PEGAH SHABEHPOUR
Selected Professional Works
01
CONTENTS
PARK RIDGE POLICE DEPARTMENT EVIDENCE STORAGEMaemar PC ArchitectsPark Ridge, Illinois, USA
LIGGETT RESIDENCEMaemar PC ArchitectsLake Forest, Illinois, USA
PACE TOBACCO FACTORYMaemar PC ArchitectsMongla, Bangladesh
05 |
13 |
17 |
02
PEGAH SHABEHPOUR Chicago, IL | [email protected] | linkedin.com/in/pshabehpour
Objective
To obtain an architectural position within a progressive multidisciplinary firm or organization, utilizing my diverse skill set in digital design, energy consciousness, and landscape architecture.
Experience
Architectural Intern | Maemar P.C. Architects | Long Grove, IL | 2012-Current
Assist in the streamlining of the architectural design process from conceptual design through overall completion of projects
Utilize three-dimensional building information modeling using Revit to communicate concepts to the client for approval
Produce construction and permit drawings for various scaled commercial, religious, and public projects using AutoCAD
Prepare measured drawings based on site visits of existing spaces for design development
Create three-dimensional renderings for client presentations using Revit and 3DsMax
Architectural Intern | ICL Interior Architecture, Inc. | Chicago, IL | 2008
Collaborated with both architects and engineers in a ten-person firm to develop solutions for architectural projects
Designed potential iterations of floor plans for the initial stages of projects
Produced drawings for renovations and new construction using AutoCAD
Performed redline changes and revisions of drawings
Projects included office buildings, commercial facilities, and multi-story residential buildings
Education
Illinois Institute of Technology | College of Architecture | Chicago, IL
Bachelor of Architecture | May 2013 Grade Point Average | 3.52/4.0 Cum Laude
Specializations
Digital Design + Landscape Architecture
Projects
College of International Relations | Studio | 2013
The Plant: Innovating the Farm of the 21st Century| Interprofessional Project | 2013
95th/Dan Ryan CTA Station | Studio | 2012
Building-Integrated Wind Energy Modules | Interprofessional Project | 2012
Two Apartment Towers on Spire Site | Studio | 2012
Catalytic Waterway: City Transformation in Landscape | Graduate Landscape Studio | 2011
Big Sky Ski Lodge | Studio | 2011
Near North Farmer’s Market | Studio | 2010
Bridgeport Library | Studio | 2010
Graphic Designer’s Studio and House | Studio | 2009
Technical Skills
Software
Autodesk Revit Architecture Autodesk AutoCAD Architecture Autodesk 3ds Max Design Autodesk Revit MEP Autodesk Ecotect Analysis Autodesk Vitari Autodesk AutoCAD Map 3D IES Gaia Adobe Photoshop Adobe Illustrator Adobe InDesign Adobe Dreamweaver Adobe Premiere Elements Rhinoceros Grasshopper Trimble SketchUp
Digital Fabrication
3D Printer Bridgeport Laser Cutter CMC Machine
Recognition
Nominated for the Schiff Foundation Fellowship | 2013
Track 1 Winner at IPRO Day for Wind Power and Energy Storage | 2012
Work Published on COA Arch+Fab Portal | 2011-Current
National Society of Leadership and Success | 2011-Current
Work Exhibited at COA Open House | 2010 + 2012
Dean’s List | 2009 + 2011 + 2012 + 2013
Heald Scholarship | 2008-2013
03
Creativity is the ultimate form of expression and to architect is the ultimate form of creativity.
04
PROFESSIONAL
PARK RIDGE POLICE DEPARTMENT EVIDENCE STORAGE
FIRM | MAEMAR PC ARCHITECTS
PRINCIPAL | MEHRAN FARAHMANDPOUR
TYPOLOGY | GOVERNMENT
LOCATION | PARK RIDGE, ILLINOIS
YEAR | 2013
05
1’-0” 20’-0”10’-0”
1’-0” 20’-0”10’-0”
NEW 1 STORY POLICEEVIDENCE BUILDING
CITY HALL PARKING LOT
CITY HALL PARKING LOT
EXISTING BUILDING
PARK RIDGE POLICE DEPARTMENT EVIDENCE STORAGE | Existing Site Plan
PARK RIDGE POLICE DEPARTMENT EVIDENCE STORAGE | Proposed Site Plan
06
1’-0” 5’-0” 10’-0”PARK RIDGE POLICE DEPARTMENT EVIDENCE STORAGE | Proposed Floor Plan
1 | Typ. Non-Load Bearing Stud Wall 2 | Typ. Non-Load Bearing CMU Wall 3 | Typ. Ext. Load Bearing Wall1’-0” 5’-0” 10’-0”07
1’-0” 5’-0” 10’-0”
1’-0” 5’-0” 10’-0”
1’-0” 5’-0” 10’-0”
1’-0” 5’-0” 10’-0”
PARK RIDGE POLICE DEPARTMENT EVIDENCE STORAGE | West Elevation
PARK RIDGE POLICE DEPARTMENT EVIDENCE STORAGE | North Elevation
PARK RIDGE POLICE DEPARTMENT EVIDENCE STORAGE | East Elevation
PARK RIDGE POLICE DEPARTMENT EVIDENCE STORAGE | South Elevation
08
1’-0” 5’-0” 10’-0”PARK RIDGE POLICE DEPARTMENT EVIDENCE STORAGE | Foundation Plan
1 | Footing @ Perimeter Wall 2 | Footing @ Entrance 3 | Footing @ Perimeter Wall
1’-0” 5’-0” 10’-0”4 | Footing @ Interior Wall 5 | Footing @ Perimeter Wall
09
1’-0” 5’-0” 10’-0”PARK RIDGE POLICE DEPARTMENT EVIDENCE STORAGE | Mechanical Plan
10
1’-0” 5’-0” 10’-0”PARK RIDGE POLICE DEPARTMENT EVIDENCE STORAGE | RCP/Electrical Plan
DIAGRAM | Electric Riser
11
1’-0” 5’-0” 10’-0”PARK RIDGE POLICE DEPARTMENT EVIDENCE STORAGE | Plumbing Plan
DIAGRAM | Waste/VentDIAGRAM | Water Supply
12
PROFESSIONAL
LIGGETT RESIDENCE
FIRM | MAEMAR PC ARCHITECTS
PRINCIPAL | MEHRAN FARAHMANDPOUR
TYPOLOGY | RESIDENTIAL
LOCATION | LAKE FOREST, ILLINOIS
YEAR | 2013
15
1’-0” 5’-0” 10’-0”LIGGETT RESIDENCE | Demolition Plan
1’-0” 10’-0” 20’-0”LIGGETT RESIDENCE | Second Floor Plan
14
1’-0” 5’-0” 10’-0”LIGGETT RESIDENCE | Proposed Floor Plan
1’-0” 5’-0” 10’-0”LIGGETT RESIDENCE | RCP/Electrical Plan
A | Wall Section B| Wall Section1’-0” 5’-0” 10’-0”
15
LIGGETT RESIDENCE | West Elevation
LIGGETT RESIDENCE | South Elevation
LIGGETT RESIDENCE | East Elevation
A | Master Bath B| Master Bath C| Master Bath
D | Master Closet E| Master Closet F| Master Closet
1’-0” 5’-0” 10’-0”
1’-0” 5’-0” 10’-0”
1’-0” 5’-0” 10’-0”
16
PACE TOBACCO FACTORY
FIRM | MAEMAR PC ARCHITECTS
PRINCIPAL | MEHRAN FARAHMANDPOUR
TYPOLOGY | INDUSTRIAL
LOCATION | MONGLA, BANGLADESH
YEAR | 2012
PROFESSIONAL
17
1’-0” 10’-0” 20’-0”PACE TOBACCO FACTORY | First Floor Plan
18
1’-0” 10’-0” 20’-0”PACE TOBACCO FACTORY | Second Floor Plan
19
1’-0” 10’-0” 20’-0”PACE TOBACCO FACTORY | Roof Plan
20
1’-0” 10’-0” 20’-0”PACE TOBACCO FACTORY | First Floor RCP
21
1’-0” 10’-0” 20’-0”PACE TOBACCO FACTORY | Second Floor RCP
22
1’-0” 10’-0” 20’-0”PACE TOBACCO FACTORY | First Floor Mechanical Plan
23
1’-0” 10’-0” 20’-0”PACE TOBACCO FACTORY | Second Floor Mechanical Plan
24
1’-0” 20’-0”10’-0”
PACE TOBACCO FACTORY | West Elevation
1’-0” 20’-0”10’-0”
PACE TOBACCO FACTORY | East Elevation
1’-0” 20’-0”10’-0”
PACE TOBACCO FACTORY | North Elevation
1’-0” 20’-0”10’-0”
PACE TOBACCO FACTORY | South Elevation
25
26
Top Related