Pegah Shabehpour | Professional Portfolio

Post on 20-Feb-2016

218 views 2 download

description

architecture . construction documents . selected works

Transcript of Pegah Shabehpour | Professional Portfolio

PEGAH SHABEHPOUR

Selected Professional Works

01

CONTENTS

PARK RIDGE POLICE DEPARTMENT EVIDENCE STORAGEMaemar PC ArchitectsPark Ridge, Illinois, USA

LIGGETT RESIDENCEMaemar PC ArchitectsLake Forest, Illinois, USA

PACE TOBACCO FACTORYMaemar PC ArchitectsMongla, Bangladesh

05 |

13 |

17 |

02

PEGAH SHABEHPOUR Chicago, IL | pshabehp@hawk.iit.edu | linkedin.com/in/pshabehpour

Objective

To obtain an architectural position within a progressive multidisciplinary firm or organization, utilizing my diverse skill set in digital design, energy consciousness, and landscape architecture.

Experience

Architectural Intern | Maemar P.C. Architects | Long Grove, IL | 2012-Current

Assist in the streamlining of the architectural design process from conceptual design through overall completion of projects

Utilize three-dimensional building information modeling using Revit to communicate concepts to the client for approval

Produce construction and permit drawings for various scaled commercial, religious, and public projects using AutoCAD

Prepare measured drawings based on site visits of existing spaces for design development

Create three-dimensional renderings for client presentations using Revit and 3DsMax

Architectural Intern | ICL Interior Architecture, Inc. | Chicago, IL | 2008

Collaborated with both architects and engineers in a ten-person firm to develop solutions for architectural projects

Designed potential iterations of floor plans for the initial stages of projects

Produced drawings for renovations and new construction using AutoCAD

Performed redline changes and revisions of drawings

Projects included office buildings, commercial facilities, and multi-story residential buildings

Education

Illinois Institute of Technology | College of Architecture | Chicago, IL

Bachelor of Architecture | May 2013 Grade Point Average | 3.52/4.0 Cum Laude

Specializations

Digital Design + Landscape Architecture

Projects

College of International Relations | Studio | 2013

The Plant: Innovating the Farm of the 21st Century| Interprofessional Project | 2013

95th/Dan Ryan CTA Station | Studio | 2012

Building-Integrated Wind Energy Modules | Interprofessional Project | 2012

Two Apartment Towers on Spire Site | Studio | 2012

Catalytic Waterway: City Transformation in Landscape | Graduate Landscape Studio | 2011

Big Sky Ski Lodge | Studio | 2011

Near North Farmer’s Market | Studio | 2010

Bridgeport Library | Studio | 2010

Graphic Designer’s Studio and House | Studio | 2009

Technical Skills

Software

Autodesk Revit Architecture Autodesk AutoCAD Architecture Autodesk 3ds Max Design Autodesk Revit MEP Autodesk Ecotect Analysis Autodesk Vitari Autodesk AutoCAD Map 3D IES Gaia Adobe Photoshop Adobe Illustrator Adobe InDesign Adobe Dreamweaver Adobe Premiere Elements Rhinoceros Grasshopper Trimble SketchUp

Digital Fabrication

3D Printer Bridgeport Laser Cutter CMC Machine

Recognition

Nominated for the Schiff Foundation Fellowship | 2013

Track 1 Winner at IPRO Day for Wind Power and Energy Storage | 2012

Work Published on COA Arch+Fab Portal | 2011-Current

National Society of Leadership and Success | 2011-Current

Work Exhibited at COA Open House | 2010 + 2012

Dean’s List | 2009 + 2011 + 2012 + 2013

Heald Scholarship | 2008-2013

03

Creativity is the ultimate form of expression and to architect is the ultimate form of creativity.

04

PROFESSIONAL

PARK RIDGE POLICE DEPARTMENT EVIDENCE STORAGE

FIRM | MAEMAR PC ARCHITECTS

PRINCIPAL | MEHRAN FARAHMANDPOUR

TYPOLOGY | GOVERNMENT

LOCATION | PARK RIDGE, ILLINOIS

YEAR | 2013

05

1’-0” 20’-0”10’-0”

1’-0” 20’-0”10’-0”

NEW 1 STORY POLICEEVIDENCE BUILDING

CITY HALL PARKING LOT

CITY HALL PARKING LOT

EXISTING BUILDING

PARK RIDGE POLICE DEPARTMENT EVIDENCE STORAGE | Existing Site Plan

PARK RIDGE POLICE DEPARTMENT EVIDENCE STORAGE | Proposed Site Plan

06

1’-0” 5’-0” 10’-0”PARK RIDGE POLICE DEPARTMENT EVIDENCE STORAGE | Proposed Floor Plan

1 | Typ. Non-Load Bearing Stud Wall 2 | Typ. Non-Load Bearing CMU Wall 3 | Typ. Ext. Load Bearing Wall1’-0” 5’-0” 10’-0”07

1’-0” 5’-0” 10’-0”

1’-0” 5’-0” 10’-0”

1’-0” 5’-0” 10’-0”

1’-0” 5’-0” 10’-0”

PARK RIDGE POLICE DEPARTMENT EVIDENCE STORAGE | West Elevation

PARK RIDGE POLICE DEPARTMENT EVIDENCE STORAGE | North Elevation

PARK RIDGE POLICE DEPARTMENT EVIDENCE STORAGE | East Elevation

PARK RIDGE POLICE DEPARTMENT EVIDENCE STORAGE | South Elevation

08

1’-0” 5’-0” 10’-0”PARK RIDGE POLICE DEPARTMENT EVIDENCE STORAGE | Foundation Plan

1 | Footing @ Perimeter Wall 2 | Footing @ Entrance 3 | Footing @ Perimeter Wall

1’-0” 5’-0” 10’-0”4 | Footing @ Interior Wall 5 | Footing @ Perimeter Wall

09

1’-0” 5’-0” 10’-0”PARK RIDGE POLICE DEPARTMENT EVIDENCE STORAGE | Mechanical Plan

10

1’-0” 5’-0” 10’-0”PARK RIDGE POLICE DEPARTMENT EVIDENCE STORAGE | RCP/Electrical Plan

DIAGRAM | Electric Riser

11

1’-0” 5’-0” 10’-0”PARK RIDGE POLICE DEPARTMENT EVIDENCE STORAGE | Plumbing Plan

DIAGRAM | Waste/VentDIAGRAM | Water Supply

12

PROFESSIONAL

LIGGETT RESIDENCE

FIRM | MAEMAR PC ARCHITECTS

PRINCIPAL | MEHRAN FARAHMANDPOUR

TYPOLOGY | RESIDENTIAL

LOCATION | LAKE FOREST, ILLINOIS

YEAR | 2013

15

1’-0” 5’-0” 10’-0”LIGGETT RESIDENCE | Demolition Plan

1’-0” 10’-0” 20’-0”LIGGETT RESIDENCE | Second Floor Plan

14

1’-0” 5’-0” 10’-0”LIGGETT RESIDENCE | Proposed Floor Plan

1’-0” 5’-0” 10’-0”LIGGETT RESIDENCE | RCP/Electrical Plan

A | Wall Section B| Wall Section1’-0” 5’-0” 10’-0”

15

LIGGETT RESIDENCE | West Elevation

LIGGETT RESIDENCE | South Elevation

LIGGETT RESIDENCE | East Elevation

A | Master Bath B| Master Bath C| Master Bath

D | Master Closet E| Master Closet F| Master Closet

1’-0” 5’-0” 10’-0”

1’-0” 5’-0” 10’-0”

1’-0” 5’-0” 10’-0”

16

PACE TOBACCO FACTORY

FIRM | MAEMAR PC ARCHITECTS

PRINCIPAL | MEHRAN FARAHMANDPOUR

TYPOLOGY | INDUSTRIAL

LOCATION | MONGLA, BANGLADESH

YEAR | 2012

PROFESSIONAL

17

1’-0” 10’-0” 20’-0”PACE TOBACCO FACTORY | First Floor Plan

18

1’-0” 10’-0” 20’-0”PACE TOBACCO FACTORY | Second Floor Plan

19

1’-0” 10’-0” 20’-0”PACE TOBACCO FACTORY | Roof Plan

20

1’-0” 10’-0” 20’-0”PACE TOBACCO FACTORY | First Floor RCP

21

1’-0” 10’-0” 20’-0”PACE TOBACCO FACTORY | Second Floor RCP

22

1’-0” 10’-0” 20’-0”PACE TOBACCO FACTORY | First Floor Mechanical Plan

23

1’-0” 10’-0” 20’-0”PACE TOBACCO FACTORY | Second Floor Mechanical Plan

24

1’-0” 20’-0”10’-0”

PACE TOBACCO FACTORY | West Elevation

1’-0” 20’-0”10’-0”

PACE TOBACCO FACTORY | East Elevation

1’-0” 20’-0”10’-0”

PACE TOBACCO FACTORY | North Elevation

1’-0” 20’-0”10’-0”

PACE TOBACCO FACTORY | South Elevation

25

26