Integrity Development Review of
Corruption Vulnerability Matrix: VOLUNTARY OFFER TO SELL
System Activity Corruption Risks Likelihood of
Occurrence(Low, Medium, High)
Importance or
Significance (Low,Medium, High)
Existing Controls
1. Filing ofnotarized LetterOffer (VOS Form1)
a. Selling of forms
b. Influence Peddling byattorneys-in- fact
Low
High
Low
High
None
None
Tepo
Totfof
2. DetermineCompleteness ofDocuments
a. Facilitation in thegathering of documentsby DAR personnel;
b. Loss/misplace of claimfolders/documents
High
High
High
High
Sufficient as to recordshandling of receiveddocuments as there isa checklist andlogbook. However,the risk of facilitationarises when the LOslack some basicdocument.
Basic physical safetyof premises.
eaT
Atmin
a
-
8/12/2019 2007 Dar Annex
3/28
-
8/12/2019 2007 Dar Annex
4/28
EC-
Integrity Development Review of
System Activity Corruption Risks Likelihood ofOccurrence
(Low, Medium, High)
Importance orSignificance (Low,
Medium, High)
Existing Controls
5.Preparation of FIRand LUM
- same as above- - same- - same- -same-
6. Screening &Selection of qualifiedpotential ARBs.
a. Landownerintervening/ influencingBARC members in theselection of ARBs.
b. ARB receiving grantmore than the maximumlimit provided by law.
High
Low
High
High
Policy guidelines isprovided underA.O.No.2 s.2005;MARO reviews &issue certificate ofqualified potentialARBs
None-No regional andinter-region databaseof ARBs
Atinta
1
2
3
MB
-
8/12/2019 2007 Dar Annex
5/28
EC-
Integrity Development Review of
System Activity Corruption Risks Likelihood ofOccurrence
(Low, Medium, High)
Importance orSignificance (Low,
Medium, High)
Existing Controls
7. Forwarding of CFto DARPO w/approved sub/segregation plan-CF TransmittalMemo; ASP withtechnicaldescription &perimeter land usemap
CF or some documentslost in transit ormisplaced for possibilityof facilitation of lostdocuments.
High High CF Transmittal Memostamped received
Tps
8. Evaluation of CFby DARPO
as to sufficiency andprocess-ability of CF &recommendingsubmission of CF toLBP-AOC
Abuse of discretion-delaying of evaluation &
submission of CF toLBP-AOC
Medium High None Aa
9. Preparation ofmemo request tovalue & indorsementof CF to LBP-AOC.
Abuse of discretion-delaying the preparationof memo request tovalue and the transmittalof the request to LBP-AOC
Medium High Transmittal Report AoA
10. Receipt and
acknowledgment byLBP of CF
None N/A N/A N/A N
11. Sending ofmemo valuationworksheet (LVW) toDARPO
None N/A N/A N/A N
-
8/12/2019 2007 Dar Annex
6/28
EC-
Integrity Development Review of
System Activity Corruption Risks Likelihood ofOccurrence
(Low, Medium, High)
Importance orSignificance (Low,
Medium, High)
Existing Controls
12. Receipt andreview of memo ofvaluation worksheet(LVW) from LBP-order to deposit LBPtogether with APFU-Posting of notice ofland valuation(NLVA) with MOV,LVW, and LOs replyform for 7 days
NoneN/A N/A Posting o Notice of
ValuationN
13. Issuance
certification of depositto DAR (Cert. Ofdeposit)
None N/A N/A N/A N
14. LOs to respond toNLVA within 30 daysfrm receipt & submitdocument to LBPrequesting forpayment ofcompensation
None N/A N/A N/A N
15. Sending of LOsresponse to NLVA toLBP
None purely ministerial N/A N/A N/A N
-
8/12/2019 2007 Dar Annex
7/28
EC-
Integrity Development Review of
System Activity Corruption Risks Likelihood ofOccurrence
(Low, Medium, High)
Importance orSignificance (Low,
Medium, High)
Existing Controls
**LO Acceptsvaluation -16a. Forwards toROD copy ofcertificate of deposittogether with ASPand request transfercert. of title in thename of RP
None N/A N/A N/A N
**If LO rejectsvaluation -
16b. If LO rejects theoffer price or fails toreply w/in 30 daysfrom receipt of NLVA,forwards to RODcopy of cert. ofdeposit, ASP with TDand letter of requestto ROD for issuanceof RP title
None N/A N/A N/A N
17. Issuance by RODof TCT in the name ofthe CF RP and
forwards ownersduplicate copy toDARPO
None N/A N/A N/A N
-
8/12/2019 2007 Dar Annex
8/28
EC-
Integrity Development Review of
System Activity Corruption Risks Likelihood ofOccurrence
(Low, Medium, High)
Importance orSignificance (Low,
Medium, High)
Existing Controls
18. Preparation ofrelease form;payment to LO andmortgagee-Bank/creditors ifencumbered
None N/A N/A N/A N
19. Conductssummaryadministrativeproceedings,rendering decisions &inform parties
Note: subject of separatereport.
-
8/12/2019 2007 Dar Annex
9/28
-
8/12/2019 2007 Dar Annex
10/28
EC-
Integrity Development Review of
Corruption Vulnerability Assessment: LAND USE CONVERSION
ActivityResponsibleunit/person
Objective Risk factorLikelihood ofoccurrence
Significance ofimpact
Control activity/mechanism
A
1. Secureapplication formand checklist ofrequirements fromRCLUPPIsecretariat
Applicant/RCLUPPI
Secureapplication form
Forms may beissued for a feebecause theyare kept andsold or no longeravailable andneed to bephotocopied
Medium MinorSignificance
None N
2. Applicantprepares orsecures therequirements forland conversion.1
Applicant andOfficesconcerned
Ensure thatotherregulations arecomplied with
Submission ofspuriousdocuments dueto lack of trainingin examining theauthenticity ofdocuments
High MajorSignificance
None N
1The requirements are the following among others: project feasibility study, narrative description of the development plan, proof of finan
developer, socio-economic benefit cost study of the proposed project, certification from the HLURB Regional Officer, certification from a
environmental compliance certificate, if applicable.
-
8/12/2019 2007 Dar Annex
11/28
EC-
Integrity Development Review of
ActivityResponsibleunit/person
Objective Risk factorLikelihood ofoccurrence
Significance ofimpact
Control activity/mechanism
A
3. Applicant erects
billboard, takesphotos ofbillboard, land andstructures
Applicant and/or
photographer
To show
presentcondition of theland
Possible
submission ofpictures nottaken from theactual areabecause there isno validationabout theauthenticity ofthe pictures
Medium Minor
significance
None N
4. Submits 2LUCF withattachments toMARO
Applicant/MARO
To show proofof ownership,location of theproperty, seek
MAROcertification, andprovide copy ofnotice of LUCapplication.
Submission ofspuriousdocuments dueto lack of training
in examining theauthenticity ofdocuments
Medium Majorsignificance
None Satr
3. Applicant erectsbillboard, takesphotos ofbillboard, land andstructures
Applicant and/orphotographer
To showpresentcondition of theland
Possiblesubmission ofpictures nottaken from theactual areabecause there isno validationabout the
authenticity ofthe pictures
Medium Minorsignificance
None N
-
8/12/2019 2007 Dar Annex
12/28
EC-
Integrity Development Review of
ActivityResponsibleunit/person
Objective Risk factorLikelihood ofoccurrence
Significance ofimpact
Control activity/mechanism
A
4. Submits 2
LUCF withattachments toMARO
Applicant/
MARO
To show proof
of ownership,location of theproperty, seekMAROcertification, andprovide copy ofnotice of LUCapplication.
Submission of
spuriousdocuments dueto lack of trainingin examining theauthenticity ofdocuments
Medium Major
significance
None S
atr
5. MARO receivesLUCF copy
MARO To check CARPcoverage,
presence ofFBs, inspectbillboard, postsnotices inconspicuousplaces,prepares MAROcertification
MARO might justsign the
certificationwithout inspectingthe property/billboard andwithout postingthe notice due tohigh level ofdiscretion
High Majorsignificance
Guidelines(AO 1 and
MC 2 bothseries of2002)
to
ris
-
8/12/2019 2007 Dar Annex
13/28
EC-
Integrity Development Review of
ActivityResponsibleunit/person
Objective Risk factorLikelihood ofoccurrence
Significance ofimpact
Control activity/mechanism
A
6. Applicant files 4
complete LUCFsand MAROcertification toRCLUPPISecretariat
Applicant/
RCLUPPISecretariat
To meet
requirements forconversion
Possible
submission ofspuriousdocuments dueto lack of trainingin examining theauthenticity ofdocuments
High Major
significance
Guidelines
(AO 1 andMC 2 bothseries of2002)
P
7. RCLUPPISecretariat
receives andreviewsapplication;assessment offees and cashbond
RCLUPPIsecretariat
To checkapplication
folderscompleteness; ifcomplete issuesassessment offees andcomputation ofcash bond
Discretion to passjudgment on the
application as tocompletenessand lower fees tobe paid
High Majorsignificance
Formula/guideline/
zonalvaluation
Tn
pristhstdthfe
8. Applicant payscorresponding
fees and submitreceipts toRCLUPPI
Applicant/Cashier/
RCLUPPIsecretariat
To pay amountof cash bond
and fees asassessed
None NA NA Order ofPayment
S
-
8/12/2019 2007 Dar Annex
14/28
EC-
Integrity Development Review of
ActivityResponsibleunit/person
Objective Risk factorLikelihood ofoccurrence
Significance ofimpact
Control activity/mechanism
A
9. RCLUPPI
accepts receiptsand mark it as thefiling date of theapplication
Applicant/
RCLUPPIsecretariat
To establish
date of filing ofthe application
None NA NA Date of
payment offees
10. RCLUPPIschedules and
conducts ocularinspection
RCLUPPImember/ PARO
/ MAROconcerned
To verify andevaluate onsite
the veracity ofinformation ascontained in theapplication
Applicant canbribe the OCI
party or the OCIparty candemand paymentfrom the applicantin exchange for afavorable reportdue to thepossibility ofcollusion amongthe OCI partymembers
High Majorsignificance
None
-
8/12/2019 2007 Dar Annex
15/28
EC-
Integrity Development Review of
ActivityResponsibleunit/person
Objective Risk factorLikelihood ofoccurrence
Significance ofimpact
Control activity/mechanism
A
11. OCI team
prepares fieldinvestigationreport
OCI team To document
OCI findings
Applicant can
bribe the OCIparty or the OCIparty candemand paymentfrom the applicantin exchange for afavorable reportdue to thepossibility ofcollusion amongthe OCI partymembers
High Major
significance
None
12. Examinerequirements/deliberation of FIR
RCLUPPIExcom
To confirm OCIfindings
The Applicantcan bribe theRCLUPPIRCLUPPI Excommembers or theEXCOM candemand paymentfrom theApplicant inexchange for a
favorable findingor decision
High Majorsignificance
Threemembercommittee
-
8/12/2019 2007 Dar Annex
16/28
EC-
Integrity Development Review of
ActivityResponsibleunit/person
Objective Risk factorLikelihood ofoccurrence
Significance ofimpact
Control activity/mechanism
A
13. Prepare
favorableendorsement
RCLUPPI
Excom
To inform RD of
RCLUPPIdecision
Collusion among
RCLUPPI Excommembers
NA NA NA
14. RD Approval/Disapproval
RegionalDirector
Formal approvalof the decision
The Applicantcan bribe theRegional Directorin exchange for afavorabledecision
High Majorsignificance
Time frame/appealprocess
15. IssueConversion Order
RCLUPPISecretariat
ConversionOrder document
None/ Ministerial NA NA NA
-
8/12/2019 2007 Dar Annex
17/28
EC-
Integrity Development Review of
2a Successful
2b Not
successful
Case closed
Issue BARC
certification
3. Filecompliant orpetition withRARAD/PAR
AD/PARO
5aRespondentdoes not file
answer
5bRespondentfiles answerwithin 10days fromreceipt of
summons
5c No declaratior judgment by respondent alloparticipate uponexplanation of f
an answer
6a Parties settle/compromise
Agreement
7 Noagreementcompromise. hearing
continues
7a PartiessubmitMemorandawithin 10
days fromterminationof hearing
1 Agrariancase, dispute
or controversy
2. Submit to BARC ofbarangay where propertyis situated for mediationor conciliation by BARC
or PARO within 30 days
4 Summons served onrespondent by DARABSheriff or designatedofficer within 2 days from
filing
6 HearingbyAd udicator
8 RuAdjuday
60 d
9 MRec15 drece
dec
Process Flow: AGRARIAN ADJUDICATION
-
8/12/2019 2007 Dar Annex
18/28
EC-
Integrity Development Review of
Corruption Vulnerability Matrix: AGRARIAN ADJUDICATION
Activity Risk factorLikelihood of
occurrence
Significance of
impact
Control ac
mechan1. Submit to BARC ofbarangay where property issituated for mediation orconciliation by BARC orPARO within 30 days
If successful, case closed.
None NA NA NA
2. If not successful, IssueBARC Certification
None NA NA NA
3. Filing of sworncomplaint/verified petition toDARAB
None NA NA NA
4. Receiving clerk checks ifthe complainant has paidfiling fee or not.
None NA NA NA
-
8/12/2019 2007 Dar Annex
19/28
EC-
Integrity Development Review of
Activity Risk factorLikelihood ofoccurrence
Significance ofimpact
Control acmechan
Counsel of the farmer
complainant may ask forpayment of filing fee even ifcomplainant is exempted(pauper litigant)
High Highly significant List of fees (from
rules)
5. If complainant is notconsidered a pauper litigant,litigant is required to payfiling fee at the DAR cashier.
None NA NA NA
COB may ask for paymentof personal service fee
exceeding prescribedamount
High Highly significant List of fees
-
8/12/2019 2007 Dar Annex
20/28
EC-
Integrity Development Review of
Activity Risk factorLikelihood ofoccurrence
Significance ofimpact
Control acmechan
6. Complainant returns to
COB for docketing of thecomplaint/petition
None NA NA NA
7. Raffling of case2 Case may not be actuallyraffled but assigned topreferred sala.
Low Low None
Possible collusion betweenCOBs to get preferred case.
Low Low None
8. PARAD/COB determines ifthe complaint has a BARCcertification and certificate ofnon-forum shopping
None NA NA NA
9. If there is no certificate of
non-forum shopping, PARADissues order directingcomplainant to submit one.
None NA NA NA
2If there is more than one sala in the province.
-
8/12/2019 2007 Dar Annex
21/28
EC-
Integrity Development Review of
Activity Risk factorLikelihood ofoccurrence
Significance ofimpact
Control acmechan
10. If complete, the COB will
prepare summons
COB may ask for exorbitant
fees for serving summons
High Highly significant List of fees
11. Summons served onrespondent by DARAB sheriffor designated officer within 2days from filing.
Sheriff may ask for fees forserving summons(exceeding actual andincidental expenses subjectto approval of theAdjudicator)
High Highly significant List of fees
11a If respondent does notfile answer, no declaration
judgment by default,respondent allowed toparticipate upon satisfactoryexplanation of failure to fileanswer
None NA NA NA
11b If respondent filesanswer within 10 days fromreceipt of summons, conducthearing by adjudicator
None NA NA NA
12. If partiessettle/compromiseagreement, adjudicatorapproves agreement afterdetermining validity (thencase closed)
None NA NA NA
-
8/12/2019 2007 Dar Annex
22/28
EC-
Integrity Development Review of
Activity Risk factorLikelihood ofoccurrence
Significance ofimpact
Control acmechan
13. If no agreement
/compromise, hearingcontinues, parties submitmemoranda within 10 daysfrom termination of hearing
None NA NA NA
14. Draft resolution isprepared by COB or LO
LO may extort from partiesfor favorable decision
High Major significance PARAD reviews dresolution
Parties may offer bribe to LOfor favorable decision
High Major significance PARAD reviews dresolution
15. Ruling by Adjudicatorwithin 15 days fromsubmission, 60 days fromfiling. Decision final after 15days, writ of execution andimplementation
Possible collusion betweencomplainant or defendantand the adjudicator.
High Major Significance Motion for recons
-
8/12/2019 2007 Dar Annex
23/28
EC-
Integrity Development Review of
Activity Risk factorLikelihood ofoccurrence
Significance ofimpact
Control acmechan
16. Motion for
reconsideration 15 days fromreceipt of decision
Possible collusion between
complainant or defendantand the adjudicator.
High Highly
Significant
Appeal to the DA
Central Office
17. Decision on the MR Possible collusion between
complainant or defendantand the adjudicator
High Highly
Significant
Appeal to the DA
Central Office
18. Filing of notice of appeal
to DARAB Secretariat/DARAB Adjudicator and payappeal fee
None NA NA NA
-
8/12/2019 2007 Dar Annex
24/28
EC-
Integrity Development Review of
Activity Risk factorLikelihood ofoccurrence
Significance ofimpact
Control acmechan
19. PARAD forwards the
complete case folder toDARAB CO
Records may be lost in
transit
Low Minor significance Parties are furnis
of documents sub
20. DARAB Secretariat
receives the case folder andchecks if appeal fee is paid.
None NA NA NA
21. DARAB Secretariatconducts raffling of case andforwards case folder toponente.
Case may not be actuallyraffled but assigned topreferred ponente.
Low Minorsignificance
None
-
8/12/2019 2007 Dar Annex
25/28
EC-
Integrity Development Review of
Activity Risk factorLikelihood ofoccurrence
Significance ofimpact
Control acmechan
Possible collusion between
Chief of staff and member ofthe DARAB Secretariat toget preferred case.
Low Minor significance None
22. Review of case Possible offer of bribe fromparties
High Major significance Review of ponen
LO may contact parties askfor money in exchange forfavorable decision
High Major significance Review of ponen
Possible collusion betweenLO and ponente
High Major significance Subject to reviewsignature by otheof the Board
-
8/12/2019 2007 Dar Annex
26/28
EC-
Integrity Development Review of
Activity Risk factorLikelihood ofoccurrence
Significance ofimpact
Control acmechan
Possible outside or political
influence
Low Major Significance
23. Rerouting of decisionponente to other members ofthe Board
Possible collusion betweenLO and ponente
High Major significance Subject to reviewsignature by otheof the Board
-
8/12/2019 2007 Dar Annex
27/28
EC-
Integrity Development Review of
Activity Risk factorLikelihood ofoccurrence
Significance ofimpact
Control acmechan
24. Promulgation of decision Delay in the release of
decision
High Major significance None
25. Execution of Decision Possible extortion andintentional delay in theexecution of decision
High Major significance None
-
8/12/2019 2007 Dar Annex
28/28
EC-OMB Corruption Prevention Project