220611 Costos OT-022-10

84
kg/m2 m2/m2 BARRA CUADRADA LISA BC01 Barra Cuadrada 1/ 4" 0.32 0.025 BC02 Barra Cuadrada 3/ 8" 0.71 0.038 BC03 Barra Cuadrada 1/ 2" 1.27 0.051 BC04 Barra Cuadrada 5/ 8" 1.98 0.064 BC05 Barra Cuadrada 3/ 4" 2.85 0.076 BC06 Barra Cuadrada 7/ 8" 3.88 0.069 BC07 Barra Cuadrada 1" 5.06 0.102 BC08 Barra Cuadrada 1 1/8" 6.41 0.114 BC09 Barra Cuadrada 1 1/ 4" 7.91 0.127 BC10 Barra Cuadrada 1 3/ 8" 9.57 0.14 BC11 Barra Cuadrada 1 1/2" 11.39 0.152 BC12 Barra Cuadrada 1 5/ 8" 13.37 0.165 BC13 Barra Cuadrada 1 3/ 4" 15.51 0.178 BC14 Barra Cuadrada 2" 20.26 0.203 BC15 Barra Cuadrada 2 1/ 4" 25.64 0.229 BC16 Barra Cuadrada 1 1/2" 31.65 0.254 BCm01 Barra Cuadrada 9mm 0.64 0.036 BCm02 Barra Cuadrada 12mm 1.13 0.048 BCm03 Barra Cuadrada 15mm 1.77 0.06 CANAL ESTRUCTURAL C01 Caa! 3" 4.1# 6.10 0.296 C02 Caa! 3" 6# 8.93 0.315 C03 Caa! 4" $ 5%4 # 8.04 0.364 C04 Caa! 4" $ 7%25 # 10.79 0.378 C05 Caa! 5" 6.7# 9.97 0.432 C06 Caa! 5" 9# 13.39 0.446 C07 Caa! 6" 8.2# 12.20 0.500 C0 8 Ca a! 6" 10.5# 15.63 0.511 C09 Caa! 6" 1 3# 19.35 0.524 C1 0 Ca a! 8" 11. 5# 17.11 0.636 C11 Ca a! 8" 13. 75# 20.46 0.644 C1 2 Ca a! 8" 18.75# 27.90 0.663 C1 3 Ca a! 10" 15.3 # 22.77 0.772 C14 Caa! 10" 20# 29.76 0.786 C15 Caa! 10" 25# 37.21 0.801 C1 6 Ca a! 12" 20.7 # 30.81 0.909 C17 Caa! 12" 25# 37.21 0.919 C18 Caa! 12" 30# 44.65 0.932 C1 9 Ca a! 15" 33.9 # 50.45 1.107 C20 Caa! 15" 40# 59.53 1.120 C21 Caa! 15" 50# 74.41 1.140 CANAL C &LE'AD( C&01 Ca a! C d) 3" 2" 2. 0mm a*+),ad - 3.08 0.412

Transcript of 220611 Costos OT-022-10

Page 1: 220611 Costos OT-022-10

7/23/2019 220611 Costos OT-022-10

http://slidepdf.com/reader/full/220611-costos-ot-022-10 1/84

kg/m2 m2/m2

BARRA CUADRADA LISA

BC01 Barra Cuadrada 1/4" 0.32 0.025

BC02 Barra Cuadrada 3/8" 0.71 0.038

BC03 Barra Cuadrada 1/2" 1.27 0.051

BC04 Barra Cuadrada 5/8" 1.98 0.064

BC05 Barra Cuadrada 3/4" 2.85 0.076

BC06 Barra Cuadrada 7/8" 3.88 0.069

BC07 Barra Cuadrada 1" 5.06 0.102

BC08 Barra Cuadrada 1 1/8" 6.41 0.114

BC09 Barra Cuadrada 1 1/4" 7.91 0.127

BC10 Barra Cuadrada 1 3/8" 9.57 0.14

BC11 Barra Cuadrada 1 1/2" 11.39 0.152

BC12 Barra Cuadrada 1 5/8" 13.37 0.165

BC13 Barra Cuadrada 1 3/4" 15.51 0.178

BC14 Barra Cuadrada 2" 20.26 0.203

BC15 Barra Cuadrada 2 1/4" 25.64 0.229

BC16 Barra Cuadrada 1 1/2" 31.65 0.254

BCm01 Barra Cuadrada 9mm 0.64 0.036

BCm02 Barra Cuadrada 12mm 1.13 0.048

BCm03 Barra Cuadrada 15mm 1.77 0.06

CANAL ESTRUCTURAL

C01 Caa! 3" 4.1# 6.10 0.296

C02 Caa! 3" 6# 8.93 0.315

C03 Caa! 4" $ 5%4 # 8.04 0.364

C04 Caa! 4" $ 7%25 # 10.79 0.378

C05 Caa! 5" 6.7# 9.97 0.432

C06 Caa! 5" 9# 13.39 0.446

C07 Caa! 6" 8.2# 12.20 0.500

C08 Caa! 6" 10.5# 15.63 0.511

C09 Caa! 6" 13# 19.35 0.524

C10 Caa! 8" 11.5# 17.11 0.636

C11 Caa! 8" 13.75# 20.46 0.644

C12 Caa! 8" 18.75# 27.90 0.663

C13 Caa! 10" 15.3# 22.77 0.772

C14 Caa! 10" 20# 29.76 0.786

C15 Caa! 10" 25# 37.21 0.801

C16 Caa! 12" 20.7# 30.81 0.909

C17 Caa! 12" 25# 37.21 0.919

C18 Caa! 12" 30# 44.65 0.932

C19 Caa! 15" 33.9# 50.45 1.107

C20 Caa! 15" 40# 59.53 1.120

C21 Caa! 15" 50# 74.41 1.140

CANAL C &LE'AD(

C&01 Caa! C d) 3" 2" 2.0mm a*+),ad- 3.08 0.412

Page 2: 220611 Costos OT-022-10

7/23/2019 220611 Costos OT-022-10

http://slidepdf.com/reader/full/220611-costos-ot-022-10 2/84

C&02 Caa! C d) 3" 2" 2.3mm a*+),ad- 3.51 0.412

C&03 Caa! C d) 3" 2" 2.5mm a*+),ad- 3.92 0.428

C&04 Caa! C d) 3" 2" 3mm a*+),ad- 4.62 0.428

C&05 Caa! C d) 3" 2" 4%5mm a*+),ad- 6.80 0.440

C&06 Caa! C d) 4"2"2%0 mm a*+),ad- 3.48 0.462

C&07 Caa! C d) 4"2"2%3 mm a*+),ad- 3.97 0.462

C&08 Caa! C d) 4"2"2%5 mm a*+),ad- 4.41 0.478

C&09 Caa! C d) 4"2"3%0 mm a*+),ad- 5.22 0.478

C&10 Caa! C d) 4"2"4%5 mm a*+),ad- 7.70 0.490

C&11 Caa! C d) 5" 2" 2.0 mm a*+),ad- 3.88 0.514

C&12 Caa! C d) 5" 2" 2%3 mm a*+),ad- 4.43 0.514

C&13 Caa! C d) 5" 2" 2%5 mm a*+),ad- 4.91 0.530

C&14 Caa! C d) 5" 2" 3.0 mm a*+),ad- 5.82 0.530

C&15 Caa! C d) 5" 2" 4%5 mm a*+),ad- 8.60 0.542

C&16 Caa! C d) 6"2"2%0 mm a*+),ad- 4.28 0.564

C&17 Caa! C d) 6"2"2.3 mm a*+),ad- 4.89 0.564

C&18 Caa! C d) 6"2"2.5 mm a*+),ad- 5.41 0.580

C&19 Caa! C d) 6"2"3%0 mm a*+),ad- 6.42 0.580

C&20 Caa! C d) 6"2"4%5 mm a*+),ad- 9.50 0.592

C&21 Caa! C d) 6"3"2%0 mm a*+),ad- 5.18 0.684

C&22 Caa! C d) 6"3"2.3 mm a*+),ad- 5.92 0.684

C&23 Caa! C d) 6"3"2.5 mm a*+),ad- 6.53 0.696

C&24 Caa! C d) 6"3"3%0 mm a*+),ad- 7.91 0.708

C&25 Caa! C d) 6"3"4.5 mm a*+),ad- 11.52 0.708

C&26 Caa! C d) 7"2"2.0 mm a*+),ad- 4.68 0.614

C&27 Caa! C d) 7"2"2.3 mm a*+),ad- 5.35 0.614

C&28 Caa! C d) 7"2"2.5 mm a*+),ad- 5.91 0.630

C&29 Caa! C d) 7"2"3.0 mm a*+),ad- 7.01 0.630

C&30 Caa! C d) 7"2"4%5 mm a*+),ad- 10.39 0.642

C&31 Caa! C d) 7"3"2.0 mm a*+),ad- 5.58 0.734

C&32 Caa! C d) 7"3"2%3 mm a*+),ad- 6.38 0.734

C&33 Caa! C d) 7"3"2%5 mm a*+),ad- 7.03 0.746

C&34 Caa! C d) 7"3"3.0 mm a*+),ad- 8.51 0.758

C&35 Caa! C d) 7"3"4%5 mm a*+),ad- 12.41 0.758

C&36 Caa! C d) 8"2"2%0 mm a*+),ad- 5.08 0.665

C&37 Caa! C d) 8"2"2%3 mm a*+),ad- 5.80 0.666

C&38 Caa! C d) 8"2"2%5 mm a*+),ad- 6.41 0.682

C&39 Caa! C d) 8"2"3.0 mm a*+),ad- 7.61 0.682

C&40 Caa! C d) 8"2"4%5 mm a*+),ad- 11.29 0.694

C&41 Caa! C d) 8" 3" 2.0 mm a*+),ad- 5.98 0.786

C&42 Caa! C d) 8" 3" 2%3 mm a*+),ad- 6.84 0.786

C&43 Caa! C d) 8" 3" 2%5 mm a*+),ad- 7.53 0.798

C&44 Caa! C d) 8" 3" 3.0 mm a*+),ad- 9.11 0.810

C&45 Caa! C d) 8" 3" 4%5 mm a*+),ad- 13.31 0.810

C&46 Caa! C d) 9"2"2%0 mm a*+),ad- 5.48 0.716

Page 3: 220611 Costos OT-022-10

7/23/2019 220611 Costos OT-022-10

http://slidepdf.com/reader/full/220611-costos-ot-022-10 3/84

C&47 Caa! C d) 9"2"2%3 mm a*+),ad- 6.26 0.716

C&48 Caa! C d) 9"2"2%5 mm a*+),ad- 6.91 0.732

C&49 Caa! C d) 9"2"3.0 mm a*+),ad- 8.21 0.732

C&50 Caa! C d) 9"2"4%5 mm a*+),ad- 12.19 0.744

C&51 Caa! C d) 9" 3" 2.0 mm a*+),ad- 6.37 0.836

C&52 Caa! C d) 9" 3" 2%3 mm a*+),ad- 7.30 0.836

C&53 Caa! C d) 9" 3" 2%5 mm a*+),ad- 8.03 0.848

C&54 Caa! C d) 9" 3" 3.0 mm a*+),ad- 9.70 0.860

C&55 Caa! C d) 9" 3" 4%5 mm a*+),ad- 14.21 0.860

C&56 Caa! C d) 10"2"2%0 mm a*+),ad- 5.88 0.768

C&57 Caa! C d) 10"2"2%3 mm a*+),ad- 6.72 0.768

C&58 Caa! C d) 10"2"2%5 mm a*+),ad- 7.41 0.784

C&59 Caa! C d) 10"2"3.0 mm a*+),ad- 8.81 0.784

C&60 Caa! C d) 10"2"4%5mm a*+),ad- 13.08 0.796

C&61 Caa! C d) 10"3"2.0 mm a*+),ad- 6.77 0.888

C&62 Caa! C d) 10"3"2.3 mm a*+),ad- 7.75 0.888

C&63 Caa! C d) 10"3"2.5 mm a*+),ad- 8.52 0.900

C&64 Caa! C d) 10"3"3.0mm a*+),ad- 10.30 0.912

C&65 Caa! C d) 10"3"4.5mm a*+),ad- 15.11 0.912

C&66 Caa! C d) 11"2"2%0 mm a*+),ad- 6.27 0.818

C&67 Caa! C d) 11"2"2%3 mm a*+),ad- 7.18 0.818

C&68 Caa! C d) 11"2"2%5 mm a*+),ad- 7.90 0.834

C&69 Caa! C d) 11"2"3.0 mm a*+),ad- 9.41 0.834

C&70 Caa! C d) 11"2"4%5mm a*+),ad- 13.98 0.846

C&71 Caa! C d) 11"3"2.0 mm a*+),ad- 7.17 0.938

C&72 Caa! C d) 11"3"2.3 mm a*+),ad- 8.21 0.938

C&73 Caa! C d) 11"3"2.5 mm a*+),ad- 9.02 0.950

C&74 Caa! C d) 11"3"3.0mm a*+),ad- 10.90 0.962

C&75 Caa! C d) 11"3"4.5mm a*+),ad- 16.00 0.962

C&76 Caa! C d) 12"2"2.0mm a*+),ad- 6.67 0.868

C&77 Caa! C d) 12"2"2.3mm a*+),ad- 7.64 0.868

C&78 Caa! C d) 12"2"2.5mm a*+),ad- 8.40 0.884

C&79 Caa! C d) 12"2"3.0mm a*+),ad- 10.01 0.884

C&80 Caa! C d) 12"2"4.5mm a*+),ad- 14.88 0.896

C&81 Caa! C d) 12"3"2.0mm a*+),ad- 7.57 0.988

C&82 Caa! C d) 12"3"2.3mm a*+),ad- 8.67 0.988

C&83 Caa! C d) 12"3"2.5mm a*+),ad- 9.52 1.000

C&84 Caa! C d) 12"3"3.0mm a*+),ad- 11.50 1.012

C&85 Caa! C d) 12"3"4.5mm a*+),ad- 16.90 1.012

IERR( C(RRU'AD(

C01 ) C-rruad- 3/8" 0.56 0.030

C02 ) C-rruad- 1/2" 0.99 0.040

C03 ) C-rruad- 5/8" 1.55 0.050

C04 ) C-rruad- 3/4" 2.24 0.060

C05 ) C-rruad- 1" 3.97 0.080

Page 4: 220611 Costos OT-022-10

7/23/2019 220611 Costos OT-022-10

http://slidepdf.com/reader/full/220611-costos-ot-022-10 4/84

C06 ) C-rruad- 1 3/8" 7.91 0.113

Cm00 ) C-rruad- 6mm 0.22 0.025

Cm01 ) C-rruad- 8mm 0.40 0.025

Cm02 ) C-rruad- 12mm 0.89 0.038

 AN'UL( ESTRUCTURAL

L01 L 3/4 " 3/4" 1/8" 0.87 0.076

L02 L 1 " 1" 1/8" 1.19 0.102

L03 L 1 " 1" 3/16" 1.73 0.102

L04 L 1 " 1" 1/4" 2.22 0.102

L05 L 1 1/4" 1 1/4 " 1/8" 1.50 0.127

L06 L 1 1/4" 1 1/4 " 3/16" 2.20 0.127

L07 L 1 1/4" 1 1/4 " 1/4" 2.86 0.127

L08 L 1 1/2"1 1/2"1/8" 1.83 0.152

L09 L 1 1/2"1 1/2"3/16" 2.68 0.152

L10 L 1 1/2"1 1/2"1/4" 3.46 0.152

L11 L 1 3/4"1 3/4"1/8" 2.14 0.178

L12 L 1 3/4"1 3/4"3/16" 3.16 0.178

L13 L 1 3/4"1 3/4"1/4" 4.12 0.178

L14 L 2"2"1/8" 2.46 0.203

L15 L 2"2"3/16" 3.63 0.203

L16 L 2"2"1/4" 4.75 0.203

L17 L 2"2"5/16" 5.83 0.203

L18 L 2"2"3/8" 7.00 0.203

L19 L 2 1/2"2 1/23/16" 4.57 0.254

L20 L 2 1/2"2 1/21/4" 6.10 0.254

L21 L 2 1/2"2 1/25/16" 7.44 0.254

L22 L 2 1/2"2 1/23/8" 8.78 0.254

L23 L 3" 3" 3/16" 5.52 0.305

L24 L 3" 3" 1/4" 7.29 0.305

L25 L 3" 3" 5/16" 9.08 0.305

L26 L 3" 3" 3/8" 10.72 0.305

L27 L 3" 3" 1/2" 13.99 0.305

L28 L 3 1/2"3 1/2"1/4" 8.04 0.356

L29 L 3 1/2"3 1/2"5/16" 10.72 0.356

L30 L 3 1/2"3 1/2"3/8" 12.65 0.356

L31 L 3 1/2"3 1/2"1/2" 16.52 0.356

L32 L 4 " 4 " 1/4" 9.82 0.406

L33 L 4 " 4 " 5/16" 11.46 0.406

L34 L 4 " 4 " 3/8" 14.58 0.406

L35 L 4 " 4 "1/2" 19.05 0.406

L36 L 5 " 5 "5/16" 15.33 0.508

L37 L 5 " 5 "3/8" 18.31 0.508

L38 L 5 " 5 "1/2" 24.11 0.508

L39 L 6 " 6 "5/16" 18.45 0.610

L40 L 6 " 6" 3/8" 18.31 0.610

Page 5: 220611 Costos OT-022-10

7/23/2019 220611 Costos OT-022-10

http://slidepdf.com/reader/full/220611-costos-ot-022-10 5/84

L41 L 6 " 6" 1/2" 24.11 0.610

Lm01 L 20202.5mm 0.74 0.080

Lm02 L 20203.0mm 0.87 0.080

Lm03 L 25252.5mm 0.93 0.100

Lm04 L 25253.0mm 1.11 0.100

Lm05 L 25254.5mm 1.61 0.100

Lm06 L 25256.0mm 2.07 0.100

Lm07 L 30302.5mm 1.13 0.120

Lm08 L 30303.0mm 1.34 0.120

Lm09 L 30304.5mm 1.96 0.120

Lm10 L 30306.0mm 2.54 0.120

Lm11 L 38382.5mm 1.52 0.152

Lm12 L 38383.0mm 1.83 0.152

Lm13 L 38384.0mm 2.27 0.152

Lm14 L 50504.0mm 3.08 0.200

Lm15 L 50506.0mm 4.47 0.200

Lm16 L 60606.0mm 5.42 0.240

Lm17 L 75756.0mm 6.98 0.300

Lm18 L 1001006.0mm 9.28 0.400

Lm19 L 1001008.0mm 1.22 0.400

Lm20 L 10010010.0mm 15.00 0.400

Lm21 L 10010012.0mm 17.80 0.400

Lm22 L 15015010.0mm 23.00 0.600

Lm23 L 15015012.0mm 273.00 0.600

&LANCA ESTRUCTURAL

&E01 &!aa E,*ru*ura! 1/8" 24.92 2.00

&E02 &!aa E,*ru*ura! 3/16" 37.39 2.00

&E03 &!aa E,*ru*ura! 1/4" 49.85 2.00

&E04 &!aa E,*ru*ura! 5/16" 62.31 2.00

&E05 &!aa E,*ru*ura! 3/8" 74.77 2.00

&E06 &!aa E,*ru*ura! 1/2" 99.70 2.00

&E07 &!aa E,*ru*ura! 5/8" 124.62 2.00

&E08 &!aa E,*ru*ura! 3/4" 149.54 2.00

&E09 &!aa E,*ru*ura! 1" 199.30 2.00

&E10 &!aa E,*ru*ura! 1 1/4" 249.24 2.00

&E11 &!aa E,*ru*ura! 1 1/2" 299.09 2.00

&E12 &!aa E,*ru*ura! 2" 398.78 2.00

&Em01 &!aa E,*ru*ura! 3.0mm 23.55 2.00

&Em02 &!aa E,*ru*ura! 4.0mm 31.40 2.00

&Em03 &!aa E,*ru*ura! 4.5mm 35.33 2.00

&Em04 &!aa E,*ru*ura! 5.0mm 39.25 2.00

&Em05 &!aa E,*ru*ura! 6.0mm 47.10 2.00

&Em06 &!aa E,*ru*ura! 8.0mm 62.80 2.00

&Em07 &!aa E,*ru*ura! 9.0mm 70.65 2.00

&Em08 &!aa E,*ru*ura! 9.5mm 74.58 2.00

Page 6: 220611 Costos OT-022-10

7/23/2019 220611 Costos OT-022-10

http://slidepdf.com/reader/full/220611-costos-ot-022-10 6/84

&Em09 &!aa E,*ru*ura! 10.0mm 78.50 2.00

&Em10 &!aa E,*ru*ura! 12.0mm 94.20 2.00

&Em11 &!aa E,*ru*ura! 12.5mm 98.13 2.00

&Em12 &!aa E,*ru*ura! 16.0mm 125.60 2.00

&Em13 &!aa E,*ru*ura! 20.0mm 157.00 2.00

&Em14 &!aa E,*ru*ura! 25.0mm 196.25 2.00

&Em15 &!aa E,*ru*ura! 32.0mm 251.20 2.00

&Em16 &!aa E,*ru*ura! 38.0mm 298.30 2.00

&Em17 &!aa E,*ru*ura! 50.0mm 392.50 2.00

&Em18 &!aa E,*ru*ura! 22.0mm 172.70 2.00

&Em19 &!aa E,*ru*ura! 10.0mm 78.50 2.00

&LANCA 'ALANIADA

&'01 &!aa 'a!a+ada 0%25mm 1.97 2.00

&'02 &!aa 'a!a+ada 0%3mm 2.36 2.00

&'03 &!aa 'a!a+ada 0.4mm 3.14 2.00

&'04 &!aa 'a!a+ada 0.5mm 3.93 2.00

&'05 &!aa 'a!a+ada 0.6mm 4.71 2.00

&'06 &!aa 'a!a+ada 0.9mm 7.06 2.00

&'07 &!aa 'a!a+ada 1%0mm 7.65 2.00

&'08 &!aa 'a!a+ada 1%2mm 9.42 2.00

&'09 &!aa 'a!a+ada 1%5mm 11.97 2.00

&'10 &!aa 'a!a+ada 2.0mm 15.97 2.00

&LANCA LAC

&LC01 &!aa LAC d) 2.0 mm 15.70 2.000

&LC02 &!aa LAC d) 2.5 mm 19.62 2.000

&LC03 &!aa LAC d) 3.0 mm 23.55 2.000

&LC04 &!aa LAC d) 4.0 mm 31.40 2.000

&LC05 &!aa LAC d) 4.5 mm 35.32 2.000

&LC06 &!aa LAC d) 5.0 mm 39.25 2.000

&LC07 &!aa LAC d) 6.0 mm 47.10 2.000

&LC08 &!aa LAC d) 8.0 mm 62.80 2.000

&LC09 &!aa LAC d) 9.5 mm 74.58 2.000

&LC10 &!aa LAC d) 12.5 mm 98.13 2.000

&LC11 &!aa LAC d) 16.0 mm 125.60 2.000

&LC12 &!aa LAC d) 20.0 mm 157.00 2.000

&LC13 &!aa LAC d) 25.0 mm 196.25 2.000

&LC14 &!aa LAC d) 32.0 mm 251.20 2.000

&LC15 &!aa LAC d) 38.0 mm 298.30 2.000

&LC16 &!aa LAC d) 50.0 mm 392.50 2.000

&LANCA LA

&L01 &!aa LA d) 0.4 mm 3.14 2.000

&L02 &!aa LA d) 0.5 mm 3.93 2.000

&L03 &!aa LA d) 0.6 mm 4.71 2.000

&L04 &!aa LA d) 0.8 mm 6.28 2.000

&L05 &!aa LA d) 0.9 mm 7.07 2.000

Page 7: 220611 Costos OT-022-10

7/23/2019 220611 Costos OT-022-10

http://slidepdf.com/reader/full/220611-costos-ot-022-10 7/84

&L06 &!aa LA d) 1.0 mm 7.85 2.000

&L07 &!aa LA d) 1.2 mm 9.42 2.000

&L08 &!aa LA d) 1.5 mm 11.77 2.000

&L09 &!aa LA d) 2.0 mm 15.10 2.000

&LATINA ESTRUCTURAL

&T01 &!a*+a 1/2" 1/8" 0.33 0.032

&T02 &!a*+a 1/2" 3/16" 0.48 0.035

&T03 &!a*+a 1/2" 1/4" 0.64 0.038

&T04 &!a*+a 5/8" 1/8" 0.39 0.036

&T05 &!a*+a 5/8" 3/16" 0.61 0.041

&T06 &!a*+a 5/8" 1/4" 0.80 0.044

&T07 &!a*+a 3/4" 1/8" 0.48 0.044

&T08 &!a*+a 3/4" 3/16" 0.71 0.048

&T09 &!a*+a 3/4" 1/4" 0.95 0.051

&T10 &!a*+a 1" 1/8" 0.64 0.057

&T11 &!a*+a 1" 3/16" 0.95 0.060

&T12 &!a*+a 1" 1/4" 1.27 0.064

&T13 &!a*+a 1" 3/8" 1.91 0.070

&T14 &!a*+a 1" 1/2" 2.53 0.076

&T15 &!a*+a 1 1/4" 1/8" 0.80 0.070

&T16 &!a*+a 1 1/4" 3/16" 1.19 0.073

&T17 &!a*+a 1 1/4" 1/4" 1.58 0.076

&T18 &!a*+a 1 1/4" 3/8" 2.38 0.083

&T19 &!a*+a 1 1/4" 1/2" 3.17 0.089

&T20 &!a*+a 1 1/2" 1/8" 0.97 0.083

&T21 &!a*+a 1 1/2" 3/16" 1.43 0.086

&T22 &!a*+a 1 1/2" 1/4" 1.91 0.089

&T23 &!a*+a 1 1/2" 3/8" 2.84 0.095

&T24 &!a*+a 1 1/2" 1/2" 3.81 0.102

&T25 &!a*+a 2" 1/8" 1.28 0.108

&T26 &!a*+a 2" 3/16" 1.91 0.111

&T27 &!a*+a 2" 1/4" 2.53 0.114

&T28 &!a*+a 2" 3/8" 3.80 0.121

&T29 &!a*+a 2" 1/2" 5.06 0.127

&T30 &!a*+a 2 1/2" 3/16" 2.38 0.137

&T31 &!a*+a 2 1/2" 1/4" 3.17 0.140

&T32 &!a*+a 2 1/2" 3/8" 4.75 0.146

&T33 &!a*+a 2 1/2" 1/2" 6.33 0.152

&T34 &!a*+a 3" 3/16" 2.84 0.162

&T35 &!a*+a 3" 1/4" 3.80 0.165

&T36 &!a*+a 3" 3/8" 5.70 0.171

&T37 &!a*+a 3" 1/2" 7.59 0.178

&T38 &!a*+a 3" 5/8" 9.50 0.184

&T39 &!a*+a 3" 3/4" 11.40 0.191

&T40 &!a*+a 3" 1" 15.18 0.203

Page 8: 220611 Costos OT-022-10

7/23/2019 220611 Costos OT-022-10

http://slidepdf.com/reader/full/220611-costos-ot-022-10 8/84

&T41 &!a*+a 3 1/2" 3/16" 3.32 0.167

&T42 &!a*+a 3 1/2" 1/4" 4.44 0.191

&T43 &!a*+a 3 1/2" 3/8" 6.65 0.197

&T44 &!a*+a 3 1/2" 1/2" 8.86 0.203

&T45 &!a*+a 3 1/2" 5/8" 11.07 0.210

&T46 &!a*+a 3 1/2" 3/4" 13.29 0.216

&T47 &!a*+a 3 1/2" 1" 17.71 0.229

&T48 &!a*+a 4" 3/16" 3.80 0.213

&T49 &!a*+a 4" 1/4" 5.06 0.216

&T50 &!a*+a 4" 3/8" 7.59 0.222

&T51 &!a*+a 4" 1/2" 10.14 0.229

&T52 &!a*+a 4" 5/8" 12.67 0.235

&T53 &!a*+a 4" 3/4" 15.18 0.241

&T54 &!a*+a 4" 1" 20.24 0.254

&T55 &!a*+a 5" 3/16" 4.75 0.264

&T56 &!a*+a 5" 1/4" 6.33 0.267

&T57 &!a*+a 5" 3/8" 9.50 0.273

&T58 &!a*+a 5" 1/2" 12.67 0.279

&T59 &!a*+a 5" 5/8" 15.78 0.286

&T60 &!a*+a 5" 3/4" 19.05 0.292

&T61 &!a*+a 5" 1" 25.30 0.305

&T62 &!a*+a 6" 3/16" 5.70 0.314

&T63 &!a*+a 6" 1/4" 7.59 0.318

&T64 &!a*+a 6" 3/8" 11.40 0.324

&T65 &!a*+a 6" 1/2" 15.18 0.330

&T66 &!a*+a 6" 5/8" 19.05 0.337

&T67 &!a*+a 6" 3/4" 22.77 0.343

&T68 &!a*+a 6" 1" 30.36 0.356

&LANCA ESTRIADA

&$01 &L ),*r+ada 3/32" 3 8 21.97 2.00

&$02 &L ),*r+ada 1/8" 3 8 30.06 2.00

&$03 &L ),*r+ada 3/16" 4 8 42.53 2.00

&$04 &L ),*r+ada 1/4" 4 8 54.98 2.00

&$05 &L ),*r+ada 5/16" 4 8 67.43 2.00

&$06 &L ),*r+ada 3/8" 4 8 79.93 2.00

RED(ND( LIS(

RL01 R)d-d- !+,- 1/4" 0.25 0.020

RL02 R)d-d- !+,- 5/16" 0.39 0.025

RL03 R)d-d- !+,- 3/8" 0.56 0.030

RL04 R)d-d- !+,- 7/16" 0.76 0.035

RL05 R)d-d- !+,- 1/2" 0.99 0.040

RL06 R)d-d- !+,- 5/8" 1.55 0.050

RL07 R)d-d- !+,- 3/4" 2.24 0.060

RL08 R)d-d- !+,- 7/8" 3.05 0.070

RL09 R)d-d- !+,- 1" 3.98 0.080

Page 9: 220611 Costos OT-022-10

7/23/2019 220611 Costos OT-022-10

http://slidepdf.com/reader/full/220611-costos-ot-022-10 9/84

RL10 R)d-d- !+,- 1 1/8" 5.03 0.090

RL11 R)d-d- !+,- 1 1/4" 6.22 0.100

RL12 R)d-d- !+,- 1 3/8" 7.52 0.110

RL13 R)d-d- !+,- 1 1/2" 8.95 0.120

RL14 R)d-d- !+,- 1 5/8" 10.52 0.130

RL15 R)d-d- !+,- 1 3/4" 12.18 0.140

RL16 R)d-d- !+,- 2" 15.91 0.160

RL17 R)d-d- !+,- 2 1/4" 20.14 0.180

RL18 R)d-d- !+,- 2 1/2" 24.86 0.200

RL19 R)d-d- !+,- 3" 35.80 0.220

RL20 R)d-d- !+,- 4" 63.64 0.220

TEE ESTRUCTURAL

T01 T)) 1/8"3/4" 0.87 0.076

T02 T)) 1/8"1" 1.13 0.102

T03 T)) 1/8"1 1/4" 1.54 0.127

T04 T)) 1/8"1 1/2" 1.84 0.152

T05 T)) 3/16"1 1/2" 2.72 0.152

T06 T)) 1/4"2" 4.97 0.203

Tm01 T)) 20203.0mm 0.88 0.080

Tm02 T)) 25253.0mm 1.10 0.100

TUB( CUADRAD(

TC01 Tu:- uadrad- 1/2" 0.8 mm 0.31 0.051

TC02 Tu:- uadrad- 1/2" 0.9 mm 0.35 0.051

TC03 Tu:- uadrad- 1/2" 1.0 mm 0.39 0.051

TC04 Tu:- uadrad- 1/2" 1%2 mm 0.46 0.051

TC05 Tu:- uadrad- 1/2" 1.5 mm 0.57 0.051

TC06 Tu:- uadrad- 1/2" 2.0 mm 0.74 0.051

TC07 Tu:- uadrad- 5/8" 0.8 mm 0.37 0.064

TC08 Tu:- uadrad- 5/8" 0.9 mm 0.42 0.064

TC09 Tu:- uadrad- 5/8" 1.0 mm 0.48 0.064

TC10 Tu:- uadrad- 5/8" 1%2 mm 0.55 0.064

TC11 Tu:- uadrad- 5/8" 1.5 mm 0.68 0.064

TC12 Tu:- uadrad- 5/8" 2.0 mm 0.90 0.064

TC13 Tu:- uadrad- 3/4" 0.8 mm 0.50 0.076

TC14 Tu:- uadrad- 3/4" 0.9 mm 0.53 0.076

TC15 Tu:- uadrad- 3/4" 1.0 mm 0.58 0.076

TC16 Tu:- uadrad- 3/4" 1%2 mm 0.71 0.076

TC17 Tu:- uadrad- 3/4" 1.5 mm 0.89 0.076

TC18 Tu:- uadrad- 3/4" 2.0 mm 1.22 0.076

TC19 Tu:- uadrad- 1" 0.8 mm 0.62 0.102

TC20 Tu:- uadrad- 1" 0.9 mm 0.70 0.102

TC21 Tu:- uadrad- 1" 1 mm 0.78 0.102

TC22 Tu:- uadrad- 1" 1.2 mm 0.93 0.102

TC23 Tu:- uadrad- 1" 1.5 mm 1.16 0.102

TC24 Tu:- uadrad- 1" 2.0 mm 1.54 0.102

Page 10: 220611 Costos OT-022-10

7/23/2019 220611 Costos OT-022-10

http://slidepdf.com/reader/full/220611-costos-ot-022-10 10/84

TC25 Tu:- uadrad- 1" 2.5 mm 1.87 0.102

TC26 Tu:- uadrad- 1" 3.0 mm 2.25 0.102

TC27 Tu:- uadrad- 1 1/4" 0.9 mm 0.92 0.127

TC28 Tu:- uadrad- 1 1/4" 1.0 mm 1.01 0.127

TC29 Tu:- uadrad- 1 1/4" 1.2 mm 1.21 0.127

TC30 Tu:- uadrad- 1 1/4" 1.5 mm 1.51 0.127

TC31 Tu:- uadrad- 1 1/4" 2.0 mm 2.01 0.127

TC32 Tu:- uadrad- 1 1/4" 2.5 mm 2.50 0.127

TC33 Tu:- uadrad- 1 1/4" 3.0 mm 2.98 0.127

TC34 Tu:- uadrad- 1 1/2" 0.9 mm 1.07 0.152

TC35 Tu:- uadrad- 1 1/2" 1.0 mm 1.19 0.152

TC36 Tu:- uadrad- 1 1/2" 1.2 mm 1.42 0.152

TC37 Tu:- uadrad- 1 1/2" 1.5 mm 1.78 0.152

TC38 Tu:- uadrad- 1 1/2" 2.0 mm 2.34 0.152

TC39 Tu:- uadrad- 1 1/2" 2.5 mm 2.95 0.152

TC40 Tu:- uadrad- 1 1/2" 3.0 mm 3.53 0.152

TC41 Tu:- uadrad- 1 1/2" 4.0 mm 4.66 0.152

TC42 Tu:- uadrad- 2" 1.2 mm 1.88 0.203

TC43 Tu:- uadrad- 2" 1.5 mm 2.34 0.203

TC44 Tu:- uadrad- 2" 2.0 mm 3.11 0.203

TC45 Tu:- uadrad- 2" 3.0 mm 4.57 0.203

TC46 Tu:- uadrad- 2" 1/8" 4.75 0.203

TC47 Tu:- uadrad- 2" 3/16" 6.43 0.203

TC48 Tu:- uadrad- 2" 1/4" 8.05 0.203

TC49 Tu:- uadrad- 2 1/2" 1/8" 6.01 0.254

TC50 Tu:- uadrad- 2 1/2" 3/16" 8.32 0.254

TC51 Tu:- uadrad- 2 1/2" 1/4" 10.58 0.254

TC52 Tu:- uadrad- 3" 2.5 mm 5.87 0.305

TC53 Tu:- uadrad- 3" 3.0 mm 7.03 0.305

TC54 Tu:- uadrad- 3" 1/8" 7.28 0.305

TC55 Tu:- uadrad- 3" 3/16" 10.22 0.305

TC56 Tu:- uadrad- 3" 1/4" 13.11 0.305

TC57 Tu:- uadrad- 4" 2.5mm 7.88 0.406

TC58 Tu:- uadrad- 4" 3.0mm 9.42 0.406

TC59 Tu:- uadrad- 4" 1/8" 9.81 0.406

TC60 Tu:- uadrad- 4" 3/16" 14.02 0.406

TC61 Tu:- uadrad- 4" 1/4" 18.17 0.406

TC62 Tu:- uadrad- 4" 5/16" 22.07 0.406

TC63 Tu:- uadrad- 5" 1/8" 12.35 0.508

TC64 Tu:- uadrad- 5" 3/16" 17.61 0.508

TC65 Tu:- uadrad- 5" 1/4" 23.25 0.508

TC66 Tu:- uadrad- 5" 5/16" 28.40 0.508

TC67 Tu:- uadrad- 6" 1/8" 14.88 0.610

TC68 Tu:- uadrad- 6" 3/16" 21.62 0.610

TC69 Tu:- uadrad- 6" 1/4" 28.31 0.610

Page 11: 220611 Costos OT-022-10

7/23/2019 220611 Costos OT-022-10

http://slidepdf.com/reader/full/220611-costos-ot-022-10 11/84

TC70 Tu:- uadrad- 6" 5/16" 34.74 0.610

TC71 Tu:- uadrad- 8" 3/16" 29.21 0.813

TC72 Tu:- uadrad- 8" 1/4" 38.43 0.813

TC73 Tu:- uadrad- 8" 5/16" 47.38 0.813

TC74 Tu:- uadrad- 8" 3/8" 56.09 0.813

TC75 Tu:- uadrad- 10" 3/16" 36.80 1.016

TC76 Tu:- uadrad- 10" 1/4" 48.56 1.016

TC77 Tu:- uadrad- 10" 5/16" 60.05 1.016

TC78 Tu:- uadrad- 10" 3/8" 71.29 1.016

TC79 Tu:- uadrad- 12" 3/16" 44.41 1.219

TC80 Tu:- uadrad- 12" 1/4" 58.68 1.219

TC81 Tu:- uadrad- 12" 5/16" 72.71 1.219

TC82 Tu:- uadrad- 12" 3/8" 86.46 1.219

TCm01 Tu:- uadrad- 15 0.8 mm 0.37 0.060

TCm02 Tu:- uadrad- 15 0.9 mm 0.42 0.060

TCm03 Tu:- uadrad- 15 1.0 mm 0.46 0.060

TCm04 Tu:- uadrad- 15 1.2 mm 0.55 0.060

TCm05 Tu:- uadrad- 15 1.5 mm 0.68 0.060

TCm06 Tu:- uadrad- 20 0.8 mm 0.50 0.080

TCm07 Tu:- uadrad- 20 0.9 mm 0.56 0.080

TCm08 Tu:- uadrad- 20 1.0 mm 0.62 0.080

TCm09 Tu:- uadrad- 20 1.2 mm 0.74 0.080

TCm10 Tu:- uadrad- 20 1.5 mm 0.93 0.080

TCm11 Tu:- uadrad- 20 2.0 mm 1.23 0.080

TCm12 Tu:- uadrad- 25 0.8 mm 0.62 0.100

TCm13 Tu:- uadrad- 25 0.9 mm 0.70 0.100

TCm14 Tu:- uadrad- 25 1.0 mm 0.78 0.100

TCm15 Tu:- uadrad- 25 1.2 mm 0.93 0.100

TCm16 Tu:- uadrad- 25 1.5 mm 1.16 0.100

TCm17 Tu:- uadrad- 25 2.0 mm 1.54 0.100

TCm18 Tu:- uadrad- 30 0.9 mm 0.85 0.120

TCm19 Tu:- uadrad- 30 1.0 mm 0.94 0.120

TCm20 Tu:- uadrad- 30 1.2 mm 1.12 0.120

TCm21 Tu:- uadrad- 30 1.5 mm 1.40 0.120

TCm22 Tu:- uadrad- 30 2.0 mm 1.84 0.120

TCm23 Tu:- uadrad- 40 0.9 mm 1.13 0.160

TCm24 Tu:- uadrad- 40 1.0 mm 1.25 0.160

TCm25 Tu:- uadrad- 40 1.2 mm 1.50 0.160

TCm26 Tu:- uadrad- 40 1.5 mm 1.87 0.160

TCm27 Tu:- uadrad- 40 2.0 mm 2.49 0.160

TCm28 Tu:- uadrad- 40 2.5 mm 3.04 0.160

TCm29 Tu:- uadrad- 40 3.0 mm 3.63 0.160

TCm30 Tu:- uadrad- 40 4.0 mm 4.72 0.160

TCm31 Tu:- uadrad- 40 4.5 mm 5.27 0.160

TCm32 Tu:- uadrad- 50 1.2 mm 1.88 0.200

Page 12: 220611 Costos OT-022-10

7/23/2019 220611 Costos OT-022-10

http://slidepdf.com/reader/full/220611-costos-ot-022-10 12/84

TCm33 Tu:- uadrad- 50 1.5 mm 2.34 0.200

TCm34 Tu:- uadrad- 50 2.0 mm 3.11 0.200

TCm35 Tu:- uadrad- 50 2.5 mm 3.83 0.200

TCm36 Tu:- uadrad- 50 3.0 mm 4.57 0.200

TCm37 Tu:- uadrad- 50 4.0 mm 6.00 0.200

TCm38 Tu:- uadrad- 50 4.5 mm 6.68 0.200

TCm39 Tu:- uadrad- 60 1.2 mm 2.25 0.240

TCm40 Tu:- uadrad- 60 1.5 mm 2.81 0.240

TCm41 Tu:- uadrad- 60 2.0 mm 3.37 0.240

TCm42 Tu:- uadrad- 60 2.5 mm 4.61 0.240

TCm43 Tu:- uadrad- 60 3.0 mm 5.51 0.240

TCm44 Tu:- uadrad- 60 4.0 mm 7.18 0.240

TCm45 Tu:- uadrad- 60 4.5 mm 7.96 0.240

TCm46 Tu:- uadrad- 100 2.5 mm 7.86 0.400

TCm47 Tu:- uadrad- 100 3.0 mm 9.40 0.400

TCm48 Tu:- uadrad- 100 4.0 mm 12.40 0.400

TCm49 Tu:- uadrad- 100 4.5 mm 13.83 0.400

TUB( ELECTR(S(LDAD( RED(ND(

TER01 Tu:- )!)*r-,-!dad- ;1/2" 0%8mm 0.25 0.040

TER02 Tu:- )!)*r-,-!dad- ;1/2" 0%9mm 0.28 0.040

TER03 Tu:- )!)*r-,-!dad- ;1/2" 1.0mm 0.31 0.040

TER04 Tu:- )!)*r-,-!dad- ;1/2" 1.2mm 0.37 0.040

TER05 Tu:- )!)*r-,-!dad- ;1/2" 1.5mm 0.45 0.040

TER06 Tu:- )!)*r-,-!dad- ;1/2" 2.0mm 0.59 0.040

TER07 Tu:- )!)*r-,-!dad- ;5/8" 0%8mm 0.31 0.050

TER08 Tu:- )!)*r-,-!dad- ;5/8" 0%9mm 0.35 0.050

TER09 Tu:- )!)*r-,-!dad- ;5/8" 1.0mm 0.39 0.050

TER10 Tu:- )!)*r-,-!dad- ;5/8" 1.2mm 0.46 0.050

TER11 Tu:- )!)*r-,-!dad- ;5/8" 1.5mm 0.57 0.050

TER12 Tu:- )!)*r-,-!dad- ;5/8" 2.0mm 0.74 0.050

TER13 Tu:- )!)*r-,-!dad- ;3/4" 0%8mm 0.37 0.060

TER14 Tu:- )!)*r-,-!dad- ;3/4" 0%9mm 0.42 0.060

TER15 Tu:- )!)*r-,-!dad- ;3/4" 1.0mm 0.46 0.060

TER16 Tu:- )!)*r-,-!dad- ;3/4" 1.2mm 0.55 0.060

TER17 Tu:- )!)*r-,-!dad- ;3/4" 1.5mm 0.68 0.060

TER18 Tu:- )!)*r-,-!dad- ;3/4" 2.0mm 0.90 0.060

TER19 Tu:- )!)*r-,-!dad- ;7/8" 0%8mm 0.44 0.070

TER20 Tu:- )!)*r-,-!dad- ;7/8" 0%9mm 0.49 0.070

TER21 Tu:- )!)*r-,-!dad- ;7/8" 1.0mm 0.54 0.070

TER22 Tu:- )!)*r-,-!dad- ;7/8" 1.2mm 0.65 0.070

TER23 Tu:- )!)*r-,-!dad- ;7/8" 1.5mm 0.81 0.070

TER24 Tu:- )!)*r-,-!dad- ;7/8" 2.0mm 1.06 0.070

TER25 Tu:- )!)*r-,-!dad- ;1" 0.8mm 0.50 0.080

TER26 Tu:- )!)*r-,-!dad- ;1" 0.9mm 0.56 0.080

TER27 Tu:- )!)*r-,-!dad- ;1" 1.0mm 0.62 0.080

Page 13: 220611 Costos OT-022-10

7/23/2019 220611 Costos OT-022-10

http://slidepdf.com/reader/full/220611-costos-ot-022-10 13/84

TER28 Tu:- )!)*r-,-!dad- ;1" 1.2mm 0.74 0.080

TER29 Tu:- )!)*r-,-!dad- ;1" 1.5mm 0.93 0.080

TER30 Tu:- )!)*r-,-!dad- ;1" 2.0mm 1.23 0.080

TER31 Tu:- )!)*r-,-!dad- ;1 1/4" 0.9mm 0.70 0.100

TER32 Tu:- )!)*r-,-!dad- ;1 1/4" 1.0mm 0.78 0.100

TER33 Tu:- )!)*r-,-!dad- ;1 1/4" 1.2mm 0.93 0.100

TER34 Tu:- )!)*r-,-!dad- ;1 1/4" 1.5mm 1.16 0.100

TER35 Tu:- )!)*r-,-!dad- ;1 1/4" 2.0mm 1.54 0.100

TER36 Tu:- )!)*r-,-!dad- ;1 1/2" 0.9mm 0.85 0.100

TER37 Tu:- )!)*r-,-!dad- ;1 1/2" 1.0mm 0.94 0.120

TER38 Tu:- )!)*r-,-!dad- ;1 1/2" 1.2mm 1.13 0.120

TER39 Tu:- )!)*r-,-!dad- ;1 1/2" 1.5mm 1.40 0.120

TER40 Tu:- )!)*r-,-!dad- ;1 1/2" 2.0mm 1.84 0.120

TER41 Tu:- )!)*r-,-!dad- ;1 3/4" 0.9mm 0.99 0.140

TER42 Tu:- )!)*r-,-!dad- ;1 3/4" 1.0mm 1.10 0.140

TER43 Tu:- )!)*r-,-!dad- ;1 3/4" 1.2mm 1.32 0.140

TER44 Tu:- )!)*r-,-!dad- ;1 3/4" 1.5mm 1.64 0.140

TER45 Tu:- )!)*r-,-!dad- ;1 3/4" 2.0mm 2.17 0.140

TER46 Tu:- )!)*r-,-!dad- ;2" 0.9mm 1.13 0.160

TER47 Tu:- )!)*r-,-!dad- ;2" 1.0mm 1.25 0.160

TER48 Tu:- )!)*r-,-!dad- ;2" 1.2mm 1.50 0.160

TER49 Tu:- )!)*r-,-!dad- ;2" 1.5mm 1.87 0.160

TER50 Tu:- )!)*r-,-!dad- ;2" 2.0mm 2.49 0.160

TER51 Tu:- )!)*r-,-!dad- ;2 1/4" 1.2mm 1.68 0.180

TER52 Tu:- )!)*r-,-!dad- ;2 1/4" 1.5mm 2.11 0.180

TER53 Tu:- )!)*r-,-!dad- ;2 1/4" 2.0mm 2.79 0.180

TER54 Tu:- )!)*r-,-!dad- ;2 1/2" 1.2mm 1.88 0.200

TER55 Tu:- )!)*r-,-!dad- ;2 1/2" 1.5mm 2.34 0.200

TER56 Tu:- )!)*r-,-!dad- ;2 1/2" 2.0mm 3.11 0.200

TER57 Tu:- )!)*r-,-!dad- ;3" 1.2mm 2.25 0.239

TER58 Tu:- )!)*r-,-!dad- ;3" 1.5mm 2.81 0.239

TER59 Tu:- )!)*r-,-!dad- ;3" 2%0mm 3.74 0.239

TUB(S NE'R( ESTRUCTURAL RED(ND(

TNER01 Tu:- N)r- E,*ru*ura! ;3/8"1.8mm 0.67 0.054

TNER02 Tu:- N)r- E,*ru*ura! ;3/8"2.0mm 0.74 0.054

TNER03 Tu:- N)r- E,*ru*ura! ;1/2"1.8mm 0.90 0.067

TNER04 Tu:- N)r- E,*ru*ura! ;1/2"2.0mm 0.95 0.080

TNER05 Tu:- N)r- E,*ru*ura! ;1/2"2.35mm 1.10 0.093

TNER06 Tu:- N)r- E,*ru*ura! ;1/2"2.5mm 1.28 0.106

TNER07 Tu:- N)r- E,*ru*ura! ;1/2"2.65mm 1.21 0.119

TNER08 Tu:- N)r- E,*ru*ura! ;3/4"1.8mm 1.15 0.085

TNER09 Tu:- N)r- E,*ru*ura! ;3/4"2.0mm 1.24 0.085

TNER10 Tu:- N)r- E,*ru*ura! ;3/4"2.35mm 1.38 0.085

TNER11 Tu:- N)r- E,*ru*ura! ;3/4"2.5mm 1.58 0.085

TNER12 Tu:- N)r- E,*ru*ura! ;3/4"2.65mm 1.56 0.085

Page 14: 220611 Costos OT-022-10

7/23/2019 220611 Costos OT-022-10

http://slidepdf.com/reader/full/220611-costos-ot-022-10 14/84

TNER13 Tu:- N)r- E,*ru*ura! ;1"2.0mm 1.62 0.106

TNER14 Tu:- N)r- E,*ru*ura! ;1"2.3mm 1.80 0.106

TNER15 Tu:- N)r- E,*ru*ura! ;1"2.5mm 1.99 0.106

TNER16 Tu:- N)r- E,*ru*ura! ;1"2.9mm 2.20 0.106

TNER17 Tu:- N)r- E,*ru*ura! ;1"3.0mm 2.28 0.106

TNER18 Tu:- N)r- E,*ru*ura! ;1"3.25mm 2.41 0.106

TNER19 Tu:- N)r- E,*ru*ura! ;1"3.3mm 2.50 0.106

TNER20 Tu:- N)r- E,*ru*ura! ;1 1/4"2.0mm 2.04 0.133

TNER21 Tu:- N)r- E,*ru*ura! ;1 1/4"2.3mm 2.34 0.133

TNER22 Tu:- N)r- E,*ru*ura! ;1 1/4"2.5mm 2.34 0.133

TNER23 Tu:- N)r- E,*ru*ura! ;1 1/4"2.65mm 2.54 0.133

TNER24 Tu:- N)r- E,*ru*ura! ;1 1/4"2.9mm 2.82 0.133

TNER25 Tu:- N)r- E,*ru*ura! ;1 1/4"3.0mm 2.84 0.133

TNER26 Tu:- N)r- E,*ru*ura! ;1 1/4"3.25mm 3.10 0.133

TNER27 Tu:- N)r- E,*ru*ura! ;1 1/4"3.3mm 3.14 0.133

TNER28 Tu:- N)r- E,*ru*ura! ;1 1/2"2.0mm 2.35 0.152

TNER29 Tu:- N)r- E,*ru*ura! ;1 1/2"2.3mm 2.63 0.152

TNER30 Tu:- N)r- E,*ru*ura! ;1 1/2"2.5mm 2.84 0.152

TNER31 Tu:- N)r- E,*ru*ura! ;1 1/2"2.9mm 3.23 0.152

TNER32 Tu:- N)r- E,*ru*ura! ;1 1/2"3.0mm 3.37 0.152

TNER33 Tu:- N)r- E,*ru*ura! ;1 1/2"3.25mm 3.56 0.152

TNER34 Tu:- N)r- E,*ru*ura! ;1 1/2"3.3mm 3.80 0.152

TNER35 Tu:- N)r- E,*ru*ura! ;1 1/2"4.0mm 4.56 0.152

TNER36 Tu:- N)r- E,*ru*ura! ;2"2.0mm 2.92 0.189

TNER37 Tu:- N)r- E,*ru*ura! ;2"2.3mm 3.30 0.189

TNER38 Tu:- N)r- E,*ru*ura! ;2"2.5mm 3.63 0.189

TNER39 Tu:- N)r- E,*ru*ura! ;2"2.9mm 4.06 0.189

TNER40 Tu:- N)r- E,*ru*ura! ;2"3.0mm 4.23 0.189

TNER41 Tu:- N)r- E,*ru*ura! ;2"3.25mm 4.49 0.189

TNER42 Tu:- N)r- E,*ru*ura! ;2"3.3mm 4.75 0.189

TNER43 Tu:- N)r- E,*ru*ura! ;2"3.6mm 5.03 0.189

TNER44 Tu:- N)r- E,*ru*ura! ;2"4.0mm 5.63 0.189

TNER45 Tu:- N)r- E,*ru*ura! ;2"4.5mm 6.28 0.189

TNER46 Tu:- N)r- E,*ru*ura! ;2 1/2"2.5mm 4.59 0.229

TNER47 Tu:- N)r- E,*ru*ura! ;2 1/2"3.0mm 5.49 0.229

TNER48 Tu:- N)r- E,*ru*ura! ;2 1/2"3.3mm 6.02 0.229

TNER49 Tu:- N)r- E,*ru*ura! ;2 1/2"4.0mm 7.26 0.229

TNER50 Tu:- N)r- E,*ru*ura! ;2 1/2"4.5mm 8.11 0.229

TNER51 Tu:- N)r- E,*ru*ura! ;3"2.5mm 5.38 0.279

TNER52 Tu:- N)r- E,*ru*ura! ;3"3.0mm 6.44 0.279

TNER53 Tu:- N)r- E,*ru*ura! ;3"3.3mm 7.06 0.279

TNER54 Tu:- N)r- E,*ru*ura! ;3"3.6mm 7.55 0.279

TNER55 Tu:- N)r- E,*ru*ura! ;3"4.0mm 8.36 0.279

TNER56 Tu:- N)r- E,*ru*ura! ;3"4.5mm 9.54 0.279

TNER57 Tu:- N)r- E,*ru*ura! ;4"3.0mm 8.32 0.359

Page 15: 220611 Costos OT-022-10

7/23/2019 220611 Costos OT-022-10

http://slidepdf.com/reader/full/220611-costos-ot-022-10 15/84

TNER58 Tu:- N)r- E,*ru*ura! ;4"3.3mm 9.13 0.359

TNER59 Tu:- N)r- E,*ru*ura! ;4"3.6mm 9.75 0.359

TNER60 Tu:- N)r- E,*ru*ura! ;4"4.0mm 11.02 0.359

TNER61 Tu:- N)r- E,*ru*ura! ;4"4.5mm 12.20 0.359

TUB( NE'R( LIIAN(

TNL01 Tu:- LI 3/8" 1.8 mm 0.67 0.054

TNL02 Tu:- LI 1/2" 2.0 mm 0.95 0.067

TNL03 Tu:- LI 3/4" 2.0 mm 1.20 0.085

TNL04 Tu:- LI 1" 2.65 mm 2.01 0.106

TNL05 Tu:- LI 1 1/4" 2.65 mm 2.58 0.134

TNL06 Tu:- LI 1 1/2" 2.65 mm 2.97 0.152

TNL07 Tu:- LI 2" 2.9 mm 4.11 0.189

TNL08 Tu:- LI 2 1/2" 3.0 mm 5.37 0.239

TNL09 Tu:- LI 3" 3.25 mm 6.81 0.279

TNL10 Tu:- LI 4" 3.25 mm 9.89 0.358

TUB( NE'R( STANDARD

TNS01 Tu:- STD 3/8" 2.0 mm 0.75 0.055

TNS02 Tu:- STD 1/2" 2.35 mm 1.10 0.068

TNS03 Tu:- STD 3/4" 2.35 mm 1.41 0.085

TNS04 Tu:- STD 1" 2.9 mm 2.21 0.107

TNS05 Tu:- STD 1 1/4" 2.9 mm 2.84 0.134

TNS06 Tu:- STD 1 1/2" 2.9 mm 3.26 0.153

TNS07 Tu:- STD 2" 3.25 mm 4.56 0.191

TNS08 Tu:- STD 2 1/2" 3.5 mm 5.18 0.240

TNS09 Tu:- STD 3" 3.65 mm 7.65 0.261

TNS10 Tu:- STD 4" 4.05 mm 11.00 0.361

TUB( RECTAN'ULAR

TR01 Tu:- R)*au!ar 3/4"1/2"0.9mm 2.52 0.064

TR02 Tu:- R)*au!ar 3/4"1/2"1.0mm 2.80 0.064

TR03 Tu:- R)*au!ar 1"1/2"0.8mm 0.50 0.076

TR04 Tu:- R)*au!ar 1"1/2"0.9mm 0.56 0.076

TR05 Tu:- R)*au!ar 1"1/2"1.0mm 0.62 0.076

TR06 Tu:- R)*au!ar 1"1/2"1.2mm 0.74 0.076

TR07 Tu:- R)*au!ar 1"1/2"1.5mm 0.93 0.076

TR08 Tu:- R)*au!ar 1"1/2"2.0mm 1.23 0.076

TR09 Tu:- R)*au!ar 1 1/2"1/2"0.9mm 0.70 0.102

TR10 Tu:- R)*au!ar 1 1/2"1/2"1.0mm 0.78 0.102

TR11 Tu:- R)*au!ar 1 1/2"1/2"1.2mm 0.93 0.102

TR12 Tu:- R)*au!ar 1 1/2"1/2"1.5mm 1.16 0.102

TR13 Tu:- R)*au!ar 1 1/2"1/2"2.0mm 1.54 0.102

TR14 Tu:- R)*au!ar 2"1"0.9mm 1.07 0.152

TR15 Tu:- R)*au!ar 2"1"1.0mm 1.19 0.152

TR16 Tu:- R)*au!ar 2"1"1.2mm 1.42 0.152

TR17 Tu:- R)*au!ar 2"1"1.5mm 1.78 0.152

TR18 Tu:- R)*au!ar 2"1"2.0mm 2.36 0.152

Page 16: 220611 Costos OT-022-10

7/23/2019 220611 Costos OT-022-10

http://slidepdf.com/reader/full/220611-costos-ot-022-10 16/84

TR19 Tu:- R)*au!ar 2"1"1/8" 3.48 0.152

TR20 Tu:- R)*au!ar 2"1"3/16" 4.99 0.152

TR21 Tu:- R)*au!ar 3"2"1/8" 5.84 0.254

TR22 Tu:- R)*au!ar 3"2"3/16" 8.32 0.254

TR23 Tu:- R)*au!ar 4"2"1/8" 7.28 0.305

TR24 Tu:- R)*au!ar 4"2"3/16" 10.22 0.305

TR25 Tu:- R)*au!ar 4"2"1/4" 13.11 0.305

TR26 Tu:- R)*au!ar 4"3"1/8" 8.55 0.356

TR27 Tu:- R)*au!ar 4"3"3/16" 12.13 0.356

TR28 Tu:- R)*au!ar 4"3"1/4" 15.64 0.358

TR29 Tu:- R)*au!ar 6"2"1/8" 9.81 0.406

TR30 Tu:- R)*au!ar 6"2"3/16" 14.02 0.406

TR31 Tu:- R)*au!ar 6"2"1/4" 18.17 0.406

TR32 Tu:- R)*au!ar 6"3"1/8" 11.08 0.457

TR33 Tu:- R)*au!ar 6"3"3/16" 15.92 0.457

TR34 Tu:- R)*au!ar 6"3"1/4" 20.70 0.457

TR35 Tu:- R)*au!ar 6"4"1/8" 12.35 0.508

TR36 Tu:- R)*au!ar 6"4"3/16" 17.81 0.508

TR37 Tu:- R)*au!ar 6"4"1/4" 23.25 0.508

TR38 Tu:- R)*au!ar 8"2"1/8" 12.35 0.508

TR39 Tu:- R)*au!ar 8"2"3/16" 17.81 0.508

TR40 Tu:- R)*au!ar 8"2"1/4" 23.25 0.508

TR41 Tu:- R)*au!ar 8"4"1/8" 14.88 0.610

TR42 Tu:- R)*au!ar 8"4"3/16" 21.62 0.610

TR43 Tu:- R)*au!ar 8"4"1/4" 28.31 0.610

TR44 Tu:- R)*au!ar 8"6"1/8" 17.41 0.711

TR45 Tu:- R)*au!ar 8"6"3/16" 25.42 0.711

TR46 Tu:- R)*au!ar 8"6"1/4" 33.37 0.711

TR47 Tu:- R)*au!ar 10"2"1/8" 14.88 0.610

TR48 Tu:- R)*au!ar 10"2"3/16" 21.62 0.610

TR49 Tu:- R)*au!ar 10"2"1/4" 28.31 0.610

TR50 Tu:- R)*au!ar 10"4"1/8" 17.41 0.711

TR51 Tu:- R)*au!ar 10"4"3/16" 25.42 0.711

TR52 Tu:- R)*au!ar 10"4"1/4" 33.37 0.711

TR53 Tu:- R)*au!ar 10"6"1/8" 17.94 0.813

TR54 Tu:- R)*au!ar 10"6"3/16" 29.21 0.813

TR55 Tu:- R)*au!ar 10"6"1/4" 38.43 0.813

TR56 Tu:- R)*au!ar 12"4"1/8" 19.94 0.813

TR57 Tu:- R)*au!ar 12"4"3/16" 29.21 0.813

TR58 Tu:- R)*au!ar 12"4"1/4" 38.43 0.813

TR59 Tu:- R)*au!ar 12"6"1/8" 22.47 0.914

TR60 Tu:- R)*au!ar 12"6"3/16" 33.01 0.914

TR61 Tu:- R)*au!ar 12"6"1/4" 43.50 0.914

TR61<1 Tu:- R)*au!ar 12"6"1/2" 44.31 1.000

TR62 Tu:- R)*au!ar 12"8"1/8" 25.01 1.016

Page 17: 220611 Costos OT-022-10

7/23/2019 220611 Costos OT-022-10

http://slidepdf.com/reader/full/220611-costos-ot-022-10 17/84

TR63 Tu:- R)*au!ar 12"8"3/16" 36.80 1.016

TR64 Tu:- R)*au!ar 12"8"1/4" 48.56 1.160

TRm01 Tu:- R)*au!ar 40200.9mm 0.00 0.000

TRm02 Tu:- R)*au!ar 40201.0mm 0.00 0.000

TRm03 Tu:- R)*au!ar 40201.2mm 1.12 0.120

TRm04 Tu:- R)*au!ar 40201.5mm 1.40 0.120

TRm05 Tubo Rectangular 40x20x2.0mm 1.84 0.120

TRm06 Tu:- R)*au!ar 40300.9mm 0.99 0.140

TRm07 Tu:- R)*au!ar 40301.0mm 1.10 0.140

TRm08 Tu:- R)*au!ar 40301.2mm 1.32 0.140

TRm09 Tu:- R)*au!ar 40301.5mm 1.64 0.140

TRm10 Tu:- R)*au!ar 40302.0mm 2.17 0.140

TRm11 Tu:- R)*au!ar 50200.9mm 0.99 0.140

TRm12 Tu:- R)*au!ar 50201.0mm 1.10 0.140

TRm13 Tu:- R)*au!ar 50201.2mm 1.32 0.140

TRm14 Tu:- R)*au!ar 50201.5mm 1.64 0.140

TRm15 Tu:- R)*au!ar 50202.0mm 2.17 0.140

TRm16 Tu:- R)*au!ar 50300.9mm 1.13 0.160

TRm17 Tu:- R)*au!ar 50301.0mm 1.25 0.160

TRm18 Tu:- R)*au!ar 50301.2mm 1.50 0.160

TRm19 Tu:- R)*au!ar 50301.5mm 1.87 0.160

TRm20 Tu:- R)*au!ar 50302.0mm 2.49 0.160

TRm21 Tu:- R)*au!ar 50401.2mm 1.68 0.180

TRm22 Tu:- R)*au!ar 50401.5mm 2.11 0.180

TRm23 Tu:- R)*au!ar 50402.0mm 2.79 0.180

TRm24 Tu:- R)*au!ar 60401.2mm 1.88 0.200

TRm25 Tu:- R)*au!ar 60401.5mm 2.34 0.200

TRm26 Tu:- R)*au!ar 60402.0mm 3.11 0.200

TRm27 Tu:- R)*au!ar 70501.5mm 2.81 0.240

TRm28 Tu:- R)*au!ar 70502.0mm 3.74 0.240

TRm29 Tu:- R)*au!ar 70502.5mm 4.61 0.240

TRm30 Tu:- R)*au!ar 70503.0mm 5.50 0.240

TRm31 Tu:- R)*au!ar 80401.5mm 2.81 0.240

TRm32 Tu:- R)*au!ar 80402.0mm 3.74 0.240

TRm33 Tu:- R)*au!ar 80402.5mm 4.61 0.240

TRm34 Tu:- R)*au!ar 80403.0mm 5.50 0.240

TRm35 Tu:- R)*au!ar 100502.0mm 4.68 0.300

TRm36 Tu:- R)*au!ar 100502.5mm 5.80 0.300

TRm37 Tu:- R)*au!ar 100503.0mm 6.93 0.300

TRm38 Tu:- R)*au!ar 100504.0mm 9.11 0.300

TRm39 Tu:- R)*au!ar 100504.5mm 10.16 0.300

TUB( NE'R( SC 40

TS4001 Tu:- d) a)r- SC 40 3/8" 0.85 0.054

TS4002 Tu:- d) a)r- SC 40 1/2" 1.27 0.067

TS4003 Tu:- d) a)r- SC 40 3/4" 1.68 0.064

Page 18: 220611 Costos OT-022-10

7/23/2019 220611 Costos OT-022-10

http://slidepdf.com/reader/full/220611-costos-ot-022-10 18/84

TS4004 Tu:- d) a)r- SC 40 1" 2.50 0.105

TS4005 Tu:- d) a)r- SC 40 1 1/4" 3.38 0.133

TS4006 Tu:- d) a)r- SC 40 1 1/2" 4.05 0.152

TS4007 Tu:- d) a)r- SC 40 2" 5.44 0.189

TS4008 Tu:- d) a)r- SC 40 2 1/2" 8.62 0.229

TS4009 Tu:- d) a)r- SC 40 3" 11.29 0.279

TS4010 Tu:- d) a)r- SC 40 4" 16.07 0.359

TS4011 Tu:- d) a)r- SC 40 5" 21.78 0.444

TS4012 Tu:- d) a)r- SC 40 6" 28.26 0.529

TS4013 Tu:- d) a)r- SC 40 8" 42.53 0.688

TS4014 Tu:- d) a)r- SC 40 10" 60.29 0.858

TS4015 Tu:- d) a)r- SC 40 12" 79.65 1.017

TS4016 Tu:- d) a)r- SC 40 14" 81.28 1.117

TS4017 Tu:- d) a)r- SC 40 16" 93.21 1.277

TS4018 Tu:- d) a)r- SC 40 18" 105.05 1.436

TS4019 Tu:- d) a)r- SC 40 20" 117.07 1.596

TUB( NE'R( SC 80

TS8001 Tu:- d) a)r- SC 80 3/8" 1.10 0.054

TS8002 Tu:- d) a)r- SC 80 1/2 " 1.62 0.067

TS8003 Tu:- d) a)r- SC 80 3/4 " 2.19 0.084

TS8004 Tu:- d) a)r- SC 80 1 " 3.23 0.105

TS8005 Tu:- d) a)r- SC 80 1 1/4" 4.47 0.133

TS8006 Tu:- d) a)r- SC 80 1 1/2" 5.41 0.152

TS8007 Tu:- d) a)r- SC 80 2" 7.48 0.189

TS8008 Tu:- d) a)r- SC 80 2 1/2" 11.41 0.229

TS8009 Tu:- d) a)r- SC 80 3" 15.27 0.279

TS8010 Tu:- d) a)r- SC 80 4 " 22.31 0.359

TS8011 Tu:- d) a)r- SC 80 5" 30.95 0.444

TS8012 Tu:- d) a)r- SC 80 6" 42.56 0.529

TS8013 Tu:- d) a)r- SC 80 8" 64.63 0.688

TS8014 Tu:- d) a)r- SC 80 10" 95.88 0.858

TS8015 Tu:- d) a)r- SC 80 12" 132.01 1.017

CANAL U &LE'AD(

U&01 Caa! U d) 2" 1" 2%0 mm 1.49 0.200

U&02 Caa! U d) 2" 1" 2%3 mm 1.70 0.200

U&03 Caa! U d) 2" 1" 2%5 mm 1.83 0.200

U&04 Caa! U d) 2" 1" 3 mm 2.16 0.200

U&05 Caa! U d) 3" 1 1/2" 2.0 mm 2.29 0.304

U&06 Caa! U d) 3" 1 1/2" 2.3 mm 2.62 0.304

U&07 Caa! U d) 3" 1 1/2" 2.5 mm 2.63 0.304

U&08 Caa! U d) 3" 1 1/2" 3.0 mm 3.36 0.304

U&09 Caa! U d) 3" 1 1/2" 4%5 mm 4.86 0.304

U&10 Caa! U d) 3" 2" 2.0 mm 2.70 0.352

U&11 Caa! U d) 3" 2" 2.3 mm 3.10 0.352

U&12 Caa! U d) 3" 2" 2.5 mm 3.34 0.352

Page 19: 220611 Costos OT-022-10

7/23/2019 220611 Costos OT-022-10

http://slidepdf.com/reader/full/220611-costos-ot-022-10 19/84

U&13 Caa! U d) 3" 2" 3.0 mm 3.95 0.352

U&14 Caa! U d) 3" 2" 4.5 mm 5.77 0.352

U&15 Caa! U d) 4" 2" 2.0 mm 3.09 0.402

U&16 Caa! U d) 4" 2" 2.3 mm 3.53 0.402

U&17 Caa! U d) 4" 2" 2.5 mm 3.83 0.402

U&18 Caa! U d) 4" 2" 3.0 mm 4.55 0.402

U&19 Caa! U d) 4" 2" 4%5 mm 6.66 0.402

U&20 Caa! U d) 5" 2" 2.0 mm 3.49 0.454

U&21 Caa! U d) 5" 2" 2.3 mm 3.99 0.454

U&22 Caa! U d) 5" 2" 2.5 mm 4.32 0.454

U&23 Caa! U d) 5" 2" 3.0 mm 5.15 0.454

U&24 Caa! U d) 5" 2" 4.5 mm 7.55 0.454

U&25 Caa! U d) 6" 2" 2.0 mm 3.88 0.504

U&26 Caa! U d) 6" 2" 2.3 mm 4.45 0.504

U&27 Caa! U d) 6" 2" 2.5 mm 4.82 0.504

U&28 Caa! U d) 6" 2" 3.0 mm 5.75 0.504

U&29 Caa! U d) 6" 2" 4.5 mm 8.45 0.504

U&30 Caa! U d) 6" 3" 2.0 mm 4.68 0.608

U&31 Caa! U d) 6" 3" 2.3 mm 5.37 0.608

U&32 Caa! U d) 6" 3" 2.5 mm 5.82 0.608

U&33 Caa! U d) 6" 3" 3.0 mm 6.95 0.608

U&34 Caa! U d) 6" 3" 4.5 mm 10.24 0.608

U&35 Caa! U d) 7" 2" 2.0 mm 4.28 0.554

U&36 Caa! U d) 7" 2" 2.3 mm 4.91 0.554

U&37 Caa! U d) 7" 2" 2.5 mm 5.32 0.554

U&38 Caa! U d) 7" 2" 3.0 mm 6.35 0.554

U&39 Caa! U d) 7" 2" 4.5 mm 9.35 0.554

U&40 Caa! U d) 7" 3" 2.0 mm 5.08 0.658

U&41 Caa! U d) 7" 3" 2.3 mm 5.83 0.658

U&42 Caa! U d) 7" 3" 2.5 mm 6.32 0.658

U&43 Caa! U d) 7" 3" 3.0 mm 7.54 0.658

U&44 Caa! U d) 7" 3" 4.5 mm 11.14 0.658

U&45 Caa! U d) 8" 2" 2.0 mm 4.68 0.606

U&46 Caa! U d) 8" 2" 2.3 mm 5.37 0.606

U&47 Caa! U d) 8" 2" 2.5 mm 5.82 0.606

U&48 Caa! U d) 8" 2" 3.0 mm 6.95 0.606

U&49 Caa! U d) 8" 2" 4.5 mm 10.24 0.606

U&50 Caa! U d) 8" 3" 2.0 mm 5.48 0.710

U&51 Caa! U d) 8" 3" 2.3 mm 6.28 0.710

U&52 Caa! U d) 8" 3" 2.5 mm 6.82 0.710

U&53 Caa! U d) 8" 3" 3.0 mm 8.14 0.710

U&54 Caa! U d) 8" 3" 4.5 mm 12.04 0.710

U&55 Caa! U d) 9" 2" 2.0 mm 5.08 0.656

U&56 Caa! U d) 9" 2" 2.3 mm 5.83 0.656

U&57 Caa! U d) 9" 2" 2.5 mm 6.32 0.656

Page 20: 220611 Costos OT-022-10

7/23/2019 220611 Costos OT-022-10

http://slidepdf.com/reader/full/220611-costos-ot-022-10 20/84

U&58 Caa! U d) 9" 2" 3.0 mm 7.54 0.656

U&59 Caa! U d) 9" 2" 4.5 mm 11.14 0.656

U&60 Caa! U d) 9" 3" 2.0 mm 5.88 0.760

U&61 Caa! U d) 9" 3" 2.3 mm 6.74 0.760

U&62 Caa! U d) 9" 3" 2.5 mm 7.32 0.760

U&63 Caa! U d) 9" 3" 3.0 mm 8.74 0.760

U&64 Caa! U d) 9" 3" 4.5 mm 12.94 0.760

U&65 Caa! U d) 10" 2" 2.0 mm 5.48 0.708

U&66 Caa! U d) 10" 2" 2.3 mm 6.28 0.708

U&67 Caa! U d) 10" 2" 2.5 mm 6.82 0.708

U&68 Caa! U d) 10" 2" 3.0 mm 8.14 0.708

U&69 Caa! U d) 10" 2" 4.5 mm 12.04 0.708

U&70 Caa! U d) 10" 3" 2.0 mm 6.28 0.812

U&71 Caa! U d) 10" 3" 2.3 mm 7.20 0.812

U&72 Caa! U d) 10" 3" 2.5 mm 7.81 0.812

U&73 Caa! U d) 10" 3" 3.0 mm 9.34 0.812

U&74 Caa! U d) 10" 3" 4.5 mm 13.83 0.812

U&75 Caa! U d) 11" 2" 2.0 mm 5.88 0.758

U&76 Caa! U d) 11" 2" 2.3 mm 6.74 0.758

U&77 Caa! U d) 11" 2" 2.5 mm 7.32 0.758

U&78 Caa! U d) 11" 2" 3.0 mm 8.74 0.758

U&79 Caa! U d) 11" 2" 4.5 mm 12.94 0.758

U&80 Caa! U d) 11" 3" 2.0 mm 6.68 0.862

U&81 Caa! U d) 11" 3" 2.3 mm 7.66 0.862

U&82 Caa! U d) 11" 3" 2.5 mm 8.31 0.862

U&83 Caa! U d) 11" 3" 3.0 mm 9.94 0.862

U&84 Caa! U d) 11" 3" 4.5 mm 14.73 0.862

U&85 Caa! U d) 12" 2" 2.0 mm 6.28 0.808

U&86 Caa! U d) 12" 2" 2.3 mm 7.20 0.808

U&87 Caa! U d) 12" 2" 2.5 mm 7.81 0.808

U&88 Caa! U d) 12" 2" 3.0 mm 9.34 0.808

U&89 Caa! U d) 12" 2" 4.5 mm 13.83 0.808

U&90 Caa! U d) 12" 3" 2.0 mm 7.07 0.912

U&91 Caa! U d) 12" 3" 2.3 mm 8.12 0.912

U&92 Caa! U d) 12" 3" 2.5 mm 8.81 0.912

U&93 Caa! U d) 12" 3" 3.0 mm 10.53 0.912

U&94 Caa! U d) 12" 3" 4.5 mm 15.63 0.912

I'A LA=INADA >%I%

>001 +a > 4" 7%7# 11.46 0.474

>002 +a > 4" 13# 19.35 0.597

>003 +a > 6" 9# 13.39 0.680

>004 +a > 6" 12# 17.86 0.690

>005 +a > 6" 15# 23.32 0.890

>006 +a > 6" 20# 29.76 0.902

>007 +a > 6" 25# 37.21 0.914

Page 21: 220611 Costos OT-022-10

7/23/2019 220611 Costos OT-022-10

http://slidepdf.com/reader/full/220611-costos-ot-022-10 21/84

>008 +a > 8" 10# 14.88 0.780

>009 +a > 8" 13# 19.35 0.786

>010 +a > 8" 15# 22.32 0.796

>011 +a > 8" 18# 26.79 0.924

>012 +a > 8" 21# 31.25 0.930

>013 +a > 8" 24# 35.72 1.033

>014 +a > 8" 28# 41.67 1.042

>015 +a > 8" 31# 46.13 1.186

>016 +a > 8" 35# 52.09 1.195

>017 +a > 8" 40# 59.53 1.204

>018 +a > 10" $ 12# 17.86 0.881

>019 +a > 10" $ 15# 22.32 0.890

>020 +a > 10" $ 22# 32.74 1.076

>021 +a > 10" $ 26# 38.69 1.085

>022 +a > 10" $ 30# 44.65 1.094

>023 +a > 10" $ 33# 49.11 1.268

>024 +a > 10" $ 39# 58.04 1.277

>025 +a > 10" $ 45# 66.97 1.289

>026 +a > 10" $ 49# 72.92 1.484

>027 +a > 10" $ 54# 80.36 1.490

>028 +a > 12" $ 14# 20.84 0.985

>029 +a > 12" $ 16# 23.81 0.991

>030 +a > 12" $ 19# 28.28 1.000

>031 +a > 12" $ 22# 32.74 1.009

>032 +a > 12" $ 26# 38.69 1.256

>033 +a > 12" $ 30# 44.65 1.262

>034 +a > 12" $ 35# 52.09 1.274

>035 +a > 12" $ 40# 59.53 1.378

>036 +a > 12" $ 45# 66.97 1.387

>037 +a > 12" $ 50# 74.41 1.396

>038 +a > 12" $ 53# 78.88 1.585

>039 +a > 12" $ 58# 86.32 1.591

>040 +a > 12" $ 65# 96.73 1.789

>041 +a > 12" $ 72# 107.15 1.798

>042 +a > 14" $ 22# 32.74 1.176

>043 +a > 14" $ 26# 38.69 1.186

>044 +a > 14" $ 30# 44.65 1.356

>045 +a > 14" $ 34# 50.60 1.362

>046 +a > 14" $ 38# 56.55 1.372

>047 +a > 14" $ 43# 63.99 1.463

>048 +a > 14" $ 48# 71.43 1.472

>049 +a > 14" $ 53# 78.88 1.481

>050 +a > 14" $ 61# 90.78 1.676

>051 +a > 14" $ 68# 101.20 1.686

>052 +a > 14" $ 74# 110.13 1.695

Page 22: 220611 Costos OT-022-10

7/23/2019 220611 Costos OT-022-10

http://slidepdf.com/reader/full/220611-costos-ot-022-10 22/84

>053 +a > 14" $ 82# 122.03 1.704

>054 +a > 16" $ 26# 38.69 1.326

>055 +a > 16" $ 31# 46.13 1.338

>056 +a > 16" $ 36# 53.58 1.484

>057 +a > 16" $ 40# 59.53 1.490

>058 +a > 16" $ 45# 66.97 1.500

>059 +a > 16" $ 50# 74.41 1.509

>060 +a > 16" $ 57# 84.83 1.518

>061 +a > 16" $ 67# 99.71 1.832

>062 +a > 16" $ 77# 114.59 1.844

>063 +a > 16" $ 89# 132.45 1.859

>064 +a > 18" $ 35# 52.09 1.475

>065 +a > 18" $ 40# 59.53 1.487

>066 +a > 18" $ 46# 68.46 1.497

>067 +a > 18" $ 50# 74.41 1.640

>068 +a > 18" $ 55# 81.85 1.649

>069 +a > 18" $ 60# 89.29 1.655

>070 +a > 18" $ 65# 96.73 1.664

>071 +a > 18" $ 71# 105.66 1.670

>072 +a > 18" $ 76# 113.10 2.009

>073 +a > 18" $ 86# 127.99 2.018

>074 +a > 21" $ 44# 65.48 1.670

>075 +a > 21" $ 50# 74.41 1.679

>076 +a > 21" $ 57# 84.83 1.695

>077 +a > 21" $ 62# 92.27 1.862

>078 +a > 21" $ 73# 108.64 1.878

>079 +a > 21" $ 83# 123.52 1.890

>080 +a > 21" $ 93# 138.40 1.902

>081 +a > 24" $ 55# 81.85 1.868

>082 +a > 24" $ 62# 92.27 1.878

>083 +a > 24" $ 68# 101.20 2.073

>084 +a > 24" $ 76# 113.10 2.085

>085 +a > 24" $ 84# 125.01 2.094

>086 +a > 24" $ 94# 139.89 2.109

>087 +a > 24" $ 104# 154.77 2.472

>088 +a > 27" $ 84# 125.01 2.320

>089 +a > 27" $ 94# 139.89 2.332

>090 +a > 27" $ 102# 151.80 2.341

>091 +a > 27" $ 114# 169.66 2.353

>092 +a > 30" $ 90# 133.94 2.505

>093 +a > 30" $ 99# 147.33 2.515

>094 +a > 30" $ 108# 160.73 2.524

>095 +a > 30" $ 116# 172.63 2.533

>096 +a > 33" $ 118# 175.61 2.777

>097 +a > 33" $ 130# 193.47 2.769

Page 23: 220611 Costos OT-022-10

7/23/2019 220611 Costos OT-022-10

http://slidepdf.com/reader/full/220611-costos-ot-022-10 23/84

>098 +a > 33" $ 141# 209.84 2.801

>099 +a > 36" $ 135# 200.91 2.957

>100 +a > 36" $ 150# 223.23 2.975

>101 +a > 36" $ 160# 238.11 2.984

>102 +a > 40" $ 149# 221.74 3.048

>103 +a > 40" $ 167# 248.53 3.078

>104 +a > 40" $ 183# 272.34 3.109

>105 +a > 40" $ 235# 349.73 4.544

&ERIL ETA &LE'AD(

&01 &)r?+! )*a 3" 2" 2.0 mm 3.08 0.412

&02 &)r?+! )*a 3" 2" 2.3 mm 3.51 0.412

&03 &)r?+! )*a 3" 2" 2.5 mm 3.92 0.428

&04 &)r?+! )*a 3" 2" 3.0 mm 4.62 0.428

&05 &)r?+! )*a 3" 2" 4.5 mm 6.80 0.440

&06 &)r?+! )*a 4" 2" 2.0 mm 3.48 0.462

&07 &)r?+! )*a 4" 2" 2.3 mm 3.97 0.462

&08 &)r?+! )*a 4" 2" 2.5 mm 4.41 0.478

&09 &)r?+! )*a 4" 2" 3.0 mm 5.22 0.478

&10 &)r?+! )*a 4" 2" 4.5 mm 7.70 0.490

&11 &)r?+! )*a 5" 2" 2.0 mm 3.88 0.514

&12 &)r?+! )*a 5" 2" 2.3 mm 4.43 0.514

&13 &)r?+! )*a 5" 2" 2.5 mm 4.91 0.530

&14 &)r?+! )*a 5" 2" 3.0 mm 5.82 0.530

&15 &)r?+! )*a 5" 2" 4.5 mm 8.60 0.542

&16 &)r?+! )*a 6" 2" 2.0 mm 4.28 0.564

&17 &)r?+! )*a 6" 2" 2.3 mm 4.89 0.564

&18 &)r?+! )*a 6" 2" 2.5 mm 5.41 0.580

&19 &)r?+! )*a 6" 2" 3.0 mm 6.42 0.580

&20 &)r?+! )*a 6" 2" 4.5 mm 9.50 0.592

&21 &)r?+! )*a 6" 3" 2.0 mm 5.18 0.684

&22 &)r?+! )*a 6" 3" 2.3 mm 5.92 0.684

&23 &)r?+! )*a 6" 3" 2.5 mm 6.53 0.696

&24 &)r?+! )*a 6" 3" 3.0 mm 7.91 0.708

&25 &)r?+! )*a 6" 3" 4.5 mm 11.52 0.708

&26 &)r?+! )*a 7" 2" 2.0 mm 4.68 0.614

&27 &)r?+! )*a 7" 2" 2.3 mm 5.35 0.614

&28 &)r?+! )*a 7" 2" 2.5 mm 5.91 0.630

&29 &)r?+! )*a 7" 2" 3.0 mm 7.01 0.630

&30 &)r?+! )*a 7" 2" 4.5 mm 10.39 0.642

&31 &)r?+! )*a 7" 3" 2.0 mm 5.58 0.734

&32 &)r?+! )*a 7" 3" 2.3 mm 6.38 0.734

&33 &)r?+! )*a 7" 3" 2.5 mm 7.03 0.746

&34 &)r?+! )*a 7" 3" 3.0 mm 8.51 0.756

&35 &)r?+! )*a 7" 3" 4.5 mm 12.41 0.758

&36 &)r?+! )*a 8" 2" 2.0 mm 5.08 0.666

Page 24: 220611 Costos OT-022-10

7/23/2019 220611 Costos OT-022-10

http://slidepdf.com/reader/full/220611-costos-ot-022-10 24/84

&37 &)r?+! )*a 8" 2" 2.3 mm 5.80 0.666

&38 &)r?+! )*a 8" 2" 2.5 mm 6.41 0.682

&39 &)r?+! )*a 8" 2" 3.0 mm 7.61 0.682

&40 &)r?+! )*a 8" 2" 4.5 mm 11.29 0.694

&41 &)r?+! )*a 8" 3" 2.0 mm 5.98 0.786

&42 &)r?+! )*a 8" 3" 2.3 mm 6.84 0.786

&43 &)r?+! )*a 8" 3" 2.5 mm 7.53 0.798

&44 &)r?+! )*a 8" 3" 3.0 mm 9.11 0.810

&45 &)r?+! )*a 8" 3" 4.5 mm 13.31 0.810

&46 &)r?+! )*a 9" 2" 2.0 mm 5.48 0.716

&47 &)r?+! )*a 9" 2" 2.3 mm 6.28 0.716

&48 &)r?+! )*a 9" 2" 2.5 mm 6.91 0.732

&49 &)r?+! )*a 9" 2" 3.0 mm 8.21 0.732

&50 &)r?+! )*a 9" 2" 4.5 mm 12.19 0.744

&51 &)r?+! )*a 9" 3" 2.0 mm 6.37 0.836

&52 &)r?+! )*a 9" 3" 2.3 mm 7.30 0.836

&53 &)r?+! )*a 9" 3" 2.5 mm 8.03 0.848

&54 &)r?+! )*a 9" 3" 3.0 mm 9.70 0.860

&55 &)r?+! )*a 9" 3" 4.5 mm 14.21 0.860

&56 &)r?+! )*a 10" 2" 2.0 mm 5.88 0.768

&57 &)r?+! )*a 10" 2" 2.3 mm 6.72 0.768

&58 &)r?+! )*a 10" 2" 2.5 mm 7.41 0.784

&59 &)r?+! )*a 10" 2" 3.0 mm 8.81 0.784

&60 &)r?+! )*a 10" 2" 4.5 mm 13.08 0.796

&61 &)r?+! )*a 10" 3" 2.0 mm 6.77 0.888

&62 &)r?+! )*a 10" 3" 2.3 mm 7.75 0.888

&63 &)r?+! )*a 10" 3" 2.5 mm 8.52 0.900

&64 &)r?+! )*a 10" 3" 3.0 mm 10.30 0.912

&65 &)r?+! )*a 10" 3" 4.5 mm 15.11 0.912

&66 &)r?+! )*a 11" 2" 2.0 mm 6.27 0.818

&67 &)r?+! )*a 11" 2" 2.3 mm 7.18 0.818

&68 &)r?+! )*a 11" 2" 2.5 mm 7.90 0.834

&69 &)r?+! )*a 11" 2" 3.0 mm 9.41 0.834

&70 &)r?+! )*a 11" 2" 4.5 mm 13.98 0.846

&71 &)r?+! )*a 11" 3" 2.0 mm 7.17 0.938

&72 &)r?+! )*a 11" 3" 2.3 mm 8.21 0.938

&73 &)r?+! )*a 11" 3" 2.5 mm 9.02 0.950

&74 &)r?+! )*a 11" 3" 3.0 mm 10.90 0.962

&75 &)r?+! )*a 11" 3" 4.5 mm 16.00 0.962

&76 &)r?+! )*a 12" 2" 2.0 mm 6.67 0.868

&77 &)r?+! )*a 12" 2" 2.3 mm 7.64 0.868

&78 &)r?+! )*a 12" 2" 2.5 mm 8.40 0.884

&79 &)r?+! )*a 12" 2" 3.0 mm 10.01 0.884

&80 &)r?+! )*a 12" 2" 4.5 mm 14.88 0.896

&81 &)r?+! )*a 12" 3" 2.0 mm 7.57 0.988

Page 25: 220611 Costos OT-022-10

7/23/2019 220611 Costos OT-022-10

http://slidepdf.com/reader/full/220611-costos-ot-022-10 25/84

&82 &)r?+! )*a 12" 3" 2.3 mm 8.67 0.988

&83 &)r?+! )*a 12" 3" 2.5 mm 9.52 1.000

&84 &)r?+! )*a 12" 3" 3.0 mm 11.50 1.012

&85 &)r?+! )*a 12" 3" 4.5 mm 16.90 1.012

&ERN( C(N TUERCA

&T001 &ERN( 1 1/4"1/2" 0.08

&T002 &ERN( 1 1/4"5/8" 0.14

&T003 &ERN( 1 1/4"3/4" 0.23

&T004 &ERN( 1 1/4"7/8" 0.34

&T005 &ERN( 1 1/4"1" 0.47

&T006 &ERN( 1 1/2"1/2" 0.09

&T007 &ERN( 1 1/2"5/8" 0.15

&T008 &ERN( 1 1/2"3/4" 0.24

&T009 &ERN( 1 1/2"7/8" 0.35

&T010 &ERN( 1 1/2"1" 0.49

&T011 &ERN( 1 1/2"1 1/8" 0.67

&T012 &ERN( 1 1/2"1 1/4" 0.89

&T013 &ERN( 1 3/4"1/2" 0.09

&T014 &ERN( 1 3/4"5/8" 0.16

&T015 &ERN( 1 3/4"3/4" 0.25

&T016 &ERN( 1 3/4"7/8" 0.37

&T017 &ERN( 1 3/4"1" 0.52

&T018 &ERN( 1 3/4"1 1/8" 0.70

&T019 &ERN( 1 3/4"1 1/4" 0.93

&T020 &ERN( 1 3/4"1 3/8" 1.18

&T021 &ERN( 1 3/4"1 1/2" 1.51

&T022 &ERN( 2"1/2" 0.10

&T023 &ERN( 2"5/8" 0.17

&T024 &ERN( 2"3/4" 0.27

&T025 &ERN( 2"7/8" 0.39

&T026 &ERN( 2"1" 0.54

&T027 &ERN( 2"1 1/8" 0.73

&T028 &ERN( 2"1 1/4" 0.96

&T029 &ERN( 2"1 3/8" 1.23

&T030 &ERN( 2"1 1/2" 1.56

&T031 &ERN( 2 1/4"1/2" 0.11

&T032 &ERN( 2 1/4"5/8" 0.18

&T033 &ERN( 2 1/4"3/4" 0.28

&T034 &ERN( 2 1/4"7/8" 0.41

&T035 &ERN( 2 1/4"1" 0.56

&T036 &ERN( 2 1/4"1 1/8" 0.76

&T037 &ERN( 2 1/4"1 1/4" 1.00

&T038 &ERN( 2 1/4"1 3/8" 1.27

&T039 &ERN( 2 1/4"1 1/2" 1.61

&T040 &ERN( 2 1/2"1/2" 0.11

Page 26: 220611 Costos OT-022-10

7/23/2019 220611 Costos OT-022-10

http://slidepdf.com/reader/full/220611-costos-ot-022-10 26/84

&T041 &ERN( 2 1/2"5/8" 0.19

&T042 &ERN( 2 1/2"3/4" 0.29

&T043 &ERN( 2 1/2"7/8" 0.43

&T044 &ERN( 2 1/2"1" 0.59

&T045 &ERN( 2 1/2"1 1/8" 0.79

&T046 &ERN( 2 1/2"1 1/4" 1.04

&T047 &ERN( 2 1/2"1 3/8" 1.32

&T048 &ERN( 2 1/2"1 1/2" 1.66

&T049 &ERN( 2 3/4"1/2" 0.12

&T050 &ERN( 2 3/4"5/8" 0.20

&T051 &ERN( 2 3/4"3/4" 0.31

&T052 &ERN( 2 3/4"7/8" 0.45

&T053 &ERN( 2 3/4"1" 0.61

&T054 &ERN( 2 3/4"1 1/8" 0.82

&T055 &ERN( 2 3/4"1 1/4" 1.08

&T056 &ERN( 2 3/4"1 3/8" 1.36

&T057 &ERN( 2 3/4"1 1/2" 1.72

&T058 &ERN( 3"1/2" 0.12

&T059 &ERN( 3"5/8" 0.21

&T060 &ERN( 3"3/4" 0.32

&T061 &ERN( 3"7/8" 0.47

&T062 &ERN( 3"1" 0.64

&T063 &ERN( 3"1 1/8" 0.85

&T064 &ERN( 3"1 1/4" 1.12

&T065 &ERN( 3"1 3/8" 1.41

&T066 &ERN( 3"1 1/2" 1.77

&T067 &ERN( 3 1/2"1/2" 0.14

&T068 &ERN( 3 1/2"5/8" 0.23

&T069 &ERN( 3 1/2"3/4" 0.35

&T070 &ERN( 3 1/2"7/8" 0.50

&T071 &ERN( 3 1/2"1" 0.69

&T072 &ERN( 3 1/2"1 1/8" 0.92

&T073 &ERN( 3 1/2"1 1/4" 1.19

&T074 &ERN( 3 1/2"1 3/8" 1.51

&T075 &ERN( 3 1/2"1 1/2" 1.89

&T076 &ERN( 4"1/2" 0.15

&T077 &ERN( 4"5/8" 0.25

&T078 &ERN( 4"3/4" 0.38

&T079 &ERN( 4"7/8" 0.54

&T080 &ERN( 4"1" 0.74

&T081 &ERN( 4"1 1/8" 0.98

&T082 &ERN( 4"1 1/4" 1.27

&T083 &ERN( 4"1 3/8" 1.60

&T084 &ERN( 4"1 1/2" 2.00

&T085 &ERN( 4 1/2"1/2" 0.16

Page 27: 220611 Costos OT-022-10

7/23/2019 220611 Costos OT-022-10

http://slidepdf.com/reader/full/220611-costos-ot-022-10 27/84

&T086 &ERN( 4 1/2"5/8" 0.27

&T087 &ERN( 4 1/2"3/4" 0.41

&T088 &ERN( 4 1/2"7/8" 0.58

&T089 &ERN( 4 1/2"1" 0.78

&T090 &ERN( 4 1/2"1 1/8" 1.04

&T091 &ERN( 4 1/2"1 1/4" 1.35

&T092 &ERN( 4 1/2"1 3/8" 1.70

&T093 &ERN( 4 1/2"1 1/2" 2.11

&T094 &ERN( 5"1/2" 0.18

&T095 &ERN( 5"5/8" 0.29

&T096 &ERN( 5"3/4" 0.43

&T097 &ERN( 5"7/8" 0.62

&T098 &ERN( 5"1" 0.83

&T099 &ERN( 5"1 1/8" 1.11

&T100 &ERN( 5"1 1/4" 1.43

&T101 &ERN( 5"1 3/8" 1.79

&T102 &ERN( 5"1 1/2" 2.22

&T103 &ERN( 5 1/2"1/2" 0.19

&T104 &ERN( 5 1/2"5/8" 0.31

&T105 &ERN( 5 1/2"3/4" 0.46

&T106 &ERN( 5 1/2"7/8" 0.66

&T107 &ERN( 5 1/2"1" 0.89

&T108 &ERN( 5 1/2"1 1/8" 1.17

&T109 &ERN( 5 1/2"1 1/4" 1.51

&T110 &ERN( 5 1/2"1 3/8" 1.89

&T111 &ERN( 5 1/2"1 1/2" 2.34

&T112 &ERN( 6"1/2" 0.20

&T113 &ERN( 6"5/8" 0.33

&T114 &ERN( 6"3/4" 0.49

&T115 &ERN( 6"7/8" 0.70

&T116 &ERN( 6"1" 0.94

&T117 &ERN( 6"1 1/8" 1.23

&T118 &ERN( 6"1 1/4" 1.58

&T119 &ERN( 6"1 3/8" 1.98

&T120 &ERN( 6"1 1/2" 2.45

&T121 &ERN( 6 1/2"5/8" 0.35

&T122 &ERN( 6 1/2"3/4" 0.52

&T123 &ERN( 6 1/2"7/8" 0.74

&T124 &ERN( 6 1/2"1" 0.99

&T125 &ERN( 6 1/2"1 1/8" 1.30

&T126 &ERN( 6 1/2"1 1/4" 1.66

&T127 &ERN( 6 1/2"1 3/8" 2.08

&T128 &ERN( 6 1/2"1 1/2" 2.56

&T129 &ERN( 7"5/8" 0.37

&T130 &ERN( 7"3/4" 0.55

Page 28: 220611 Costos OT-022-10

7/23/2019 220611 Costos OT-022-10

http://slidepdf.com/reader/full/220611-costos-ot-022-10 28/84

&T131 &ERN( 7"7/8" 0.78

&T132 &ERN( 7"1" 1.04

&T133 &ERN( 7"1 1/8" 1.36

&T134 &ERN( 7"1 1/4" 1.74

&T135 &ERN( 7"1 3/8" 2.17

&T136 &ERN( 7"1 1/2" 2.67

&T137 &ERN( 7 1/2"5/8" 0.39

&T138 &ERN( 7 1/2"3/4" 0.58

&T139 &ERN( 7 1/2"7/8" 0.81

&T140 &ERN( 7 1/2"1" 1.09

&T141 &ERN( 7 1/2"1 1/8" 1.42

&T142 &ERN( 7 1/2"1 1/4" 1.82

&T143 &ERN( 7 1/2"1 3/8" 2.27

&T144 &ERN( 7 1/2"1 1/2" 2.79

&T145 &ERN( 8"5/8" 0.41

&T146 &ERN( 8"3/4" 0.60

&T147 &ERN( 8"7/8" 0.85

&T148 &ERN( 8"1" 1.14

&T149 &ERN( 8"1 1/8" 1.49

&T150 &ERN( 8"1 1/4" 1.90

&T151 &ERN( 8"1 3/8" 2.36

&T152 &ERN( 8"1 1/2" 2.90

Page 29: 220611 Costos OT-022-10

7/23/2019 220611 Costos OT-022-10

http://slidepdf.com/reader/full/220611-costos-ot-022-10 29/84

um@-* ?)@)d um@)d ?)@ar ?)@r) d@r-d2010000022 5/10/2011 0000065999 5/10/2011 5/11/2011 80050562010000022 5/11/2011 0000066014 5/11/2011 5/11/2011 10010022010000022 5/11/2011 0000066014 5/11/2011 5/11/2011 10010032010000022 5/11/2011 0000066014 5/11/2011 5/11/2011 10020012010000022 5/11/2011 0000066014 5/11/2011 5/11/2011 10020042010000022 5/11/2011 0000066014 5/11/2011 5/11/2011 1002008

2010000022 5/11/2011 0000066014 5/11/2011 5/11/2011 10070032010000022 5/11/2011 0000066014 5/11/2011 5/11/2011 15010072010000022 5/11/2011 0000066014 5/11/2011 5/11/2011 15010292010000022 5/11/2011 0000066014 5/11/2011 5/11/2011 15010302010000022 5/11/2011 0000066022 5/11/2011 5/12/2011 73100022010000022 5/11/2011 0000066022 5/11/2011 5/12/2011 73100042010000022 5/11/2011 0000066022 5/11/2011 5/12/2011 73150032010000022 5/11/2011 0000066022 5/11/2011 5/12/2011 73150042010000022 5/11/2011 0000066022 5/11/2011 5/12/2011 73190362010000022 5/11/2011 0000066022 5/11/2011 5/12/2011 73190532010000022 5/11/2011 0000066022 5/11/2011 5/12/2011 73200482010000022 5/11/2011 0000066022 5/11/2011 5/12/2011 7320106

2010000022 5/13/2011 0000066116 5/16/2011 5/16/2011 56010012010000022 5/14/2011 0000066137 5/16/2011 5/16/2011 90010482010000022 5/16/2011 0000066140 5/16/2011 5/16/2011 75010012010000022 5/16/2011 0000066140 5/16/2011 5/16/2011 75010052010000022 5/16/2011 0000066140 5/16/2011 5/16/2011 75010682010000022 5/16/2011 0000066140 5/16/2011 5/16/2011 75020282010000022 5/16/2011 0000066140 5/16/2011 5/16/2011 75020292010000022 5/16/2011 0000066140 5/16/2011 5/16/2011 75020522010000022 5/16/2011 0000066140 5/16/2011 5/16/2011 75021442010000022 5/16/2011 0000066140 5/16/2011 5/16/2011 75022792010000022 5/16/2011 0000066153 5/16/2011 5/17/2011 65280102010000022 5/17/2011 0000066185 5/17/2011 5/17/2011 9001048

2010000022 5/19/2011 0000066265 < < 5/20/2011 57010102010000022 5/19/2011 0000066265 < < 5/20/2011 57020012010000022 5/22/2011 0000066362 < < < < 65030042010000022 5/22/2011 0000066365 < < 5/23/2011 65020052010000022 5/22/2011 0000066365 < < 5/23/2011 65020402010000022 5/22/2011 0000066365 < < 5/23/2011 65020902010000022 5/22/2011 0000066365 < < 5/23/2011 65021692010000022 5/22/2011 0000066365 < < 5/23/2011 65030042010000022 5/22/2011 0000066365 < < 5/23/2011 70121212010000022 5/22/2011 0000066365 < < 5/23/2011 70130022010000022 5/22/2011 0000066365 < < 5/23/2011 70140032010000022 5/22/2011 0000066365 < < 5/23/2011 7014010

2010000022 5/22/2011 0000066365 < < 5/23/2011 85010042010000022 5/24/2011 0000066428 < < < < 45090122010000022 5/24/2011 0000066439 < < 5/25/2011 45090122010000022 5/27/2011 0000066545 5/27/2011 5/27/2011 56010012010000022 5/27/2011 0000066547 5/27/2011 5/27/2011 75010122010000022 5/27/2011 0000066547 5/27/2011 5/27/2011 75050032010000022 5/27/2011 0000066547 5/27/2011 5/27/2011 99015662010000022 5/27/2011 0000066554 5/27/2011 5/28/2011 57010052010000022 5/27/2011 0000066554 5/27/2011 5/28/2011 57010052010000022 5/27/2011 0000066554 5/27/2011 5/28/2011 5701005

Page 30: 220611 Costos OT-022-10

7/23/2019 220611 Costos OT-022-10

http://slidepdf.com/reader/full/220611-costos-ot-022-10 30/84

2010000022 5/27/2011 0000066554 5/27/2011 5/28/2011 57010052010000022 5/27/2011 0000066554 5/27/2011 5/28/2011 57010102010000022 5/27/2011 0000066554 5/27/2011 5/28/2011 57020012010000022 5/30/2011 0000066586 5/30/2011 5/30/2011 45040042010000022 5/30/2011 0000066591 5/30/2011 5/30/2011 90015672010000022 5/30/2011 0000066594 5/30/2011 5/30/2011 900131592010000022 6/1/2011 0000066648 6/1/2011 6/1/2011 9001567

2010000022 6/2/2011 0000066711 < < 6/3/2011 58203702010000022 6/2/2011 0000066711 < < 6/3/2011 75010152010000022 6/2/2011 0000066711 < < 6/3/2011 75010482010000022 6/2/2011 0000066711 < < 6/3/2011 75010682010000022 6/2/2011 0000066711 < < 6/3/2011 75011012010000022 6/2/2011 0000066711 < < 6/3/2011 75011032010000022 6/2/2011 0000066711 < < 6/3/2011 75020012010000022 6/2/2011 0000066711 < < 6/3/2011 75020962010000022 6/2/2011 0000066711 < < 6/3/2011 75021042010000022 6/2/2011 0000066711 < < 6/3/2011 75021892010000022 6/2/2011 0000066711 < < 6/3/2011 75021922010000022 6/2/2011 0000066711 < < 6/3/2011 7502294

2010000022 6/3/2011 0000066727 6/3/2011 6/3/2011 45060862010000022 6/3/2011 0000066732 < < 6/6/2011 70120052010000022 6/4/2011 0000066751 6/4/2011 6/4/2011 90013012010000022 6/6/2011 0000066786 6/6/2011 6/6/2011 70120052010000022 6/8/2011 0000066838 6/8/2011 6/8/2011 75020542010000022 6/8/2011 0000066860 6/8/2011 6/8/2011 90013012010000022 6/8/2011 0000066861 6/8/2011 6/8/2011 90015662010000022 6/8/2011 0000066878 6/8/2011 6/8/2011 90013159

Page 31: 220611 Costos OT-022-10

7/23/2019 220611 Costos OT-022-10

http://slidepdf.com/reader/full/220611-costos-ot-022-10 31/84

d),@r-d a@)d a@-mSELL( 4 0DISC( DE C(RTE ; 4.5" $ 1/8" $ 7/8" &/=ETAL 60 0DISC( DE C(RTE ; 7" $ 1/8" $ 7/8" &/=ETAL 20 0DISC( DE DESBASTE ; 4.5" $ 1/4" $ 7/8" &/=ETAL 20 0DISC( DE DESBASTE ; 7" $ 1/4" $ 7/8" &/=ETAL 20 0DISC( TI&( 27 DE DESBASTE ; 4.5" TI&( LA= 20 0

ESC(BILLA CIRCULA TRENADA ;4.5" TI&( 'RATA 12 0S(LDADURA E6011 ; 1/8" 20 0S(LDADURA E7018 ; 1/8" 40 0S(LDADURA E7018 ; 3/16" 40 0NIEL DE ALU=INI( 12" STANLE 4 0NIEL DE ALU=INI( 24" STANLE 2 0>INCA DE 5 =ETR(S 2 0>INCA DE 8 =ETR(S 4 0RE'LA DE ALU=INI( DE 1< 1/2" $ 4" $ 3.00 =TS 2 0C(RDEL DE NL(N 1 0&L(=ADA DE 3 IL(S 1 0&L(=ADA DE 1 IL( 2 0

C(=BUSTIBLE &ETR(LE( D<2 55 0SERICI( DE TRANS&(RTE 1 0B(TINES DE CUER( C(N &UNTA DE ACER( < &LANTA DE CAUC( 6 0UNI(R=E DENI= 100 C(TT(N C/CINTA RELECTI( CA=ISAC( &AN 6 0=A=ELUC( DE &LASTIC( &ARA &INT(R 6 0LENTES DE SE'URIDAD (SCUR(S 16 0LENTES DE SE'URIDAD TRANS&ARENTES 16 0TA&(NES AUDITI(S C(N ESTUCE 30 0'AA DE &INT(R ER'(N(=IC( ANTISAL&ICADURA < LENTE &LASTIC 6 0'UANTES DE CUER( CR(=( 13" 20 0&IST(LA &/&INTAR ALTA &RESI(N 80 &SI DEILBISS C/ AS( 2 0SERICI( DE TRANS&(RTE 1 0

'AS C(2 $ IL('RA=(S 100 0($I'EN( INDUSTRIAL 'ASE(S( 80 0CARB(NES &/A=(LAD(RA 4.5" B(SC 1.607.014.138 12 0TI& DE C(NTACT( DE 1.2 == =A'NUN 400 6 0DIUS(R &ARA &IST(LA =A'NUN 400 4 0DIUS(R &ARA &IST(LA =A'NUN &R( 4 0TI& DE C(NTACT( DE 1.2 == =A'NUN &R( 6 0CARB(NES &/A=(LAD(RA 4.5" B(SC 1.607.014.138 12 0

 A=&(LLA 1000 >ATTS 4 0=ARCAD(R DE =ETAL NISSEN C(L(R BLANC( 10 0CINTA AISLANTE 3/4" 3= 1000 4 0CINTA AUT(ULCANIANTE NITT( 3/4" 2 0

TIA DE CALDERER( 100 0TUERCA ARANDELA ; 1" UNC A307 80 0TUERCA ARANDELA ; 1" UNC A307 80 0C(=BUSTIBLE &ETR(LE( D<2 60 0ILTR( 3= 2097 < &100 C/&ARTICULAS NI =(LEST(S D U=(S =E 16 0

 A'UA DE =ESA SAN ANT(NI( $ 20 LITR(S 15 0RES&IRAD(R D(BLE IA 6200 4 0'AS =ECLA 80 < 20 AR<C(2 98 0'AS =ECLA 80 < 20 AR<C(2 98 0'AS =ECLA 80 < 20 AR<C(2 98 0

Page 32: 220611 Costos OT-022-10

7/23/2019 220611 Costos OT-022-10

http://slidepdf.com/reader/full/220611-costos-ot-022-10 32/84

'AS =ECLA 80 < 20 AR<C(2 98 0'AS C(2 $ IL('RA=(S 150 0($I'EN( INDUSTRIAL 'ASE(S( 110 0TUERCA E$A'(NAL ;1" 80 0SERICI( DE ALFUILER DE =(NTACAR'A DE 10 TN 2 0SERICI( DE =(ILIACI(N DES=(ILIACI(N DE EFUI&( 1 0SERICI( DE ALFUILER DE =(NTACAR'A DE 10 TN 1 0

CA=ISA EN TELA DENI= DEL'AD( C(N L('( 4 0ILTR( 7093 &ARA RES&IRAD(R SERIE 7000 4 0 ADA&TAD(R DE ILTR(S 3= 502 &/ILTR(S 7093 4 0=A=ELUC( DE &LASTIC( &ARA &INT(R 2 0&(L( DE AL'(DGN 20 AL 1 C(N L('( 15 0B(TINES DE CUER( C(N &UNTA DE ACER( < &LANTA DE NE(&REN( 4 0BARBIFUEH( C(N =ENT(NERA 10 0RE&UEST( SUS&ENSI(N DE CASC( < RACET N(RT =(D A59R 6 0RE&UEST( SUS&ENSI(N DE CARETA DE S(LDAD(R 6 0CARTUC(S 3= 6001 C(NTRA A&(RES (R'ANIC(S 4 0

 ARNES &/RES&IRAD(R D(BLE IA 3= SERIE 6000 N/& 6281 6 0'UANTES DE (&ERAD(R DE CUER( A=ARILL( ULTRALE$IBLE 9.5" T 15 0

 ARANDELA ESTRUCTURAL AST= 436<1 ; 1" 80 0SIA'R(UT 212 $ 30 'S 14 0SERICI( DE TRANS&(RTE TRAILER 1 0SIA'R(UT 212 $ 30 'S 6 0LUNA RECTAN'ULAR BLANCA 200 0SERICI( DE TRANS&(RTE TRAILER 1 0SERICI( DE ALFUILER DE =(NTACAR'A DE 7 TN 2 0SERICI( DE =(ILIACI(N DES=(ILIACI(N DE EFUI&( 1 0

Page 33: 220611 Costos OT-022-10

7/23/2019 220611 Costos OT-022-10

http://slidepdf.com/reader/full/220611-costos-ot-022-10 33/84

a@--m um@--m ?)a-rd-m a@-mrada m-)da r)+- d,*- +m-r*) umu++0 4 20 0000064131

60 046445 5/11/2011 60 D(LARES 1.241 0 74.46 000006387020 046445 5/11/2011 20 D(LARES 1.88 0 37.6 000006387020 046445 5/11/2011 20 D(LARES 1.878 0 37.56 000006387020 046445 5/11/2011 20 D(LARES 3.05 0 61 000006387020 046445 5/11/2011 20 D(LARES 4.63 0 92.6 0000063870

12 046445 5/11/2011 12 D(LARES 6 0 72 000006387020 046447 5/11/2011 20 D(LARES 2.7742 0 55.48 000006388540 046447 5/11/2011 40 D(LARES 2.7548 0 110.19 000006388540 046447 5/11/2011 40 D(LARES 2.7354 0 109.42 00000638852 046472 5/12/2011 2 D(LARES 4.05 0 8.1 99000005482 046472 5/12/2011 2 D(LARES 5.66 0 11.32 99000005482 046472 5/12/2011 2 D(LARES 4.33 0 8.66 99000005480 00 20 00 1 99000005450 2 9900000545

55 046507 5/16/2011 55 S(LES 9.983 0 549.07 00000639651 006646 5/16/2011 1 S(LES 500 0 5006 046514 5/16/2011 6 D(LARES 20.3 0 121.8 00000639766 046513 5/16/2011 6 S(LES 58.5 0 3516 046512 5/16/2011 6 S(LES 26 0 156

16 046529 5/17/2011 16 S(LES 2.59 0 41.44 000006400416 046529 5/17/2011 16 S(LES 2.59 0 41.44 000006407030 046529 5/17/2011 30 S(LES 1.26 0 37.8 00000640046 046579 5/18/2011 6 S(LES 14.5 0 87 0000064050

20 046516 5/16/2011 20 S(LES 18 0 360 00000640292 046563 5/18/2011 2 D(LARES 250 0 5001 006782 5/30/2011 1 S(LES 600 0 600

0 1000 800 06 046653 5/23/2011 6 D(LARES 0.6 0 3.6 00000641554 046653 5/23/2011 4 D(LARES 1.8 0 7.2 00000641554 046653 5/23/2011 4 D(LARES 5.5 0 22 00000641556 046653 5/23/2011 6 D(LARES 1 0 6 0000064155

12 046661 5/24/2011 12 D(LARES 8.81 0 105.720 4

10 046656 5/24/2011 10 D(LARES 5.62 0 56.2 00000641274 046690 5/25/2011 4 D(LARES 0.9163 0 3.67 00000642302 046690 5/25/2011 2 D(LARES 9.8877 0 19.78 0000064230

100 046653 5/23/2011 100 D(LARES 0.1 0 10 00000641550 00 80 0000064132

60 046740 5/27/2011 60 S(LES 9.983 0 598.980 0

15 046743 5/27/2011 15 S(LES 12.71 0 190.65 00000642500 0

98 046750 5/30/2011 98 S(LES 11 0 528 000006424798 046750 5/30/2011 98 S(LES 11 0 528 000006424898 046751 5/30/2011 98 S(LES 11 0 550 0000064247

Page 34: 220611 Costos OT-022-10

7/23/2019 220611 Costos OT-022-10

http://slidepdf.com/reader/full/220611-costos-ot-022-10 34/84

98 046751 5/30/2011 98 S(LES 11 0 550 0000064248150 046750 5/30/2011 150 S(LES 2.4 0 360 0000064247110 046750 5/30/2011 110 S(LES 4.9 0 539 0000064247

0 02 006777 5/30/2011 2 S(LES 130 0 2601 006777 5/30/2011 1 S(LES 130 0 1300 1

0 44 046868 6/6/2011 4 S(LES 10.38 0 41.52 00000643834 046868 6/6/2011 4 S(LES 7.57 0 30.28 00000643832 046948 6/13/2011 2 S(LES 26 0 52 00000645110 15 00000645114 046853 6/6/2011 4 D(LARES 20.3 0 81.2 00000644240 06 046862 6/6/2011 6 S(LES 8.91 0 53.46 00000644586 046862 6/6/2011 6 S(LES 4.72 0 28.32 00000644584 046868 6/6/2011 4 S(LES 24.464 0 97.86 00000643836 046868 6/6/2011 6 S(LES 9.24 0 55.44 0000064383

15 046878 6/7/2011 15 S(LES 12.9 0 193.5 0000064384

0 014 046856 6/6/2011 14 S(LES 63.5593 0 889.83 00000645040 16 046856 6/6/2011 6 S(LES 63.5593 0 381.36 00000645040 2000 12 006877 6/8/2011 2 S(LES 90 0 1801 006877 6/8/2011 1 S(LES 90 0 90

Page 35: 220611 Costos OT-022-10

7/23/2019 220611 Costos OT-022-10

http://slidepdf.com/reader/full/220611-costos-ot-022-10 35/84

?)a+ a+ umu+a,a! ?)a,a! a,a! d),@r5/25/2011 45/12/2011 60 SEDISA S.A.C.5/12/2011 20 SEDISA S.A.C.5/12/2011 20 SEDISA S.A.C.5/12/2011 20 SEDISA S.A.C.5/12/2011 20 SEDISA S.A.C.

5/12/2011 12 SEDISA S.A.C.5/13/2011 20 S(LDE$A S.A5/13/2011 40 S(LDE$A S.A5/13/2011 40 S(LDE$A S.A5/18/2011 2 ESE&SA S.A5/18/2011 2 ESE&SA S.A5/18/2011 2 ESE&SA S.A

5/17/2011 15/17/2011 2

5/17/2011 55 RE&S(L C(=ERCIAL S.A.C.  < < 0 < < 0 FUIS&E CA=ARENA ANA5/18/2011 6 INDUSTRIAS =ANRIFUE S.A.C.

INDUSTRIAS CRA( S.A.C. AILA (CAA INE ANT(NILA

5/19/2011 16 ARTICUL(S DE SE'URIDAD INDUSTRIAL S.A.5/21/2011 16 ARTICUL(S DE SE'URIDAD INDUSTRIAL S.A.5/19/2011 30 ARTICUL(S DE SE'URIDAD INDUSTRIAL S.A.5/20/2011 6 HE&ESA RE&RESENTACI(NES S.R.L.5/20/2011 20 &R(INDUSTRIAL S(CIEDAD AN(NI=A CERRADA

REI=S INTERNACI(NAL S.A.  < < 0 < < 0 FUIS&E CA=ARENA ANA

5/26/2011 6 S(LDA=UND( &ERU S.A.C.5/26/2011 4 S(LDA=UND( &ERU S.A.C.5/26/2011 4 S(LDA=UND( &ERU S.A.C.5/26/2011 6 S(LDA=UND( &ERU S.A.C.

 AUT(RE$ &ERUANA S.A

5/25/2011 10 &R(>ELD S.A.C.5/31/2011 4 &R(=(T(RES ELECTRIC(S S.A.5/31/2011 2 &R(=(T(RES ELECTRIC(S S.A.

5/26/2011 100 S(LDA=UND( &ERU S.A.C.

5/25/2011 80RE&S(L C(=ERCIAL S.A.C.

5/31/2011 15 DISTRIBUID(RA &RE=IU= S.A.

5/31/2011 48 A'A S.A.5/31/2011 50 A'A S.A.5/31/2011 48 A'A S.A.

Page 36: 220611 Costos OT-022-10

7/23/2019 220611 Costos OT-022-10

http://slidepdf.com/reader/full/220611-costos-ot-022-10 36/84

5/31/2011 50 A'A S.A.5/31/2011 150 A'A S.A.5/31/2011 110 A'A S.A.

  < < 0 < < 0 AIR( = J R SAC  < < 0 < < 0 AIR( = J R SAC

6/8/2011 4 ANTRADIN' S.R.L.6/8/2011 4 ANTRADIN' S.R.L.

6/15/2011 2 AILA (CAA INE ANT(NILA6/15/2011 156/9/2011 4 INDUSTRIAS =ANRIFUE S.A.C.

6/13/2011 6 ARTICUL(S DE SE'URIDAD INDUSTRIAL S.A.6/13/2011 6 ARTICUL(S DE SE'URIDAD INDUSTRIAL S.A.6/8/2011 4 ANTRADIN' S.R.L.6/8/2011 6 ANTRADIN' S.R.L.6/8/2011 15 &R(INDUSTRIAL S(CIEDAD AN(NI=A CERRADA

6/14/2011 14 =AESTR( &ERU S.A.

6/14/2011 6 =AESTR( &ERU S.A.

  < < 0 < < 0 AIR( = J R SAC  < < 0 < < 0 AIR( = J R SAC

Page 37: 220611 Costos OT-022-10

7/23/2019 220611 Costos OT-022-10

http://slidepdf.com/reader/full/220611-costos-ot-022-10 37/84

d@u,r L=ATE(L=ATE(L=ATE(L=ATE(L=ATE(L=ATE(

L=ATE(L=ATE(L=ATE(L=ATE(L=ATE(L=ATE(L=ATE(L=ATE(L=ATE(L=ATE(L=ATE(L=ATE(

L=ATE(L=ATE(L=ATE(L=ATE(L=ATE(L=ATE(L=ATE(L=ATE(L=ATE(L=ATE(L=ATE(L=ATE(

L=ATE(L=ATE(L=ATE(L=ATE(L=ATE(L=ATE(L=ATE(L=ATE(L=ATE(L=ATE(L=ATE(L=ATE(

L=ATE(L=ATE(L=ATE(HRUIHRUIHRUIHRUIH=INAAH=INAAH=INAA

Page 38: 220611 Costos OT-022-10

7/23/2019 220611 Costos OT-022-10

http://slidepdf.com/reader/full/220611-costos-ot-022-10 38/84

H=INAAH=INAAH=INAAHRUIHRUIHRUIRRA'A

L=ATE(L=ATE(L=ATE(L=ATE(L=ATE(L=ATE(L=ATE(L=ATE(L=ATE(L=ATE(L=ATE(L=ATE(

HRUIL=ATE(HRUIHRUIHRUIHRUIHRUIHRUI

Page 39: 220611 Costos OT-022-10

7/23/2019 220611 Costos OT-022-10

http://slidepdf.com/reader/full/220611-costos-ot-022-10 39/84

SALIDA DE MATERIALES Y SUMINISTROS

ITEM No DE VALE DESCRIPCION UNIDAD CANTIDAD FECHA OT  

1 096905 LIJA # 100 UN 1 14-May 006-2010

2 096905 ROCHA DE 2! UN 1 14-May 006-2010

" 096904 DISCO DE CORTE 4$5! % 1&'! % (&'! P&METAL UN 1 14-May 022-2010

4 096906 DISCO DE CORTE (! % 1&'! % (&'! P&METAL UN 1 1(-May 022-2010

5 096906 ESCOILLA CIRCULA TREN)ADA 4$5! TIPO *RATA UN 1 1(-May 022-2010

6 096906 DISCO DE CORTE 4$5! % 1&'! % (&'! P&METAL UN 1 1(-May 022-2010

( 09690( ROCHA DE 2! UN 1 1(-May 006-2010

' 09690( +IT TERMOJET DE 500 ,PASTA *LN 1 1(-May 006-2010

9 09690( TERMOJET 500 ,LI.UIDO *LN 1 1(-May 006-2010

10 09690' +IT TERMOJET DE 500 ,PASTA *LN 1 1(-May 006-2010

11 09690' TERMOJET 500 ,LI.UIDO *LN 1 1(-May 006-2010

12 096909 DISCO DE CORTE (! % 1&'! % (&'! P&METAL UN 1 1(-May 022-2010

1" 096909 SOLDADURA E(01' 1&'! +* 1 1(-May 022-2010

14 096909 DISCO DE DESASTE (! % 1&4! % (&'! P&METAL UN 1 1(-May 022-2010

15 096914 DISCO DE CORTE 4$5! % 1&'! % (&'! P&METAL UN 6 1(-May 022-2010

16 09691" DISCO DE DESASTE 4$5! % 1&4! % (&'! P&METAL UN 1 1'-May 022-2010

1( 096912 DISCO DE DESASTE (! % 1&4! % (&'! P&METAL UN 1 1'-May 022-20101' 096910 DISCO DE DESASTE 4$5! % 1&4! % (&'! P&METAL UN 4 1'-May 022-2010

19 096910 LUNAS TRANSPARENTES UN ' 1'-May 022-2010

20 096910 LUNAS NE*RAS # 11 UN 2 1'-May 022-2010

21 096910 SOLDADURA E6011 1&'! +* 4 1'-May 022-2010

22 096910 SOLDADURA E(01' 1&'! +* 4 1'-May 022-2010

2" 096915 MASILLA EPO%ICA +IT 1 20-May 006-2010

24 09691' DIFUSOR PARA PISTOLA MA*NUN 400 UN 1 20-May 022-2010

25 09691' LUNAS TRANSPARENTES UN 4 20-May 022-2010

26 09691( DISCO TIPO 2( DE DESASTE 4$5! TIPO LAM UN 1 20-May 022-2010

2( 09691( LIJA # 100 UN ( 20-May 022-2010

2' 096916 LUNAS TRANSPARENTES UN " 20-May 022-2010

29 096916 DISCO DE CORTE (! % 1&'! % (&'! P&METAL UN 1 20-May 022-2010

"0 096919 LUNAS TRANSPARENTES UN 4 21-May 022-2010

"1 096919 DISCO DE CORTE 4$5! % 1&'! % (&'! P&METAL UN 2 21-May 022-2010

"2 096919 DISCO DE DESASTE 4$5! % 1&4! % (&'! P&METAL UN 2 21-May 022-2010

"" 096919 ESCOILLA CIRCULA TREN)ADA 4$5! TIPO *RATA UN 1 21-May 022-2010

"4 096920 DIFUSOR PARA PISTOLA MA*NUN 400 UN 1 21-May 022-2010

"5 096920 ANTIESPATER UN 1 21-May 022-2010

"6 096922 DISCO DE DESASTE (! % 1&4! % (&'! P&METAL UN " 2"-May 022-2010

"( 096921 PINTURA LANCA RAL 9010 *LN 1 2"-May 006-2010

"' 096921 CATALI)ADOR 400 *LN 1 2"-May 006-2010

"9 096921 DILU/ENTE 65 *LN 1 2"-May 006-2010

40 096924 SOLDADURA TUULAR (1T-1 1$2 MM % 15 +ILOS RLL 2 24-May 022-2010

41 096924 LUNAS TRANSPARENTES UN 2 24-May 022-2010

42 096924 DISCO DE CORTE 4$5! % 1&'! % (&'! P&METAL UN 4 24-May 022-2010

4" 096924 DISCO DE DESASTE 4$5! % 1&4! % (&'! P&METAL UN 2 24-May 022-2010

44 096924 TIP DE CONTACTO DE 1$2 MM MA*NUN 400 UN 2 24-May 022-2010

45 096925 DISCO DE CORTE 4$5! % 1&'! % (&'! P&METAL UN 2 24-May 022-2010

46 096925 LUNAS TRANSPARENTES UN " 24-May 022-2010

4( 09692" PINTURA LANCA RAL 9010 *LN 1 24-May 006-2010

4' 09692" CATALI)ADOR 400 *LN 1 24-May 006-2010

49 09692" DILU/ENTE 65 *LN 1 24-May 006-2010

50 096926 DISCO DE DESASTE (! % 1&4! % (&'! P&METAL UN 2 24-May 022-2010

51 09692( SOLDADURA E(01' 1&'! +* 2 24-May 022-2010

52 0969"0 PINTURA AMARILLA +IT 1 25-May 006-20105" 09692' SOLDADURA E(01' 1&'! +* 2 25-May 022-2010

54 0969"2 ROCHA DE "! UN 1 25-May 006-2010

Page 40: 220611 Costos OT-022-10

7/23/2019 220611 Costos OT-022-10

http://slidepdf.com/reader/full/220611-costos-ot-022-10 40/84

56 0969"4 DISCO DE CORTE (! % 1&'! % (&'! P&METAL UN 1 2(-May 022-2010

5( 0969"( DISCO DE DESASTE (! % 1&4! % (&'! P&METAL UN 1 2(-May 022-2010

5' 0969"( DISCO DE CORTE (! % 1&'! % (&'! P&METAL UN 1 2(-May 022-2010

59 0969"5 ESPATULA "! UN 1 2(-May 006-2010

60 0969"" TUERCAS 1! A-"25 UN '0 2(-May 022-2010

61 0969"" ARANDELAS 1! A-"0( UN '0 2(-May 022-2010

62 0969"6 DISCO DE CORTE (! % 1&'! % (&'! P&METAL UN 1 2(-May 022-2010

6" 0969"6 DISCO DE DESASTE 4$5! % 1&4! % (&'! P&METAL UN 1 2(-May 022-2010

64 096940 DISCO DE CORTE (! % 1&'! % (&'! P&METAL UN 2 2(-May 022-2010

65 0969"9 SOLDADURA TUULAR (1T-1 1$2 MM % 15 +ILOS RLL 1 2(-May 022-2010

66 0969"9 DISCO DE CORTE (! % 1&'! % (&'! P&METAL UN 2 2(-May 022-2010

6( 0969"' SOLDADURA TUULAR (1T-1 1$2 MM % 15 +ILOS RLL 1 2(-May 022-2010

6' 096944 DISCO DE CORTE (! % 1&'! % (&'! P&METAL UN 1 2'-May 022-2010

69 09694" AMERLO+ 400 RAL (046 *LN 1 2'-May 006-2010

(0 09694" AMERLO+ 400 RAL 9010 *LN 1 2'-May 006-2010

(1 09694" DILU/ENTE 65 *LN 1 2'-May 006-2010

(2 09694" CATALI)ADOR 400 *LN 1 2'-May 006-2010

(" 09694" LIJA # '0 UN 2 2'-May 006-2010

(4 09694" THINNER *LN 1 2'-May 006-2010

(5 096941 DISCO DE CORTE 4$5! % 1&'! % (&'! P&METAL UN 2 2'-May 022-2010

(6 096942 DISCO DE CORTE 4$5! % 1&'! % (&'! P&METAL UN 2 2'-May 022-2010

(( 096945 SOLDADURA MI* SOLIDO ER (0S-6 1$00 MM RLL 1 "0-May 022-2010

(' 096945 DISCO DE CORTE 4$5! % 1&'! % (&'! P&METAL UN 2 "0-May 022-2010

(9 096945 DISCO DE DESASTE 4$5! % 1&4! % (&'! P&METAL UN 1 "0-May 022-2010

'0 096945 ESCOILLA CIRCULA TREN)ADA 4$5! TIPO *RATA UN 1 "0-May 022-2010

'1 096946 CATALI)ADOR 400 *LN 1 1-J 006-2010

'2 096946 AMERLO+ 400 RAL 9010 *LN 1 1-J 006-2010

'" 096946 DILU/ENTE 65 *LN 1 1-J 006-2010

'4 09694( TIP DE CONTACTO DE 1$2 MM MA*NUN 400 UN 1 2-J 022-2010

'5 09694( LUNAS TRANSPARENTES UN 4 2-J 022-2010

'6 09694( DISCO DE DESASTE 4$5! % 1&4! % (&'! P&METAL UN 2 2-J 022-2010'( 09694' DISCO DE DESASTE (! % 1&4! % (&'! P&METAL UN 1 2-J 022-2010

'' 096949 SOLDADURA E(01' 1&'! +* 1 2-J 022-2010

'9 096949 SOLDADURA E6011 5&"2! +* 1 2-J 022-2010

90 096950 CINTA AISLANTE "&4! "M 1000 UN 1 "-J 022-2010

91 096950 CINTA VULCANI)ANTE UN 1 "-J 022-2010

92 096956 DISCO DE CORTE 4$5! % 1&'! % (&'! P&METAL UN " 4-J 022-2010

9" 096956 LUNAS NE*RAS # 10 UN 1 4-J 022-2010

94 096959 DISCO DE DESASTE (! % 1&4! % (&'! P&METAL UN 1 4-J 022-2010

95 096951 SOLDADURA E6011 1&'! +* 1 4-J 022-2010

96 096954 SOLDADURA MI* SOLIDO ER (0S-6 1$00 MM RLL 1 6-J 022-2010

9( 096954 OTELLA AR*OMI% 3 10 6-J 022-2010

9' 096954 ESCOILLA CIRCULA TREN)ADA 4$5! TIPO *RATA UN 1 6-J 022-2010

99 096954 LUNAS TRANSPARENTES UN 4 6-J 022-2010

100 096954 ANTIESPATER UN 1 6-J 022-2010

101 09695" MARCADOR DE METAL NISSEN COLOR LANCO UN 1 6-J 022-2010

102 096952 LIJA # 100 UN 1 6-J 006-2010

10" 096955 DISCO DE CORTE 4$5! % 1&'! % (&'! P&METAL UN 2 (-J 022-2010

104 096955 DISCO DE DESASTE 4$5! % 1&4! % (&'! P&METAL UN 1 (-J 022-2010

105 09695( CATALI)ADOR 400 *LN 1 (-J 006-2010

106 09695( DISCO TIPO 2( DE DESASTE 4$5! TIPO LAM UN 1 (-J 006-2010

10( 09695' DISCO DE CORTE 4$5! % 1&'! % (&'! P&METAL UN 2 (-J 022-2010

10' 096960 LUNAS TRANSPARENTES UN 4 '-J 022-2010

109 096960 TIP DE CONTACTO DE 1$2 MM MA*NUN 400 UN 1 '-J 022-2010

110 096960 DIFUSOR PARA PISTOLA MA*NUN 400 UN 1 '-J 022-2010

111 096960 DIFUSOR PARA PISTOLA MA*NUN PRO UN 1 '-J 022-2010

Page 41: 220611 Costos OT-022-10

7/23/2019 220611 Costos OT-022-10

http://slidepdf.com/reader/full/220611-costos-ot-022-10 41/84

11" 096964 DISCO DE CORTE 4$5! % 1&'! % (&'! P&METAL UN " 10-J 022-2010

114 096964 DISCO DE DESASTE 4$5! % 1&4! % (&'! P&METAL UN 1 10-J 022-2010

115 096964 LUNAS TRANSPARENTES UN 4 10-J 022-2010

116 096965 PINTURA *RIS RAL (046 *LN 1 10-J 006-2010

11( 096965 CATALI)ADOR 400 *LN 1 10-J 006-2010

11' 096965 DILU/ENTE 65 *LN 1 10-J 006-2010

119 096966 LUNAS TRANSPARENTES UN 2 10-J 022-2010

120 09696" DISCO DE CORTE 4$5! % 1&'! % (&'! P&METAL UN 2 10-J 022-2010121 09696" DISCO DE DESASTE 4$5! % 1&4! % (&'! P&METAL UN 1 10-J 022-2010

122 096962 DISCO DE CORTE 4$5! % 1&'! % (&'! P&METAL UN 2 10-J 022-2010

12" 096962 DISCO DE DESASTE 4$5! % 1&4! % (&'! P&METAL UN 1 10-J 022-2010

124 096962 LUNAS TRANSPARENTES UN " 10-J 022-2010

125 09696( SOLDADURA E6011 1&'! +* 1 11-J 022-2010

126 09696( LUNAS TRANSPARENTES UN " 11-J 022-2010

12( 09696' SOLDADURA E6011 1&'! +* 1 1"-J 022-2010

12' 096969 LUNAS TRANSPARENTES UN 4 1"-J 022-2010

129 096969 DISCO DE CORTE 4$5! % 1&'! % (&'! P&METAL UN 2 1"-J 022-2010

1"0 0969(2 SOLDADURA E(01' 1&'! +* 2 14-J 022-2010

1"1 0969(1 DISCO DE CORTE (! % 1&'! % (&'! P&METAL UN 2 14-J 022-2010

1"2 0969(1 DISCO DE CORTE 4$5! % 1&'! % (&'! P&METAL UN 2 14-J 022-2010

1"" 0969(" DISCO DE CORTE (! % 1&'! % (&'! P&METAL UN 1 14-J 022-2010

1"4 0969(0 TIP DE CONTACTO DE 1$2 MM MA*NUN 400 UN 1 14-J 022-2010

1"5 0969(0 LUNAS TRANSPARENTES UN 4 14-J 022-2010

1"6 0969(0 DISCO DE CORTE 4$5! % 1&'! % (&'! P&METAL UN 2 14-J 022-2010

1"( 0969(4 CARONES P&AMOLADORA 4$5! OSCH ,1$60($014$1UN 2 15-J 022-2010

1"' 0969(5 CARONES P&AMOLADORA 4$5! OSCH ,1$60($014$1UN 2 15-J 022-2010

1"9 0969(5 CINTA AISLANTE "&4! "M 1000 UN 1 15-J 022-2010

140 0969(6 SI+A*ROUT 212 % "0 +*S UN 20 15-J 022-2010

141 0969(( DISCO TIPO 2( DE DESASTE 4$5! TIPO LAM UN 1 16-J 006-2010

142 0969(' DISCO DE CORTE (! % 1&'! % (&'! P&METAL UN 2 16-J 022-2010

14" 0969(9 DISCO DE CORTE (! % 1&'! % (&'! P&METAL UN 2 16-J 022-2010

144 09'9(9 DISCO DE DESASTE (! % 1&4! % (&'! P&METAL UN 2 16-J 022-2010

145 0969'0 TIP DE CONTACTO DE 1$2 MM MA*NUN 400 UN 1 16-J 022-2010

146 0969'0 SOLDADURA E(01' 1&'! +* 1 16-J 022-2010

14( 0969'1 DISCO DE CORTE 4$5! % 1&'! % (&'! P&METAL UN " 1(-J 022-2010

14' 0969'1 DISCO DE DESASTE 4$5! % 1&4! % (&'! P&METAL UN 2 1(-J 022-2010

149 0969'1 LUNAS TRANSPARENTES UN 4 1(-J 022-2010

150 0969'1 ESCOILLA CIRCULA TREN)ADA 4$5! TIPO *RATA UN 1 1(-J 022-2010

151 0969'2 DISCO DE CORTE 4$5! % 1&'! % (&'! P&METAL UN 4 1(-J 022-2010

152 0969'" DISCO DE CORTE 4$5! % 1&'! % (&'! P&METAL UN 4 1(-J 022-2010

15" 0969'" LUNAS TRANSPARENTES UN 4 1(-J 022-2010

154 0969'4 DISCO DE CORTE 4$5! % 1&'! % (&'! P&METAL UN 2 1(-J 022-2010

155 0969'4 DISCO DE DESASTE 4$5! % 1&4! % (&'! P&METAL UN 2 1(-J 022-2010

156 0969'5 SOLDADURA TUULAR (1T-1 1$2 MM % 15 +ILOS RLL 1 1'-J 022-2010

15( 0969'5 LUNAS TRANSPARENTES UN " 1'-J 022-2010

15' 0969'6 DISCO DE CORTE 4$5! % 1&'! % (&'! P&METAL UN 2 1'-J 022-2010

159 0969'( SOLDADURA E(01' 1&'! +* 1 20-J 022-2010

160 0969'( SOLDADURA E6011 1&'! +* 1 20-J 022-2010161 0969'' DISCO DE CORTE (! % 1&'! % (&'! P&METAL UN 1 22-J 022-2010

162 0969'9 SOLDADURA TUULAR (1T-1 1$2 MM % 15 +ILOS UN 1 2"-J 022-2010

16" 0969'9 DISCO DE CORTE 4$5! % 1&'! % (&'! P&METAL UN 5 2"-J 022-2010

164 0969'9 LUNAS TRANSPARENTES UN ' 2"-J 022-2010

165

166

16(

16'

169

1(0

1(1

1(2

1("1(4

1(5

Page 42: 220611 Costos OT-022-10

7/23/2019 220611 Costos OT-022-10

http://slidepdf.com/reader/full/220611-costos-ot-022-10 42/84

1((

1('

1(9

1'0

1'1

1'2

1'"

1'4

1'51'6

1'(

1''

1'9

190

191

192

19"

194

195

196

19(

19'199

200

201

202

20"

204

205

206

20(

20'

209

210

211

212

21"

214

215

216

21(

21'

219

220

221

222

22"

224

225

226

22(

22'

229

2"0

2"1

2"2

2""

2"4

2"5

2"6

2"(

2"'2"9

240

Page 43: 220611 Costos OT-022-10

7/23/2019 220611 Costos OT-022-10

http://slidepdf.com/reader/full/220611-costos-ot-022-10 43/84

242

24"

244

245

246

24(

24'

249

250251

252

25"

254

255

256

25(

25'

259

260

261

262

26"264

265

266

26(

26'

269

2(0

2(1

2(2

2("

2(4

2(5

2(6

2((

2('

2(9

2'0

2'1

2'2

2'"

2'4

2'5

2'6

2'(

2''

2'9

290

291

292

29"

294

295

296

29(

29'

299

"00

"01

"02

"0""04

"05

Page 44: 220611 Costos OT-022-10

7/23/2019 220611 Costos OT-022-10

http://slidepdf.com/reader/full/220611-costos-ot-022-10 44/84

"0(

"0'

"09

"10

"11

"12

"1"

"14

"15"16

"1(

"1'

"19

"20

"21

"22

"2"

"24

"25

"26

"2(

"2'"29

""0

""1

""2

"""

""4

""5

""6

""(

""'

""9

"40

"41

"42

"4"

"44

"45

"46

"4(

"4'

"49

"50

"51

"52

"5"

"54

"55

"56

"5(

"5'

"59

"60

"61

"62

"6"

"64

"65

"66

Page 45: 220611 Costos OT-022-10

7/23/2019 220611 Costos OT-022-10

http://slidepdf.com/reader/full/220611-costos-ot-022-10 45/84

SOLICITA AUTORI)A

DEIV/S MARTINE) PERC/ ELORREA*A

 AEL PAREDES PERC/ ELORREA*A

TOMM/ *ALVE) PERC/ ELORREA*A

 AEL PAREDES PERC/ ELORREA*A

 AEL PAREDES PERC/ ELORREA*A

 AEL PAREDES PERC/ ELORREA*A

RICARDO NI)AMA PERC/ ELORREA*A

RICARDO NI)AMA PERC/ ELORREA*A

RICARDO NI)AMA PERC/ ELORREA*A

RICARDO NI)AMA PERC/ ELORREA*A

RICARDO NI)AMA PERC/ ELORREA*A

LUIS ROLES PERC/ ELORREA*A

LUIS ROLES PERC/ ELORREA*A

LUIS ROLES PERC/ ELORREA*A

ROERT ME)A PERC/ ELORREA*A

MANUEL ES.UEN PERC/ ELORREA*A

MANUEL ES.UEN PERC/ ELORREA*ALUCAS CCORAHUA PERC/ ELORREA*A

LUCAS CCORAHUA PERC/ ELORREA*A

LUCAS CCORAHUA PERC/ ELORREA*A

LUCAS CCORAHUA PERC/ ELORREA*A

LUCAS CCORAHUA PERC/ ELORREA*A

MANUEL ES.UEN PERC/ ELORREA*A

ROERT ME)A PERC/ ELORREA*A

ROERT ME)A PERC/ ELORREA*A

RICARDO NI)AMA PERC/ ELORREA*A

RICARDO NI)AMA PERC/ ELORREA*A

LUCAS CCORAHUA PERC/ ELORREA*A

LUCAS CCORAHUA PERC/ ELORREA*A

LUCAS CCORAHUA PERC/ ELORREA*A

LUCAS CCORAHUA PERC/ ELORREA*A

LUCAS CCORAHUA PERC/ ELORREA*A

LUCAS CCORAHUA PERC/ ELORREA*A

LUCAS CCORAHUA PERC/ ELORREA*A

LUCAS CCORAHUA PERC/ ELORREA*A

DEIV/S MARTINE) PERC/ ELORREA*A

MANUEL ES.UEN PERC/ ELORREA*A

MANUEL ES.UEN PERC/ ELORREA*A

MANUEL ES.UEN PERC/ ELORREA*A

ROERT ME)A PERC/ ELORREA*A

ROERT ME)A PERC/ ELORREA*A

ROERT ME)A PERC/ ELORREA*A

ROERT ME)A PERC/ ELORREA*A

ROERT ME)A PERC/ ELORREA*A

LUCAS CCORAHUA PERC/ ELORREA*A

LUCAS CCORAHUA PERC/ ELORREA*A

RICARDO NI)AMA PERC/ ELORREA*A

RICARDO NI)AMA PERC/ ELORREA*A

RICARDO NI)AMA PERC/ ELORREA*A

DEIV/S MARTINE) PERC/ ELORREA*A

LUIS ROLES PERC/ ELORREA*A

RICARDO NI)AMA PERC/ ELORREA*ALUIS ROLES PERC/ ELORREA*A

MANUEL ES.UEN PERC/ ELORREA*A

Page 46: 220611 Costos OT-022-10

7/23/2019 220611 Costos OT-022-10

http://slidepdf.com/reader/full/220611-costos-ot-022-10 46/84

DEIV/S MARTINE) PERC/ ELORREA*A

TOMM/ *ALVE) PERC/ ELORREA*A

TOMM/ *ALVE) PERC/ ELORREA*A

RICARDO NI)AMA PERC/ ELORREA*A

 JUAN HUALPA PERC/ ELORREA*A

 JUAN HUALPA PERC/ ELORREA*A

 AEL PAREDES PERC/ ELORREA*A

 AEL PAREDES PERC/ ELORREA*A

ROLANDO LAURENT PERC/ ELORREA*A

LUCAS CCORAHUA PERC/ ELORREA*A

LUCAS CCORAHUA PERC/ ELORREA*A

ROERT ME)A PERC/ ELORREA*A

 AEL PAREDES PERC/ ELORREA*A

RICARDO NI)AMA PERC/ ELORREA*A

RICARDO NI)AMA PERC/ ELORREA*A

RICARDO NI)AMA PERC/ ELORREA*A

RICARDO NI)AMA PERC/ ELORREA*A

RICARDO NI)AMA PERC/ ELORREA*A

RICARDO NI)AMA PERC/ ELORREA*A

LUCAS CCORAHUA PERC/ ELORREA*A

ROERT ME)A PERC/ ELORREA*A

LUCAS CCORAHUA PERC/ ELORREA*A

LUCAS CCORAHUA PERC/ ELORREA*A

LUCAS CCORAHUA PERC/ ELORREA*A

LUCAS CCORAHUA PERC/ ELORREA*A

MANUEL ES.UEN PERC/ ELORREA*A

MANUEL ES.UEN PERC/ ELORREA*A

MANUEL ES.UEN PERC/ ELORREA*A

ROERT ME)A PERC/ ELORREA*A

ROERT ME)A PERC/ ELORREA*A

ROERT ME)A PERC/ ELORREA*AROERT ME)A PERC/ ELORREA*A

DEIV/S MARTINE) PERC/ ELORREA*A

DEIV/S MARTINE) PERC/ ELORREA*A

TOMM/ *ALVE) PERC/ ELORREA*A

TOMM/ *ALVE) PERC/ ELORREA*A

ROERT ME)A PERC/ ELORREA*A

ROERT ME)A PERC/ ELORREA*A

DEIV/S MARTINE) PERC/ ELORREA*A

ROERT ME)A PERC/ ELORREA*A

*USTAVO RODRI*U PERC/ ELORREA*A

*USTAVO RODRI*U PERC/ ELORREA*A

*USTAVO RODRI*U PERC/ ELORREA*A

*USTAVO RODRI*U PERC/ ELORREA*A

*USTAVO RODRI*U PERC/ ELORREA*A

ROERT ME)A PERC/ ELORREA*A

RICARDO NI)AMA PERC/ ELORREA*A

*USTAVO RODRI*U PERC/ ELORREA*A

*USTAVO RODRI*U PERC/ ELORREA*A

RICARDO NI)AMA PERC/ ELORREA*A

RICARDO NI)AMA PERC/ ELORREA*A

DEIV/S MARTINE) PERC/ ELORREA*A

ROERT ME)A PERC/ ELORREA*A

ROERT ME)A PERC/ ELORREA*A

ROERT ME)A PERC/ ELORREA*A

ROERT ME)A PERC/ ELORREA*A

Page 47: 220611 Costos OT-022-10

7/23/2019 220611 Costos OT-022-10

http://slidepdf.com/reader/full/220611-costos-ot-022-10 47/84

ROERT ME)A PERC/ ELORREA*A

ROERT ME)A PERC/ ELORREA*A

ROERT ME)A PERC/ ELORREA*A

MANUEL ES.UEN PERC/ ELORREA*A

MANUEL ES.UEN PERC/ ELORREA*A

MANUEL ES.UEN PERC/ ELORREA*A

 AEL PAREDES PERC/ ELORREA*A

LUIS ROLES PERC/ ELORREA*ALUIS ROLES PERC/ ELORREA*A

*USTAVO RODRI*U PERC/ ELORREA*A

*USTAVO RODRI*U PERC/ ELORREA*A

*USTAVO RODRI*U PERC/ ELORREA*A

LUIS ROLES PERC/ ELORREA*A

LUIS ROLES PERC/ ELORREA*A

DEIV/S MARTINE) PERC/ ELORREA*A

ROERT ME)A PERC/ ELORREA*A

ROERT ME)A PERC/ ELORREA*A

LUIS ROLES PERC/ ELORREA*A

SALA)AR VILCA PERC/ ELORREA*A

SALA)AR VILCA PERC/ ELORREA*A

LUIS ROLES PERC/ ELORREA*A

*USTAVO RODRI*U PERC/ ELORREA*A

*USTAVO RODRI*U PERC/ ELORREA*A

*USTAVO RODRI*U PERC/ ELORREA*A

TOMM/ *ALVE) PERC/ ELORREA*A

TOMM/ *ALVE) PERC/ ELORREA*A

TOMM/ *ALVE) PERC/ ELORREA*A

LUIS ROLES PERC/ ELORREA*A

RICARDO NI)AMA PERC/ ELORREA*A

LUIS ROLES PERC/ ELORREA*A

SALA)AR VILCA PERC/ ELORREA*A

SALA)AR VILCA PERC/ ELORREA*A

ROERT ME)A PERC/ ELORREA*A

ROERT ME)A PERC/ ELORREA*A

*USTAVO RODRI*U PERC/ ELORREA*A

*USTAVO RODRI*U PERC/ ELORREA*A

*USTAVO RODRI*U PERC/ ELORREA*A

*USTAVO RODRI*U PERC/ ELORREA*A

RICARDO NI)AMA PERC/ ELORREA*A

ROERT ME)A PERC/ ELORREA*A

ROERT ME)A PERC/ ELORREA*A

SALA)AR VILCA PERC/ ELORREA*A

SALA)AR VILCA PERC/ ELORREA*A

*USTAVO RODRI*U PERC/ ELORREA*A

*USTAVO RODRI*U PERC/ ELORREA*A

 AEL PAREDES PERC/ ELORREA*A

SALA)AR VILCA PERC/ ELORREA*A

SALA)AR VILCA PERC/ ELORREA*ARICARDO NI)AMA PERC/ ELORREA*A

ROERT ME)A PERC/ ELORREA*A

ROERT ME)A PERC/ ELORREA*A

ROERT ME)A PERC/ ELORREA*A

Page 48: 220611 Costos OT-022-10

7/23/2019 220611 Costos OT-022-10

http://slidepdf.com/reader/full/220611-costos-ot-022-10 48/84

Page 49: 220611 Costos OT-022-10

7/23/2019 220611 Costos OT-022-10

http://slidepdf.com/reader/full/220611-costos-ot-022-10 49/84

Page 50: 220611 Costos OT-022-10

7/23/2019 220611 Costos OT-022-10

http://slidepdf.com/reader/full/220611-costos-ot-022-10 50/84

Page 51: 220611 Costos OT-022-10

7/23/2019 220611 Costos OT-022-10

http://slidepdf.com/reader/full/220611-costos-ot-022-10 51/84

(T DESCRI&CI(N Sum < CANTI006<2010 34

 A=ERL( 400 RAL 70 1 A=ERL( 400 RAL 90 2BR(CA DE 2" 2BR(CA DE 3" 1CATALIAD(R 400 6DILUENTE 65 5DISC( TI&( 27 DE DE 2ES&ATULA 3" 1IT TER=(HET DE 50 2LIHA # 100 2LIHA # 80 2

=ASILLA E&($ICA 1&INTURA A=ARILLA 1&INTURA BLANCA RA 2&INTURA 'RIS RAL 70 1TER=(HET 500 LIFUI 2TINNER 1

022<2010 449 ANTIES&ATER 2 ARANDELAS ;1" A<30 80B(TELLA AR'(=I$ 10CARB(NES &/A=(LA 4CINTA AISLANTE 3/4" 2

CINTA ULCANIANT 1DIUS(R &ARA &IST( 3DIUS(R &ARA &IST( 1DISC( DE C(RTE ; 4 62DISC( DE C(RTE ; 7 20DISC( DE DESBASTE 23DISC( DE DESBASTE 12DISC( TI&( 27 DE DE 1ESC(BILLA CIRCULA 5LIHA # 100 7LUNAS NE'RAS # 10 1LUNAS NE'RAS # 11 2LUNAS TRANS&AREN 75=ARCAD(R DE =ETA 1SIA'R(UT 212 $ 30 20S(LDADURA E6011 ; 8S(LDADURA E6011 ; 1S(LDADURA E7018 ; 14S(LDADURA =I' S(L 2S(LDADURA TUBULA 6TI& DE C(NTACT( DE 6TUERCAS ;1" A<325 80

)m*K

)m*KTotal Result 483

Page 52: 220611 Costos OT-022-10

7/23/2019 220611 Costos OT-022-10

http://slidepdf.com/reader/full/220611-costos-ot-022-10 52/84

63.54228.97166.10

 $777.24

 454.00

Page 53: 220611 Costos OT-022-10

7/23/2019 220611 Costos OT-022-10

http://slidepdf.com/reader/full/220611-costos-ot-022-10 53/84

Page 54: 220611 Costos OT-022-10

7/23/2019 220611 Costos OT-022-10

http://slidepdf.com/reader/full/220611-costos-ot-022-10 54/84

Page 55: 220611 Costos OT-022-10

7/23/2019 220611 Costos OT-022-10

http://slidepdf.com/reader/full/220611-costos-ot-022-10 55/84

Page 56: 220611 Costos OT-022-10

7/23/2019 220611 Costos OT-022-10

http://slidepdf.com/reader/full/220611-costos-ot-022-10 56/84

Page 57: 220611 Costos OT-022-10

7/23/2019 220611 Costos OT-022-10

http://slidepdf.com/reader/full/220611-costos-ot-022-10 57/84

AD

($(

"5$2

6$4

'$'

0$9

9$9

1$'

5$5

1$2

1$9

1$9

"$1

4$6

6$0

0$4

0$'

1$0

0$0

5$6

22$(

"$1

2$'

2$'

22$'

"4$5

0$6

0$6

Page 58: 220611 Costos OT-022-10

7/23/2019 220611 Costos OT-022-10

http://slidepdf.com/reader/full/220611-costos-ot-022-10 58/84

63.54188.75165.61

$!.73

454.00

Page 59: 220611 Costos OT-022-10

7/23/2019 220611 Costos OT-022-10

http://slidepdf.com/reader/full/220611-costos-ot-022-10 59/84

Page 60: 220611 Costos OT-022-10

7/23/2019 220611 Costos OT-022-10

http://slidepdf.com/reader/full/220611-costos-ot-022-10 60/84

Page 61: 220611 Costos OT-022-10

7/23/2019 220611 Costos OT-022-10

http://slidepdf.com/reader/full/220611-costos-ot-022-10 61/84

Page 62: 220611 Costos OT-022-10

7/23/2019 220611 Costos OT-022-10

http://slidepdf.com/reader/full/220611-costos-ot-022-10 62/84

Page 63: 220611 Costos OT-022-10

7/23/2019 220611 Costos OT-022-10

http://slidepdf.com/reader/full/220611-costos-ot-022-10 63/84

EQUIPOS SE= 19Equipos Menores 13<=aK 14<=aK 15<=aK 16<=aK 17<=aK 18<=aKMaquina de Soldar H-M 6 6 6 4 8Alimentador de alambre mig H-M 6 6 6 4 8Maquina de Soldar - Apuntal H-M 8Equipo oxi-corte (Carrito) H-MEquipo oxi-corte (Manual) H-M

 Turbineta H-MHorno Estabilizador de 5g H-M Taladro Magn!tico H-M 4 8Esmeril manual "#$ H-M 4 4 4 4 12Esmeril manual "5$ H-MAndamio H-MHerramientas %arias & M'Equipos Mayores

antograo C*C H-MMaquina corte + Taladro C*C H-M Taladro C*C H-MSierra de banda C*C H-M

unzonadora el!ctrica mec, H-MM,quina de corte autom,tic H-Muillotina .idraulica H-Mranalladora tipo cabina H-Mranalladora per/les H-M0oladora C.ica H-M0oladora Mediana H-MCamion Hiab 1Ton H-MMontacarga 2ae3o H-MMontacarga 4ale H-M0A 67 T'* H-Metr8leo 29 A:;

Page 64: 220611 Costos OT-022-10

7/23/2019 220611 Costos OT-022-10

http://slidepdf.com/reader/full/220611-costos-ot-022-10 64/84

T(TAL ACU= SE= 20 T(TAL ACU=SE= 19 SE= 19 19<=aK 20<=aK 21<=aK 22<=aK 23<=aK 24<=aKSE= 20 SE= 20 25<=aK 26<=aK

30 30 4 5 5 16 16 46 76 16 1030 30 4 5 5 16 16 46 76 16 168 8 4 5 5 16 8 38 46 80 0 0 00 0 2 2 4 4

0 0 0 00 0 0 0

12 12 0 1228 28 4 4 5 8 8 29 57 80 0 8 8 10 16 16 58 58 160 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 0

0 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 0

Page 65: 220611 Costos OT-022-10

7/23/2019 220611 Costos OT-022-10

http://slidepdf.com/reader/full/220611-costos-ot-022-10 65/84

SE= 21 T(TAL ACU= SE= 2227<=aK 28<=aK 29<=aK 30<=aK SE= 21 SE= 21 31<=aK 1<Hu 2<Hu 3<Hu 4<Hu 5<Hu

10 36 11216 48 1248 16 62 2 4 5

0 00 4

0 00 00 12

16 24 81 2 4 516 32 90 2 4 5

0 00 00 00 00 00 00 0

0 00 00 00 00 00 00 00 00 00 00 00 0

Page 66: 220611 Costos OT-022-10

7/23/2019 220611 Costos OT-022-10

http://slidepdf.com/reader/full/220611-costos-ot-022-10 66/84

T(TAL ACU= SE= 23 T(TAL ACU=SE= 22 SE= 22 6<Hu 7<Hu 8<Hu 9<Hu 10<Hu 11<Hu SE= 23 SE= 23 13<Hu 14<Hu

0 112 16 10 16 16 16 74 186 16 160 124 16 10 16 16 16 74 198 16 16

11 73 8 5 8 8 8 37 110 8 80 0 0 00 4 5 1 6 10

0 0 0 00 0 0 00 12 0 12

11 92 8 8 10 8 8 8 50 142 8 811 101 16 10 16 16 16 74 175 16 160 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 0

0 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 0

Page 67: 220611 Costos OT-022-10

7/23/2019 220611 Costos OT-022-10

http://slidepdf.com/reader/full/220611-costos-ot-022-10 67/84

SE= 24 T(TAL ACU= SE= 2515<Hu 16<Hu 17<Hu 18<Hu SE= 24 SE= 24 20<Hu 21<Hu 22<Hu 23<Hu 24<Hu 25<Hu

16 16 16 16 96 282 16 16 1616 16 16 16 96 294 16 16 16 0 0 08 8 8 8 48 158 8 8 8

0 08 8 8 24 34 8 8 8

0 00 00 12

8 8 8 8 48 190 8 8 816 16 16 16 96 271 16 16 16

0 00 00 00 00 00 00 0

0 00 00 00 00 00 00 00 00 00 00 00 0

Page 68: 220611 Costos OT-022-10

7/23/2019 220611 Costos OT-022-10

http://slidepdf.com/reader/full/220611-costos-ot-022-10 68/84

T(TAL ACU=SE= 25 SE= 25

48 33048 34224 1820 0

24 58

0 00 00 12

24 21448 3190 00 00 00 00 00 00 0

0 00 00 00 00 00 00 00 00 00 00 00 0

1457

Page 69: 220611 Costos OT-022-10

7/23/2019 220611 Costos OT-022-10

http://slidepdf.com/reader/full/220611-costos-ot-022-10 69/84

CONTROL DE HH DIRECTAS DE MONTAJE

:AS HH 2<0ECTAS <*C:4E= SE0><S'0? 'E0A0<'S? '@<C<A:ES? S':2*' <*C:4E= STA@@? A:MACE*E0'? 'E0A2'0 2E 0A? 0<E0:A <*@'0MAC<B* SE 'T<E*E 2E :'S TA0E'S 2E: E0S'*A: '0E0'

DIARIO

M'2:'S FF7 55 #9 G 1 FG I9<S'S 9 5G I9E*0EDA2'SESCA:E0AS

SEMANAL

7FJDun 71JDun F5JDun 99JDun 96JDun 7GJDul FIJDulM'2:'S IG5 95# IGG 9## 95G

<S'S 17 971 G7 FF1 9I9E*0EDA2'S 7 7 7 7 7ESCA:E0AS 7 7 7 7 7

CA*T; 0'MMANPOWE 6 F7 6 1 F7

ACUMULADO

7FJDun 71JDun F5JDun 99JDun 96JDun 7GJDul FIJDulM'2:'S IG5 G99 611 F9G5 F59F<S'S 17 911 I1 GG G61E*0EDA2'S 7 7 7 7 7ESCA:E0AS 7 7 7 7 7TOTAL 44 !"# "$$% "&$" ''"!

( ACUMUL

7FJDun 71JDun F5JDun 99JDun 96JDun 7GJDul FIJDulM'2:'S 97;#& I5;I& 5G;F& #F;6& 1G;&<S'S F9;#& 5;#& 55;9& #;7& E*0EDA2'S 7;7& 7;7& 7;7& 7;7& 7;7&ESCA:E0AS 7;7& 7;7& 7;7& 7;7& 7;7&TOTAL "$)"( '%)!( $!)4( ")"( %)(

TAREOS

7FJDun 71JDun F5JDun 99JDun 96JDun 7GJDul FIJDulSEMA*A: G79 G9# G59 G57 GF7ACM:A2' G79 F996 F11F 95IF IFF

Page 70: 220611 Costos OT-022-10

7/23/2019 220611 Costos OT-022-10

http://slidepdf.com/reader/full/220611-costos-ot-022-10 70/84

2'0ES

  2E :'S 0E'0TES 2E T0AAD' 2<A0<'S

1 F75 #9 5G #G 1 7 #9

G #9 7 9 FG

97JDul

97JDul .. prog(base7F)F#G7GI791#57

$$** FFG6

97JDul

97JDul

Page 71: 220611 Costos OT-022-10

7/23/2019 220611 Costos OT-022-10

http://slidepdf.com/reader/full/220611-costos-ot-022-10 71/84

# GF 51 9 #7 I9 I9 7 1 9 I997 I7 1 FG FG 1 7 7 G 9

Page 72: 220611 Costos OT-022-10

7/23/2019 220611 Costos OT-022-10

http://slidepdf.com/reader/full/220611-costos-ot-022-10 72/84

5G 5G9 7

Page 73: 220611 Costos OT-022-10

7/23/2019 220611 Costos OT-022-10

http://slidepdf.com/reader/full/220611-costos-ot-022-10 73/84

CLIENTE - PROCTER . +AM/LE

PRO,ECTO - ESTRUCTURA DE NUCLEO DE ESCALERAS

OT - #''0'#"#

ELA/ORADO POR - LMATEO 1 JPUELLES

2ECHA DE CORTE - T3ursay5 June '$5 '#""

6ALOR 6ENTA - K#G?F96;II

PRESUPUESTO COMERCIAL

U Can7 US81U To7a9 US8

CONSUMI/LES

I79 S':2A20A g 7;& I91;5I I;7 "5""&)#'

S':2A20A EG7FF " FJ1$

S':2A20A E#7F1 " FJ1$

S':2A20A M< S':<2' E0 #7S-G " F;77 MM

 T:A0 E #F T-FF "F;GMM

 T:A0 E #F T-FF "F;9MM

I7I ASES "5"4)"&

AS ACET<:E*' Lg

AS C'9 L<:'0AM'S Lg

AS MA 95 LS CJ 'T G;G 1;G6 5G7;G

AS MENC:A 17& - 97& (A0-C'9) MTI

'<E*' <*2ST0<A: ASE'S' MTI mIJton 7;96 F;# 56I;#F

'<E*' :<O<2' MTI

I7F 2<SC'S 9 zaJton F6;9# I;57 '')4%

2<SC' 2E C'0TE " ;5$ FJ1$ #J1$ JMETA:

2<SC' 2E C'0TE " #$ FJ1$ #J1$ JMETA:

2<SC' 2E 2ESASTE " #$ FJ$ #J1$ JMETA:2<SC' 2E 2ESASTE " ;5$ FJ$ #J1$ JMETA:

ESC'<::A C<0C:A T0E*NA2A ";5$ T<' 0ATA

2<SC' T<' 9# 2E 2ESASTE " ;5$ T<' :AM

I7 'T0'S C'*SM<:ES I& &M' FI?165;G6 4"%)*&

#)#4 81:; $5'"#)'

MANO DE O/RA DIRECTA

<MEC'*

Modulos 1?97;7 g F?696;G9 ;# 1?GF1;65

lanc.as de iso G?1F1;F7 g I7;6F ;79 F?IG6;1#

arandas 5?#55;97 g 9I7;9F ;9 6#G;F

EnrePados FI?199;67 g G6F;F5 ;9 9?6I7;5

#)"! 81:; <<<

EPP

I6F EO<'S 2E 0'TECC<'* E0S'*A: &M' I;57& &M' FI?165;G6 1G;I5

#)#" 81:; 4*%)$

EQUIPOS

Equipos Menores $54%)%%

as MapJ'xigQFJ5

Page 74: 220611 Costos OT-022-10

7/23/2019 220611 Costos OT-022-10

http://slidepdf.com/reader/full/220611-costos-ot-022-10 74/84

Maquina de Soldar H-M F;7& #56;5I KF;77 #56;5I

Alimentador de alambre migJmag H-M

Maquina de Soldar - Apuntalar H-M

Equipo oxi-corte (Carrito) H-M

Equipo oxi-corte (Manual) H-M

 Turbineta H-M

Horno Estabilizador de 5g H-M Taladro Magn!tico H-M

Esmeril manual "#$ H-M F;F& 175;66 K7;I7 9F;17

Esmeril manual "5$ H-M

Andamio H-M 7;& 91;I# K#;97 9?7#;G

Herramientas %arias & M' FI?165;G6 K7;7I FG;1#

Equipos Mayores *5"*%)!*

Camion Hiab 1Ton H-M 91;5 K9;6F G?F16;9

etr8leo 29 A:; 97 lnJdRa #;9 K;9F F?66#;55

#)"% 81:; <<<

SER6ICIOS Transporte F5;77 KI57;77 5?957;77

Alquiler de Equipos (rua de 67 Ton) 7;79 97F;5G K#5;77 F5?FFG;#I

#)'& 81:; <<<

PRUE/AS

I7# T<*TES E*ET0A*TES  D'; 9G;#F KI5;77 61G;9

Cali/caci8n de Soldadores n; 5;77 KI5;77 F#5;77

2ossier de calidad lb 55?9;77 K7;7F 55;9

#)#' 81:; "5&")*4

TRATAMIENTO SUPER2ICIAL  

intura= 0etoque + Acabados

Materiales $$$)!"

ase= Ninc 0ic. (F x I mils) gln

Acabado= Epoxico (F x mils) gln

0esane de pintura gln F7& F7;97 K91;57 967;##

2ilu+ente Epoxico gln 97& F;79 KFF;57 FF;#I

 T.inner 5& 1;6# KI;57 IF;F

M'2 de intado H-H II6;I KI;## "5'&&)%#

Equipo de intado %&')!$

Compresora de 957 pcm (propio) H-E G;19 KG;1 I97;I#

Equipo de intar *eum,tico H-M FG6;G# KF;6 I96;FG

Montacarga Ton (<MEC'*) H-M 9;I KF7;77 9I;F

#)#$ 81:; '5'*4)44

*<T T'TA:

Page 75: 220611 Costos OT-022-10

7/23/2019 220611 Costos OT-022-10

http://slidepdf.com/reader/full/220611-costos-ot-022-10 75/84

COSTO DIRECTO <<< US8 <<<

+ASTO +ENERAL DE MONTAJE $#( US8 <<<

UTILIDAD "'( US8 %54$$)4%

TOTAL 6ENTA <<< US8 <<<

Page 76: 220611 Costos OT-022-10

7/23/2019 220611 Costos OT-022-10

http://slidepdf.com/reader/full/220611-costos-ot-022-10 76/84

SE+UIMIENTO , CONTROL DE COSTOS

MaquinariasPESO =>+?

#?GIG;G7

PLANTA MAQUINARIAS

PRESUPUESTO META AR+EN US COSTOS AL- '%1#1'#""

  Can7 US81U To7a9 US8 Can7 US81U To7a9 US8

7;51& I9;16 I;7 F?#F;1I $"*)%4

6 g I;75 9#;5

F g 9;#G I1;#F

9 rollos 99;17 5;G7

G rollos I;1 97G;16

5I;GF %$)4

as MapJ'xig QFJ5 96;15 1;G6 956;51

F7 m G;I5 GI;5

9 mIJton F1;GG F;# 9#5;7

F;5 zaJton FFF;65 I;7 I17;G5 ''*)!&

G9;77 F;9 #G;6

97;77 F;11 I#;G7

F9;77 I;75 IG;G79I;77 F;11 I;F6

5;77 G;77 I7;77

F;77 ;GI ;GI

9;9& & M' 99#;9 915;77 9;F1 %'#)"#

<<< '5%"4)" !%)## "5'$")'4

'5'"!)##

9;71 LgJ.. 9?77I;I 9;67 5?176;G1 F?59F;77 I;97 ?1G#;97

FG;55 LgJ.. F9;71 I;7 F?7F;76 G61;77 I;97 9?9II;G7

9I;56 LgJ.. 9I;65 ;F F?7#5;1F

F1;1# LgJ.. #I9;7 9;17 9?757;#F

<<< <<< $5*)4# &5"##)*#

I;57& &M' IGF;1F

<<< $%")*" "'4)4

$5#4")!&

Page 77: 220611 Costos OT-022-10

7/23/2019 220611 Costos OT-022-10

http://slidepdf.com/reader/full/220611-costos-ot-022-10 77/84

7;17& 56#;76 7;61 515;F5 II7 7;1 F51;7

F;77 I9 7;9G 11;69

7;II F19 7;9F I1;99

;F 7 7;57 7;77

7;F7& #;G 7;57 51 7;95 F;57

7;17 7 7;17 7;77

7;7I 7 7;F7 7;777;97& F6;9# 7;G F9 7;F ;69

7;#G& 5G#;9 7;9# F59;9I 9F 7;69 F6G;11

7;F6 IF6 7;I F71;G

7;& 961;55 #;97 9?F6;5I 7 #;97 7;77

F7?II#;96 7;79 F55;7G 7 7;79 7;77

45*"")&#

7;9& F6;9# 9;6F I?#F1;#

# lnJdRa 9G;77 ;F F?769;6G FF7 I;5G I69;7#

<<< &5*$)%& $5&!*)!& "5##')$&

F7;77 KI57;77 I?577;77 ;77 F51;#G GI5;7

99;77 K#5;77 FG?177;77 IF7;77 F1;5 5?#F6;57

<<< <<< %%)&$ %5$4)4

9G;F9 KI5;77 6F;I7

7;77 KI5;77 7;77

#?GIG;G7 K7;7F #G;I#

<<< "5%%#)%% )"*

$'")"$

F7;97 K91;57 967;##

F;79 KFF;57 FF;#I

5;I9 KI;57 F1;GI

II6;I KI;5G "5'#*)#4

$#4)##

; KG;1 I7;77

7;77 KF;6 7;77

7;77 KF7;77 7;77

<<< "5*$$)"& 4")'&

*<T T'TA:

Page 78: 220611 Costos OT-022-10

7/23/2019 220611 Costos OT-022-10

http://slidepdf.com/reader/full/220611-costos-ot-022-10 78/84

#)%#' 81:; US8 <<< *$)*%( "5%**)!

$#( US8 <<<

"'( US8 %54$$)4%

#)!#4 81:; US8 <<<

1?G5F;F7

Page 79: 220611 Costos OT-022-10

7/23/2019 220611 Costos OT-022-10

http://slidepdf.com/reader/full/220611-costos-ot-022-10 79/84

O@seraBiones

K 1;67 S'* 2E TE0CAS 4 A0A*2E:AS 2E "F$ A-I59 A2<C<'*

K 5;77 S'* 2E: S<LA0'T F9 (':SA x I7g) A2<C<'*A: 2E

4&)#!( #')!#

#91;I

A+RE+AR HH POR ADICIONALES , SSMA

%*)%!(

#)##(

Page 80: 220611 Costos OT-022-10

7/23/2019 220611 Costos OT-022-10

http://slidepdf.com/reader/full/220611-costos-ot-022-10 80/84

"')&%(

$")$#(

#)##(

#)##(

Page 81: 220611 Costos OT-022-10

7/23/2019 220611 Costos OT-022-10

http://slidepdf.com/reader/full/220611-costos-ot-022-10 81/84

$4)*!(

'!5'&')"%

IG;5&

Page 82: 220611 Costos OT-022-10

7/23/2019 220611 Costos OT-022-10

http://slidepdf.com/reader/full/220611-costos-ot-022-10 82/84

:

  0'T

Page 83: 220611 Costos OT-022-10

7/23/2019 220611 Costos OT-022-10

http://slidepdf.com/reader/full/220611-costos-ot-022-10 83/84

Page 84: 220611 Costos OT-022-10