    MINUTES OF MEETING

    Page 1 of 2 

    MoM # 1

    Date of Meeting 07-May-16 Time 3:30 PM

    Minutes Prepared By Residents of SSO Location SSO Club House

    Meeting Objective

    The purpose of the meeting was to review the status of all pending work and site visit & discuss the quality issue with Mr.

    Madhan (Sr. Consultant).

    Attendees: Shyamsundar, Harish, Ramesh(here after referred as manager), Raghvendra and Madhan(consultant)

    Siju, Rahul T, Rajesh, Ramesh, Appu, Sandeep, Ashish, Suyog, Vishwajeeet, Aniruudh, Hanmant, Girija,

    Ritam and Deepu

    General Discussion:

    Sr. No Discussion

    1 Harish took Madhan on a site walk to D block and accepted few mistakes happened in construction from builder

    side.

    2 Madhan explained few scenarios related to poor quality of construction i.e use of poor quality of sand, improper

    curing, improper composition of cement to sand ratio etc… 

    3 Madhan has addressed individual’s query related to construction quality i.e cracks in walls and ceiling, seepage on

    wall above skirting, bad draining smell etc… 

    4 It is agreed by builder team that quality check of the building will be done and transparency will be maintained.

    5 Madhan will provide all the necessary support to resolve quality issues. He agreed to visit SSO every weekend for

    2 hours and will visit each house if necessary.

    6 Ramesh will provide a snag list to each resident on 8th May, 2016 and owner has to list down the issues in

    consultation of builder’s representative like Ramesh or Raghavendra. 

    7 After receiving the list from each flat, Ramesh or Raghavendra will categorize and priorities the issues in

    consultation with Mr. Madhan

    8 All identified issues will be resolved by builder team ASAP.

    9 Ramesh has committed to SSO owners to close all the pending issues by end of May 2016 like sheets over terrace,

    building wall, main entrance work and so on….. 

    10 Ramesh to address the issue related to shower near swimming pool ASAP.

    11 When asked about road, Ramesh explained saying this issue need to be addressed by BBMP or a new builderbuilding the apartment. So, we will have to rely on some other builder. Backside road to apartment is now closed for

    4-wheelers.

    Here are Mr. Madhan’s observation on few issues in construction quality:

    a. 

    All hair crack (crack below 2 mm width) need to be V-grooved till the depth of the crack and filled with

    GP2 cement.

    b.  All major crack above 2 mm need to be scraped to 5-6 inches in width till the depth of the crack. A mesh

    need to be laid and then a layer of rough plaster and on that a layer of fine plaster need to be done.

    c. 

    Cracks on the edge of all doors and windows have been developed due to improper support to the lintel.

    Above method to be adopted to fill all cracks.

    d.  All balconies need to be grouted by Epoxy grouting to avoid seepage on wall above skirting.

    e. 

    All drainage pipes need to be extended1 meter above skylight (sheet) to avoid bad smell.

    New Action:

    Sr. No Action Owner Due Date

    1 Preparation of Snag List Ramesh & Owners 14-May-16

    2 Completion of all pending work Ramesh 31-May-16

    3 Quality check of building by 3rd party Ramesh 31-May-16

    4 Cleaning of Swimming pool and repair to shower Ramesh 14-May-16

    5 Epoxy grouting in balconies Ramesh 31-May-16

  • 8/17/2019 MoM #1-v1.0 dd160507

    2/2

    MINUTES OF MEETING

    Page 2 of 2 

    Open Action:

    Sr. No Action Owner Due Date

    Closed Action:

    Sr. No Action Owner Closed Date