    Thank you truly for purchasing TOSTEM product for this time. 

    and damage of the donor etc.beforehand.Please follow the content of this book (instruction) after understanding the content of the display sign well.

    In this installation instruction, the following signs are used.

     The content of the display sign shown in this installation instruction is used to construct the product safely and correctly,and to prevent harm

    caution  The content to which the user might owe the inside and the slight injury and the content with the fear of the property

    damage are shown. when mishandling it. 

    Sign concerning generalinformation

    pointIt is shown work especially caerfully according to the fitting.

    The content are shown that cannot be attached and the trouble in the future might occur in the entire product if it

    doesn't defend.

    It is shown the notes of all content of the installation instruction (individual explanation frame)

    The condition is shown when it show be limitation in installation instruction.

    Convenient is shown when knowing content of the explanation.Supplementation

    Caution

    This product is a simple type garage. Please do not recklessly remodel and change to divert the barn,the playground or the dwelling

    partially.

     

    Please set it up at the position in which the snow avalanche of the snow is not received directly from the roof in the building.

    Please avoid the superior road construction as shown in the rooftop and the wind on

    the high wind site,especially the cliff.

    Please confirm whether to store in the construction plase the size and correctly.

    Please construct it so that the heat exhausts such as the boilers and heaters should

    Please do not construct it to the place where the heat exhausts such as the boilers and heaters shut oneself up in the product.

      There is fear of poisoning by the exhaust.

    Please secure the burial depth of a low place when setting it up in the slopingland.

    TOSTEM CO.LTD

    MAL-913  AW53 1 May 2008 publication

     Please make construction by technical installation supplier.

    Sign concerning safety  Meaning of sign

    For Roof port sigma ,please set up on area which don't get over the snow (fresh snow) 20 cm.And for Roof port sigma 1500

    (type 1500 for snow area),please set up on area which don't get over the snow (new snow) 50 cm.

    Roof port sigma   /Roof port sigma 1500

    Harm and the property damage to the person by the product damage and the collapse are assumed,and guard the following matter,please

    When use rear frame (for falling snow),please construct it by keeping the shortest degree 50 cm from adjacent land because it have

    Installation Instruction -basic  TATERENTO- 

      not hit the product.

    There is fear of the coating deterioration and flaking off by the exhaust (hakuri).

    structure which snow is easy falling.And please construct it by moreover keeping that base on condition of construct site.

  • 8/19/2019 Montagehandleidng Carport Amsterdam

    2/24

    Caution

    Please consider an amount (volume) concrete in the base part enough by the site (weak the ground etc.) though the burial depth of each  

    product of the base part has been decided.

    (sea sand) and a chlorine system strong alkali for mortar and concrete.It causes the metal sush as aluminum to corrode when using it.

    Please use the admixture of non-chlorine system and non-alkali system when it is necessary.

    Please wipe off promptly when mortar and concrete,etc.adhere to the surface of the product.It cause the defective appearances such as

    bristletail and irregularity.

    not installed for the display label.

    Please tighten by using our specification goods in a specified number so as not to loosen and fix the bolt and the screw.

    Please do not process holes other than remodeling and a specified part of the product.

    Please repair the dirt that attaches to the product with the refinish paint when you apply kizu removing, and by mistake.

    There is fear of the polycarbonate plate of the crack etc.,and use the dealcoholization system sealing material of our specification,please

    Product name & product No.

    Shin-etsu chemical industry sealant 72

    Toss seal 380

    Torre silicone

    TOSHIBA silicone

    Please increase and tighten the bolt and the screw.

    Please pass the manual to the donor.

    There is fear of getting wet water,and do the sealing to a specified part,please.

    Please install the base under the frost heave line when using it in the region in which the frost heave dread exists in the cold district.

    Please manage insulating for condition of aluminium product contact with metal except stainless,zinc.

    f rom damage of  product.

    the base.Water in the post damages and the frozen expansion doing and the post might be damaged.

    Please make the movement of the post within the range of our specification.

    The display disappears when the leader is installed on the post where "Direction" label is pasted.Please give to the side where the leader is

    Please use specified screw when fitting arch to rear frame.Wind load performance go down and might have unexpected injury from

    φPlease pave guri stone in the base without fail to do the water pulling out in the pillar,and open drain hole (  6) to the roof of the post and

    Please do not use the admixture (antifreezing agent,coagulation accelerant,and quick setting agent,etc.) for the concrete of saline sand

    when you use the silicone sealing compound.

    sealing compound maker

  • 8/19/2019 Montagehandleidng Carport Amsterdam

    3/24

    1. packing specification............................................................................4

    1. name of each part............................................................................82. actual dimension and name of each part...............................................8

    2. actual dimention..............................................................................10

    3. execution method of HONTAI..............................................................13

    2. setting of front frame........................................................................143. setting of post and rising beam..........................................................15

    1. execution of HONTAI........................................................................13

    4. setting of roof purline and rear frame.................................................16

    6. setting of roofing..............................................................................187. setting of roofing holder....................................................................198. setting of TATEDOI...........................................................................20

    4. execution method of TARENTO............................................................21

    1. execution of base..............................................................................21

    2. joint of HONTAI................................................................................23

    5. setting of side frame and roof  

    rafter...................................................17

  • 8/19/2019 Montagehandleidng Carport Amsterdam

    4/24

    Packing specification

     Please confirm whether a necessary material and parts have become complete by the packing statement before construction.

    parts set

    Name Rough sketch

     quantity

    600 type  1500 type  1500  type option

     50 type  57 type  14 type  50 type  56 type  12 type 

    50 type  56 type  12 type 

    front frame corner cap R 

    front frame corner cap L

    rear frame corner cap R 

    rear frame corner cap L

    rear frame corner cap R 

    (for snow)

    rear frame corner cap L

    (for snow)

    rear frame corner cap R 

    (for falling snow)

    rear frame corner cap L(for falling snow)

    bracket cover R 

    bracket cover L

    rising beam cap

    roof holder cap

    reinforcement plate for fitting

    rising beam

    back  plate for fitting  rising beam

    hanging metal for front frame

    anchor rod

  • 8/19/2019 Montagehandleidng Carport Amsterdam

    5/24

    M8x25 hexagon head bolt(SW+PW)

    φ5x55 countersunk head tapping screw

    φ5x14 truss screw

    φ4x10 washer head screw

    φ4x13 pan head drill screw

    φ4x13 pan head drill screw (with color)

    φ5x13 pan head drill screw

    φ6x70 hexagon head tapping screw

    M6plain washer

    φ4x50 truss screw

    φ6x35 hexagon head bolt

    instruction for installation

    Rough sketchName

    Quantity

    butyl rubber sealing compound

    hole cover seal

     AMADOI attachment

     AMADOI covering hole cap

    attachment gaskets

    drain elbow for φ40

    92°elbow for φ40

    DENDEN

    adhesive

      600 type  1500 type  1500  type option

    50 type  56 type  12 type 50 type  57 type  14 type  50 type  56 type  12 type 

    roofing buffer

    roof ing holder spacer

    Quantity in ( ) is for 35 and 39 type.

  • 8/19/2019 Montagehandleidng Carport Amsterdam

    6/24

     

     

     

     

     

     

     

     

     

     

     

     

    packing specification (continuation)

    Name Rough sketch

    Quantity

    Name Rough sketchQuantity

    Name Rough sketchQuantity

    Name Rough sketch

    Quantity

    instruction for installation

    bracket setTATEDOI set

    2 pieces included 2 pieces included   3 pieces included1 piece included

     pieces included31 piece included 1 piece included 1 piece included 1 piece included

     H23 for frost

    2 pieces included 1 piece included

    long set

    TATEDOI

    TATEDOI 

    TATEDOI

    bracket 

    600 type  1500 type 

    600 type  1500 type  1500  type option

     Quantity in ( ) is for 35 and 39 type.

     50 type  57 type  14 type  50 type  56 type  12 type 50 type  56 type  12 type 

    standard post H 18

    long post H23

    long post H23 for frost

    main post set

    front frame 

    rear frame

    rear frame (for snow)

    rear frame (for falling snow)

    roof purline

    long post

    roof ing holder

  • 8/19/2019 Montagehandleidng Carport Amsterdam

    7/24

    Name Rough sketchQuantity

    Name Rough sketch

    Quantity

    Name Rough sketch

    Quantity

    Name Rough sketch

    Quantity

    Name Rough sketch

    Quantity

    Name Rough sketch

    Quantity

    2 pieces included 1 piece included  pieces included3 1 piece included

    1 piece included   3 pieces included 4 pieces included

    type 50 type 57 type 14 type 50 type 56 type 12

    For 30For 30 For 30For 3  5 39 For 3  5 39For 3  5 39  

    roof material set

         

    width set   width set continuation

    width set for RENTO

    φ4x13 pan head drill screw

     50 type  57 type  50 type  56 type  50 type  57 type  50 type  56 type

      600 type  1500 type

     

    600 type 

    1500 type

      600 type  1500 type 1500  type option

    parts set for RENTO

    rising beam set

    rising beam 

    side frame R

    side frame L 

    roof holder 

    roof rafter 

    roof holder

    roof rafter 

    roof holder

    front frame sleeve 

    rear frame sleeve

    rear frame sleeve (for snow)

    rear frame sleeve (for falling snow)

    roof purline sleeve

    roof ing 

    600 type  1500 type

      600 type  1500 type

  • 8/19/2019 Montagehandleidng Carport Amsterdam

    8/24

    name of each part

    φ4x13 pan head drill screw

    φ4x13 pan head drill screw

     φ4x10 washer head screw

     φ4x10 washer head screw

    φ5x13 pan head drill screw

     hexagon head tapping screw

    M8x25 hexagon head bolt(SW+PW) φ5x55 countersunk head tapping screw

    M8x25 hexagon head bolt(SW+PW)

    hexagon head bolt

    truss screw

    water pulling out hole (site processing)

    φ5x13 pan head drill screw

    bracket 

    bracket 

    cover

    position of indication lot No.

    position of indication lot No.

    position of indication lot No.

    position of

    indication lot No.

    indication lot No.

    position of

    Supplementation

    600  type

    actual dimension and name of each part

    roof ing  holder

    roof ingroof holder

    roof rafter 

    front frame

    reinforcement plate for fitting rising beam

    back plate for fitting rising beam

    rising beam cap

    front frame corner cap

    roof holder

    side frame roof purline

    rear frame corner cap

    rear frame

    roofing catchpost

    rising beam 

     30 size will not stick roof ing holder.

  • 8/19/2019 Montagehandleidng Carport Amsterdam

    9/24

    M8x25 hexagon head bolt (SW+PW)

    M8x25 hexagon head bolt (SW+PW)

    φ4x10 washer head screw

    φ4x10 washer head screw

    bracket cover bracket

    countersunk head tapping screw

     truss screw

     hexagon head tapping screw

    hexagon head bolt

    cap

    position of indication lot No.

    position of indication lot No.

    position of indication lot No.

    position of indication lot No.

    indication

    position of 

    lot No.

    φ5x13 pan head drill screw

    φ6 water pulling out hole (site processing)

    φ4x13  pan head drill screw

    φ4x13  pan head drill screw

    1500 type

    roofing roof holder

    roof rafter 

    front frame 

    reinforcement plate for fitting rising beam

    back plate for fitting rising beam

    rising beam cap

    front frame corner

    roof holder

    side frame roof purline

    rear frame corner cap

    post

    roofing catch

    rear frame

    rising beam

  • 8/19/2019 Montagehandleidng Carport Amsterdam

    10/24

              

                                                                 

                                                                 

                   

                   

                   

         

              

                      

              

                  

                         

                         

                         

                         

              

                                

                         

     

         

    Basic size

    width

     

     

    earth floorconcrete 

    earth floor

    concrete 

    basic

    concrete concrete

    basic

                 (  e  a  r   t   h

        f   l  o  o  r

     

      c  o  n  c  r  e   t  e

     

       ) 

                               

      e  a  r   t   h

        f   l  o  o  r

                               

                 (

            c       o       n       c      r       e        t

                  )

    table 2-1 unit mm. table 2-2 unit mm.

           e

    width width

    [GURI] stone

    Depth

    Dimension in < > shows depth 57 type.  Dimension in < > shows depth 56 type.

    earth floor

    concrete 

    earth floor

    concrete 

     

     

    600 type 1500  type

    none earth floornone earth floor

    none earth floor       n       o       n       e 

      e  a  r   t   h

        f   l  o  o  r

    600 type   1500  type

    Figure shows the standard post specification. Dimension in ( ) shows long post H 23.

              (          r          i       s          i       n

           g             b

           e       a       m          )  

              (          r          i       s          i       n

           g             b

           e       a       m          )  

                    

     (post) (post)

      p  o  s   t   f  o  r

       f  r  o  s   t

    please make the post SHINSHIN dimension within ±100mm.

    (roof rafter SHINSHIN)   (roof rafter SHINSHIN)

       p  o  s   t   f  o  r

       f  r  o  s   t

     (post) (post)

    [GURI] stone

  • 8/19/2019 Montagehandleidng Carport Amsterdam

    11/24

     

     

         

     

    concrete 

    earth floor

    earth floor

    concrete 

    Dimension in < > shows depth 57 type.

    Dimension in < > shows depth 56 type.

    14 extension in depth 600 type

    none earth floor

           n       o       n       e 

      e  a  r   t   h

        f   l  o  o  r

    12 extension in depth  1500  type

    Please make the post SHINSHIN dimension within ±100mm.

    (roof rafter SHINSHIN)

     (post)

    Please make the post SHINSHIN dimension within ±100mm.

    (roof rafter SHINSHIN)

     (post)

          p      o      s       t   f  o  r

       f  r  o  s   t

  • 8/19/2019 Montagehandleidng Carport Amsterdam

    12/24

       

     

     

       

             

       

    Dimension in < > shows depth 57 type. 

    Dimension in < > shows depth 56 type.

    (continuation)

    earth floor

    concrete 

    depth

    depth

    earth floor

    concrete 

    none earth floor

           n       o        n       e 

                                                                                                                                                                                                                                                                                                                                e                                                                                                                                                                                                                                                                                                                                  a                                                                                                                                                                                                                                                                                                                            r                                                                                                                                                                                                                                                                                                                                                                                                            t                                                                                                                                                                                                                                                                                                                                                                                                                                                   h

                                                                                                                                                                                                                                                                                                                                                                                                                                                   f                                                                                                                                                                                                                                                                                                                                                                                                                                             l                                                                                                                                                                                                                                                                                                                             o         

                                                                                                                                                                                                                                                                                                                                o                                                                                                                                                                                                                                                                                                                             r

    600 type

    1500  type

    table 2-4  unit : mm.

    Please make the post SHINSHIN dimension within ±100mm.

    (roof rafter SHINSHIN)

    (roof rafter SHINSHIN)

     (post)

    table 2-3  unit:mm.

    C D E

      C   D   E

     (post)  p  o  s   t   f  o  r

       f  r  o  s   t

    depth length TATE RETO type

  • 8/19/2019 Montagehandleidng Carport Amsterdam

    13/24

         

         

         

                

         

    Dimension in < > shows depth 57 type. 

    Dimension in < > shows depth 56 type.

     

    Execution of base

    Indian ink putting out at basic position

    Carport HONTAI outside line

    (roof dimension) a a1 d a a1 dwidthearth floor concrete 

    Supplementation

     Supplementation

    width(roof dimension)

    earth floor concrete 

    a a1 d a a1 d a a1 d

    Carport HONTAI outside line

    Execution method of base

    600 type

    none earth floor

    1500  type

    none earth floor

    table 1-1 unit:mm.

    Please put out the burial position of the post,and dig up a basic hole.

    table 1-2 unit:mm.

    for f rostpost

    Please put out the burial position of the post,and dig up a basic hole.

    The [post shinshin] size must become within ±100mm though the movement of the post is within ±100mm. 

    The [post shinshin] size must become within ±100mm though the movement of the post is within ±100mm. 

  • 8/19/2019 Montagehandleidng Carport Amsterdam

    14/24

                

                       

        

                

         

              

              

        

             

                   

                    

           

        

             

             

                

                

           

          

     

                  

    (continuation)

    basic sizeIncase of specification none earth floor , earth floor concrete specification ,long specification for frost (1500 type only).

       M  A   E   W

      A   K    U 

      s   i  d  e

    earth floor

    concrete 

    Reinforced

    Figure 1-1 Figure 1-  2Figure 1-  3

    For specification none earth floor For earth floor concrete specification

    basic none earth floor basic earth floor concrete basic none earth floor basic earth floor concrete

    Point

    Sealing

    600 type 1500 typewidth

     truss screw

    hexagon tapping screw

    Figure 2-2 Figure 2-3Figure 2-4

     Figure 2-1

    Point

    by 1-8  and 1-9. (Refer to Figure 2-3)

    rod

    For specification for frost (1500 type only).

    table 1-3 600 type unit:mm. table 1-4 1500 type  unit:mm.

    hanging metal 

    hanging metal 

     

     Please stick a hole cover seal on current processing hole.

    table 2-1  unit:mm.

    200 or more

              1           0           0   o

      r  m  o  r  e

     Sealing compoundSealing compound

    Sealing compound

       f  r  o  n   t

        f  r  a  m

      e   s   i  d

      e

       f  r  o  n   t    f

      r  a  m  e   s   i  d

      e

       f  r  o  n   t

        f  r  a  m

      e   s   i  d

      e

     post 

    long post for frost

    Setting of front frame

    for front frame

    plain washer

    front frame 

    front frame 

    for front frame

    Please hang front frame on a hanging metal for front frame.(Refer to Figure 2-2)

    Please make a temporary hole Φ4.5 in structure  and fill sealing compound and install front frame. 

    Please fill sealing compound in top of front frame. (Refer to Figure 2-4)

    Please match front frame to the rising beam and process the hole of Φ4.5 when you move post.

    The edge distance of the upper surface of the base and earth floor concrete must become 200 mm or more.

    Please construct the reinforced rod in earth floor concrete.  

    front frame by 1-10. (Refer to Figure 2-1)

    Please make a temporary hole Φ3 in main post of structure or middle post and fill sealing compound and install hanging metal for

  • 8/19/2019 Montagehandleidng Carport Amsterdam

    15/24

            

    cuation

    The display disappears when the leader is

    label is pasted.Please give to the sidewhere the leader is not installed for thedisplay label.

    water pulling out hole for vicnity (ground

    supplementation

    500 mm and construct processing hole  

    for fitting bracket incase of 1500 type for

    Please apply reinforcement plate for fitting

    .(Refer to Figure 3-3)

     hexagon head bolt (PW+SW)

     hexagon head bolt (PW+SW)

    bracket cover

    bracket

    anchor rod

    weep hole Φ6 (  )

     

    hexagon head bolt

    cutting  

    process

    process

    top bottomhole for fitting bracket (through) (process)

    Figure 3-2

    Figure 3-  1

    Figure 3-  3

     countersunk  head screw

    back plate

    rising beam cap

    back plate for fitting rising beam Please install the bracket on the post by

    Please install the rising beam on the bracket by

    Please install back plate for fitting rising beam

    on rising beam cap.(Refer to Figure 3-1)

    Please install rising beam cap on rising beam.

     installed on the post where "Directions"

    G.L of the post.Please make the Φ6

    side). Water in post might be frozenexpand and psot might be damaged.

    for fitting rising beam

    rising beam cappost

    reinforcement plate for fitting rising beam

    front frame

    rising beam 

    Please cut from top of long post for frost

     forst standard post.(Refer to Figure 3-2)

    Installation of post and rising beam

    rising beam

      Please insert a an chor rod in post.

    Please install bracket cover on bracket by

    rising beam in top of front frame and fixing by

  • 8/19/2019 Montagehandleidng Carport Amsterdam

    16/24

     truss screw

     washer head screw

    fin part

    cutting ()

    bracket cover

    option

     washer head screw

    Figure 4-  2

    Figure  4-1

    cover by 1-3 .(Refer to Figure 4-1)

    Point

    (Refer to Figure 4-1)

    Point

    between cutting and cutting equally.

    and cutting. 

    Please stick a hole cover seal on current

    processing hole.

    setting of roof purline  rear frame

    roofing catch

    rear frame

    post

    roof purline

    rising beam

    Please install the rear frame on the bracket

    Please stick panel buffer to spacer of cutting 

    Please install the roof purline on rising beam by

    on front frame side for fin.

    rear frame (for falling snow)

    rear frame 

    roof purline

     r e a r  f r a

     m e  s i d e

     f r o n t  f r a

     m e  s i d e

    Please match the rear frame and roof

    purline to the rising beam and process

    the hole of Φ5.5 incase of rear frame ,Φ5.5

      in case of roof purline  .

    roofing bufferPlease move the roofing catch to distribute 

    roofing buffer

    rising beam

    rear frame (for snow)

  • 8/19/2019 Montagehandleidng Carport Amsterdam

    17/24

    install in side frame.

    (Refer to Figure 5-1)

     Point

    There is right and left in side frame.

    Please match the hole of side frame to the

    cuation

      Point

    Please put out the opposite angle in the roof

    frame circumference, the horizontal,vertical

    supplementation

      pan head drill screw

     pan head drill screw

    sealing compound

    sealing compound

    sealing compoundsealing

    sealing sealing

    sealing

    sealing compound

     

    pan head drill screw

    For snow

    cutting

    cutting

    . Installation of side frame and roof rafter

    front framefront frame corner cap

    corner cap and front frame corner cap and

    roof purline

    rising beam

    side frame

    Figure 5-1

    rear frame 

    rear frame corner cap

    For fallingsnow

    (rear frame)

    roof rafter

    rear frame

    roof rafter

    side frame

    roof rafter

    roof purlineFigure 5  -2

    side frame R 

    side frame LFigure 5-  3

    rear frame siderear frame side

    Please adjust that it is cutting to rear frame 

    side.(Refer to Figure 5-3)

    front frame , rear frame and roof purline 

    It confirms it before and behind the roof rafter

    and please match the hole of the roof rafter to the

    5-3 )

    Please use 1-7 when install roof rafter 

    to rear frame.Wind load pressure

    performance go down and might have

    product. (Refer to Figure 5-2)

    Please fill the sealing compound to the space

    roof rafter on rear frame.

      (Refer to Figure 5-2)

    of roof rafter and rear frame before installing 

    in the post.

    There isn't processing hole on front frame

    and rear frame , roof purline.

    unexpected  injury by damage of 

    Please fill sealing compound on rear frame 

      by 1-5  .

     

     

    front frame and the roof purline,and install it by

    1-5 . (Refer to Figure 5-2,Figure

    (front frame roof purline)

    sealing compound

    roof rafter

  • 8/19/2019 Montagehandleidng Carport Amsterdam

    18/24

       

     

    cover part

    cover part

     falling

    option

    Point

    Please install the roof panel after confirming both sides without fail,and peeling off protection seat.

    sealing compound

    washer head screw

    washer head screw

     

    pan head drill screw  (with color)

     

    Point

    .Installation of roof ing

    setting of roof ing roof ing

    roofing catch

    front frame

    rear frame Figure 6-1

    roofing catch roofing catch roofing catch

    roof ing

    front frame

    Figure 6-  3Figure 6-2

    rear frame rear frame (for snow)rear frame(for snow)

    Please insert roofing to cover part of front frame and insert to roofing catch.

    Please make including dimension of rear frame (roofing catch) between right and left equally.

    Please make including dimension of roof rafter part between right and left equally.

    Installation of roof holder

    front frame

    roof holder

    roof holder

    roof holder

    side frame

    roof holder

    roof ing

    Figure 6-  4

    rear frame

    roof ing

    roof holder roof holder

    roof holder cap

    roof rafter 

    rear frame (For falling snow  )

    Figure 6-  6Figure 6-  5roof rafter 

    Please install roof holder from top of rising beam to rear frame  (Refer to Figure 6-4)

    Please confirm roof rafter and roof holder meet well. (Refer to Figure 6-5)

    front frame

    Please install roof holder cap on end roof holder by in case of rear frame (for snow). (Refer to Figure 6-6)

    Please fill the sealing compound during roof holder and front frame.(Refer to Figure 6-4)

  • 8/19/2019 Montagehandleidng Carport Amsterdam

    19/24

       Setting for 600 type only.

    the middle is one side sticking

    cutting

     pan head drill screw

     pan head drill screw

    cross section of roof material holder

     

       b  a  c   k

      s   i   d  e

       t  a   b   l  e

       s   i   d  e

      (Refer to Figure 7-1)

    Point

    (edge:Figure 7-1and the middle:Refer to Figure 7-3)

    front frame

      f r o n  t   f r a

     m e  s  i d

     e

      r e  a  r

       f  r  a  m

     e   s  i d

     e

    roof holder

    side frame

    roof holder

    Figure 7-1

    rear frame

    roof holder

    side frame

    roof ing

    Figure 7-2

    Figure 7-3 Figure 7-4

    (Refer to Figure 7-4)

    (Refer to Figure7-2)

    7. Installation of roof ing holder 

    Installation of roof ing holder 

    roof ing holder

    roof ing holder

    roof ing holder spacer

    roof ing holder

    roof ing holder spacer

    roof ing holder

    Please count the roof ing holder the rear frame side and install it on the position right above the third roof purline by

    There isn't a roof ing holder in opening 30 size.

    In case of fitting second places ,please make opposite with the first roofing holder and install to meet well cutting parts.

    Please stick roof ing holder spacer under roof ing holder before fitting.

    Please fix only the screw on the roof holder side,and fix the other side after installing the following roofing and the roof holder.

  • 8/19/2019 Montagehandleidng Carport Amsterdam

    20/24

        

    Setting of TATEDOI

    sealing compound

    TATEDOI

    DENDEN

    weep hole

    weep hole

    gasket for attachment

     AMADOI attachment

    gasket for attachment

    adhesive spreading

    adhesive spreading

     washer head screw

     washer head screw

     

    pan head drill screw

    adhesive spreading

    92°elbow

    Depth

    Depth

    and

    drain elbow

     AMADOI covering hole cap

    Table 8-1 600 type TATEDOI cutting size unit:mm

    Table 8-2 1500 type TATEDOI cutting size unit:mm

    Figure 8-1

    rising beam

    Please cutTATEDOI.(Refer to Table 8-1 , 8-2)

    Please install gasket for attachment,AMADOI attachment,drain elbow,TATEDOI 92°elbow,DENDEN with adhesive and

    on one side of the end of rear frame.

    Please install gasket for attachment and AMADOI covering hole cap on the other water pulling out hole by .

    Please fill the sealing to the screw position.

    rear frame

    rear frame

  • 8/19/2019 Montagehandleidng Carport Amsterdam

    21/24

         

         

         

             

         

        

    basic construction

    14 extension in depth

    Dimension in < > shows depth 56 type.

    Dimension in < > shows depth 57 type.

    width

     (roof dimension)

    earth floor concrete 

    width

     (roof dimension)

    earth floor concrete 

    supplementation

    supplementation

    600  type

    CARPORT HONTAI outside line

    none earth floor

    table 1-1  unit:mm.

    Please put out the burial position of the post,and dig up a basic hole.

    CARPORT HONTAI outside line

    12 extension in depth  1500  type

    none earth floor   post for frost

    table 1-2  unit:mm.

    Please refer [2 actual dimension and name of each part 2.actual dimension] for base construction.

    Please refer [2 actual dimension and name of each part 2.actual dimension] for base construction.

    Construction method of TATE RENTO

    The [post shinshin] size must become within ±100 mm. though the movement of the post is within ±100 or less.

    The [post shinshin] size must become within ±100 mm. though the movement of the post is within ±100 or less.

    Please put out the burial position of the post,and dig up a basic hole.

  • 8/19/2019 Montagehandleidng Carport Amsterdam

    22/24

     

             

         

             

         

        

        

    (continuation)

      Dimension in < > shows depth 57 type.

    Dimension in < > shows depth 56 type. type

    supplementation

    supplementation

    width(roof dimension)

    earth floor concrete 

    width (roof dimension)  earth floor concrete 

    depth

    depth

     depth TATE RENTO type

    600 type

    CARPORT HONTAI outside line

    table 1-3 

    unit:mm. table 1-4 

    unit:mm.

    none earth floor

     1500

    CARPORT HONTAI outside line

    table 1-5  unit:mm. table 1-6  unit:mm.

    none earth floor post for frost

    Please refer [2 actual dimension and name of each part 2.actual dimension] for base construction.

    Please refer [2 actual dimension and name of each part 2.actual dimension] for base construction.

    The [post shinshin] size must become within ±100 mm.

     

    though the movement of the post is within ±100 or less.

    Please put out the burial position of the post,and dig up a basic hole.

    The [post shinshin] size must become within ±100 mm. though the movement of the post is within ±100 or less.

  • 8/19/2019 Montagehandleidng Carport Amsterdam

    23/24

    (continuation)

    sealing compound

    sealing compound

     pan head drill screw

     pan head drill screw

    option

    optionoption

    Figure 2-  6

     joint of RENTO part

    Point

    sealing treatment

    sealingsealing

    sealing sealing (for falling snow)optionoption

    sealing

    Figure 2-9

     

    front frame 

    roof purline 

    rear frame 

    rear frame sleeeve

    roof purline sleeve

    roof rafter

    front frame sleeeve

    rear frame (for falling snow)

    rear frame sleeve (for falling snow)

    Figure 2-8 For rear frame (for falling snow)

    Please joint front frame sleeve,roof purline, rear frame sleeve in front frame,roof purline,rear frame by

    front frame sleeevefront frame 

    roof purline 

    roof purline sleeve

    rear frame sleeeve

    rear frame sleeeverear frame sleeeve

    rear frame 

    rear frame 

    sleeve rear frame sleeve

    (for snow  )

    rear frame (for snow)

    rear frame sleeve (for snow)

    Figure 2-7 For rear frame (for snow)

    Please fill sealing compound all around

    Please refer [3. execution method of base] for assembly except RENTO part.

    Please fill sealing compound in RENTO part.(Refer to Figure 2-9)

  • 8/19/2019 Montagehandleidng Carport Amsterdam

    24/24

                  

                  

                          

     

                                    

                                    

                    

                          

          

       

                          

                  

                  

                  

                  

                  

                          

                          

                          

     

    Joint of HONTAI

    process of joint part

    option

    hole

    hole

    hole

    hole

    hole

    Point

    dimension in ( ) show 1500 type.

    Figure 2-1 process of front frame

    Figure 2-2 process of roof purline

    Figure 2-3 process of rear frame

    Figure 2-4 process of rear frame (for snow)

    Figure 2-5 process of rear frame (for falling snow)

    Please process hole of RENTO side of roof purline,front frame,rear frame.(Pleaese refer to 2-1,2-2,2-3,2-4,2-5)