Part (a) Positing for Vaporizer

The crane had assisted with the CO2 vaporizer positioning in CGRS as shown below but it failed to position it into the CGRS due to roof height issue. To amend the issue, by using the forklift, CGRS operator are able to move the vaporizer into the CGRS plant without exceeding the roof height limits. The position of the vaporizer are meant to be nearby to a drain so that droplets formed from the CO2 liquid can be conveniently drained.

Crane is positioning the vaporizer

Final position of the vaporizer after the adjustment from the forklift

Part (b) Ground Drilling for Vaporizer

To tighten the vaporizer onto the ground, our mainetance team do for drilling for each sides (total of 4 side) in order for the placement of bolts, nuts and washers. After the tightening, the water level balancing is off the aligment and after some obresvations, it is seen that the there is a gap between the vaporizor and the ground at two sides as shown below. To compensate for the differ in ground heights, our mainetance team put a shim beneath the vaporizer before putting the bolt. In the end, the water level balancing is shown with a normal reading.

Drilling and bolting the vaporizer onto the ground

The off-set of water level balancing as seen in the middle

The gap bewteen the vaporizer and ground

The water level balancing after putting the shim

The shim beneath the vaporizer

The final position of the vaporizer

Part (c) Railing for Vaporizer

The railing is installed at 3 sides of the vaporizer to prevent any collision onto the vaporizer from pallet or forklift.

Part (4) Vaporizer Specification

Vaporizer Parameters and Dimensions

Dimensions (m) Surface Area (m¿¿2)¿

Weight (kg)

Rating(kg/hr)

Pressure Material FlangeL W H MAW

P(barg)

Testing

(barg)1.14 m

1.71 m

4.95 m

208m2 738 kg 400 kg/hr

80 barg 88 barg Aluminium

Flange

with 112

” 300# R.F.W.N ANSI

Flange Dimensions

Flange connection with 112 with ANSI 300#

Nominal Pipe Size

NPS (inches)

Diameter of Flange (inches)

No of Bolts Diameter of Bolts Holes

(inches)

Diameter of Bolt Holes

(inches)

Bolt Circle (inches)

1 12

6 18

4 34

0.88” 4 12

Part (d) Vaporizer’s Fittings and costing

Justification:

Inlet connection:

SS)Shut-off valve:

Firstly, to turn on the gas flow of CO2 through the vaporizer during refilling operation. Secondly, to turn off the gas flow when changing pallet connection from depleted pallet to filled pallet, this is to ensure safety purpose by preventing the backflow of gas from the vaporizer.

2) Vent/Purge valve

First, to safety vent out all the remaining gas and liquid which remained inside the tubing during the time period between after switching off the gas flow and before changing the pallet connection. Second, to purge the residual moisture and contamination.

3) Relief/ Safety valve:

To prevent the vaporizer from being overpressurized.

Outlet connection:

SS)Temperature gauge (exist with vaporizer)

To monitor and ensure that all the CO2 are in gas phase by refering to the phase diagram of CO2 (Pressure-Temperature graph) as shown below.

2) Check valve

To prevent backflow of gas into the vaporizer at all times.

*The specification for all fittings and tubing is stated as below

The outlet connection doesn’t need a venting valve since the CGRS mixed gas refilling itself is provided with one as shown below.

Fitting and tubing required

No Equipment Dimension/Connection

Description Quantity Total Price

1 Blind Flange Class 300#Threaded with ½” FNPT

Material:Stainless Steel 304

Manufacturer:JET Engineering

2 RM 442.00

2 Gasket Class 300#NPS: 1.5”

Material:PTFE (Teflon)Manufacturer:

“Any”

2 RM 134.00

3 Bolts, nuts and washers for

flange

M20 x 90mm”

Material:Stainless Steel 316

8 sets RM 68.00

4 Meca-Inox shut-off valve

½” FNPT Purpose:On/Off application

Manufacturer:Meca-InoxMaterial:

Stainless SteelTemperature

Range:-50°C to 54°C

Working Pressure:100 barg

Type:Full bore cryogenic

ball valve, 3pc

1 RM 560.00

5 Ball/Vent ½” (Tube) Purpose: 1 RM 636.80

valve For venting gasManufacturer:

Dk-LokOrdering Number:

SS-63TS8

6 Check valve ½” FNPT Purpose:Prevent back flowManufacturer:

Dk-LokOrdering Number:

V33D-F-8N-1-S

1 RM 291.70

7 Safety/ Relief valve

½” MNPT Purpose:To prevent excessive

pressure into the vaporizer

Manufacturer:GenerantMaterial:

Stainless Steel 316Seal Material:

TeflonTemperature

Range:-220°C to 205°C

Set pressure:1100 psi (76 bar)

Ordering number:HPRVA-500-SS-T-

1100

1 RM 2,050.00

8 Elbows ½” Manufacturer:Dk-Lok

Material:Stainless Steel

Ordering number:DL-8

4 RM 100.00

9 Male Elbows ½” to MNPT Manufacturer:Dk-Lok

Material:Stainless Steel

Ordering number:DLM8-8N

3 RM 90.90

10 Tee ½”(Tube)½”(Tube) ½”(Tube)

Purpose:For vent valve/ relief

Manufacturer:

2 RM 136.40

Dk-LokOrdering number:

DT-8

11 Male connector

½”(Tube)½”(MNPT)

Purpose:To connect tube with

superior valveManufacturer:

Dk-LokOrdering number:

DMC8-8N

2 RM 200.00

12 Male connector

½”(Tube)¼”(MNPT)

Purpose:To connect tube with

smart hoseManufacturer:

Dk-LokOrdering number:

DMC8-4N-S

1 RM 40.00

13 Female connector

½” to FNPT Purpose:To connect tube with

relief valveManufacturer:

Dk-LokOrdering number:

DCF-8-8N

1 RM 70.00

14 Stainless Steel Tubing

½” Manufacturer:SwagelokLength:

20ft (1 meter)Thickness:

0.049”Ordering number:

SS-T8-S-049-20

2 RM 480.80

15 Tube clamp ½” 5 RM 32.5016 Ambient

Vaporizer1 RM 28,000

Total costing RM 33,333.10

Part (f) Completion of Installation

The fittings had been completely installed on 30/6/2016.

Part (g) Testing

Maximum pressure achieved – up to 75 barg

Leak test – No possible leak is found

Part (h) Operation

Status: Currently, up and running with pallet.