HALO: Status and VisionHALO: Status and Vision€¦ · HALO is not yet as ready as we wished it...

14
HALO: Status and Vision HALO: Status and Vision Ulrich Schumann Ulrich Schumann and the HALO team Institut für Physik der Atmosphäre Institut für Physik der Atmosphäre in cooperation with Ludwig-Maximilians University Munich

Transcript of HALO: Status and VisionHALO: Status and Vision€¦ · HALO is not yet as ready as we wished it...

Page 1: HALO: Status and VisionHALO: Status and Vision€¦ · HALO is not yet as ready as we wished it would be HALO in OP: January 24, 2009 Ground vibration tests Feb-March 2009 First successful

HALO: Status and VisionHALO: Status and Vision

Ulrich SchumannUlrich Schumannand the HALO team

Institut für Physik der Atmosphäre Institut für Physik der Atmosphärein cooperation with Ludwig-Maximilians University Munich

Page 2: HALO: Status and VisionHALO: Status and Vision€¦ · HALO is not yet as ready as we wished it would be HALO in OP: January 24, 2009 Ground vibration tests Feb-March 2009 First successful

Jan. 1999, HGF-Climate Reviewers: German Atmospheric Science needs a larger platform for tropospheric researchg p p p

Institut für Physik der AtmosphäreFolie 2 >

Page 3: HALO: Status and VisionHALO: Status and Vision€¦ · HALO is not yet as ready as we wished it would be HALO in OP: January 24, 2009 Ground vibration tests Feb-March 2009 First successful

HALO – is becoming a new airborne platform for At h i d E th t hAtmospheric and Earth system research

HALO for Earth system research: atmosphere and geophysics.Long range (>8000 km) high altitude (up to 15500 m) and large payloadLong range (>8000 km), high altitude (up to 15500 m) and large payload

(about 3 tons) HALO science driven: more than 30 institutes with international support from

EUFAR NCAR/NSF IOC EU tEUFAR, NCAR/NSF, IOC, EU etc.HALO belongs to the German and European Geo-science research

communityOperated by DLR flight facilities on behalf of the communityGerman industry support

(RR Germany RUAG Aerostructures etc )(RR Germany, RUAG, Aerostructures etc.)Finance: BMBF/BMWi, MPG, DFG,

HGF, FZJ, FZK, DLR, GFZ, IfTH B BMBF DLRHangar: Bayern, BMBF, DLROperation control: HALO KuratoriumScience: guided by WLA

Institut für Physik der AtmosphäreFolie 3 >

Science: guided by WLA

Page 4: HALO: Status and VisionHALO: Status and Vision€¦ · HALO is not yet as ready as we wished it would be HALO in OP: January 24, 2009 Ground vibration tests Feb-March 2009 First successful

HALO: Demo - Missions

Dynamics &Weather

Chemistry &Transportur

e

NEPTUNNARVALHALO THORPEX

pOMOTACTSPOLSTRACC

pres

su

HALO – THORPEX-NAWDEX

POLSTRACC

-90° latitude 90°

Clouds &P ti l

Earth Observations & GeophysicsParticles

ML-CIRRUS

& GeophysicsEO - HALOANTHALOon

gitu

deML CIRRUSACRIDICONCIRRUS-RS

GEOHALOlo

Institut für Physik der AtmosphäreFolie 4 >

87°N latitude 76°N

Page 5: HALO: Status and VisionHALO: Status and Vision€¦ · HALO is not yet as ready as we wished it would be HALO in OP: January 24, 2009 Ground vibration tests Feb-March 2009 First successful

ML-CIRRUS: Natural cirrus and contrail/soot cirrus

Simulation:Simulation:

Lidar (WALES):Lidar (WALES):

Institut für Physik der AtmosphäreFolie 5 >

WALES: 4-λ water vapor differential absorption lidar, Wirth et al. (2009, Appl. Phys. B)

Page 6: HALO: Status and VisionHALO: Status and Vision€¦ · HALO is not yet as ready as we wished it would be HALO in OP: January 24, 2009 Ground vibration tests Feb-March 2009 First successful

RHi and Contrail-Threshold altitude

contrails form above this altitude

RHi from WALES-Lidar-H2O-MR and ECMWF-temperature

gaps because too strong cirrus backscatter from p11.8 km Falcon altitude

far better measurements possible with HALO from 1

Institut für Physik der AtmosphäreFolie 6 >

possible with HALO from 1 or 2 km higher altitude

Page 7: HALO: Status and VisionHALO: Status and Vision€¦ · HALO is not yet as ready as we wished it would be HALO in OP: January 24, 2009 Ground vibration tests Feb-March 2009 First successful

HALO is not yet as ready as we wished it would be

HALO in OP: January 24, 2009

Ground vibration tests Feb-March 2009

First successful flight tests for data acquisition, noseboom etc in Nov. 2009

First scientific demo missions (OMO, ML-CIRRUS,…) now scheduled for summer 2011summer 2011 The certification task was underestimated

Institut für Physik der AtmosphäreFolie 7 >

Page 8: HALO: Status and VisionHALO: Status and Vision€¦ · HALO is not yet as ready as we wished it would be HALO in OP: January 24, 2009 Ground vibration tests Feb-March 2009 First successful

HALO within DLR:

Operation by Flight Facilities OPBasic engineering provided by DLR-Institutes for

ÖAeroelasticity (GÖ), Structures and Design (ST), Flight Mechanics and Aerodynamics (BS) g y ( )“Entwicklungsbetrieb (EB)” (Stephan Kommallein, BS)

DLR i f th HALO iDLR is one of the HALO science users DLR coordinates HALO project with users: Helmut Ziereis, IPA+FB DLR chairs the HALO KuratoriumDLR chairs the HALO Kuratorium

Institut für Physik der AtmosphäreFolie 8 >

Page 9: HALO: Status and VisionHALO: Status and Vision€¦ · HALO is not yet as ready as we wished it would be HALO in OP: January 24, 2009 Ground vibration tests Feb-March 2009 First successful

HALO issue 1: Aeroelastic Flatter tests - StatusL t t t d i d f l fl tt dLarge structures mounted on wing and fuselage- > flatter danger.Flatter analysis without mountings finished; report sent to LBA 2009 Belly Pod/Ventral Fin: flight tests summer 2010Belly Pod/Ventral Fin: flight tests summer 2010Wing pod: needs discussion with Gulfstream (this week)PMS flatter analysis in progress y p gFlight tests with wing pod and PMS carrier: 2010 - 2011

Institut für Physik der AtmosphäreFolie 9 >

Page 10: HALO: Status and VisionHALO: Status and Vision€¦ · HALO is not yet as ready as we wished it would be HALO in OP: January 24, 2009 Ground vibration tests Feb-March 2009 First successful

HALO issue 2: Bird Strike certification for inlets etc.

Bird strike in (rigid) inlets may cause unacceptable fuselage damages.g g

Nevertheless, permission for a few test flights can be expected

Next:Analysis for reduced flight speed at FL < 2 4 kmAnalysis for reduced flight speed at FL < 2.4 kmLess rigid inlet design

Institut für Physik der AtmosphäreFolie 10 >

Page 11: HALO: Status and VisionHALO: Status and Vision€¦ · HALO is not yet as ready as we wished it would be HALO in OP: January 24, 2009 Ground vibration tests Feb-March 2009 First successful

HALO issues: Management

More than 80 modifications; this is beyond the DLR - capacity(G üExternal companies (Gomolzig-Enviscope, Rücker, V-Plane,

Optimare, Aerostruktur) are being involved

More personal for DLR-EB (total 5) Project task force for HALO certification coordinationDLR-“Flight facilities (FB)” will be upgraded to “Flight Experiments”

Institut für Physik der AtmosphäreFolie 11 >

Page 12: HALO: Status and VisionHALO: Status and Vision€¦ · HALO is not yet as ready as we wished it would be HALO in OP: January 24, 2009 Ground vibration tests Feb-March 2009 First successful

HALO Techno Mission

Instrument Mission PI Design MIRAH OMO Uni

WuppertalDLR

Mass spectrometer

OMO DLR Optimare/DLR

SR OMO FZJ E i /SR-Radianzen

OMO FZJ Enviscope/ Gomolzig

WALES ML DLR DLRWALES ML-CIRRUS

DLR DLR

as preparation for science missions in 2011

Institut für Physik der AtmosphäreFolie 12 >

Page 13: HALO: Status and VisionHALO: Status and Vision€¦ · HALO is not yet as ready as we wished it would be HALO in OP: January 24, 2009 Ground vibration tests Feb-March 2009 First successful

HALO Future: more than a Vision

2010 – early 2011: flight tests and certificationHALO Infrastruktur: trailing cone,HALO Infrastruktur: trailing cone, Lidar window, liquid cooling system, aeroelastic flatter, 7 types of inlets7 types of inlets, belly pod for GLORIA and Radar, wing pod and wing stations (PMS etc.)

mid-2010: Techno mission4 different instruments, EIs, PIs, companies, for OMO/CIRRUS

OMO 2011OMO: summer 2011ML-CIRRUS: autumn 2011Further science missions until 2014HALO designed for 30 years of operation

Institut für Physik der AtmosphäreFolie 13 >

Page 14: HALO: Status and VisionHALO: Status and Vision€¦ · HALO is not yet as ready as we wished it would be HALO in OP: January 24, 2009 Ground vibration tests Feb-March 2009 First successful

Methane-DIAL on HALO and German/French Satellite

DIAL measurement of CH4

2012: CH4/CO2-Lidar “CHARM-F” on HALO of CH4 C o O(G. Ehret et al., funded by BMBF)

2014: Climate Satellite

Global distribution of CH4

*DIAL = Differential Absorption Lidar CHARM on MYRIADE(CNES & DLR)

Regional CH4 fluxesCH4 concentration

Institut für Physik der AtmosphäreFolie 14 >

4

CHARM - French-German Climate Monitoring Initiative