2/26
www.GustoMSC.com
Exploration Construction Production
Jack-up
Semi-submersible
Vessel
8/14/2019 Nils Van Nood
3/26
OFFSHORE WIND INSTALLATION
Content
Present offshore wind market
Present installation methods
GustoMSC installation equipment
Scenarios for future offshore wind
Future challenges for installation
8/14/2019 Nils Van Nood
4/26
OFFSHORE WIND INSTALLATION
How do we get 30,000 of these unitsinstalled offshore in 2030?
EU target 20 for 20
30 for 30
8/14/2019 Nils Van Nood
5/26
OFFSHORE WIND INSTALLATION
Present offshore wind market
Turbine dimensions 2 5 MWD = 80 126 m, mass = 250 450 t
8/14/2019 Nils Van Nood
6/26
OFFSHORE WIND INSTALLATION
Present offshore wind market
Europe is largest market at the moment
www. offshorewindenergy.org
8/14/2019 Nils Van Nood
7/26
OFFSHORE WIND INSTALLATION
Present offshore wind market
Foundation types
30 m
Present: 40 - 45 m
http://www.renewables-made-in-germany.com/index.php?eID=tx_cms_showpic&file=fileadmin/user_upload/167/167_img.jpg&width=800m&bodyTag=%3Cbody%20bgColor=white%20style=%22margin:%200%22%3E&wrap=%3Ca%20href=%22javascript:close();%22%3E%20|%20%3C/a%3E&md5=8c1f55daa617c7ba1df46a2fa8b3be868/14/2019 Nils Van Nood
8/26
OFFSHORE WIND INSTALLATION
Present installation methods
Install in several steps:
Install foundation
Install transition piece (if applicable)
Install steel tower
Install turbine: nacelle, hub, blades
several sequences and assemblies possible
Often done with jack-up
8/14/2019 Nils Van Nood
9/26
OFFSHORE WIND INSTALLATION
Present installation methods
(8 slides of various installation examples & details removed for copy-right purposes)
8/14/2019 Nils Van Nood
10/26
OFFSHORE WIND INSTALLATION
Present installation methods
Purpose-build vessels for wind turbine installation
8/14/2019 Nils Van Nood
11/26
OFFSHORE WIND INSTALLATION
GustoMSC equipment
Pile upending tool: 1400 t, D = 4 6 mIn case pile weight > crane capacity
8/14/2019 Nils Van Nood
12/26
OFFSHORE WIND INSTALLATION
GustoMSC equipment
Rotor rotation tool (horizontal to vertical): 165 t SWL
Photo s courtesy Bard Engineering GmbH
8/14/2019 Nils Van Nood
13/26
OFFSHORE WIND INSTALLATION
GustoMSC equipment
Hydraulic jacking systems
8/14/2019 Nils Van Nood
14/26
OFFSHORE WIND INSTALLATION
GustoMSC equipment
Non self propelled jack-up barges: SEA series
8/14/2019 Nils Van Nood
15/26
OFFSHORE WIND INSTALLATION
GustoMSC equipment
Non self propelled jack-up barges: SEA 2000
8/14/2019 Nils Van Nood
16/26
OFFSHORE WIND INSTALLATION
GustoMSC equipment
Photo courtesy Deme / GeoSea : GustoMSC jack-ups Vagant, Buzzard, Zeebouwer
8/14/2019 Nils Van Nood
17/26
8/14/2019 Nils Van Nood
18/26
OFFSHORE WIND INSTALLATION
GustoMSC equipment
Integrated design, self propelled unitsPayload 6000 t, crane 1000 t
Delivery 2x in 2011
Payload 2600 t, Crane 500 t
Delivery 2009
8/14/2019 Nils Van Nood
19/26
OFFSHORE WIND
Future offshore wind
Scenarios for Europe (www.EWEA.org)40 150 GW installedoffshore wind in 2030
total power demand in 2030: 1,158 GW
http://www.ewea.org/http://www.ewea.org/8/14/2019 Nils Van Nood
20/26
8/14/2019 Nils Van Nood
21/26
OFFSHORE WIND
Future offshore wind installation
Challenges:
cost reduction
larger turbines
faster and safer installation
deeper water / future foundations
8/14/2019 Nils Van Nood
22/26
OFFSHORE WIND
Future offshore wind installation
Challenge: cost reduction
Required for the whole industry. For installation:
Faster installation process
Optimized, fit for purpose vessel design
Innovations for foundations and installation processes
8/14/2019 Nils Van Nood
23/26
OFFSHORE WIND
Future offshore wind installation
Challenge: faster and safer
Install more turbines in available weather window by:
Optimized logistics & industrialized repetitive process
Feeder vessels? solve offshore transfer
Faster deck handling and assembly logistics
Installation in one piece?
8/14/2019 Nils Van Nood
24/26
OFFSHORE WIND
Future offshore wind installation
installation in one piece?Apply proven drilling technology:
XY cantilever system
8/14/2019 Nils Van Nood
25/26
Courtesy:
NREL
OFFSHORE WIND
Future offshore wind installation
Challenge: deeper water / future foundations
Handling of larger structures and weights at deeperwater cheaper alternative for jack-up + crane?
Floating turbines: new installation procedures and
dedicated vessels (or just standard tugs?)
Tri-floater
8/14/2019 Nils Van Nood
26/26
OFFSHORE WIND
In summary a possible future scenario for Europe:
30,000 turbines in 2030with 30 installation units