Met hout in de hoogte!

Jan-Willem van de Kuilen

Congres Bouwmaterialen en Innovatie

31-10-2013 TU Delft

Met hout de hoogte in!

100 m

Roller CoasterAmusement Park, Heide-Park Soltau,

Germany Height 52 m, length ca.1300 m, 120 km/h

Timber Wind Turbine TowerHannover Marienwerder/Germany 2012100m height, 100t weight, 1.5 MW, supplies 1000 households with electricity

52 m

Met hout in de hoogte!

PyramidenkogelOostenrijk

April 8, 2023 3

77 meter

Toenemend materiaalgebruik….

April 8, 2023 4

1 ton 5 ton 35 tonVoedsel,Wapens,

Bescherming

Voedsel,Gebouwen

Gereedschap

Voedsel, Gebouwen, Auto´s, Computers,

Gereedschap

Industriele revolutie

2013: Alles is cradle to cradle….

• Staal• Beton• VVK• Hout• Aluminium

April 8, 2023 5

2013: Alles is cradle to cradle….

April 8, 2023 6

• Bron:Cobouw

Maar met hout heeft u de laagste milieubelasting!

Vermelding onderdeel organisatie

April 8, 2023

Dus met hout in de hoogte!

5-laags HSB, Delft, Ecoduswijk, 1992

April 8, 2023 8

Meerverdiepingbouw

XLAM / CLTHSB

Cross Laminated Timber

Sterkte, stijfheid en flexibiliteit≈25 fabrikanten in Europa

XLAM – Elements:

Plate action

Loads:

Plate bending

Shear action

Walls and floors Stairs

Contacts in XLAM

Wall-Foundation

Floor-Floor

Wall-Wall

Wall-Floor

Aansluitingen

Bouwsnelheid….2 dagen

6 dagen

4 dagen

10 dagen

Vermelding onderdeel organisatie

April 8, 2023

Simpele standaard verbindingsmiddelen

Vermelding onderdeel organisatie

April 8, 2023

Murray Grove – KLH

Apartment building in London9 storeys

4 apartments / storeycrosslam elevator shaft

17 weeks time saving during construction

Limnologen, Sweden8 Storey CLT

17July, 2013

Limnologen, SwedenFloor plan

• CLT Walls and floors• TF Internal walls• Tension bars for prestressing• Sprinkler system

18July, 2013

Limnologen, SwedenSprinkler system

Reduced requirements for:

•Combustible façade cladding up to eight storeys;•Surface linings in apartments in multi‐storey buildings, down to class D‐s1,d0;•Fire spread through windows in the same building;•Walking distance in escape routes.

19July, 2013

Lifecycle Tower, Dornbirn, Oostenrijk

Architect Herman KaufmannProf. Holzbau TU München

Bouwtijd 8 dagen

Houtdag 14 November!

Forte Building, Melbourne

April 8, 2023 21

• 10 verdiepingen• 32.2 meter hoog• 23 appartementen

Investor: A ton of steel produces 1,5 tons of carbon in the making. A ton of cement 1,125 tons. And they aren’t as interesting, as versatile, as expressive. A tree

produces oxygen, and absorbs 1,42 tons of carbon for every ton of timber grown.

Forte Building, Melbourne

April 8, 2023 22

• Investor: • …..A ton of steel produces 1,5 tons of carbon in the making.

A ton of cement 1,125 tons. And they aren’t as interesting, as versatile, as expressive. A tree produces oxygen, and absorbs 1,42 tons of carbon for every ton of timber grown…

• …. Commercially speaking, the biggest thing is speed. With it being pre-fabricated, all of the main penetrations were already taken care of, and fixing into timber is a lot easier than fixing into concrete, so for the electricians, plumbers, plasterers and others, it’s a lot easier job [working with a CLT structure] than working with concrete.

Vermelding onderdeel organisatie

April 8, 2023

Wood-concrete skyscrapers

Vermelding onderdeel organisatie

April 8, 2023

Skyscrapers

Outrigger concepts

Outrigger concepts

Outrigger function

• Providing stability to the core• Providing a lever arm for the global bending

moments• Providing a division between timber sections for

fire safety• Allowing for building services (equipment)• Shelter spaces in case of emergencies

Outrigger concept

©TU-E

Outrigger concept

©TU-E

Foundation

Concrete storey as outrigger

Roof

Wood-concrete skyscrapers

Dock tower (120 m)

32July, 2013

Typical Shanghai Building Lay-out

Integrated tension bars

Wall element

Floor element

Wall element

Tension bars

Results

• Sway: 1/770H with H is building height• Sway: shear/bending ratio ≈ 1 to 5• Compression stresses timber < 5 N/mm2

• Tension bars # 26, Ø 30 mm• Reduction of bars over the building height

40 Storeys is possible, also with a wood coreArchitects need to make their buildings

slightly more ´square´

Bouwproces

Bouwproces

Crane times

• One-third of hoisting time.• Building speed of 1 storey per day• Cheaper cranes (> 6000 USD per month)• Longer reach → Fewer cranes

Environmental impact

• Wood stores CO2

• 0.8 – 0.9 tons of CO2 per m3

• Savings in other materials 1.1 tons of CO2

• 26.300 m3 for a 40 storey building

• 50.000 tons of CO2 emissions can be avoided

• Eq. of 33000 car emissions/year.

En hoe zit het dan met brand?

Outlook: Big wood, Chicago

Michael Charters,

USA

Big Wood, Chicago

Tall wood, Vancouver, Michael Green

April 8, 2023 47

Skidmore, Owens Merrill

April 8, 2023 48

Stockholm, SwedenMoller, Dinell Johansson

April 8, 2023 49

Il bosco verticale

April 8, 2023 50

Boeri, Milano

If trees can grow 100 metres high, why not wooden buildings?

…and wood is best compatible with the environment…

April 8, 2023 51