Page 1 of X 19-XX-XXX
Texas
Application
INTERCONNECTING PRIVATE GENERATION The following information shall be supplied by the customer or customer’s designated representative. Applicable information must be complete to assure accurate evaluation of interconnection with the utility system.
For assistance, please contact Steven Hudson, principal area engineer
Email: [email protected]
Phone: 806.378.2165
Note: Be sure your inverter, converter, controller and interconnection equipment meet universal Underwriters Laboratories or Institute of Electrical and Electronics Engineers pre-certification standards UL-1741 and IEEE 1547.1 (required frequency 60 Hz).
APPLICATION FOR INTERCONNECTION AND PARALLEL OPERATION
Customer name
Service point
Street address (home, business, facility) City State ZIP
Contact name
Phone Email
Information prepared and submitted by (if different than contact)
Name
Address
Signature
Generator information
Number of individual units (photovoltaic panels, turbines, engines, batteries, etc.)
Panel manufacturer and model number, if applicable
Inverter manufacturer and model number, if applicable
Type of distributed generation to be produced (synchronous, induction, inverter)
‘Fuel’ source (solar, wind, natural gas, etc.)
Kilowatt rating (total system DC rating, 95 F at location)
Kilovolt-ampere rating (total system AC rating, 95 F at location)
Expected start-up date (energization)
Interconnecting Private Generation Application
Texas
Normal operation of interconnected private generation is expected to supply power to meet baseload, offset power consumption (demand management), provide
standby or back-up power, other (please describe)
One-line diagram attached: Yes (document title) No __________
Precertification label or type number (e.g., UL-1741, IEEE 1547.1) ____________
Layout sketch showing lockable “visible” disconnect device attached: Yes (document title) No __________
Which interconnection option do you prefer (see diagram labeled TEXAS PRIVATE GENERATION INTERCONNECTION OPTIONS)
Option 1__________ Option 2__________ Option 3__________
If you plan to export electricity, do you have an expected power export estimate (kilowatt-hours per day you expect to push onto the grid) kWh
Customer Authorized Release of Information
By signing below, customer authorizes Xcel Energy’s Southwestern Public Service Company to release customer’s proprietary information to the extent necessary
to process this application:
Customer signature Date
Please provide with application (check all that apply):
o Complete copy of all technical manuals.
o One-line diagram of the system and any other applicable schematic drawings.
o A drawing of the facility where you intend to install the system. For instance, provide the house/business location in relation to our electric service, where the private generation will be installed, and any pertinent information that provides our engineer a helpful visual description before he makes a site visit.
Return completed application to:
Resource Planning Dept.790 Buchanan St, 7th FloorAmarillo, TX 79101
Email: [email protected]
Phone: 806.378.2165
See “Texas solar and private generation” in information packet and on xcelenergy.com for interconnection options and definitions.
¹Commission rules provide for three metering and billing options for customer-owned generation through Xcel Energy rate schedule IV-86 (PUCT Substantive Rule 25.242, found at 16 Texas Administrative Code § 25.242).
xcelenergy.com | © 2019 Xcel Energy Inc. | Xcel Energy is a registered trademark of Xcel Energy Inc. | 19-11-311
Source:Southwestern Public Service CompanyElectric TariffSection No. IVSheet No. IV-150Revision No. 6
Top Related