13-04-2023 Wim Poelman, Concept House 1
Concept House
Ontwikkeing van een duurzaam huis in een sociaal duurzame context
13-04-2023 Wim Poelman, Concept House 2
Concept House
• Initiatief: gepensioneerde ondernemer in de bouwsector die gelooft in volledig geïndustrialiseerde woningen
• Uitdaging opgepakt door: Prof. Mick Eekhout, Chair of Product Development TU Delft
• Projectleider beginfase: Dr. Wim Poelman• Project leader realisatiefase: Dr. Arjan van Timmeren
13-04-2023 Wim Poelman, Concept House 3
Waarom een Concept House van uit de TU Delft?
• Onafhankelijk van practische sociale beperkingen • Onafhankelijk van economische beperkingen • Gelegenheid om zelf te bepalen wat er gebeurt• Gelegenheid om resultaten te onderzoeken• Gelegenheid voor derden om te zien en te leren• Gelegenheid om reproduceerbaar onderzoek te doen• Gelegenheid om de industrie te stimuleren
13-04-2023 Wim Poelman, Concept House 4
Voorwaarden:
• Conceptuele ideeën• Visie op de toekomst• Financiële ruimte• Geschikte partners• Materialen en componenten• Mankracht• Locatie
13-04-2023 Wim Poelman, Concept House 5
Partners
• Voor elk betrokken materiaal/component zijn partners vereist
• Het aantal partners groeide voortdurend• Sociale complexiteit groeide voortdurend• Aantal stakeholder = aantal belangen
13-04-2023 Wim Poelman, Concept House 6
Initiële componenten
13-04-2023 Wim Poelman, Concept House 7
Stakeholders and interests
• Onderwijsinstituten: TU Delft – kennis– onderzoek
• Building companies: 10 partners– kennis, – nieuwe opdrachten– uitstraling
• Suppliers: 30 industries– verkoop
• Local governments: Rotterdam– prestige
13-04-2023 Wim Poelman, Concept House 8
Conceptuele ideeën
• Overvloed aan ideeën• Selectie criteria• Technische haalbaarheid• Sociale haalbaarheid• Vooroordelen (hout?)• Impact van de innovatie• Niet te veel in een keer willen
13-04-2023 Wim Poelman, Concept House
Sustainability as a new item
9
Sustainable scheme single house, Arjan van Timmeren
13-04-2023 Wim Poelman, Concept House 10
Three goals
Industrieel Gestapelde bouwDuurzaam
Plug & Play ApartementenEnergie voorziening
13-04-2023 Wim Poelman, Concept House 11
Methaphors
13-04-2023 Wim Poelman, Concept House 12
Early ideas
High density apartments
13-04-2023 Wim Poelman, Concept House 13
Designs Concept House Urban Villa
13-04-2023 Wim Poelman, Concept House 14
Model Concept House Urban Villa
13-04-2023 Wim Poelman, Concept House 15
Materials & Components
• Compromis tussen:– Wat kan gesponsord worden– Wat is in overeenstemming met de doelstellingen
13-04-2023 Wim Poelman, Concept House 16
Human Resources
Reguliere staf:- Twee onderzoekers aan de TU in Delft (Industrial
Design Engineering and Architecture)Flexible staf (gesponsorde uren):- Een groot aantal mensen vanuit:
- Hogeschool Rotterdam- Albeda College- Vanuit toeleverende bedrijven
13-04-2023 Wim Poelman, Concept House 17
Location in Rotterdam Harbour area
13-04-2023 Wim Poelman, Concept House 18
De realisatie van start30 Juni 2011
Mick Eekhout (TU Delft) and Bert Hooijer (Rotterdam)
13-04-2023 Wim Poelman, Concept House 19
Product Development OrganogramMick Eekhout
13-04-2023 Wim Poelman, Concept House 20
Financieel ‘kaartenhuis’
13-04-2023 Wim Poelman, Concept House 21
Construction/Structures study
13-04-2023 Wim Poelman, Concept House 22
Creative studies for prototype
13-04-2023 Wim Poelman, Concept House 23
Development of prototype
2009 model 2011 prototype2010 details
13-04-2023 Wim Poelman, Concept House 24
Presentatie van concepten
Teneinde interesse te wekken
2009
2010
13-04-2023 Wim Poelman, Concept House 25
Applications on location
Voorstel in Delft / Rotterdam
13-04-2023 Wim Poelman, Concept House 26
Finally real location in Rotterdam
In urban renewal neighbourhood
13-04-2023 Wim Poelman, Concept House 27
Gebruikte materialen
• Hout (7,5 meter overspanning)• Houtvezelplaat• Cellulose isolatie• Keramiek• Aluminium• Gips• Kit (was niet de bedoeling)• Staal (voor demonstratieopstelling)
13-04-2023 Wim Poelman, Concept House 28
Composition of construction
13-04-2023 Wim Poelman, Concept House 29
Detail roof/wall/floor
13-04-2023 Wim Poelman, Concept House 30
Energy & climate section
13-04-2023 Wim Poelman, Concept House 31
The assembly adventure
Prefabrication: installation in 5 days watertight
13-04-2023 Wim Poelman, Concept House 32
People present on location during assembly
13-04-2023 Wim Poelman, Concept House 33
Prototype impression
As built situation 2012
13-04-2023 Wim Poelman, Concept House 34
Technical evaluation Transition traditional to IDF mindset
• Partner Unica used to measure bathrooms. Not necessary anymore.
• Partner MdR was confronted with another steel building sequence.
• Partner VDM had calculated 1500 KG for the bathroom. This turned out to be 4000 KG, leading to many unexpected adaptations.
• The Solarlux façade was not adapted for housing. • The FAAY electrical wall channels were not tuned with the
timber building structure of VDM.
1
13-04-2023 Wim Poelman, Concept House 35
• Insufficient attention for flexibility, resulting in problems in electrical installation.
• Flexibility lacked between floors and walls by partner Unica. • The electricity channels in the floor not properly produced. • The drawings of FAAY came too late.• FAAY refused flexible wiring in the ceiling. • Electric wiring in the façade by VDM became unattainable by
the outside ceramic cladding.• Holes for toilets were not realised in the factory but on the
spot.
Technical evaluation 2
13-04-2023 Wim Poelman, Concept House 36
• The screws for mounting inner walls to floor were too long.• Integration partner Niko (Home control) and Itho
(Autotemp) turned out to be impossible, because of intellectual property.
• A decentralised ventilation system of Renson per room, was taken at the last moment
• The architecture of the installation space had to be changed dramatically at the last moment and improvised.
• Partner Unica was too late with detailing and drawing result inefficient use of space.
Technical evaluation 3
13-04-2023 Wim Poelman, Concept House 37
• Rainwater drainage was forgotten.• Partner Icopal ordered insufficient materials. Improvisation
is necessary. • Partner VDM changes drawings, made by TU Delft. Partner
Justimax had to draw the cladding a second time.• The holes in the ceramic tiles of partner Mosa were
wrongly drilled. 120 m2 has to be redone. • Obsolete tiles could be returned to Mosa for recycling. But
the tiles went to a common waste processor. • Consoles for the solar protection system of partner Renson
came too late. Causing extra hiring of aerial platform.
Technical evaluation 4
13-04-2023 Wim Poelman, Concept House 38
• The edge of the roof is not realized according to drawings, resulting in improvisation.
• Inaccurate connection between the inner walls on the structure of VDM were done by forbidden PUR.
• The ceiling was made seamless although industrial seams were acceptable.
• Materials as the floor made installation dangerous and troublesome.
Technical evaluation 5
13-04-2023 Wim Poelman, Concept House 39
Conclusions
• A step into sustainable building practice • For cooperation between companies and universities is a
challenge.• It is difficult to involve companies in futuristic developments. • The strategy to build a complete house turned out to be
effective. All parties participated with a great motivation. • The project disturbs the primary process of the companies.• Parties are experienced better results. • The change of project leaders at TU Delft gave instability. • Necessary permission next steps of finance determined
further possibilities.
1
13-04-2023 Wim Poelman, Concept House 40
Conclusions
• Difficult to plan a project in changing. • Experimenting and building are no friends. • Difficult to mobilize knowledge at the university and to link it
to practical experience of companies. • The culture at the university did not contributed to the
project. However the guts and perseverance happen to be present in the chair holder Mick Eekhout.
• Politics form an important success factor. Not only the product, but also the context is important.
• Concept House Village might be a useful platform just as Booosting and Barba House.
2
13-04-2023 Wim Poelman, Concept House 41
Concept House Urban Villa
Next experimental phase to take 2-3 years in a recession period in the building industry.