Bd Checklist Edwin

download Bd Checklist Edwin

of 8

Transcript of Bd Checklist Edwin

  • 8/19/2019 Bd Checklist Edwin

    1/19

    BRIDGE DESIGN PLANS/REPORTS REVIEW CHECKLIS

    REPUBLIC OF THE PHILIPPINESDepartment of P!"#$ Wor%& an'

    H#()*a+&BUREAU OF DESIGN

    Brea of De(n ,ne -.-

  • 8/19/2019 Bd Checklist Edwin

    2/19

  • 8/19/2019 Bd Checklist Edwin

    3/19

    0 I& t)e $o1er &)eet pro1#'e' *#t) proper pro2e$tt#t"e an' proper name&/(natre of o3$#a"&*#t) 'e(nat#on& of appro1#n(/$on$rr#n(o3$#a"&4

    -0 I& t)e In'e5 of &)eet&/'ra*#n(& $omp"ete *#t)proper &)eet nm!er an' &et nm!er&4

  • 8/19/2019 Bd Checklist Edwin

    4/19

    60 LOCATION 7AP/VICINIT8 7AP

    • Is the location of proposed bridge with respect to existing road,road section, towns, etc. indicated?

    Are the important landmarks/existing structures indicated?• Are the contours indicated?

    • Are the location of boreholes indicated?

    • Are the direction of stream ow indicated?

    Are the stationings indicated?• Are the bench marks indicated?

    • Is the azimuth of bridge longitudinal axis indicated?

    • Is the directional sign/informatory sign indicated?

    • Is the location of priate and public structures/utilities that maybea!ected by the proposed pro"ect indicated?

    • Is the location of existing bridge and possible detours, if any,indicated?

    • Is the #itle $lock with proper signatories indicated?

  • 8/19/2019 Bd Checklist Edwin

    5/19

    90 GENERAL NOTES

    •.

    Are the codes and speci%cations indicated?•. Is the &ighway 'oading indicated?

    •. Is the (esign )tresses indicated?

    •. Are the codes and speci%cations indicated?

    •. Is the material speci%cation indicated?

    •. Is the construction procedure/se*uence indicated?

    •. Is the special proision/information, if any, indicated?

    •. Is the notes for foundation +bored piles, .-. piles, spreadfooting, etc. indicated?

    •. Is the #itle $lock with proper signatories indicated?

  • 8/19/2019 Bd Checklist Edwin

    6/19

    :0 SU77AR8 OF ;UANTITIES IN TABULATED FOR7

    •.

    Are the Item umbers correct?•. Are the (escription of 0ork +or Item (escription correct?

    •. Are the 1nits of 2easurement correct?

    •. Are the 3uantities for Abutment, 4iers and )uperstructuresseparately presented?

    •. Are the total for all items inoled indicated?

    •. Are the original *uantities and new +reised *uantitiesseparately indicated in case of reised plans/5As6staked5 or 7As6$uilt plans?

    •. Is the #itle $lock with proper signatories indicated?

  • 8/19/2019 Bd Checklist Edwin

    7/19

  • 8/19/2019 Bd Checklist Edwin

    8/19

    =0 FOUNDATION PLAN AND LA8OUT

    •. Are the boring logs and location indicated?

    •. Are the eleation and stationings of )4# indicated?

    •. Are the 6alues indicated?

    •. Are the description and soil classi%cation of boring logsindicated?

    •. Is the plan of footing showing size of footing and arrangementof piles indicated?

    •. Is the #itle $lock with proper signatories indicated?

  • 8/19/2019 Bd Checklist Edwin

    9/19

    >0 DETAILS OF SUPERSTRUCTURES

    :.; I( -9->#> (>- 8I(>

    • Is the eleation showing dimensions, girders reinforcement, railingand rail post reinforcement indicated?

    • Is the plan showing dimensions, slab reinforcement, diaphragmreinforcements, location of drains, railing and railing postdistances, bearing details indicated?

    • Is the typical roadway, cross6section half showing dimensions andhalf showing slab reinforcement, sidewalk reinforcement andrailing reinforcements indicated?

    • Is the crown slopes of supereleation indicated?

    • Is the camber diagram indicated?

    • Is the bar bending diagram and bar bending schedule indicated?

    • Is the estimate of *uantities indicated?

    • Is the typical section of girders, deck slab diaphragm showingdimensions and rebars indicated?

  • 8/19/2019 Bd Checklist Edwin

    10/19

    :.@ )#>))>( -9->#> 8I(>

    • Is there notes for prestressed concrete girder?

    Is there separate detail of girders showing position of prestressingcables and end anchorages?

    • Is the dowels and diaphragms location indicated?

    • Is the details of prestressing cables and end anchoragesindicated?

    • Is the re*uired "acking force and net prestressing force indicated?

    • Is the girder section details, one at the end block, one atintermediate and one showing girder dimensions indicated?

    • Is the estimate of *uantities indicated?

    Is the #itle $lock with proper signatories indicated?

  • 8/19/2019 Bd Checklist Edwin

    11/19

    :. >' #1)) )14>)#1-#1>

    • Is the general iew showing eleation, plan, top and bottom iewwith dimensions, number of "oints and dimensions indicated?

    • Is the summary of stresses in tabulated form indicated?

    • Is the list of drawings for details of truss members indicated?

    • Is the camber diagram indicated?

    • Is the general notes +speci%cation, deadload, lieload concrete

    slab, reinforcing steel, structural steel, bolts/riets, and memberdesignations indicated indicated?

    • Is the details of expansion "oints indicated?

    • Is the estimate of *uantities indicated?

    Is the #itle $lock with proper signatories indicated?

  • 8/19/2019 Bd Checklist Edwin

    12/19

    ?0 7ISCELLANEOUS DETAILS

    • Is the details of drain indicated?

    • Is the details of railing and sidewalk indicated?

    • Is the details of expansion and %xed bearings indicated?

    • Is the details of elastomeric bearing pad indicated?

    • Is the details of expansion dam/"oints indicated?

  • 8/19/2019 Bd Checklist Edwin

    13/19

    .0 DETAILS OF PIERS

    •. Is the plan, front and side eleation half6showing dimensionsand half6showing reinforcements indicated?

    •.

    Is the plan, front and side eleation half6showing dimensionsand half6showing reinforcements indicated?

    •. Is the position of bearings, centerline of "oints, centerline of pierand eccentricity, if any, indicated?

    •. Is the position of risers/bridge seats, if any, indicated?

    •. Is the eleations of #op of -oping and $ottom of

  • 8/19/2019 Bd Checklist Edwin

    14/19

    0 DETAILS OF ABUT7ENTS

    •. Is the plan, front and side eleation half6showing dimensionsand half6showing reinforcements indicated?

    •.

    Is the position of bearings, anchorages and shear blocksindicated?

    •. Is the position of risers of bridge seats, if any, indicated?

    •. Is the deeloped side eleation showing wingwallreinforcements indicated?

    •. Is the )ection showing backwall, coping, shaft and footing+reinforcement and dimension indicated?

    •. Is the footing/pile cap plan and eleation, half showingreinforcement and half showing dimensions, pile locations andestimated length of piles indicated?

    •. Is the location of construction "oints indicated?

    •. Is the $ar $ending (iagram and $ar $ending )cheduleindicated?

    •. Is the estimate of *uantities for each abutment indicated?

    •.

    Is the #itle $lock with proper signatories indicated?

  • 8/19/2019 Bd Checklist Edwin

    15/19

    -0 RIVER PROTECTION WORKS @ #f an+ Refer toH+'ra"#$& D#1#on

    •. Is the bridge height/eleation indicated?

    •. Is the ;.==m freeboard for streams without debris complied?

    •. Is the ;.B=m freeboard for streams with debris complied?

    •. Is the rier training works indicated?

    •. Are the details of piers and abutment scour protection worksindicated?

  • 8/19/2019 Bd Checklist Edwin

    16/19

    60 RE;UIRED SUPPORTING DOCU7ENTS

    ;.; Is there #echnical )tudy of Alternatie #ype of )tructure?

    ;.@ )tructural (esign AnalysesC

    • Is there )tructural (esign analysis?

    • Is there )uperstructure (esign analysis?

    • Is there )ubstructure (esign analysis?

    • Is there

  • 8/19/2019 Bd Checklist Edwin

    17/19

    90 7INI7U7 DESIGN PARA7ETERS

    • Is the ;.==m freeboard for stream without debris complied?

    • Is the ;.B=m freeboard for streams with debris complied?

    • Is the .EBm freeboard for naigable rier or unless speci%ed bythe 4hilippine -oastguard complied?

    • Is the D.::m ertical clearance for highway/underpass /tunnelcomplied?

    • Is the '/:== superstructure deection for rural areas complied?

    • Is the '/;=== superstructure deection for urban areascomplied?

    • Is the design discharge 3FB= years return period complied?

    • Is the D.==m minimum roadway width +; lane complied?• Is the G.E=m minimum roadway width +@ lanes rural areas

    complied?

    • Is the E.@m minimum roadway width +@ lanes urban areascomplied?

  • 8/19/2019 Bd Checklist Edwin

    18/19

    • Is the @==@ AA) )tandard )peci%cations for &ighway$ridges, ;Eth >dition complied?

    • Is the (.9. o. EB, series of ;HH@ eC (40& Adisory for)eismic (esign of $ridges complied?

    • Is the @==D (40& )tandard )peci%cations for &ighways, $ridgesand Airport +$lue $ook complied?

    • Is the (40& (esign 8uidelines, -riteria and )tandards, Jol. I K II+ed $ook 'atest >dition complied?

    • Is the (40& (.9. o. BG, )eries of ;HHB eC 3uality of 4lanscomplied?

  • 8/19/2019 Bd Checklist Edwin

    19/19