Boland Payeh Azar COMPANY PROFILE...

32
Boland Payeh Azar COMPANY PROFILE 2018 Dynamic, versatile and fast growing: BPA Engineering is one of the largest, fully empowered construction companies in Iran * The information contained in this document is correct as at February 2016 1/31/2018 Company Profile 2016 1

Transcript of Boland Payeh Azar COMPANY PROFILE...

Page 1: Boland Payeh Azar COMPANY PROFILE 2015bpa-ir.com/wp-content/uploads/2018/02/Boland-Payeh-Azar-2018.pdf · 1/31/2018 * The information contained in this document is correct as at February

Boland Payeh Azar

COMPANY PROFILE 2018 Dynamic, versatile and fast growing:

BPA Engineering is one of the largest, fully

empowered construction companies in Iran

* The information contained in this document is correct as at February 2016 1/31/2018 Company Profile 2016 1

Page 2: Boland Payeh Azar COMPANY PROFILE 2015bpa-ir.com/wp-content/uploads/2018/02/Boland-Payeh-Azar-2018.pdf · 1/31/2018 * The information contained in this document is correct as at February

BPA Engineering Co. Empowered to deliver

1. OVERVIEW

• About Us

• Our Services

i. Building

ii. Civil Engineering

2. OUR VALUES

3. OUR CLIENTS

4. MANAGEMENT AND STAFF

• Chief Executive Officer

• Chairman

• Directors

• Company Organogram

Contents

1/31/2018 * The information contained in this document is correct as at February 2016 2

Page 3: Boland Payeh Azar COMPANY PROFILE 2015bpa-ir.com/wp-content/uploads/2018/02/Boland-Payeh-Azar-2018.pdf · 1/31/2018 * The information contained in this document is correct as at February

5. CORPORATE GOVERNANCE

6. POLICIES AND CERTIFICATES

• Affirmative Action Policy Statement

• Quality Control for Building Work Instructions

• Environmental Management Plan

• MPO Rating Certificates

• ISO 9001:2008 Certificate

• HSE Certificates

7. MAJOR PLANT AND EQUIPMENT

8. PROJECTS

• Current and Completed Projects

• Project Fact Sheets

1/31/2018 * The information contained in this document is correct as at February 2016 3

Page 4: Boland Payeh Azar COMPANY PROFILE 2015bpa-ir.com/wp-content/uploads/2018/02/Boland-Payeh-Azar-2018.pdf · 1/31/2018 * The information contained in this document is correct as at February

About Us

BPA J.S was formed in 2003, servicing the commercial, industrial and residential markets of I.R Iran. Today BPA Construction is one of the largest truly empowered construction companies in Iran. The Company has a total staff complement of 35.

The Company is accredited with Planning and Management Organization ratings of 2, confirming BPA ability to take on projects of unlimited value in both the general building and civil engineering industries. BPA is 100% black-owned .

Our Philosophy

BPA prides itself on meeting modern-day construction challenges and ensuring the successful completion of complex projects. We promise to deliver the highest quality of workmanship and client satisfaction – both imperatives to the BPA Construction philosophy. The Company strives to conduct its business fairly and honestly and with consideration to the long-term needs of all its stakeholders, i.e. clients, employees, subcontractors, suppliers and service providers

“BPA Construction is a fully certified company in terms of ISO 9001:2008 specifications.”

“Our approach is uniform: uncompromising quality, commitment to client satisfaction and personal attention to relationships with everyone we work with.”

1/31/2018 * The information contained in this document is correct as at February 2016 4

Page 5: Boland Payeh Azar COMPANY PROFILE 2015bpa-ir.com/wp-content/uploads/2018/02/Boland-Payeh-Azar-2018.pdf · 1/31/2018 * The information contained in this document is correct as at February

Our Services

BPA Construction offers contracting services on a wide variety of projects, from Finance, Design, Build and Operate to Public Private Partnership Contracts as well as the conventional building contracts. Backed by our significant resources, the Company is well placed to effectively tackle projects of any size and complexity.

• Building BPA’s expertise ranges from office blocks to shopping centres, residential developments, parking, industrial buildings and schools. Our MPO rating of 2 is testament to our capability and the caliber of work that we have delivered in the past. Our successful performance in this sector is supported by a client base of major players in the industry who have commended BPA Construction on their ability to deliver.

• Civil Engineering BPA Construction’s MPO rating of 2, is verification of our capacity to effectively execute civil engineering projects of unlimited value. Our track record in the construction of industrial buildings, shopping centers, and infrastructure, demonstrates our ability in the field of Civil Engineering.

“Our track record allows BPA to stand

shoulder-to-shoulder with some of the

major listed construction companies in

Iran.”

1/31/2018 * The information contained in this document is correct as at February 2016 5

Page 6: Boland Payeh Azar COMPANY PROFILE 2015bpa-ir.com/wp-content/uploads/2018/02/Boland-Payeh-Azar-2018.pdf · 1/31/2018 * The information contained in this document is correct as at February

Our Values People

Our greatest asset is our people; from people in the workplace to our clients. We remain true to our founding values of quality, commitment, hard-work and integrity in all our projects, and are proactive in finding solutions for our clients that best achieve their goals. BPA Construction places great emphasis on attracting and retaining highly-skilled senior and middle management staff. The Company follows a consultative process with its employees at all levels on matters affecting them in their work environment. It is an equal opportunity employer and no discrimination is made because of race, gender or creed. We are also committed to a policy of Affirmative Action whereby the company is charged with the responsibility of uplifting the previously disadvantaged segments of our society and for providing training for our employees so that they can develop to their full potential.

Training

BPA places great emphasis on the training and development of all employees. Through our in-house-mentorship scheme, the needs of our staff are identified and training programmes implemented in order to effectively develop individual growth and performance. Skills education is facilitated at site level through formal training programmes.

1/31/2018 * The information contained in this document is correct as at February 2016 6

Page 7: Boland Payeh Azar COMPANY PROFILE 2015bpa-ir.com/wp-content/uploads/2018/02/Boland-Payeh-Azar-2018.pdf · 1/31/2018 * The information contained in this document is correct as at February

Quality

BPA Construction’s quality assurance procedures are comprehensive and fully enforced and the Company has been awarded full ISO 9001:2008 certification.

Safety, Health and Environment

Our mission is to achieve and maintain the highest level of Safety, Health and Environmental control in all areas of the Company’s operations. Innovative training and education programs allow us to provide our employees and subcontractors with the tools they need to increase safety and reduce the risk on every project we manage.

Our Values

1/31/2018 * The information contained in this document is correct as at February 2016 7

Page 8: Boland Payeh Azar COMPANY PROFILE 2015bpa-ir.com/wp-content/uploads/2018/02/Boland-Payeh-Azar-2018.pdf · 1/31/2018 * The information contained in this document is correct as at February

Our Clients Our impressive client list includes a number of high-profile Iran businesses and governmental organizations, such as: • NIOC • Standard Organization • Municipility Organization • Universities • Aras Free Zone • N.G.O Companies

1/31/2018 * The information contained in this document is correct as at February 2016 8

Page 9: Boland Payeh Azar COMPANY PROFILE 2015bpa-ir.com/wp-content/uploads/2018/02/Boland-Payeh-Azar-2018.pdf · 1/31/2018 * The information contained in this document is correct as at February

MANAGEMENT AND STAFF Managing Director

Mohsen-Heidari Civil Eng. M.Sc. Degree 19 Years Experience Civil Engineering E.P.C Field.

Chairman & Business

Development Mgr.

Mohammad-Heidari Civil Eng. M.Sc. Degree 16 Years Experience Civil Engineering E.P.C , Geotecnick & HSE Field.

Executive Deputy Mohammad-Bazoubandi Process Eng. M.Sc. Degree 15 Years Experience Process Engineering E.P.C Field.

Commercial Director Ebrahim-Kousari Civil Eng. M.Sc. Degree 5 Years Experience Tendering & Commercial Field.

Financial Director Reza-Heidari Management Bs. 20 years Experience Financial Field

1/31/2018 * The information contained in this document is correct as at February 2016 9

Engineering Director Aliakbar-Amirahmadi Civil Eng. Bs. Degree 10 Years Experience Tchnical & Engineering Field.

Page 10: Boland Payeh Azar COMPANY PROFILE 2015bpa-ir.com/wp-content/uploads/2018/02/Boland-Payeh-Azar-2018.pdf · 1/31/2018 * The information contained in this document is correct as at February

COMPANY ORGANOGRAM AS AT JUNE 2016

1/31/2018 * The information contained in this document is correct as at February 2016 10

Page 11: Boland Payeh Azar COMPANY PROFILE 2015bpa-ir.com/wp-content/uploads/2018/02/Boland-Payeh-Azar-2018.pdf · 1/31/2018 * The information contained in this document is correct as at February

CORPORATE GOVERNANCE BPA Construction is committed to the principles of integrity, accountability and transparency as set out in MPO.

The Board

The Board consists of three Directors, and meets fortnightly on a formal basis. It is responsible for setting strategy, determining investment policy, reviewing quarterly performance in detail against previously approved budgets and identifying and monitoring risk areas. BPA Construction complies with the mandatory requirement of having a Chairman as well as a Managing Director, with separate functions within the Company.

Remuneration Committee

The Board has established a Remuneration Committee, which consists of all three Executive Directors. It is responsible for determining the remuneration packages and conditions of employment of the Executive Directors and staff complement.

Audit and Risk Management

Committees The Audit Committee consists of two Executive Directors. Both the head of the internal audit department and the external audit partners have unrestricted access to the Audit Committee. With a small Board of Directors, BPA Construction believes that the creation of a Nomination Committee would be giving precedence to substance over form. However, the Board regularly reviews the appropriateness of its size and how best it can perform its duties. The Risk Management Committee consists of all three Executive Directors. The Committee reports to the Board on a regular basis setting out its evaluations of the risks faced by the Company and the recommended strategies for mitigating the impact thereof on the Company. Responsibility for risk identification, evaluation and management remains with the Board.

1/31/2018 * The information contained in this document is correct as at February 2016 11

Page 12: Boland Payeh Azar COMPANY PROFILE 2015bpa-ir.com/wp-content/uploads/2018/02/Boland-Payeh-Azar-2018.pdf · 1/31/2018 * The information contained in this document is correct as at February

POLICIES AND CERTIFICATES This section includes the following:

1. Affirmative Action Policy Statement

2. Quality Control for Building Work Instructions

3. Environmental Management Plan

4. The ISO 9001:2008 Certificate

5. MPO Certificates

1/31/2018 * The information contained in this document is correct as at February 2016 12

Page 13: Boland Payeh Azar COMPANY PROFILE 2015bpa-ir.com/wp-content/uploads/2018/02/Boland-Payeh-Azar-2018.pdf · 1/31/2018 * The information contained in this document is correct as at February

1. Affirmative Action Policy Statement

BPA Construction recognises Affirmative Action as an integral part of its business strategy. Accepting the values and aspirations of the country, we ensure the implementation of Affirmative Action through the following:

• Equal employment opportunities and conditions

This embraces the removal of differences in conditions of employment based on race or gender and the establishment of a company culture respectful of diversity.

In this we recognise the right of every employee to be treated fairly in his / her employment based on authentic merits and achievements.

• Advancement of all employees

Equality of opportunity extends to all educational, training and development aspects and progress and achievements have to be continuous and measurable against set targets.

Employees who are educationally disadvantaged or lack training will be assisted through a Mentorship program to realise their career potential.

BPA Construction has a proactive Affirmative Action Committee that meets quarterly to ensure the above is put into practice.

1/31/2018 * The information contained in this document is correct as at February 2016 13

Page 14: Boland Payeh Azar COMPANY PROFILE 2015bpa-ir.com/wp-content/uploads/2018/02/Boland-Payeh-Azar-2018.pdf · 1/31/2018 * The information contained in this document is correct as at February

2. Quality Control for Building Work Instructions

All sites are to comply with Construction’s Quality Control Procedures as provided in the Building Works Inspections Manual. This procedure describes the method to be used for the inspection and monitoring of BPA’s building works.

All sites are to allocate persons responsible for compliance with the implementation of the system in the designated areas. Key performance areas requiring special monitoring are to be identified and, if deemed necessary, additional systems incorporated to ensure compliance with standards.

*Contact our Head Office for the complete document

on our Quality Control for Building Work Instructions.

3. Environmental Management Plan

The protection of our environment is a prerequisite consideration in all decisions and actions of the Company. Coupled with our generic Environmental Management Plan (EMP), the site management will formulate a site specific EMP prior to occupation of the project. This plan will also take into account the Employers’ EMP usually issued by their appointed Environmental Control Officer (ECO).

The EMP includes: • General Environmental Procedures • Stormwater Management Plan • Management of Topsoil • Destruction of Vegetation • Impact on Animal Life • Site Office / Construction Camp Management Plan • Toilet Facilities, Waste Water and Refuge Disposal

1/31/2018 * The information contained in this document is correct as at February 2016 14

Page 15: Boland Payeh Azar COMPANY PROFILE 2015bpa-ir.com/wp-content/uploads/2018/02/Boland-Payeh-Azar-2018.pdf · 1/31/2018 * The information contained in this document is correct as at February

ISO & HSE MS Certificates

1/31/2018 * The information contained in this document is correct as at February 2016 15

Page 16: Boland Payeh Azar COMPANY PROFILE 2015bpa-ir.com/wp-content/uploads/2018/02/Boland-Payeh-Azar-2018.pdf · 1/31/2018 * The information contained in this document is correct as at February

MPO& Chamber of Commerc Membership Certificates

1/31/2018 * The information contained in this document is correct as at February 2016 16

Page 17: Boland Payeh Azar COMPANY PROFILE 2015bpa-ir.com/wp-content/uploads/2018/02/Boland-Payeh-Azar-2018.pdf · 1/31/2018 * The information contained in this document is correct as at February

MAJOR PLANT AND EQUIPMENT

1/31/2018 * The information contained in this document is correct as at February 2016 17

Description QTY

Crane

Tower Crane 1

Truck Crane 1

Material Handling Equipment

Bobcats 2

Backhoe 1

Siezer Lifting 1

Site Accommodation

Container 2

Portable Accomodation Unit 4

Other

Surveying Equipment (Total Station, Teodolit) 3 sets

Welding equipment and full set of construction equipments

Page 18: Boland Payeh Azar COMPANY PROFILE 2015bpa-ir.com/wp-content/uploads/2018/02/Boland-Payeh-Azar-2018.pdf · 1/31/2018 * The information contained in this document is correct as at February

PROJECTS FACT SHEET

1/31/2018 * The information contained in this document is correct as at February 2016 18

Only projects exceeding a contract value of 3billion Rials, dating back to 2004, have been listed:

CURRENT AND COMPLETED PROJECTS

Project Value Date

P.C. Of Commercial Complex Of Noorafarinan e Aras (Aras Free Zone) 82,090000,000 Rials Oct. 02, 2014

P.C. of Structure , Foundation, Control room Of MEK unit of Iranol Oil Co. 25,061,206,294 Rials Dec. 08 , 2014

P.C. Of Swimming Pool Of Kharg Petrochemical Company 45,767,689,739 Rials July 06 , 2014

P.C. of Concrete Dike Wall of Iranol Oil Co. 7,369,263,457 Rials Jun. 01 , 2016

P.C. of Export Terminal of Agri Products of Jiroft of Golshan Ara Eram Co. 106/459/000/000 Rials May. 10 , 2016

P.C. Of Standard Organization Buildings & Installations & Swimming Pool 13,568,000,000 Rials March. 01 , 2014

P.C. Of Pardis Sari Complex- Phase-2 (Training & Swimming Complex) 52,500,000,000 Rials Jan 21 , 2013

P.C. Of Pardis Sari Complex- Phase-1 (Training & Swimming Complex) 20,000,000,000 Rials April 27 , 2011

P.C. Of Iran Intrenational Exhibition Buildings & Installations (Two Projects) 16,857,298,618 Rials Nov. 28 , 2010

P.C. Of Payam Nour Universiti Training Complex (Two Projects) 10,243,000,000 Rials April 09 , 2008

P.C. Of Bager Shahr Crisis & Training Complex 10,500,000,000 Rials June 02 , 2008

E.C. Of Bitumen Loading Platforms, Paving & Shelter Structure 3,146,000,000 Rials June 25 , 2007

Page 19: Boland Payeh Azar COMPANY PROFILE 2015bpa-ir.com/wp-content/uploads/2018/02/Boland-Payeh-Azar-2018.pdf · 1/31/2018 * The information contained in this document is correct as at February

PROJECTS FACT SHEET

1/31/2018 * The information contained in this document is correct as at February 2016 19

Engineering and Construction of Bitumin Loading Platforms

Value: 3/146/000/000 Rials

Date: June 25 , 2007

Location: Iran-Tehran Refinery-Pasargad Oil Co. Site

Client: Pasargad Oil Co.

Scope: Design, Procurement & Construction Of Bitumen Platforms, Paving & Shelter

Page 20: Boland Payeh Azar COMPANY PROFILE 2015bpa-ir.com/wp-content/uploads/2018/02/Boland-Payeh-Azar-2018.pdf · 1/31/2018 * The information contained in this document is correct as at February

P.C. Of Bager Shahr Crisis & Training Complex

Value: 10/500/000/000 Rials

Date: June 02 , 2008

Location: Iran-Tehran-Bager Shahr City

Client: Bager Shahr Municipility Organization

Scope: Procurement & Construction Of Crisis & Training Complex

PROJECTS FACT SHEET

* The information contained in this document is correct as at February 2016 20

Page 21: Boland Payeh Azar COMPANY PROFILE 2015bpa-ir.com/wp-content/uploads/2018/02/Boland-Payeh-Azar-2018.pdf · 1/31/2018 * The information contained in this document is correct as at February

1/31/2018 * The information contained in this document is correct as at February 2016 21

P.C. Of Payam Nour Universiti Training Complex (Two Projects)

Value: 10/243/000/000 Rials

Date: April 09 , 2008

Location: Iran-Tehran- Esfahan – Zarrin Shahr City

Client: Payam e Nour Universiti

Scope: Procurement & Construction Of Training Complex (Two Projects )

PROJECTS FACT SHEET

Page 22: Boland Payeh Azar COMPANY PROFILE 2015bpa-ir.com/wp-content/uploads/2018/02/Boland-Payeh-Azar-2018.pdf · 1/31/2018 * The information contained in this document is correct as at February

1/31/2018 * The information contained in this document is correct as at February 2016 22

P.C. Of Iran Intrenational Exhibition Buildings & Installations (Two Projects)

Value: 16/857/298/618 Rials

Date: Nov. 28 , 2010

Location: Iran-Tehran- Chamran High Way – Iran International Exhibition

Client: Iran International Exhibition

Scope: Procurement & Construction Of Iran Intrenational Exhibition Buildings & Installations

PROJECTS FACT SHEET

Page 23: Boland Payeh Azar COMPANY PROFILE 2015bpa-ir.com/wp-content/uploads/2018/02/Boland-Payeh-Azar-2018.pdf · 1/31/2018 * The information contained in this document is correct as at February

1/31/2018 * The information contained in this document is correct as at February 2016 23

P.C. Of Pardis Sari Complex- Phase-1 (Training & Swimming Complex)

Value: 20/000/000/000 Rials

Date: April 27 , 2011

Location: Iran-Mazndaran Province- Sari City

Client: Bonyad e Taavon e Naja

Scope: Procurement & Construction Of Concrete Structure of Training & Swimming Complex

PROJECTS FACT SHEET

Page 24: Boland Payeh Azar COMPANY PROFILE 2015bpa-ir.com/wp-content/uploads/2018/02/Boland-Payeh-Azar-2018.pdf · 1/31/2018 * The information contained in this document is correct as at February

1/31/2018 * The information contained in this document is correct as at February 2016 24

P.C. Of Pardis Sari Complex- Phase-2 (Training & Swimming Complex)

Value: 52/500/000/000 Rials

Date: Jan 21 , 2013

Location: Iran-Mazndaran Province- Sari City

Client: Bonyad e Taavon e Naja

Scope: Procurement & Construction Of Framework & Installations of Training & Swimming Complex

PROJECTS FACT SHEET

Page 25: Boland Payeh Azar COMPANY PROFILE 2015bpa-ir.com/wp-content/uploads/2018/02/Boland-Payeh-Azar-2018.pdf · 1/31/2018 * The information contained in this document is correct as at February

1/31/2018 * The information contained in this document is correct as at February 2016 25

P.C. Of Standard Organization Buildings & Installations & Swimming Pool

Value: 13/568/000/000 Rials

Date: March. 01 , 2014

Location: Iran-Alborz Province- Karaj City

Client: Standard Organization Of Iran

Scope: Procurement & Construction Of Standard Organization Buildings & Installations & Swimming Pool

PROJECTS FACT SHEET

Page 26: Boland Payeh Azar COMPANY PROFILE 2015bpa-ir.com/wp-content/uploads/2018/02/Boland-Payeh-Azar-2018.pdf · 1/31/2018 * The information contained in this document is correct as at February

1/31/2018 * The information contained in this document is correct as at February 2016 26

P.C. Of Swimming Pool Of Kharg Petrochemical Company

Value: 45/767/689/739 Rials

Date: July 06 , 2014

Location: Iran- Kharg Island – Petrochemical Company

Client: Kharg Island Petrochemical Company

Scope: Procurement & Construction Training Complex & Swimming Pool

PROJECTS FACT SHEET

Page 27: Boland Payeh Azar COMPANY PROFILE 2015bpa-ir.com/wp-content/uploads/2018/02/Boland-Payeh-Azar-2018.pdf · 1/31/2018 * The information contained in this document is correct as at February

1/31/2018 * The information contained in this document is correct as at February 2016 27

P.C. of Structure , Foundation, Control room Of MEK unit of Iranol Oil Co.

Value: 25/061/206/294 Rials

Date: Dec. 08 , 2014

Location: Iran-Tehran Refinery-Iranol Oil Co. Site

Client: Iranol Oil Company

Scope: Procurement & Construction Of Structure , Foundation, Control room Of MEK unit of Iranol Oil Co.

PROJECTS FACT SHEET

Page 28: Boland Payeh Azar COMPANY PROFILE 2015bpa-ir.com/wp-content/uploads/2018/02/Boland-Payeh-Azar-2018.pdf · 1/31/2018 * The information contained in this document is correct as at February

P.C. of Concrete Dike Wall of Iranol Oil Co.

Value: 7/369/263/457 Rials Date: Jun. 01 , 2016 Location: Iran-Tehran Refinery-Iranol Oil Co. Site

Client: Iranol Oil Company Scope: Concrete Dike Wall of Iranol Oil Co.

1/31/2018 * The information contained in this document is correct as at May 2015 28

Page 29: Boland Payeh Azar COMPANY PROFILE 2015bpa-ir.com/wp-content/uploads/2018/02/Boland-Payeh-Azar-2018.pdf · 1/31/2018 * The information contained in this document is correct as at February

P.C. of Export Terminal of Agri Products of Jiroft of Golshan Ara Eram Co.

Value: 106/459/000/000 Rials

Date: May. 10 , 2016

Location: Iran-Kerman-Jiroft

Client: Golshan Ara Eram

Scope:Export Terminal of Agri Products of Jiroft of Golshan Ara Eram Co.

1/31/2018 * The information contained in this document is correct as at May 2015 29

Page 30: Boland Payeh Azar COMPANY PROFILE 2015bpa-ir.com/wp-content/uploads/2018/02/Boland-Payeh-Azar-2018.pdf · 1/31/2018 * The information contained in this document is correct as at February

1/31/2018 * The information contained in this document is correct as at February 2016 30

P.C. Of Commercial Complex Of Noorafarinan e Aras (Aras Free Zone)

Value: 82/090/000/000 Rials

Date: Oct. 02, 2014

Location: Iran-Azarbayjan e Shargi – Aras Free Zone

Client: Noorafarinan e Aras Company

Scope: Procurement & Construction Of Concrete Structure of Commercial Complex

Page 31: Boland Payeh Azar COMPANY PROFILE 2015bpa-ir.com/wp-content/uploads/2018/02/Boland-Payeh-Azar-2018.pdf · 1/31/2018 * The information contained in this document is correct as at February

Projects of B.P.A Co. 1-E.C. Of Bitumen Loading Platforms, Paving & Shelter Structure 2-P.C. Of Bager Shahr Crisis & Training Complex 3-P.C. Of Iran Intrenational Exhibition Buildings & Installations (Two Projects) 4-P.C. of Structure , Foundation, Control room Of MEK unit of Iranol Oil Co. 5-P.C. Of Pardis Sari Complex- Phase-1 (Training & Swimming Complex) 6-P.C. Of Pardis Sari Complex- Phase-1 (Training & Swimming Complex) 7-P.C. Of Payam Nour Universiti Training Complex (Semnan-Damgan Unit) 8-P.C. Of Payam Nour Universiti Training Complex (Esfahan-Zarrinshahr Unit) 9-P.C. Of Commercial Complex Of Noorafarinan e Aras (Aras Free Zone) 10-P.C. Of Swimming Pool Of Kharg Petrochemical Company 11-P.C. Of School 12 Classroom (Gazvin) 12-P.C. Of Standard Organization Buildings & Installations & Swimming Pool Experiences Of B.P.A Co. Directors 13-P.C. Of Residential Complexs 14-Dessign & Execution Control of MDF Production Convened. 15-Dessign & Execution Control of Tar Reserve Tanks. 16-Dessign & Execution Control of Oil Reserve Tanks. 17-Technical & Commercial Studies Of NGL Refinery. 18-Dessign & Execution Control of ChadorMaloo line-4. 19-Dessign & Execution Control of Aromatics Oxidation Project.

1/31/2018 * The information contained in this document is correct as at February 2016 31

Page 32: Boland Payeh Azar COMPANY PROFILE 2015bpa-ir.com/wp-content/uploads/2018/02/Boland-Payeh-Azar-2018.pdf · 1/31/2018 * The information contained in this document is correct as at February

(There are 10 other completed

projects. The fact sheet can be made available upon request)

32