MV 600 SS SP Vaporizer
![Page 2: MV 600 SS SP vapaorizer (cyroquip)](https://reader034.fdocuments.nl/reader034/viewer/2022042604/58aa2bf71a28abbb108b4d21/html5/thumbnails/2.jpg)
Part (a) Positing for Vaporizer
The crane had assisted with the CO2 vaporizer positioning in CGRS as shown below but it failed to position it into the CGRS due to roof height issue. To amend the issue, by using the forklift, CGRS operator are able to move the vaporizer into the CGRS plant without exceeding the roof height limits. The position of the vaporizer are meant to be nearby to a drain so that droplets formed from the CO2 liquid can be conveniently drained.
Crane is positioning the vaporizer
Final position of the vaporizer after the adjustment from the forklift
![Page 3: MV 600 SS SP vapaorizer (cyroquip)](https://reader034.fdocuments.nl/reader034/viewer/2022042604/58aa2bf71a28abbb108b4d21/html5/thumbnails/3.jpg)
Part (b) Ground Drilling for Vaporizer
To tighten the vaporizer onto the ground, our mainetance team do for drilling for each sides (total of 4 side) in order for the placement of bolts, nuts and washers. After the tightening, the water level balancing is off the aligment and after some obresvations, it is seen that the there is a gap between the vaporizor and the ground at two sides as shown below. To compensate for the differ in ground heights, our mainetance team put a shim beneath the vaporizer before putting the bolt. In the end, the water level balancing is shown with a normal reading.
Drilling and bolting the vaporizer onto the ground
The off-set of water level balancing as seen in the middle
![Page 4: MV 600 SS SP vapaorizer (cyroquip)](https://reader034.fdocuments.nl/reader034/viewer/2022042604/58aa2bf71a28abbb108b4d21/html5/thumbnails/4.jpg)
The gap bewteen the vaporizer and ground
The water level balancing after putting the shim
![Page 5: MV 600 SS SP vapaorizer (cyroquip)](https://reader034.fdocuments.nl/reader034/viewer/2022042604/58aa2bf71a28abbb108b4d21/html5/thumbnails/5.jpg)
The shim beneath the vaporizer
The final position of the vaporizer
![Page 6: MV 600 SS SP vapaorizer (cyroquip)](https://reader034.fdocuments.nl/reader034/viewer/2022042604/58aa2bf71a28abbb108b4d21/html5/thumbnails/6.jpg)
Part (c) Railing for Vaporizer
The railing is installed at 3 sides of the vaporizer to prevent any collision onto the vaporizer from pallet or forklift.
![Page 7: MV 600 SS SP vapaorizer (cyroquip)](https://reader034.fdocuments.nl/reader034/viewer/2022042604/58aa2bf71a28abbb108b4d21/html5/thumbnails/7.jpg)
Part (4) Vaporizer Specification
Vaporizer Parameters and Dimensions
Dimensions (m) Surface Area (m¿¿2)¿
Weight (kg)
Rating(kg/hr)
Pressure Material FlangeL W H MAW
P(barg)
Testing
(barg)1.14 m
1.71 m
4.95 m
208m2 738 kg 400 kg/hr
80 barg 88 barg Aluminium
Flange
with 112
” 300# R.F.W.N ANSI
Flange Dimensions
Flange connection with 112 with ANSI 300#
Nominal Pipe Size
NPS (inches)
Diameter of Flange (inches)
No of Bolts Diameter of Bolts Holes
(inches)
Diameter of Bolt Holes
(inches)
Bolt Circle (inches)
1 12
6 18
4 34
0.88” 4 12
![Page 8: MV 600 SS SP vapaorizer (cyroquip)](https://reader034.fdocuments.nl/reader034/viewer/2022042604/58aa2bf71a28abbb108b4d21/html5/thumbnails/8.jpg)
Part (d) Vaporizer’s Fittings and costing
Justification:
Inlet connection:
SS)Shut-off valve:
Firstly, to turn on the gas flow of CO2 through the vaporizer during refilling operation. Secondly, to turn off the gas flow when changing pallet connection from depleted pallet to filled pallet, this is to ensure safety purpose by preventing the backflow of gas from the vaporizer.
2) Vent/Purge valve
First, to safety vent out all the remaining gas and liquid which remained inside the tubing during the time period between after switching off the gas flow and before changing the pallet connection. Second, to purge the residual moisture and contamination.
3) Relief/ Safety valve:
To prevent the vaporizer from being overpressurized.
![Page 9: MV 600 SS SP vapaorizer (cyroquip)](https://reader034.fdocuments.nl/reader034/viewer/2022042604/58aa2bf71a28abbb108b4d21/html5/thumbnails/9.jpg)
Outlet connection:
SS)Temperature gauge (exist with vaporizer)
To monitor and ensure that all the CO2 are in gas phase by refering to the phase diagram of CO2 (Pressure-Temperature graph) as shown below.
2) Check valve
To prevent backflow of gas into the vaporizer at all times.
*The specification for all fittings and tubing is stated as below
The outlet connection doesn’t need a venting valve since the CGRS mixed gas refilling itself is provided with one as shown below.
![Page 10: MV 600 SS SP vapaorizer (cyroquip)](https://reader034.fdocuments.nl/reader034/viewer/2022042604/58aa2bf71a28abbb108b4d21/html5/thumbnails/10.jpg)
Fitting and tubing required
No Equipment Dimension/Connection
Description Quantity Total Price
1 Blind Flange Class 300#Threaded with ½” FNPT
Material:Stainless Steel 304
Manufacturer:JET Engineering
2 RM 442.00
2 Gasket Class 300#NPS: 1.5”
Material:PTFE (Teflon)Manufacturer:
“Any”
2 RM 134.00
3 Bolts, nuts and washers for
flange
M20 x 90mm”
Material:Stainless Steel 316
8 sets RM 68.00
4 Meca-Inox shut-off valve
½” FNPT Purpose:On/Off application
Manufacturer:Meca-InoxMaterial:
Stainless SteelTemperature
Range:-50°C to 54°C
Working Pressure:100 barg
Type:Full bore cryogenic
ball valve, 3pc
1 RM 560.00
5 Ball/Vent ½” (Tube) Purpose: 1 RM 636.80
![Page 11: MV 600 SS SP vapaorizer (cyroquip)](https://reader034.fdocuments.nl/reader034/viewer/2022042604/58aa2bf71a28abbb108b4d21/html5/thumbnails/11.jpg)
valve For venting gasManufacturer:
Dk-LokOrdering Number:
SS-63TS8
6 Check valve ½” FNPT Purpose:Prevent back flowManufacturer:
Dk-LokOrdering Number:
V33D-F-8N-1-S
1 RM 291.70
7 Safety/ Relief valve
½” MNPT Purpose:To prevent excessive
pressure into the vaporizer
Manufacturer:GenerantMaterial:
Stainless Steel 316Seal Material:
TeflonTemperature
Range:-220°C to 205°C
Set pressure:1100 psi (76 bar)
Ordering number:HPRVA-500-SS-T-
1100
1 RM 2,050.00
8 Elbows ½” Manufacturer:Dk-Lok
Material:Stainless Steel
Ordering number:DL-8
4 RM 100.00
9 Male Elbows ½” to MNPT Manufacturer:Dk-Lok
Material:Stainless Steel
Ordering number:DLM8-8N
3 RM 90.90
10 Tee ½”(Tube)½”(Tube) ½”(Tube)
Purpose:For vent valve/ relief
Manufacturer:
2 RM 136.40
![Page 12: MV 600 SS SP vapaorizer (cyroquip)](https://reader034.fdocuments.nl/reader034/viewer/2022042604/58aa2bf71a28abbb108b4d21/html5/thumbnails/12.jpg)
Dk-LokOrdering number:
DT-8
11 Male connector
½”(Tube)½”(MNPT)
Purpose:To connect tube with
superior valveManufacturer:
Dk-LokOrdering number:
DMC8-8N
2 RM 200.00
12 Male connector
½”(Tube)¼”(MNPT)
Purpose:To connect tube with
smart hoseManufacturer:
Dk-LokOrdering number:
DMC8-4N-S
1 RM 40.00
13 Female connector
½” to FNPT Purpose:To connect tube with
relief valveManufacturer:
Dk-LokOrdering number:
DCF-8-8N
1 RM 70.00
14 Stainless Steel Tubing
½” Manufacturer:SwagelokLength:
20ft (1 meter)Thickness:
0.049”Ordering number:
SS-T8-S-049-20
2 RM 480.80
15 Tube clamp ½” 5 RM 32.5016 Ambient
Vaporizer1 RM 28,000
Total costing RM 33,333.10
![Page 13: MV 600 SS SP vapaorizer (cyroquip)](https://reader034.fdocuments.nl/reader034/viewer/2022042604/58aa2bf71a28abbb108b4d21/html5/thumbnails/13.jpg)
Part (f) Completion of Installation
The fittings had been completely installed on 30/6/2016.
![Page 14: MV 600 SS SP vapaorizer (cyroquip)](https://reader034.fdocuments.nl/reader034/viewer/2022042604/58aa2bf71a28abbb108b4d21/html5/thumbnails/14.jpg)
Part (g) Testing
Maximum pressure achieved – up to 75 barg
Leak test – No possible leak is found
Part (h) Operation
Status: Currently, up and running with pallet.