I n t e g r i t y - S e r v i c e - E x c e l l e n c e Headquarters U.S. Air Force As of: 1 AF M&V Template K. Quinn Hart, P.E Air Force Facilities Energy Program Manager HQ AFCESA

description

AF M&V Template . K. Quinn Hart, P.E Air Force Facilities Energy Program Manager HQ AFCESA. M&V for the USAF. Cost Effective Designed to Acquire and Maintain Savings for Installations Designed to Accelerate Implementation AFCESA introducing standard M&V Plans to address 80% of the needs - PowerPoint PPT Presentation

Transcript of AF M&V Template

Page 1: AF M&V Template

I n t e g r i t y - S e r v i c e - E x c e l l e n c e

Headquarters U.S. Air Force

As of: 1

AF M&V Template

K. Quinn Hart, P.EAir Force Facilities Energy Program

ManagerHQ AFCESA

Page 2: AF M&V Template

As of: 2I n t e g r i t y - S e r v i c e - E x c e l l e n c e

M&V for the USAF

Cost Effective Designed to Acquire and Maintain Savings for

Installations Designed to Accelerate Implementation AFCESA introducing standard M&V Plans to

address 80% of the needs Common Sense Solutions

Boil M&V down to the Essence and monitor/measure only what is essential to guarantee the savings

Page 3: AF M&V Template

As of: 3I n t e g r i t y - S e r v i c e - E x c e l l e n c e

AFCESA Assists Installations & ESCOs

Standard M&V methods being introduced to accelerate growth Less review required Faster turnaround and approval Targeted for the “80% solution”

Growing pains being experienced as the USAF and ESCOs learn monitoring methods Bring our collective expertise to the table Define expectations up front Refocus from short term to long term solutions M&V cost goal--- use only 5% to 10% of savings for M&V

Page 4: AF M&V Template

As of: 4I n t e g r i t y - S e r v i c e - E x c e l l e n c e

ESCO Contract History

In the past, many Task Orders utilized stipulated savings How does this insure savings over task order term The USAF then assumed all risk for achieving savings If savings were not met, no budget existed to make up

short-fall

Page 5: AF M&V Template

As of: 5I n t e g r i t y - S e r v i c e - E x c e l l e n c e

Cost Effective M&V

Focus on cost-effective measurement and long term solutions This means that the USAF Installation and the ESCO

share the risk of energy and savings performance The USAF will typically assume the operational

“amount of use” risk The ESCO will typically have the equipment

performance risk

Page 6: AF M&V Template

As of: 6I n t e g r i t y - S e r v i c e - E x c e l l e n c e

Example - VSD

Variable Speed Drive Retrofit Can save substantial energy and maintain comfort For a VSD Retrofit with 10 motors at 50 HP

ECP Yearly Savings / M&V Cost

$0

$20,000

$40,000

$60,000

$80,000

$100,000

$120,000

$140,000

0 2000 4000 6000 8000 10000

Savings 5% 10% of Savings

• Savings estimated at $114,000 at 8760 hours per year

• M&V target cost in the range of $6,000 to $12,000 per year (5% to 10%)

Page 7: AF M&V Template

As of: 7I n t e g r i t y - S e r v i c e - E x c e l l e n c e

Example - VSD

Variable Speed Drive Retrofit Lost saving often accumulate at 10%-20% / year For a VSD Retrofit with 10 motors at 50 HP

• Losses from not performing M&V could exceed $600,000 in first 10 years

• M&V Costs at 10% are $114,000 over the 10 years

• Automating M&V can further reduce cost of M&V

Losses Exceed M&V Costs

0

200,000

400,000

600,000

800,000

1,000,000

1,200,000

Year

1

Year

2

Year

3

Year

4

Year

5

Year

6

Year

7

Year

8

Year

9

Year

10

Savings 10% / Yr Loss 10% / Yr M&V

Page 8: AF M&V Template

As of: 8I n t e g r i t y - S e r v i c e - E x c e l l e n c e

Example - VSD

Variable Speed Drive Retrofit Key risks are:

Disabling the VSD control and operating at 100% Not repairing a dysfunctional control element VSD Inverter Failure Results in $0 savings for that motor application

M&V Plan designed to prevent these risks from eroding savings

Page 9: AF M&V Template

As of: 9I n t e g r i t y - S e r v i c e - E x c e l l e n c e

Example - VSD

Variable Speed Drive Retrofit M&V Plan Outline Details

Pre-ECPMonitoringStart Post ECP Yearly

Reconciliation Done

Quantify Pre-ECPEnergy, Demand,Operating Profile,and Load Profile

Set SavingsGuarantees

DetermineOperation andLoad Profile

Post ECPAcceptance

Tests

End OfContractNo Yes

Sampled Measurements

- Measure Efficiency and Load if no Nameplate - Sample motors under 15 HP - Measure Motors equal to or over 15HP - Sample Op-Hours less than 15 HP - Measure Op-Hours equal to or over 15HP

Set Pre-ECPBaseline

- Energy Use - Demand - Operating $

Interviews andObservations

- Operating schedules determined by I&O for motors under 15HP - Validate schedules for sampled motors - % for samples determined by USAF

Measurement Validation - Verify controls are operational - Verify inverter rated motors - Verify correct nameplate - Record power/current from inverter display - If connected to EMCS verify correct operation - If EMCS available, continuously monitor over 5HP motors

PredictedGuarantees

- Energy Use - Demand - Operating $

Submit acceptance reportto USAF for approval

VFD operatingper spec

Submit reconciliationreport to USAF for

approval

Yes

CorrectDeficiencies

No

Sampled Measurements

- Sample motors less than 15HP - Measure Motors equal to or over 15 HP - Measure power continuously record at 15 min intervals - Measure Op-Hours equal to or over 15 HP - Measure Op-Hours for sampled motors less than 15HP - If EMCS available, continuously monitor 5 hp and above

AcceptanceChecklist

Page 10: AF M&V Template

As of: 10I n t e g r i t y - S e r v i c e - E x c e l l e n c e

Summary

Cost Effective M&V Solutions Being Introduced Performance Risk Shared

USAF / ESCO Designed to Maintain Performance Over Contract

Life USAF Needs $ 1 Billion Infrastructure

M&V Designed to Accelerate Implementation