or a tempera

F CONTRAC

of all distrib

NT.

hall be fixed n boards shaing, acid picduly approve

des. NeutralFor 3 phase ired using cofeeders.

ire board shaottom side o

ontacts for 1breaker sharipping elem

n all the polescility for lockiare acceptabs shall be suments.

rating of notshall be suty should be

ule and drawbus bars sha

ture rise of 3

CTOR

bution

in an all be

ckling, ed by

bars DB’s, opper

all be f DB

0 KA all be

ments, s and ing in

ble up itably

t less itably

e time

wings. all be

35° C

Page 56: S BI INFRA M ANAGEM ENT SOL UTIONS PV T. LTD. STATE …...Vijay Sa 55,Sahy Near Sta AHMED can be do It shall be r l and finan alified. tractor sh the numb itions othe to be with IMS

over theindicatingterminal fconnectin In the ca63 A withcurrent.

All outgoMCB/Fus U 2 3 RCCB /

The RCCshould be

The RCC

Measure

Compari

The RCCcheck the

All metalresistant.

It should It should It’s accurIt should It should It’s encloIt’s mech

It should rule 50 of

It should BS 4293equipmen

ambient. Eg the load difor single phng the studs

ase of MCB dh a delayed

oing feedersse base by m

Up to 15 A

5 A

2 A

MCB :

CB should sue current ope

CB should en

ement of the

ison of the fa

B should havsum of the cu

parts shou.

be truly curroperate on c

racy should boperate evetrip at a pressure should

hanical opera

provide full f IE rule1956

conform to a

3 – 1983, nt)

Each board stribution sh

hase and twoand the outg

distribution bcharacterist

shall termimeans of insu

4.0 sq.mm

6.0 sq.mm

uffices all theerated and n

nsure mainly

fault current

ault current w

ve a torroidal urrent close to

ld be inhere

rent operatedcore balancebe ± 5 %. en in case of sent leakagebe as per IP

ation life sho

protection a6.

all national aCEE 27 (In

shall havehall be pasteo terminals fgoing ECU e

boards, the bic and a min

nate on a tulated single

2.5 sq.m

m.

m.

e requiremenot on line vo

y the followin

t value.

with a referen

transformer o zero.

ently resistan

d. e torroidal tra

neutral failue current withP 30. uld be more

as envisaged

and internationternational

56 S

e two separd on the insfor 3 phase Dearth bar.

backup fusenimum pre-a

erminal stripe conductor c

mm.

63 A

ents of IS asoltage.

g functions.

nce value.

witch has the

nt to corrosi

ansformer.

re. hin 30 M.S.

than 20,000

d by IE rules

onal standarcommission

EAL & SIGN

rate earthingide of the DBDB’s shall be

es wherever arcing time o

p which in tcopper wires

40 A

16 sq.mm

s per code IS

e main condu

ion and trea

0 operations

– 61-A, 71 –

rds like IS 88n Rules for

NATURE OF

g terminals. B as instructe provided w

shown shallof 0.5 sec. A

turn is intercs as follows :

10 sq

m.

S – 12640 –

uctors of prim

ated to make

s.

– ee, 73 – e

828 : 1993, r the approv

F CONTRAC

Circuit diated. One earwith an earth

be not lessAt 9 KA/3 KA

connected to:

q.mm.

– 1988. The

mary (P – N) w

e them corro

ee, 1985 and

IS 12640 – 1ved of elec

CTOR

agram rthing h strip

s than A fault

o the

RCA

which

osion

d also

1988, ctrical

Page 57: S BI INFRA M ANAGEM ENT SOL UTIONS PV T. LTD. STATE …...Vijay Sa 55,Sahy Near Sta AHMED can be do It shall be r l and finan alified. tractor sh the numb itions othe to be with IMS

Cabl

MEDIUM Scope : The scop Standard AS PER Cables : All cablesspecifiedaluminumto load sh All cablesmaterial, 600 mm

Cable jo

Connect

le terminatiotype soldcrimped operated Cable Gl Cable glacompresscompressbe CMRS Ferrules Ferrules control caand main Cable jo Kit type jgrade ins

M VOLTAGE

pe consists o

ds :

SCHEDULE

s shall be 1 and with an

m or copper hould be with

s shall be neconductor s

centers.

ints and ter

tors :

ons shall be mder less lugssolder less crimping to

lands :

ands shall besion type csion type shS approved.

:

shall be of sable by the tntenance.

ints :

joint shall besulation.

CABLING

of Laying & te

E OF INDIAN

100 Volt gran outer PVCconductors ahout any join

ew without asize and volt

rmination:

made with cs for all alum

lugs shall bol. All cable

e of heavy dcable glandall be used f

self sticking tterminal num

e done and

esting L. T. C

N STANDAR

ade XLPE inC protective s

and cores cont.

any kind or vtage class s

opper Heavyminum cables

be used. Crie lugs should

duty brass sis shall be for outdoor l

type and shambers to whi

filled with in

57 S

Cable and its

RDS; ATTAC

nsulated, shesheath. Cabolor coded to

visible damashall be mar

y duty long ns and stud tymping shall

d be long nec

ngle compreused for i

ocations. Gl

all be emploich the cores

nsulating co

EAL & SIGN

s termination

HED IN THE

eathed with les shall havo the Indian

age. The maked on the s

nack copperype terminals

be done witck type only

ession type aindoor proteands for clas

yed to desigs are connec

mpound. Th

NATURE OF

n.

E DOCUMEN

or without sve high condStandards.

anufacturers surface of th

r crimping lus. For coppeth the help oy.

as specified.ected locatiossified haza

gnate the varcted, for eas

he joint shou

F CONTRAC

NT

steel armorinductivity straAll cables la

name, insuhe cable at e

ugs only crimr cables copf hydraulica

. Generally sons and dordous areas

rious cores ose in identific

uld be for 1.

CTOR

ng as anded aid up

lating every

mped per

ally

single ouble shall

of the cation

1 KV

Page 58: S BI INFRA M ANAGEM ENT SOL UTIONS PV T. LTD. STATE …...Vijay Sa 55,Sahy Near Sta AHMED can be do It shall be r l and finan alified. tractor sh the numb itions othe to be with IMS

C

1.0 S

1.1 Th

2.0 S 3.0 R 3.1 A

&

3.2 F

st

b

4.0 A 4.1 P

et

co

w

5.0 W 5.1 A

C 5.2 A

5.3 C

CONDUIT W

Scope :

he scope of w

Standards

Rigid and Fle

All PVC cond

& I.S.I. & of 2

Flexible condu

teel strip with

brass adapter

Accessories

PVC conduit

tc. shall be sp

onduit fitting

with galvanize

Wires :

All wires shaCopper, PVC

All wires shalPhase

R Y B N Eart Con All o

Color code s

WIRING

work shall co

: As per a

exible condu

duits shall be

25 mm. Diam

uits shall be

h a fused zin

rs.

:

fittings such

pecifically de

gs shall confo

ed conduit sh

all be single C insulated a

l be color coe

th ntrol (If any) off wires

should be s

ver supply, i

annexure - iv

its :

laid in open

meter.

formed from

nc coating on

as bends, elb

esigned and m

orm to IS:26

hall also be g

core multi-ss per IS:694

oded as follo

strictly used

58 S

installation te

v

/concealed m

m a continuou

both sides.

bows, reduce

manufacture

67-1974 and

galvanized.

strand/ flexi4 and shall b

ows : Colo

Red Yello Blue BlacGreen (insu Grey Sam

d for all wiri

EAL & SIGN

esting and co

manner which

us length of s

The conduit

ers, chase nip

ed for their p

IS:3887-196

ble copper be 660v/ 110

our of wire

d ow e ck ulated) y

me as Phase

ng.

NATURE OF

ommissionin

h are approv

spirally woun

s shall be ter

pples, split co

particular ap

66. All fitting

or single st00V grade.

e wire

F CONTRAC

g of all.

ved by F.I.A.

nd interlocke

rminated in

ouplings, plu

plication. A

g associated

rand Alumin

CTOR

ed

ugs

All

num /

Page 59: S BI INFRA M ANAGEM ENT SOL UTIONS PV T. LTD. STATE …...Vijay Sa 55,Sahy Near Sta AHMED can be do It shall be r l and finan alified. tractor sh the numb itions othe to be with IMS

6.0 S 6.1 S

shso

6.2 F

b 7.0 In 7.1 C

eC

7.2 S

12345678911

7.3 C

shE

7.4 Wefle

7.5 Ca5E

ii) iii)

For c

i) ii) iii)

Switches & S

Switches shahall be 3 pinockets shou

or heavy duox shall be p

nstallation:

Conduits shalectrical serv

Computer pip

Separate con. Normal lig. Separate . Power ou. Emergenc. Telephon. Fire alarm. Public ad. For all oth. T.V. Ante0. Water lev1. Computer

Call bell wirinhall be supp

Engineer. Wiring for sho

tc., shall be exible exten

Conduits run re properly s00 mm. Fix

Exposed con

InstallationCable mar

cable buried

Cables anInstallationCable mar

Sockets:

all be modulen with switchld be used t

ty, metal claprovided.

all be kept at vices. And mping.

nduits/racewghts and 5 Aconduit sha

utlets – 15 A cy lighting. es.

m system. dress systemher voltages nna.

vel guard. r Wiring.

ng layout of cplemented an

ort extensioninstalled in fsion shall ex

on surfacesscrewed to txing screws nduits shall

n, commissiorking.

d undergroun

nd protectiven, commissiorkers.

e type/ flush and plate tyto minimize t

ad sockets w

a minimum maintain min

ways shall beA 3 pin sockeall be laid fro

3 pin 20 A/3

m & Music s higher or lo

conduits shand complem

ns to outletsflexible condxceed 1.25 m

s shall be suthe wall or ceshall be withbe neatly r

59 S

oning and te

nd :

e bricks & tileoning & test

piano type wype cover. Cthe switch b

with M.C.B./

distance of nimum 300 m

e used for: ets on lightinm D.B. to sw

30 A, 2 pin s

system. ower than 23

all be generamented by co

in hung ceilduits. Otherwm.

pported on meiling. Saddh round or crun parallel

EAL & SIGN

esting.

es. ing.

with silver-coCombinationoxes.

Isolator mou

100 mm. Frmm distance

ng circuit. witch board scraping eart

30 V.

ally indicatedontractor on s

ling or to vibwise rigid co

metal 12 mmdles shall becheese head

or at right

NATURE OF

oated contan of multiple

unted in a ga

rom the pipee between te

or point. th metal clad

d on drawingsite with app

brating equiponduits shall

m. thick sadd at intervals

d and of rustangles to

F CONTRAC

cts. Socketsswitch units

alvanized ste

es of other noelephone, TV

d sockets.

gs and the laproval of the

pments, motol be used. N

dles which inof not moret-proof matethe walls o

CTOR

s s and

eel

on-V &

ayout e

ors No

n turn e than erials. of the

Page 60: S BI INFRA M ANAGEM ENT SOL UTIONS PV T. LTD. STATE …...Vijay Sa 55,Sahy Near Sta AHMED can be do It shall be r l and finan alified. tractor sh the numb itions othe to be with IMS

bstbin

7.6 Cmcoco

7.8 C

thPab

7.9 InrecamcosccaN

7.10 C

ocob

7.11.1 A

le 8.0 L 8.1 a

fleso

8.2 A

opwp

8.3 F

gstof

uilding. Unsteel junctione allowed u

n appearanc

Conduits embmm. intervalsonduit and bontractor. T

Conduits burihe reinforcem

Proper care st the time ofefore they a

nspection boemoval of wiase of conce

meters apart overed by 6 crews. Thesase may be

No separate c

Conduits shail. The entirontinuous beoxes of not

An insulated ength.

ighting & Po

ll final brancexi-cables ruockets, bens

All circuits shther wiring shase. Each

whichever is hase.

lexible cordsrade (three otranded copf sheath sha

seemly condn/pull throughnless it is nee.

bedded into s. Chases inbrought to thThe contracto

ied in concrement and goshall be takef pouring theare embeddeoxes shall beires. Such inealed conduor two 90o smm. clear P

se junction bincluding thcharges sha

all be free frore system of efore the coless than 32

earth wire o

ower Wiring:

ch circuits foun inside cos, and juncti

all preferablshall be bunc lighting bralower. Each

s for connecor four coresper wires, in

all be subjec

duit bends ah boxes for becessary an

the walls shn the walls she finish of thor shall prov

ete structureot approved en to ensure e concrete sued. e provided fonspection bo

uits. Inspectsolid bends oPerspex platboxes shall fe cost of rem

all be allowed

om sharp edgconduits munductors are

2 mm. deep.

f copper rate

r lighting andnduits. Theon boxes.

ly be kept inched in the snch circuit s

h conduit sha

ction to applis i.e with insnsulated, twict to the Eng

60 S

and offsets sbetter appea

nd entire con

hall be fixed hall be neathe wall but fivide wire me

e shall be puby the Enginthat the con

uitable fish w

or periodical oxes shall beion boxes shor equal. Alte truly cut aform part of moving the Pd except wh

ges and burust be compe pulled in.

ed capacity

d appliances conduit sha

a separate same condushall not havall not hold m

ances, fans sulated neutrsted and shineer’s appr

EAL & SIGN

shall be avoiarances. Nonduit installa

by means stly made andinal finish wish before m

ut in position neer, before nduits are newires shall be

inspection te flush with hall be spacel junction annd fixed withpoint wiring Perspex covhere specially

rrs and the thpletely installconduits sho

shall be run

s shall be sinall be proper

conduit up tuit except thove more thanmore than th

and pendanral wire of saeathed with oval.

NATURE OF

ided by usino cross-overation shall be

taples at notd refilled aftell be done b

making rough

and securethe concret

either dislocae drawn in a

to facilitate wthe wall or ced at not mo

nd switch boxh cadmium por conduit w

ver for paintiny mentioned

hreading freed and rendould termina

in each con

ngle conducrly connected

to the Distribose belonginn ten outlets hree branch

nts shall be 6ame size) wistrengthenin

F CONTRAC

ng fabricatedr of conduits e clean and

t more than er laying the y the buildin

h plaster.

ly fastened te is poured.ated nor choall conduits

withdrawal aceiling in the ore than 12 xes shall be plated brasswiring as theng and re-fixd.

e from greasdered electricate in junctio

nduit for enti

ctor/ strandedd or jointed i

bution Boardng to the samor 800 wattscircuits of sa

650/1100V ith tinned ng cord. Co

CTOR

d mild shall neat

500

ng

to

oked

and

s e xing.

se or cally n

re

d/ into

d. No me s ame

olor

Page 61: S BI INFRA M ANAGEM ENT SOL UTIONS PV T. LTD. STATE …...Vijay Sa 55,Sahy Near Sta AHMED can be do It shall be r l and finan alified. tractor sh the numb itions othe to be with IMS

8.4 L

ujoth

8.5 C

fixC

8.6 P

m 8.7 E

d 9.0 T 9.1 T

a b c) A 10.0 M 10.1 T

wadbco

10.2 A c 10.3 A

of

M

10.4 Beco

ooping systenavoidable,

oints shall behe length of

Control switcxed in 3 mm

Cadmium pla

Power wiring mm. and wire

Every conducrawings.

Testing :

The entire ins

) Insula

) Earth

) Polari

A test certifica

Mode of mea

The definitionwiring from D

ccessories, rawings. Thoard and/or ontractor ma

All switches sontact switc

All empty conf unit length

Measuremen

Buzzer indicalectromagneonsidered as

em of wiringthey shall b

e made unlethe standard

hes shall bem. thick paintated brass sc

shall be dises not less th

ctor shall be

stallation sha

ation resistan

continuity.

ty of single p

ate shall be

asurement:

n of point wirD.B. onwards

connection the point ratedirectly to th

ay draw max

sockets with ch shall be in

nduit runs, in.

ts shall be a

ator of the wet, Perspex cs on unit for

shall be usee made thross the lengtd coil.

e connected ted or galvancrews shall b

tinctly separhan 2.5 sq. m

provided wi

all be tested

nce.

pole switche

submitted in

ring shall bes together wto all light fit shall includhe point. Thximum 2/3 c

boxes, eartnclusive in po

ncluding junc

along the con

ays specifiecover plate, measureme

61 S

ed. Wires sough approvh of the sub

in the phasenized steel bbe used.

rate from lighmm. copper

ith identificat

for :

es.

n the Perform

in accordanith all junctiottings switche circuit wiri

he circuit wirircuits of the

hing intercooint wiring.

ction boxes f

nduit and co

d shall conschromium p

ent and paym

EAL & SIGN

hall not be joed mechanic-circuit, sub-

e conductorsboxes with co

hting wiring.shall be use

tion ferrules

ma shown u

nce with skeon boxes, coes etc. as sping from diste shall be in

e same phas

nnection and

fish wires et

oncurrent len

sist of indicatplated brass ment.

NATURE OF

ointed. Whecal connecto-main or ma

s only. Switcover plates a

Conduits ned.

at both end

nder Appen

tch drawing onnectors, eapecified andtribution boan separate cose in circuit m

d plate type

c. shall be p

ngth of sub-c

ting lamps, rscrews etc.

F CONTRAC

ere joints areors. No sucin is more th

ches shall bas specified

not less than

ds matching

dix – I.

and should arth wire, fix

d shown on ard to switch onduit. The mains condu

silver

paid on the b

circuit wiring

reset button,shall be

CTOR

e h han

e .

n 25

the

xing

uit.

basis

.

,

Page 62: S BI INFRA M ANAGEM ENT SOL UTIONS PV T. LTD. STATE …...Vijay Sa 55,Sahy Near Sta AHMED can be do It shall be r l and finan alified. tractor sh the numb itions othe to be with IMS

10.5 Ttyco

EARTHINScope : The Scoconnectin

Standard

AS PER

Plate Ea

The subs

The earth3 mm / 6maintaine The resis

The earththe drawi

Minimum

All earth

Pipe Ear

The earthgrid. Theearth res

The resisThe eartpermane

Earth lea

Earth lea on drawiwall or ce

The com independ

Equipme

All appa manner.

Two way lighype switchesontrolled. S

NG

ope of workng the powe

ds : ANNEXURErthing Statiostation earthi

hing station 600 x 600 x ed with a sui

stance of each lead shall bing.

m distance bepits shall be

rthing Statio

h station sha earth electristance shal

stance of eacth lead shalently accessibads and conad shall be baings. At roadeiling shall beplete earthindent return p

ent Earthing

ratus and eq Copper ear

t points shals, wiring from

Subsequent l

k shall cover panels, DB

E – IV. on : ing shall be w

shall be as s6 mm. Cop

itable soil tre

ch earth statbe connecte

etween two eminimum 1

on :

all be as showode shall bel be maintainch earth statl be fixed toble. nnections : are copper od crossings ne fixed on sa

ng system shpath to the ea

g :

quipment tranrth wires sha

ll be classifiem the 1 st 2 wights, if any,

er supply ofB’s and switc

with copper

shown on thper plate –

eatment as s

tion should nd to the eart

earth pits shaMt. Away fr

wn on the dre 2.5 m. long ned with a sution should no the pipe w

or aluminum necessary Haddles or wahall be mecharth source.

nsmitting or ll be used un

62 S

ed accordingway switch t, shall be me

f earthing sch boards.

plate earthin

e drawing. Tas specifiedhown on dra

not exceed 1 h plate throu

all be 2 Mts.rom building

rawing and s50 mm. Dia

uitable soil trnot exceed 5 with a and s

or galvanizeume pipes s

all. anically and

utilizing pownless otherw

EAL & SIGN

g to and conto the 2nd 2 easured as o

stations, layi

ng station un

The earth eled in B.O.Q. Tawings.

ohms. ugh copper/b

foundation.

shall be usedameter galvareatment as ohms.

safety set s

ed steel as sshall be laid.

electrically b

wer shall be ewise indicated

NATURE OF

nsist of 2 Nosway switch

ordinary sec

ing copper

less otherwi

ectrodes shaThe earth re

brass bolts a

d for equipmenized steel pshown on dr

screws. The

pecified withEarth lead ru

bonded to pr

earthed in thd in the sche

F CONTRAC

s. 2 way plato the first li

condary poin

earth strips

se specified

all be 450 x 4esistance sha

s shown on

ent earth pipe. The rawings.

clamps sha

h sizes showun on surfac

rovide an

e following edule of work

CTOR

ate ght

nt.

s and

.

450 x all be

all be

n ce of

k

Page 63: S BI INFRA M ANAGEM ENT SOL UTIONS PV T. LTD. STATE …...Vijay Sa 55,Sahy Near Sta AHMED can be do It shall be r l and finan alified. tractor sh the numb itions othe to be with IMS

and draw Power tr Metallic c insulated minimum Non-met metallic the earth for easy In the cashould fo Three PhcorrelatedSimilarly respectiv Testing The follorecorded Each ear Earthing Earth con Mode of Providingmasonry The followearth wire Main equ Connecti The cost separate Isolating

wings.

ransmission

conduit shall d/bare earth m and maxim

tallic conduitconduit. All m conductor sidentification

ase of cable,orm a separa

h. Power pand to the incofor 3 Ph a

vely, sizes be

:

owing earth .

rthing station

system as a

ntinuity cond

measureme

g earthing stachamber wi

wing items oes/strips clam

uipment earth

ons to the sw

of earthing te payment fo

g switches an

n apparatus

not be accecontinuity co

mum shall be

t shall have ametal junctioshall be connn.

an earth coate insulated

nels and distoming cable sand 1 Ph eing correlate

resistance v

n

a whole

ductors

ents :

ation completh cast iron c

of work shall mps, labor e

hing grid and

witchboard,

the followingor earthing sh

nd starters sh

s :

epted as an eonductor of s

e provided.

an insulated on and switchnected. The e

ontinuity concore of the c

tribution boasize. In caseisolating swed to the inc

values shall

ete with excacover etc. sh

be measureetc.

d connection

power panel

g items shall hall be made

hould form p

63 S

earth continusize 50% of t

earth continh boxes shaearth conduc

nductor shall cable.

rds shall have of 1 Ph. DBwitches therecoming cable

be measure

avation, electhall be treate

ed and paid p

ns to the eart

ls, distributio

become pare.

part of mount

EAL & SIGN

uity conductothe phase co

nuity conductll have an insctor shall be

either be ru

ve 2 distinct B’s a single ee shall be e.

ed with an

trode, wateried as one un

per unit lengt

thing stations

on boards etc

rt of the cost

ting frame, s

NATURE OF

or. A separatonductor sub

tor of the samside earth st distinctly co

un outside a

earth conneearth connec2 and 1 e

approved ea

ing pipe, soiit of measur

th covering t

s.

c.

of the item i

switch starter

F CONTRAC

te bject to the

me size as fotud to which olored (green

long the cab

ections of thection is adeqarth connec

arth meggar

l treatment, ement.

the cost of th

tself and no

r etc.

CTOR

or

n)

ble or

e size quate. ctions

r and

he

Page 64: S BI INFRA M ANAGEM ENT SOL UTIONS PV T. LTD. STATE …...Vijay Sa 55,Sahy Near Sta AHMED can be do It shall be r l and finan alified. tractor sh the numb itions othe to be with IMS

Light fitti Conduit w TELEPH This cove 1) The Tele Tele Tele

The 2) Co Co Ind Th 3) Ca Th Ind Ins All 0.5 Th be 0.1 Ca pol ingr All a

ngs – form p

wiring cablin

ONE DISTR

er supply ,ins

e scope of w

ephone cabl

ephone Tag

ephone wirin

e telephone e

nduits :

onduits shall

door : e conduit sh

ables and W

e type of cab

door Multi pa

side Twin cor

multi core c5 mm dia and

e conductor etween the c1 micro farad

ables laid undlyethylene coress.

armoring sha

part of install

g – should fo

RIBUTION

stallation, tes

work shall cov

les

Blocks

ng in conduit

exchange an

be as given

medium ga If in

hall generally

Wires :

bles and the

air, PVC insu

re PVC insul

ables and wd shall be co

resistance sconductors nod per kilomet

derground oompound an

all be of galv

lation of the

orm part of th

sting, comm

ver supply, in

ts

nd the hand

below :

auge Rigid Pn flooring proy be as speci

services sha

ulated sheath

lated with co

wires shall beolor coded tw

shall be less ot less than ter.

r locations snd shall have

vanized stee

64 S

light fitting.

he wiring or

issioning of t

nstallation, c

sets shall be

PVC conduit.ovide heavy ified under s

all be as follo

hed armored

onduit twisted

e of tinned cowisted pairs w

than 150 oh50 mega oh

ubject to dame sufficient p

l wires and p

EAL & SIGN

cabling.

telephone sy

commissionin

e supplied by

. gauge.

section `CON

ows :

and sheath

d cores.

opper conducwith rip cord.

hms per KM ms and the

mpness and rotection aga

protected ag

NATURE OF

ystem.

ng and testin

y the clients.

NDUIT WIRIN

ed.

ctor of not le.

and the insunominal cap

flooding shaainst moistur

ainst corrosi

F CONTRAC

ng of :

NG’.

ess than

ulation resistaacitance of a

all be filled wre and water

ion by an ou

CTOR

ance about

with r

ter

Page 65: S BI INFRA M ANAGEM ENT SOL UTIONS PV T. LTD. STATE …...Vijay Sa 55,Sahy Near Sta AHMED can be do It shall be r l and finan alified. tractor sh the numb itions othe to be with IMS

T

T

she Oute All u with

All tinnAll bus Tag

Thetwotermcon

Thecovand Ins TheWIR

The connecti resistanc

The final bra cables in

eath of PVC er sheathing

unarmored sh rip cord.

single pair ned copper ctelephone o

s bar cover w

g blocks :

telephone to terminal bminated on snnecting jum

e tag blocks vers and shad stove bus b

tallation :

e installationRING’.

Telephon

Separate

All cables

ion at the tagce.

nch connecteach condu

Conduit d inch

¾” 20 1” 1¼” 32 1½” 40

in the case og must be fire

single core c

cables for fconductors ooutlets shall with bus bar e

ag blocks shblocks, crosseparate terpers shall be

shall be moall be fully acbar.

n of condui

ne / Data pip

e J.B. shall b

s shall be on

g blocks sha

tions with sinuit shall be as

diameter

25

of indoor cabe retarding a

cables and in

final extensioof not less thconsist of 2 edges and c

hall be suitabss connect minal blockse insulated w

ounted insidecessible. Th

its shall ge

es shall be k

be provided f

n cable racks

all be silver s

ngle pair cabs follows :

Max. No. o mm.

2 Nos. sing 6 Nos. 12 Nos. sin18 Nos. sin

65 S

bles and polynd anti - term

nner sheath o

on to the tean 0.6 mm. A 2 pair po

chromium pla

ble for the mtype. All in

s and terminwires of same

e fabricated se enclosure

nerally be

kept 100 from

for telephone

s and neatly

oldered so a

bles in condu

of cables

gle pair single pair

ngle pair ngle pair

EAL & SIGN

yethylene in mite.

of armored c

elephone ouDiameter an

olythene conated brass h

multi core telencoming andnation shall be diameter a

sheet steel bshall be pain

as specified

m power con

e & Compute

stitched toge

as to achieve

its and the m

NATURE OF

the case of o

cables shall b

utlet box shand shall be dnnector in Gardware.

ephone cabled outgoing be silver soldand screw co

boxes with rnted with 2 c

d under se

nduit.

er.

ether.

e minimum c

maximum nu

F CONTRAC

outdoor cabl

be provided

all be unarmdrawn in con.I box with 6

es and shall cables sha

dered. The connected.

emovable hicoats of red o

ction `CON

contact

umber of

CTOR

les.

mored duits. 6 mm

have all be cross

inged oxide

DUIT

Page 66: S BI INFRA M ANAGEM ENT SOL UTIONS PV T. LTD. STATE …...Vijay Sa 55,Sahy Near Sta AHMED can be do It shall be r l and finan alified. tractor sh the numb itions othe to be with IMS

INSTALL This c code o (i) (ii) (iii) (iv)

(v)

(vi)

(vii)

Signatu Name : License

LATION TES

ontractor is t

of practice. H

Insulation R

Load test :

Earth resist

Certific

Circui

Certifi the supe

Certificorrect

ure of Ele

e No. :

STS CERTIF

BY EL

to certify tha

He has to giv

Resistance te

-

15A

tance for eac

cate of make

it diagram

ed that the ervision of lic

ed that the et depth confi

ectrical

FICATE

LECTRICAL

at the work is

ve the test re

est is

5A - 1000 W

A - 3000 W P

ch electrode - - -

s of material

lectrificationcensed Electr

arthing plateirming to IE

Supervisi

66 S

CONTRACT

s carried Out

eport is unde

R - Y - N B - N

W Power Poi

Power Point

- 1 Ohm 2 Ohm 3 Ohm 4 - N - E V

ls used in the

n work has brical supervi

e / pipe has bRules.

ion

EAL & SIGN

TOR

t work confir

er.

N M. OhmN M. OhmsN N. Ohms

int - 15 Minu

- 15 Minute

Volts

e work

een carried oision.

been verified

Signatu

NATURE OF

rming to IE R

ms s

utes

es

out under

and Placed

ure of Con

F CONTRAC

Rules and

at

ntractor

CTOR

Page 67: S BI INFRA M ANAGEM ENT SOL UTIONS PV T. LTD. STATE …...Vijay Sa 55,Sahy Near Sta AHMED can be do It shall be r l and finan alified. tractor sh the numb itions othe to be with IMS

1

2

3

4

5

6

7

8

9

1

1

1

1

1

1

1

1) Rates for

of main

WITH RE2) Rates for

to COMP3) Rates for

SWITCH4) Rates for

EPABX/C5) Rates for

DIFFERE6) THE CO

DBS TO DIFFEREPOINTS COPIES

7) THE COPOWER

8) THE CO9) EVERY C

, LIGHTI10) FOR DA11) FOR UP12) EMPTY 13) PVC CO14) ELE. CO

LICENS15) CONTRA16) CONTRA

r LIGHT, FAwires and P

EQUIRE CIRr COMPUTE

PUTER POWr COMPUTE

H to COMPUr TELE POINCRONE BOr A.C. / POWENT A.C. ANNTRACTOR

DIFFERENENT I/O POIWITH NUM– 1 WITH L

NTRACTORPOINTS.

NTRACTORCONDUIT FNG POINTSATA & TELE

PS & RAW PCONDUIT M

ONDUITS MUONTRACTOSE NO. / SUP

ACTOR SHACTOR SH

IMPOR

AN, EX. FANPVC pipes fr

RCUITS . ER POWER WER POINTER I/O includ

TER NODENTS include

OX to TELE. WER POINTND POWER

R SHOULD S

T SWITCHBINTS WITH BERING, ET

LAMINATION

R SHOULD U

R SHOULD UFOR UPS , RS SB SHOUE. POINTS, POWER POIMUST BE LAUST BE CLA

OR MUST SUPERVISOR OULD SUBOULD PRE

RTANT PO

N, CALL BErom LDB-RO

POINTS inc

S.

de the cost o

S.

e the cost of

POINTS.

TS include th

R POINTS WSUBMIT TH

BOARDS WNUMBERINTC. AFTER

N.

USE MAX. 3

USE MAX. 3RAW POWEULD BE SEP

BIG JUNCTINTS, BIG/ SAID FOR SEAMPED WIT

UBMIT CERCERTIFICAMIT TEST RSENT EART

67 S

OINTS TO

ELL, RAW POW POWER

clude the cos

of DATA cab

TELEPHON

e cost of wir

WITH REQUIE BUILTUP

ITH NUMBENG, TELE. K

EXECUTIO

3 CIRCUITS

3 WIRES OFR , DATA &

PARATE. TION BOX MSMALL JUNECURITY SYTH SADDLE

RTIFIED LOAATE NO. REPORT. THING PLA

EAL & SIGN

O BE NOT

POWER ETCR DB to DIFF

st of wires a

bles and PVC

NE Wires and

res and PVC

RE CIRCUITSLD OF PA

ERING, SLDKRONE BOXON OF THE

S IN ONE CO

F DATA & T& TELE., PO

MUST BE RNCTION BOYSTEM. ES IN CEILIAD LIST WIT

ATES BEFOR

NATURE OF

TED

C. POINTS in

FERENT SW

and PVC pipe

C pipes from

d PVC pipes

C pipes from

TS.

ANEL, SLD D OF DATARX TO DIFFEBRANCH. –

ONDUIT FO

TELE. IN ONOWER POINT

EQUIRED. OX MUST BE

NG ONLY. TH ELE.

RE EX

F CONTRAC

ncludes the

WITCHBOAR

es from UPS

m SERVER

s from

m A.C.DB to

OF DIFFERRACK TO RENT TELE

– 2 SETS OF

R UPS & RA

NE CONDUITTS, AC POI

E REQUIRE

CTOR

cost

RDS

S DB

RENT

E. F

AW

T. NTS

D.

Page 68: S BI INFRA M ANAGEM ENT SOL UTIONS PV T. LTD. STATE …...Vijay Sa 55,Sahy Near Sta AHMED can be do It shall be r l and finan alified. tractor sh the numb itions othe to be with IMS

APP

1 PVC rigAccess

2 L.T. Ca 3 Wires

4 Main D

5

ELCB / Circuit

6 Switch

7 Change

8 Domes

a) All SAccess

b) Hold

c) Adhe

9 10 - 30Socket

10 Telepho

11 Telepho

12 Cable L

ROVED M

gid conduitssories (FRLS

bles

(FRLS)

istribution

RCCB /MinBreaker

Gears

e Over Swit

tic fittings Switching Msories.

der/Ceilling

esive Tape

0 A Polycarb& Top

one Wires /

one tag blo

Lugs

MAKE LIS

s & S)

1.5BLto

H R

Boards MDEa

niature MDEa MDEa

tch HP

Modular Sc

Eli

roses An

Bh

bonate MD

Ea

/ Cable Fin

ock Kr

Do

ST OF EQ

5 mm thick LP / PFI /Anbe used. ).

avells / Dia

. R. Kable /

DS Legrandazy 9 ) L & T

DS Legrandazy 9 ) L & T

DS Legrandazy 9 ) L & T

PL Socomac

chneider Livite Plate) / L

nchore or E

hor (Steel G

DS Legrandazy 9 ). L &T

nolex / R. R

rone make.

owell / Lotu

68 S

QUIPMEN

ISI and FIAchor/ Polyc

mond / KEI

Havells / L

d (Lexic ) / HT Exora/ C &

d (Lexic ) / HT Exora/ C &

d (Lexic ) / HT EXORA/ C

c/ Havells /

via / L & T OLegrand My

Equivalent A

Grip) or appr

d (Lexic ) / HT EXORA / C

R. Kable / Ha

s / Jainson

EAL & SIGN

NT AND A

A approved cab make. (

/ Finolex./P

L & T / KEI/P

Hager / Cra&S Wintrip

Hager / Cra&S Wintrip

Hager / CraC &S Wintrip

L & T./Hage

Oris/ Crabtryris.

Approved m

roved .

Hager / CraC &S Wintri

avells / L &

n / 3 D.

NATURE OF

ACCESSO

- Precision( Only white

Poly Cab

Poly Cab

abtree XPRO

abtree XPRO

abtree XPROp

er

ree Verona

make.

abtree XPROp

T./ Polycab

F CONTRAC

ORIES

n / Vraj / Nihe coloured

O / Schneid

O / Schneid

O / Schneid

/ Salzer S90

O / Schneid

b

CTOR

hir / pipes

der (

der (

der (

0 (

der (

Page 69: S BI INFRA M ANAGEM ENT SOL UTIONS PV T. LTD. STATE …...Vijay Sa 55,Sahy Near Sta AHMED can be do It shall be r l and finan alified. tractor sh the numb itions othe to be with IMS

13 Cable gDouble

14 Ammet

15 Selecto

16 Indicato

17 Connec

18 Lightin

19 Exhaus

20 Ceiling

21 Wall mo

22 Data Ca LIGH

APPRO

Note: [a] W A of sh th [b] Be fro [c] Co as [d] Co m

gland Singlee Compresster / Voltme

or switches

or lamps

ctor strips

g Fixtures

st fan (Light

Fan

ounted Fan

able - I / O U

HTING FIXTUOVED EQU

here other pproved frof Non- Availhould be ushe Architect

efore startinom Architec

onsultants r and when

onsultants mentioned ab

e /

sion HM

ter AE

L & LE Wa Ph

t duty) Kh Or

n Cr

Unit D

URES - SEEUIVALENT A

Material arom the Archlability of an

sed only aftt. The Mater

ng of work cct before us

reserve the required.

reserve rigbove.

MI / Comet /

E / HPL /ME

& T salzer /

ED type Tek

ago / Elmex

hilips / Have

haitan / Cro

rient (PSPO

rompton / K

- Link./Digi

E CAT NO. &AS PER AP

re propsed hitect befor ny materilaer it is Apprial shall be

contractor sing at site

right to add

ghts to sele

69 S

/ 3D.

ECO/ Enerco

/ Kaycee m

knic / Precif

x make.

ells / GE/Cro

mpton / Hav

O)/Crompton

Khaitan / Hav

Link

& SPECIFIEPPROVED M

BANK

to be used execution of specifieroved in wr

e used in pr

must get al

d or delete n

ect any of

EAL & SIGN

on make.

ake.

fine/ Binay.

ompton/C&

vells./ Lum

n (High Bree

vells / Lum

ED MAKE INMAKE LIST

these shouof particulad make, Th

riting by theefential Ord

l samples/m

name of any

the specif

NATURE OF

&S Make.

inious.

eze)/Havells

inious.

N THE FINANDIRECTED

uld be got ar item. In cae Alternativ

e Employer der only

make appro

y manufact

ied brands

F CONTRAC

s / Luminio

NCIAL BID.BY ARCHIT

ase ve or

oved

ture

s

CTOR

us.

OR TECT/

Page 70: S BI INFRA M ANAGEM ENT SOL UTIONS PV T. LTD. STATE …...Vijay Sa 55,Sahy Near Sta AHMED can be do It shall be r l and finan alified. tractor sh the numb itions othe to be with IMS

UPS, RSARDA

S.B. No

1

2

3

4

5

6

7

8

9

10

11

12

R.POWER ARGADH B

o. Loca

BRANCH

OFFICER

OFFICER

GRAHAKTABLE

S.W COU

S.W COU

S.W COU

SERVICETABLE

DIGITAL

SERVER

RACK

E-LOBBY

TOTAL

DATA BRANCH

ation of S.B.

H MANAGER

R TABEL-1

R TABEL-2

K MISTRA

UNTER-1

UNTER-2

UNTER-3

E MANAGER

WALL

R ROOM

Y ROOM

L

& TELE.

DAT

U

R

1

70 S

POINTS F

TE: 14.05.2

UPS

3

1

1

1

1

1

1

1

1

2

1

2

16

EAL & SIGN

FOR STAT

2018

RPP

2

1

1

1

1

1

1

1

2

1

1

13

NATURE OF

TE BANK

RJ-45

3

2

2

1

2

2

2

2

2

2

4

24

F CONTRAC

OF INDIA

TELE.

2

1

1

1

1

1

1

1

1

10

CTOR

A, AT

Page 71: S BI INFRA M ANAGEM ENT SOL UTIONS PV T. LTD. STATE …...Vijay Sa 55,Sahy Near Sta AHMED can be do It shall be r l and finan alified. tractor sh the numb itions othe to be with IMS

Sr. No. DESCRIPTION QTY UNIT

A INTERNAL WIRING :1 P and M point wiring in concealed in walls, furniture's & for above false

ceiling, or on ceiling, on beams shall be fixed with saddles & spacers etc.,with conduits taken in slab with 20 mm dia FRLS PVC Rigid conduits 1.5mm thick ISI mark with 2 nos. of 1.5 sq. mm. phase & nutral & 1 nos. of 1.0sq. mm. earthing with modular switch with company made flush metalbox/surface PVC box etc. comp. with nec. main lines for switch board fromLDB of mains of 2 nos. of 2.5 sq.mm wire and 1 no.of 1.0 sqmm pvcInsulated copper conductor wire FRLS type laying in with 20 mm/25 mm diaPVC rigid conduits 1.5 mm thick ISI mark .These will be used with pointwiring of light, fan, ex. fan, callbell points, etc { Max. 3 Switchboards inone circuit - One Sp MCB }.Phase wire must be Red colour, Nutral Wiremust be Black color & Green Wire for Earthing. Color code must bemaintained. Tagging from Lighting DB MCB and Switch board must bedone. All wires should be of copper conductor FRLS insulated 1.1 Kvgrade of Approved make

a) One 5A switch controling one light point 34 No

b) One switch controlling Two light points 6 Noc) One switch controlling Three light points 1 Nod) One 5A switch controling one fan point 8 Noe) 5A socket outlet with 5A switch ( on common board ) ( 1 for LCD & 1 FOR

WATER COOLER) 14 No

f) 5A socket outlet with 5A SP switch (as an independent point ) [ 7 for ex.Fan, 1 for LCD, 13 for Wall fan 2 extra points.]

12 No

f) Call bell point with bell push complete. Switch Should be at UnderManager Table. Easy accesable while sitting.

1 No

2 SITC of 6/16 Amp. Switch and socket complete with necessory require wiringfrom PDB of 2 no of 4.0 sqmm wires and 1 no of 2.5 sqmm PVC Insulatedcopper conductor wire laying in with 20 mm/25 mm dia PVC rigid conduits1.5 mm thick ISI mark. These will be used with point wiring of power points,etc

3 No

ELECTRICAL ALLIED WORK FOR PROPOSED DESIGN OF STATE BANK OF INDIA, AT SARDARGADH BRANCH,DIST. JUNAGADH

NOTE : ALL CHARIS OR CHASES IN WALLS / COLUMNS / SLABS MADE BY THE ELECTRICAL CONTRACTOR FOR INSTALLATION OF CONDUITS / S.B. / BOXES ETC. THE FILLING OF THE SAME IS IN THE SCOPE OF THE ELECTRICAL CONTRACTOR INCLUDING ALL NECESSITY MATERIAL AND LABOUR.

BILLS OF QUANTITIES ( Not to be filled by the Bidder)

Architect: Viajy Sahijwani and Associates 71 Seal and Signature of Contractor

Page 72: S BI INFRA M ANAGEM ENT SOL UTIONS PV T. LTD. STATE …...Vijay Sa 55,Sahy Near Sta AHMED can be do It shall be r l and finan alified. tractor sh the numb itions othe to be with IMS

Sr. No. DESCRIPTION QTY UNIT

ELECTRICAL ALLIED WORK FOR PROPOSED DESIGN OF STATE BANK OF INDIA, AT SARDARGADH BRANCH,DIST. JUNAGADH

BILLS OF QUANTITIES ( Not to be filled by the Bidder)

3 SITC of 20 A/ 25 A , 230 V, with DP MCB all enclosed in a prefabricated MS boxes complete to the satisfaction of E.I.C. For SPLIT AC 1.5TR / 2.0 TRunit with necessory require wiring from ACDB of 2 no of 4.0 sqmm wires and1 no of 2.5 sqmm FRLS PVC Insulated copper conductor wire laying in with20 mm/25 mm dia PVC rigid conduits 1.5 mm thick ISI mark. These will beused with point wiring of A.C. points ,etc . Server Room AC Supply needto be given through Main Panel.Phase wire should be Red colour, NutralWire should be Black color & Green Wire for Earthing. Color code mustbe maintained. Tagging from ACDB MCB and AC point must be done.This point should be installed near Split / window AC in concealedmanner. No Looping of Neutral or earthing is allowed. Each point needsto provide seperate circuit.].

11 No

For Cassate AC power supply indoor or outdoor need to be given as perAC vendor's requirement. The height of switchboard must be atreachable point for easily operation.from that point to Split AC,emptyconduit + necessary bends must in concealed mode by ele. contractor.

4 SITC (For SPLIT AC 1.5TR unit -OUTDOOR SUPPLY) of 2 no of 4.0 sqmmwires and 1 no of 2.5 sqmm FRLS PVC Insulated copper conductor wirelaying in with 20 mm/25 mm dia PVC rigid conduits 1.5 mm thick ISI markfrom indoor unit to outdoor unit if required.

20 Rmt

5 Providing, Installing, testing, Commissioning of mains of following sizes PVCinsuleted copper conductor multistranded flexibls type wires with 20 mm/25mm dia PVC rigid conduits or flexible pipe 1.5 mm thick ISI mark with 2 noof 6.0 sqmm wire and 1 no of 4.0 sqmm FRLS PVC Insulated copperconductor wire ( UPS to UPS O/P DB & UPS I/P DB to UPS).

10 Rmt

B LIGHTING FIXTURES :

(NOTE : ANY OF FIXTURES AND FITINGS SHALL BE RE-CONFIRMED WITH THE ARCHITECTS / CONSULANTS BEFOTEORDERING THEM.

1 Supply, installation, testing and commissioning (including supply and fixingflexible wires from holder to fixtures hardwares etc.) of…. - The LED/PL /CFL lamps should be of same make as fixture make. - The marking &cutting of fixtures should be in ele. contractor's scope..

Architect: Viajy Sahijwani and Associates 72 Seal and Signature of Contractor

Page 73: S BI INFRA M ANAGEM ENT SOL UTIONS PV T. LTD. STATE …...Vijay Sa 55,Sahy Near Sta AHMED can be do It shall be r l and finan alified. tractor sh the numb itions othe to be with IMS

Sr. No. DESCRIPTION QTY UNIT

ELECTRICAL ALLIED WORK FOR PROPOSED DESIGN OF STATE BANK OF INDIA, AT SARDARGADH BRANCH,DIST. JUNAGADH

BILLS OF QUANTITIES ( Not to be filled by the Bidder)

Lighting Luminaire of LED for Office single piece die cost aluminium M24housing complete with driver unit, mirror optic and other accessories Lampsof about 100 lumen/W injection moulded PC diffusers with high brightnesscomplete unit complying with international standard (LU49, LH801) LEDLamps from PHilips, LUmileds rcatrc, oper tive on 190V - 270 V 50 Hz withMini 3 years warranty complete with mounting stystem and lamp dully wiredand tested Details as under.

a) LED 1*36 watt (2'*2') RECESS MOUNTED LUMINAIRE with making earthingconnection complete to be recessed in false ceiling with all necessoryhardwares, hanging frame arrangement,chains, hook etc., complete. Integraltype with CRC body (CROMPTON model LCPL-36- CDL (2X2) or Wipromake IMMACULATE LED or Equivelent Make as mention in therecommened make. Slim model Fittting should be 9mm thick (ASAPPROVED BY ARCHITECT/BANK)

18 No

b) 12 W LED Downleighter to be recessed in false ceiling with all necessoryhardwares, chains, hook etc., complete. CROMPTON model CROM LEDLCDD-12 CDL/WW or Wipro make LDLM 71/101-XXX-65-XX(IRIS) or Equivelent Make as mention in the recommened make.. Energy Efficientround recessed mounted LED down lighter with premium white powdercoating and die cast LM6 aluminium housing. as per details above. Diecasting material should not be CRCO OR LIGHT METAL type material.with minimum 2 years warranty.should be connected to supply wire withPVC connector. Earthing connection with lugging need to given to bodyof Fixture. (AS APPROVED BY ARCHITECT/BANK)

17 No

c) LED tube light 1 x 7 W Surface mounting type with tube, roter, bi - pinholders, starter, choke , complete. Crompton Make Cat. No. LCL-07- CDLor Equivelent Make as mention in the recommened make.(APPROVED BYTHE ARCHITECT/BANK)

4 No

d) Supply and insallation of Call bell with Indicatore. (Max or equivalent make) 1 No

e) Supply and installation of Exhaust fan of 300 mm, fresh air vantilator typewith louver complete & 6 Amp. 3 pin TOP. ( Crompton/ Khaitan makeOR Equivelent make as mentioned in the recommened make) [Wooden mounting frame should be fixed in coordination with carpenter -furniture contractor.] (APPROVED BY THE ARCHITECT/BANK)

2 No

f) Removing and Reinstalation of existing Ceiling Fan with fan stepmodular regulator,, Anchor Fastner, etc Rate also including Removing fromexising premisses

8 No

Architect: Viajy Sahijwani and Associates 73 Seal and Signature of Contractor

Page 74: S BI INFRA M ANAGEM ENT SOL UTIONS PV T. LTD. STATE …...Vijay Sa 55,Sahy Near Sta AHMED can be do It shall be r l and finan alified. tractor sh the numb itions othe to be with IMS

Sr. No. DESCRIPTION QTY UNIT

ELECTRICAL ALLIED WORK FOR PROPOSED DESIGN OF STATE BANK OF INDIA, AT SARDARGADH BRANCH,DIST. JUNAGADH

BILLS OF QUANTITIES ( Not to be filled by the Bidder)

g) Supply and instalation of 1 x 18W led batten light fixture (T-5) withelectronic driver and tube complete with necessory hardwares, etc and perwatt lumens output must be above 120/watt and 90%lumems maintaiancefor 90% of life with input voltage 90-270v ac 50hz operational withoutaffecting the life, input mov.gtd protection in driver for above 270v protection.and 2 years waranty.LED Batten Comprises of Thermally conductivematerial. Pre-wired with high efficiency electronic driver. High translucentfrosted diffuser gets glare free, smooth light distribution.CROMPTON MakeModel LCCLB20-CDL CUTE LINEA or Equivelent Make as mention in therecommened make. (APPROVED BY THE ARCHITECT/BANK)

10 No

h) Supply and installation of 400 mm sweep wall mounted fan with metal standand guard With on site 2 years warranty (Crompton model - High Flowor Havells Make or Equivelent Make as mention in the recommenedmake (APPROVED BY THE ARCHITECT/BANK)

8 No

C COMPUTER POWER SUPPLY SYSTEM.:1 SITC of 2 nos. of 6 A, 5 pin Sockets and 1 no. of 6 \ 16 A socket below table

outlets with one 16 A switche with indicator Computer power supply withconcealed company made metallic boxes or PVC flush box on walls /furniture's / trunking etc complete all respect with necessory wiring ofmains of 2 no of 2.5 sq mm and 1 no of 1.5 sqmm FRLS pvc insulatedcopper conductor multi-stranded flexible wire with 20/25 dia. PVC conduitswith accessories duly burried under floor with necessary chasing / breakingin floor and to be refinished with all necessary civil material etc. completefrom UPSDB to Computer power supply boards.{Maxi. 3 computers in onecircuit}. complete with necessary termination etc. complete.[ White Colour OuterPlate For These Switchboards].LOOP POINTS MUST BE OF SAME SIZED WIRES.

16 No

2 S & I of 2 nos. of 6 A, 5 pin Sockets and 1 no. of with one 6 A switchesraw power supply with concealed company made metallic boxes or PVCflush box on walls / furniture's / trunking etc complete all respect withnecessory wiring of mains of 2 no of 2.5 sq mm and 1 no of 1.5 sqmm FRLSpvc insulated copper conductor multi-stranded flexible wire with 20/25 dia.PVC conduits with accessories duly burried under floor with necessarychasing / breaking in floor and to be refinished with all necessary civilmaterial etc. complete from PDB to Computer power supply boards.{Maxi. 3Raw Power Points in one circuit}. complete with necessary termination etc.complete.. [ Black Colour Outer Plate For These Switchboards].LOOP POINTS MUST BE OFSAME SIZED WIRES

13 No

D DISTRIBUTION BOARD AND PANELS :

Architect: Viajy Sahijwani and Associates 74 Seal and Signature of Contractor

Page 75: S BI INFRA M ANAGEM ENT SOL UTIONS PV T. LTD. STATE …...Vijay Sa 55,Sahy Near Sta AHMED can be do It shall be r l and finan alified. tractor sh the numb itions othe to be with IMS

Sr. No. DESCRIPTION QTY UNIT

ELECTRICAL ALLIED WORK FOR PROPOSED DESIGN OF STATE BANK OF INDIA, AT SARDARGADH BRANCH,DIST. JUNAGADH

BILLS OF QUANTITIES ( Not to be filled by the Bidder)

1 Supply, installing, testing and commissioning of metallic double door typedistribution board with all necessary connection complete to be installedconcealed in wall / surface mount complete to the satisfaction of theEngineer in charge. The DB should be of same make as MCB make.Vertical Type for cable connections

a) 4 - WAY TPN DB : (LDB) 1 Noincoming : 40 A FP MCB - 1 NO outgoing : 25 A DP ELCB, 100mA ( 3 nos)outgoing : 10 to 20 A SP MCB ( 6 nos)All MCB must be class B Type

b) Removing and Reinstalltion of existing 12 WAY SPN DB: (PDB)including removal , shifting from present premises to new premises

1 No

c) 6 WAY TPN DB : (ACDB) 1 Noincoming : 63A 4P MCB-1 Nooutgoing : 25 A DP ELCB 100mA Sensitivity ( 9 Nos ) for HI- WALL SPLITAC

d) 12 WAY SPN DB : (UPS DB) OUTPUT 1 Noincoming : 40 A DP 100 mA ELCB (2 Nos.)outgoing : 10 to 20 A SP MCB ( 6 nos )All MCB must be class C Type

e) Removing and Reinstallation of existing UPS 8 WAY DB (For UPS InputDB ) including removal , shifting from present premises to newpremises 1 No

f) 12-WAY SPN DB : (LDB & ACDB) FOR E-LOBBY 1 NoIncoming : 63 A FP RCCB 100mA Sensitivity-1 Nooutgoing : 10 to 20 A SP MCB ( 2 nos)outgoing : 25A DP MCB ( 2 nos) For Split A/C

g) 4 WAY SPN DB : (UPS DB) OUTPUT for E-LOBBY 1 Noincoming : 40 A DP 100mA ELCB 100mA Sensitivity-1 Nooutgoing : 10 to 20 A SP MCB (2 nos )

Architect: Viajy Sahijwani and Associates 75 Seal and Signature of Contractor

Page 76: S BI INFRA M ANAGEM ENT SOL UTIONS PV T. LTD. STATE …...Vijay Sa 55,Sahy Near Sta AHMED can be do It shall be r l and finan alified. tractor sh the numb itions othe to be with IMS

Sr. No. DESCRIPTION QTY UNIT

ELECTRICAL ALLIED WORK FOR PROPOSED DESIGN OF STATE BANK OF INDIA, AT SARDARGADH BRANCH,DIST. JUNAGADH

BILLS OF QUANTITIES ( Not to be filled by the Bidder)

2 Shiffting and reinstallation of existing Main Panel board with. Internalreconnecting as required etc complete as directed. Including removalshifting from present premisses to new premisses

1 NoNote: Maintanance of existing panel, DBS will involve internal cleaning by blower,

cleaning of contactors terminals by cotton, CTC liquid reconnections as perrequirement Providing cable glands, suitable lugs as per requirment properbody earth by 8G G.I wire/ bare copper wire

3 Providing and Installing of 100A MCCB FP Unit compartment with hingeddoor & locking arrangement duly fabricated from 18 SWG sheet metal boxduly painted with one coat of red-oxide paint and two coats of approvedenamell paints with 100A OPEN TYPE MCCB FP UNIT with Phaseindicator lamps phase wise , control fuses & wooden back complete. THIS WILL BE INSTALLED NEAR MAIN DOOR - INSIDE OR OUTSIDE - OF THEBANK. ( first ask to BM / Consultant / Architect / Bank Authority. ) C&S Make:CSE1N MSET M4P or L&T Make: 80A or Legrand Make

1 No

E EARTHING SYSTEM:1 Providing and making Earthing Pit with all necessary mattterial and making

masonry kundi, watering arrangment etc complete as per ISI 3043-1987(FOLLOWING ITEMS MAY OPERATE)The Contractor must be Earthing Photograph with Clearly showingearthing road size need to attach with Bill

a) JEF Eco safe T-193 Hot DP galvanised with 50 mm dia outer & 25 mm innerdia P/P length 3 meters. Earthing chemical filling 2 Bags of 20KG each(Chemical Earthing) ETP MAKE or ASHLOK MAKE With 3 YearsManufacture warranty

1 No

b) Safe erthing electrode certified for use upto 11kv with 3.00 m pipe backfilling comound 2 bag of 25 Kg. with outer pipe 50mm dia and inner 25 mmdia pipe and compund filling as per UL 476 as approved by PWD (ChemicalEarthing) ETP MAKE or ASHLOK MAKE With 3 Years Manufacturewarranty. Copper earthing as per company specification.

1 No

2 Supply, laying and jointing of following wire / strip / earth cable onwalls, ceiling etc. With necessary non rusting clamps, washers, nuts andbolts etc complete

a) 8 SWG G.I. Wire with 20 mm dia. PVC rigid conduit duly cleated / concealed/ burried in floor etc. complete for ELE. PANEL, ALL DBS , ETC.

50 Rmt

Architect: Viajy Sahijwani and Associates 76 Seal and Signature of Contractor

Page 77: S BI INFRA M ANAGEM ENT SOL UTIONS PV T. LTD. STATE …...Vijay Sa 55,Sahy Near Sta AHMED can be do It shall be r l and finan alified. tractor sh the numb itions othe to be with IMS

Sr. No. DESCRIPTION QTY UNIT

ELECTRICAL ALLIED WORK FOR PROPOSED DESIGN OF STATE BANK OF INDIA, AT SARDARGADH BRANCH,DIST. JUNAGADH

BILLS OF QUANTITIES ( Not to be filled by the Bidder)

b) 8 SWG CU. Wire with 20 mm dia. PVC rigid conduit duly cleated / concealed/ burried in floor etc. complete Form Copper earthing to UPS DB

40 Rmt

c) 25 x 3 mm G.I. Strip From GI Earthing to Main Panel 20 Rmtd) 25 x 3 mm CU.strip 10 Rmt

F CABLES & CABLE TERMINATIONS:1 Supply, Lying, installation, testing and commissionig of following sizes of

PVC insulated PVC sheathed copper / aluminum conductor armoured cableto be laying in existing cable trench or to be laid in existing pipes of withnecessary clamps, spacers with cleating on wall ceilling etc. complete to thesatisfaction of EIC. All types of cable excavation works should be incontractor's scope.( LENTH TO BE VERIFY AT SITE ) With Cable lugs &Termination

a) 4 x 2.5 sq. mm Cu . Conductor YWY cable. (for Signboard) 10 Rmtb) 4 x 16sq. mm AL. Conductor A2XFY cable. (Main Panel to Input UPS DB &

PDB & LDB & ACDB ) 40 Rmt

c) 3.5 x 70 sq. mm Alu. Condudtor AYFY cable. (main cable meter to mainpanel ) (LENGTH as per site contition)

20 Rmt

d) 25 sq.mm single core Cu. wire supply & laying for main load wire from meterto main switch in flexible pipe. if required.

8 Rmt

G TELEPHONE AND STRUCTURED CABLING :1 Supply and installing telephone point with Telephine socket outlets of RJ 11

of aapproved make with company made concealed boxes in walls /furniture's etc. complete with Providing, installing, testing, commissioning of2 pair of 0.51 cross section pvc insulated copper conductor telephone wire ofITI approved with 20/25 dia. PVC conduits with accessories duly burriedunder floor with necessary chasing / breaking in floor and to be refinishedwith all necessary civil material etc. or to be cleated on wall / ceiling withsaddles / spacer etc. necessary termination etc. complete.from kroone box totable tele. points, etc. complete..Cross Ferruling need to be provided foreach point. on Telephone point tagging must be done.

a) for Intercom Tele. facility. 10 Nob) for Fax Tele. facility. 1 Noc) for Direct Tele. facility. 1 No2 Supply, installation, testing and commissioning of 20pair krone telephone tag

block duly enclosed in sheet meral powder coated box with lockingarrangement complete with necessary terminations

2 No

Architect: Viajy Sahijwani and Associates 77 Seal and Signature of Contractor

Page 78: S BI INFRA M ANAGEM ENT SOL UTIONS PV T. LTD. STATE …...Vijay Sa 55,Sahy Near Sta AHMED can be do It shall be r l and finan alified. tractor sh the numb itions othe to be with IMS

Sr. No. DESCRIPTION QTY UNIT

ELECTRICAL ALLIED WORK FOR PROPOSED DESIGN OF STATE BANK OF INDIA, AT SARDARGADH BRANCH,DIST. JUNAGADH

BILLS OF QUANTITIES ( Not to be filled by the Bidder)

a) Providing, installing, testing, commissioning of CAT 6 UTP pvc insulatedcopper conductor data cable of D - Link with 20/25 dia. PVC conduits withaccessories duly burried under floor with necessary chasing / breaking infloor and to be refinished with all necessary civil material etc. or to be cleatedon wall / ceiling with saddles / spacer etc. necessary termination. include RJ45 connector on both end etc.with ferrule numbering at both ends of eachpiece of cable complete. [ 2 Lines from BSNL Krone to new krone].

50 Rmt

3[A] Supply, installation, testing and commissioning of CAT 6, RJ 45 informationoutlet (I/O) of D-link mke with front modular cover plate, flush box metallic orPVC for trucking system etc. complete with terminations etc complet withProviding, installing, testing, commissioning of CAT 6 UTP pvc insulatedcopper conductor data cable of D-link make with 20/25 dia. PVC conduitswith accessories duly burried under floor with necessary chasing / breakingin floor and to be refinished with all necessary civil material etc. or to becleated on wall / ceiling with saddles / spacer etc. necessary termination etc.with ferrule numbering at both ends of each of piece of cable etc. completeas per the requirement from metal rack to table I / O points complete.( onefor LCD)

24 No

3[B] Supply, installation, testing and commissioning of CAT 6, RJ 45 informationoutlet (I/O) of D-link mke with front modular cover plate, flush box metallic orPVC for trucking system etc. complete with terminations etc complet withProviding, installing, testing, commissioning of CAT 6 UTP pvc insulatedcopper conductor data cable of D-link make with 20/25 dia. PVC conduitswith accessories duly burried under floor with necessary chasing / breakingin floor and to be refinished with all necessary civil material etc. or to becleated on wall / ceiling with saddles / spacer etc. necessary termination.include RJ 45 connector on both end etc. with ferrule numbering at bothends of each of piece of cable etc. complete as per the requirement frommetal rack to table I / O points complete. for IP phone facility in BM cabin.

1 No

3[C] Supply & fixing the Patch cord 1 mtr. Long (factory built) .-When supplying ,then first ask to BM / Consultant / Architect / Bank Authority.

24 No

3[D] Supply & fixing the Patch cord 2 mtr. Long (factory built) .-When supplying ,then first ask to BM / Consultant / Architect / Bank Authority.

24 No

4 Supply, installation, testing and commissioning of 9U metal rack forcomputer clamping switch etc complete with Tray Mounting Fan + powersupply board. Bank's hardware - port switch / patch panel must beinstalled by ele. Contractor in this rack.

1 No

4[a] Supplying Istallation and Testing of 24 port Cat - 6 patch panel of 'D' Linkmake complete as directed.

1 No

Architect: Viajy Sahijwani and Associates 78 Seal and Signature of Contractor

Page 79: S BI INFRA M ANAGEM ENT SOL UTIONS PV T. LTD. STATE …...Vijay Sa 55,Sahy Near Sta AHMED can be do It shall be r l and finan alified. tractor sh the numb itions othe to be with IMS

Sr. No. DESCRIPTION QTY UNIT

ELECTRICAL ALLIED WORK FOR PROPOSED DESIGN OF STATE BANK OF INDIA, AT SARDARGADH BRANCH,DIST. JUNAGADH

BILLS OF QUANTITIES ( Not to be filled by the Bidder)

4[b] Supplying Installation & Testing of 24 port unmanaged 10/100 mbh switch of'D' Link Make complete as directed.

1 No

5 SITC of CABLE TV RG - 6 cable line in PVC Conduit pipe with proper fixingand connecting with modular Co-Axial TV Socket

30 Rmt

6(A) Supply and installation of 300 x 300 x 40 mm size GI box duly fabricatedfrom 18 SWG m.s. sheet with top cover of same sheet complete withnecessary knock outs at all the sides of box for conduit entries duly fixed infloor, including breaking in floor and re-finished the same etc. complete (WireDraw Box).

10 No

6(B) Supply and installation of 150 x 150 x 40 mm size GI box duly fabricatedfrom 18 SWG m.s. sheet with top cover of same sheet complete withnecessary knock outs at all the sides of box for conduit entries duly fixed infloor, including breaking in floor and re-finished the same etc. complete (WireDraw Box).

10 No

7 Supply an installation of 24 Hr, 7 days A/C time switch with 2 nos powercontector of M.D.S, L & T ,SEIMENS,THEBEN ( indoasian) Make. Allenclosed in sheet steel powder coated enclosure of 400 X 400 mmcomplete with all necessary termination for system room A.C & E lobby AC.Here Ready made Cyclic Timer Will not be permited. time switch hast tobe provided of l&t, gic make analogue with 16A rating.

2 No

8 Supply and installation of 1.5 sq. mm. 3 core flexible cable of approved make(2 mtr. Length) with M. S. flexible pipe & 15 amp. 3 pin top of approved makefor the supply of locker room.

4 No

8[a] Supply & laying of the empty conduit 40 Rmt9 Laisioning work ( addition Load ) PGVCL Apporoval and Neccessary

cirtificate.1 Job

10 Removing old wiring in area which will be redesigned & Providing Necessaryplug points & light points for tube lights (including necessry wiring) at variouslocations as required by various contractors for execution of various works /to run equipments such as drill / cutter etc. during the entire executionprocess. The accessaories used for this purpose shall be of temp. nature(anchor piano or eq.) & the contractor has to take back the same oncompletion of the project. The supply for this shall be taken from thetemporary connection provided at / from nearby general meter underco.ordintion with the LANDLORD. & also providing temporary power supplyfor computers and data connection for computers with wiring, switchboard,Comp. I/O Points,etc. for smoothly running of the branch with removing &reshifting of the computers , printers, etc. bank hardware accessories.

1 job

[H] PUBLIC ADDRESS SYSTEM

Architect: Viajy Sahijwani and Associates 79 Seal and Signature of Contractor

Page 80: S BI INFRA M ANAGEM ENT SOL UTIONS PV T. LTD. STATE …...Vijay Sa 55,Sahy Near Sta AHMED can be do It shall be r l and finan alified. tractor sh the numb itions othe to be with IMS

Sr. No. DESCRIPTION QTY UNIT

ELECTRICAL ALLIED WORK FOR PROPOSED DESIGN OF STATE BANK OF INDIA, AT SARDARGADH BRANCH,DIST. JUNAGADH

BILLS OF QUANTITIES ( Not to be filled by the Bidder)

1 Supply, installation, testing and commissioning of the following items withnecessary M.S iron frame/enclosure as necessary as per specificationincluding cutting necessary chases in wall/floor and mending gooddamages,supply and fixing of all accessories, G.I bolts, nuts, washers, etcpainting, earthing complete as required with other details as per enclosedspecification. AHUJA Make.

i) 75 Watt PA system with control desk comprising 1 nos. of microphone withpress to talk switch and stand ( Ahuja Make PRO-3200) , selector switch,mixing amplifier 75 watt( AHUJA Make DPA 770), Digital player: MP3 playerwith USB Reader & Remote control cables with sockets, interconnections,earthing complete as required. Make: Ahuja/Boss

1 SET

ii) External speaker 8 watt unit ( AHUJA MAKE: CS 6081T) in finishedenclosure suitable for wall/ceiling mounting with external colour matching asper the final finish of the room wall/ceiling as required and having thefollowing ratings.including Providing and laying Speaker wiring 2 nos x1.0 Sqmm Copper wiring in rigid PVC conduit for Speaker. Includinginstallation testing and commissioning of speaker Wiring from PA systemAmplifier (4 pionts in one circuit) Make:Ahuja/Boss ( Should be Ahuja Make :CS 6081T Equivalant Speaker.) (6" dia speaker).

7 NO

BUY BACK OF OLD MATERIALS1 Removal of existing wiring for Lighting, Fans, Computers data cable, other

accessaries etc. and taking away the material as buy back (Excluding Computer ,Lighting fixtures ,Fans EPBX, Telephone instruments,MCB,DB,MAIN PANEL BOARD to be used as required.) From the existingpremises where branch is working now. After shifting to new premisses

1 JOB

4 2x36 W Tube light Patti with tube 2'-0" Long 8 NO

5 1x36W Tube light Patti With tube 10 NO

+ GST TAX APPLICABLENOTES:

1

2

3

ALL RATES SHOULD BE INCLUDE OF ALL TAXES EXCLUDING GOOD AND SERVICE TAX (GST)

THE CONTRACTOR SHOULD WORK ACCORDING TO THE FINAL LAYOUT.

THE CONTRACTOR SHOULD DEPUTE ONE PERSON AT SITE FROM START OF WORK TO FINISH FOR GIVING TEMPORARY CONNECTIONS & ATTENDING PROBLEMS

Architect: Viajy Sahijwani and Associates 80 Seal and Signature of Contractor

Page 81: S BI INFRA M ANAGEM ENT SOL UTIONS PV T. LTD. STATE …...Vijay Sa 55,Sahy Near Sta AHMED can be do It shall be r l and finan alified. tractor sh the numb itions othe to be with IMS

Sr. No. DESCRIPTION QTY UNIT

ELECTRICAL ALLIED WORK FOR PROPOSED DESIGN OF STATE BANK OF INDIA, AT SARDARGADH BRANCH,DIST. JUNAGADH

BILLS OF QUANTITIES ( Not to be filled by the Bidder)

4

5 USING EXISTING PVC CONDUITS LAID IN FLOOR /WALL FOR DATA CABLES/TELEPHONE CABLES/COMPUTER POWER /RAW POWER WORK

THE CONTRACTOR'S PRESENCE MUST BE COMPULSORY FOR SHIFTING / INSTALLING OF UPS , DATA RACK, EPABX SYSTEMS. - MUST HELP TO BANK'S VENDORS LIKE PCS ( HARDWARE ), UPS , DATACRAFT ( PORT SWITCH - SOFTWARE ), ETC.

Architect: Viajy Sahijwani and Associates 81 Seal and Signature of Contractor

Page 82: S BI INFRA M ANAGEM ENT SOL UTIONS PV T. LTD. STATE …...Vijay Sa 55,Sahy Near Sta AHMED can be do It shall be r l and finan alified. tractor sh the numb itions othe to be with IMS
Page 83: S BI INFRA M ANAGEM ENT SOL UTIONS PV T. LTD. STATE …...Vijay Sa 55,Sahy Near Sta AHMED can be do It shall be r l and finan alified. tractor sh the numb itions othe to be with IMS
Page 84: S BI INFRA M ANAGEM ENT SOL UTIONS PV T. LTD. STATE …...Vijay Sa 55,Sahy Near Sta AHMED can be do It shall be r l and finan alified. tractor sh the numb itions othe to be with IMS
Page 85: S BI INFRA M ANAGEM ENT SOL UTIONS PV T. LTD. STATE …...Vijay Sa 55,Sahy Near Sta AHMED can be do It shall be r l and finan alified. tractor sh the numb itions othe to be with IMS

STATE BANK OF INDIA AT  SARDARGADH  BRANCH DATE: 14.05.2018

Type of Luminaries Rating (W) Qty Total (w) S.B. No. 36 W 12 W/ 1 x 11W Exhaust Ceiling 1 x 28 Wall fan Wall Total   Ceilling 5A 

D‐1 Fan Fan Washer Load (W) Amp 1S 1L 1S 2L 1S 3L Fan C.B W.F /E.F

[a] 36 w LED 36 18 648 S.B.NO.1 3 3 ‐         ‐           ‐       ‐     1   204.00    0.985507 4 1   1 1

[b] 12 x LED D‐1 12 17 204 S.B.NO.2 4 ‐        ‐         ‐           ‐       ‐     2   264.00    1.275362 4   1 2

[c] 1 x 11 w 11 4 44 S.B.NO.3 4 2 ‐         ‐           ‐       ‐     1 228.00    1.101449 4 1 1 1

[e] Exhaust Fan 50 4 200 S.B.NO.4 4 2 ‐         ‐           ‐       ‐     3 348.00    1.681159 4 1   1 3

[f] Ceiling Fan 75 8 600 S.B.NO.5 ‐     ‐        ‐         ‐           1 1 ‐          103.00    0.497585 1   1 1  

[g] 1 x 28 w 28 10 280 S.B.NO.6 1 2 ‐         ‐           ‐       ‐     1 120.00    0.579710 1 1 1 1

[h] Wall Fan 60 8 480 S.B.NO.7 ‐     ‐        ‐         ‐           ‐       2 ‐          56.00       0.270531 2     1  

[i] Wall washers 28 0 0 S.B.NO.8 1 ‐        ‐         ‐           ‐       ‐     ‐            36.00       0.173913 1     1  

S.B.NO.9 ‐     ‐        ‐         ‐           1 1 ‐          103.00    0.497585 1   1 1 1

0 S.B.NO.10 ‐     ‐        ‐         1 1 1 ‐            153.00    0.739130 1   1 1 1

2456 S.B.NO.11 ‐     ‐        ‐         ‐           1 1 ‐            103.00    0.497585 1   1 1  

S.B.NO.12 ‐     ‐        ‐         ‐           2 2 ‐            206.00    0.995169 2   2 1  

S. B. NO PHASE S.B.NO.13 ‐     ‐        ‐         ‐           2 2 ‐            206.00    0.995169 2   2 1  

S.B.NO.14 ‐     ‐        1 ‐           ‐       ‐     ‐          11.00       0.053140 1        

S.B.NO.15 ‐     ‐        1 1 ‐       ‐     ‐          61.00       0.294686 1       1

  R S.B.NO.16 ‐     ‐        2 2 ‐       ‐     ‐          122.00    0.589372 2       2

  Y ATM ROOM                                

B S.B.NO.17 1 5 ‐         ‐           ‐       ‐     ‐          96.00       0.463768 2 2   1

O/S Branch

  S.B.NO.18 ‐     3 ‐         ‐           ‐       ‐     ‐          36.00       0.173913 1 1      

   

  18 17 4 4 8 10 8 0 2456 11.864734 35 7 0 8 14 13

 

Total Load

LIGHTING  LOAD IN BRANCH CONNECTING LOAD POINTS DETAILS

Page 86: S BI INFRA M ANAGEM ENT SOL UTIONS PV T. LTD. STATE …...Vijay Sa 55,Sahy Near Sta AHMED can be do It shall be r l and finan alified. tractor sh the numb itions othe to be with IMS

1 BRANCH MANAGER 3 2 3 22 OFFICER TABEL-1 1 1 2 13 OFFICER TABEL-2 1 1 2 1

4 GRAHAK MISTRA TABLE 1 1 1 1

5 S.W COUNTER-1 1 1 2 16 S.W COUNTER-2 1 1 2 17 S.W COUNTER-3 1 1 2 18 SERVICE MANAGER TABLE 1 1 2 19 DIGITAL WALL 1 2 2

10 SERVER ROOM 2 1 2 111 RACK 1

12 E-LOBBY ROOM 2 1 4

TOTAL 16 13 24 10

UPS RPP RJ-45 TELE.

UPS, R. POWER DATA & TELE. POINTS FOR STATE BANK OF INDIA, AT SARDARGADH BRANCH

DATE: 14.05.2018

S.B. No. Location of S.B.