5163 -Prestige Plaza TSSR

10
Survey Report Template for Split Antenna for DBS3900 Internal 5163 -Prestige Plaza Survey Report Customer Name: Safaricom Ltd Contract No.: Original Contract No.: Quotation No.: Customer Surveyor Customer Safaricom Office Spectrum Telephone Telephone 0722222213 Contact Person Surveyor Zedekiah/ Anene Email Email [email protected] Signed By Signed By Cecily Date Date 18th April 2013 Time of Site Login Time of Site Logout 2013-4-18 Huawei confidential. No spreading without permission. Page 1 of 10

Transcript of 5163 -Prestige Plaza TSSR

Page 1: 5163 -Prestige Plaza TSSR

Survey Report Template for Split Antenna for DBS3900 Internal

5163 -Prestige Plaza Survey Report

Customer Name: Safaricom Ltd

Contract No.:

Original Contract No.:

Quotation No.:

Customer Surveyor

Customer Safaricom Office SpectrumTelephone Telephone 0722222213Contact Person Surveyor Zedekiah/ AneneEmail Email [email protected] By Signed By CecilyDate Date 18th April 2013Time of Site Login Time of Site Logout

2013-4-18 Huawei confidential. No spreading without permission.

Page 1 of 10

Page 2: 5163 -Prestige Plaza TSSR

Survey Report Template for Split Antenna for DBS3900 Internal

1. Basic Information of Site

Region NAIROBI City And County NAIROBI

Site Name Prestige Plaza Site ID. 5163

Importance of Site

□Common □Important □VIP

Coordinates Longitude S:01.30075 Latitude E;36.78669

Address Ngong Road

Co-location Type

YU

Project Type □New establishment □Site Removal □ Expansion

□Others Split Antenna

Remarks:

2. Site Access

Site Ownership □Established by Customer □Lease □Others

Contact Person for Accessing the Site

Prestige Management

Contact Phone

Appropriate Contact Time

0800-1600hrs

Other Contact Means

□Fax N/A □E-Mail N/A

Requirements for Accessing the Site

□None □Requirement description:

Access letter required, inform the management on time to provide

maintenance person to accompany the team

Key Obtaining Prestige Management

Site Access Time

□24 hours □Access at specific time

Details: Apply in advance, 0800-1600hrs

Permitted Installation Time

□24 hours □Installation at specific time Details: between 0800-1600hrs

Transportation □Through stairs □Elevator □Crane □Others

Crane □Arm length of crane □Permitted use time N/A

Remarks:

2013-4-18 Huawei confidential. No spreading without permission.

Page 2 of 10

Page 3: 5163 -Prestige Plaza TSSR

Survey Report Template for Split Antenna for DBS3900 Internal

3. Site Information

If existing BBU is installed in the outdoor cabinet:

Free Installation Space

Length (mm) Width (mm) Height (mm)

Grounding point

Quantity of holes on the grounding bar: 10

(Used: 9 Remaining: 1 )

If the existing BBU is installed in the equipment room:

Free Installation Space

Length (mm) Width (mm) Height (mm)

280 150

Drilling Holes on Wall

□Permitted □Not Permitted

Feeder Window □Quantity of cabling holes on the feeder window:

(Used: Remaining: )

Grounding point

□Quantity of holes on indoor grounding bar:

(Used: Remaining: )

□Quantity of holes on outdoor grounding bar:

(Used: Remaining: ) N/A

Remarks:

4. DBS Information Survey

Original DBS Configuration

UMTS: DBS 3900

Information of Original Cabinet

Vendor Mcleen Model Cabinet quantity 2

Vendor Model Cabinet quantity

Installation Mode of BBU

□Installed in the 19-inch cabinet □Installed in the APM30 cabinet

□Others

Installation Mode of RRU

□Installed on wall □Installed on post

□Installed on angle steel □Installed on channel steel

□space for 2nd RRU installation Creat space

Whether a new cabling rack is

□No □Yes Length

2013-4-18 Huawei confidential. No spreading without permission.

Page 3 of 10

Page 4: 5163 -Prestige Plaza TSSR

Survey Report Template for Split Antenna for DBS3900 Internal

required

Optical fiber length (distance between the RRU and BBU)

RRU-Sec0 RRU-Sec1 RRU-Sec2

82 m 81 m 80 m

Length of Protection Grounding Cable Required by New BS

Cabinet in which the BBU is located

RRU-Sec0 RRU-Sec1 RRU-Sec2

Check remarks 10 m 10 m 10 m

Remarks:

5. Transmission Information Survey

Type of Transmission Equipment

□Optical fiber □Microwave □IP transmission

□Others

Whether the transmission equipment has usable port available

□Yes pair □No

DDF Connector (75 ohm) Used by New BS

□SMB male □SMB female □BNC male □BNC female

□L9 male □L9 female

Quantity pair

DDF cable connection mode (120 ohm)

□Cable punch down □Cable winding

N/A

DDF cable connection mode (FE)

□Cable punch down □Cable winding

N/A

Quantity of DDF Idle Terminal

pair of E1s

Remarks:

2013-4-18 Huawei confidential. No spreading without permission.

Page 4 of 10

Page 5: 5163 -Prestige Plaza TSSR

Survey Report Template for Split Antenna for DBS3900 Internal

6. Power Supply Equipment Survey

If the existing BBU is installed indoor/Outdoor:

Rectifier Capacity

A

Air Breaker of Original DBS

A

DC Air Breaker Available

A A A

PCS PCS PCS PCS

Installation of New Power Supply Cabinet

□Not required □Required

Required DC power supply cable: m

Whether additional DCDU Is Required

□No □Yes

DCDU power input cable length m

Required Power Supply Cable Length and Terminal Type on Power Supply Cabinet

BBU RRU-Sec1 RRU-Sec2 RRU-Sec3

Length 82 m 81 m 80 m

Terminal Type

Cable lug

Cable lug Cable lug Cable lug

Utilizing the Original Battery

Capacity of original battery in equipment room

Length of newly-delivered cable required from the battery to new BS

Terminal type of power supply cable on the battery

AH m

Remarks:

7. Antenna Feeder System Survey

Antenna Installation Scenarios

□Metal pole on building top □Tower on the ground

□Tower on building top □Guyed mast □H rack

□Antenna pole length

2013-4-18 Huawei confidential. No spreading without permission.

Page 5 of 10

Page 6: 5163 -Prestige Plaza TSSR

Survey Report Template for Split Antenna for DBS3900 Internal

Whether Existing unused antenna Pole

□No □Yes Quantity Pcs

Whether there is extra space to install Split antenna

□No □Yes Remarks To create space

Whether there is extra space to install RRU

□No □Yes Remarks To create space

Survey on the Required Jumper Type, Length, and Connector

Sector Sector-0 Sector-1 Sector-2

Number of Antenna 1 1 1

Azimuth of the Antenna 60º 195º 280º

Antenna Down tilt 1º 2º 2º

Antenna Vendor Agisson Agisson Agisson

Height of the Antenna 23m 22m 21m

Required Length of 1/2 Jumper

2m 2m 2m

Required Connector Type of 1/2 Jumper

Din Male Din Male Din Male

Remarks:

8. Site Photo

Tower panoramic photo

2013-4-18 Huawei confidential. No spreading without permission.

Page 6 of 10

Page 7: 5163 -Prestige Plaza TSSR

Survey Report Template for Split Antenna for DBS3900 Internal

Antenna/RRU photo

Exterior view and interior view of the BBU cabinet/ DCDU

Cabling rack and tray

Exterior view and interior view of the transmission equipment

2013-4-18 Huawei confidential. No spreading without permission.

Page 7 of 10

Page 8: 5163 -Prestige Plaza TSSR

Survey Report Template for Split Antenna for DBS3900 Internal

Outdoor view and indoor view of the feeder window

Jumper panoramic view/sector

2013-4-18 Huawei confidential. No spreading without permission.

Page 8 of 10

Page 9: 5163 -Prestige Plaza TSSR

Survey Report Template for Split Antenna for DBS3900 Internal

Photo of

antenna

down

tilt/sector

Photo of coverage overview of antennae/sector

2013-4-18 Huawei confidential. No spreading without permission.

Page 9 of 10

Page 10: 5163 -Prestige Plaza TSSR

Survey Report Template for Split Antenna for DBS3900 Internal

2013-4-18 Huawei confidential. No spreading without permission.

Page 10 of 10