Frankfurt (Germany), 6-9 June 2011 Trevor LUCY – IE – S1 – 1118 Treatment of Quality in Utility Specification and Procurement of Network Equipment

description

Treatment of Quality in Utility Specification and Procurement of Network Equipment. Trevor LUCY – IE – S1 – 1118. Treatment of Quality in Utility Specification and Procurement of Network Equipment. Background Specifications References Factory Inspections Post Tender Quality Control Summary. - PowerPoint PPT Presentation

Transcript of Trevor LUCY – IE – S1 – 1118

Page 1: Trevor LUCY – IE – S1 – 1118

Frankfurt (Germany), 6-9 June 2011

Trevor LUCY – IE – S1 – 1118

Treatment of Quality in Utility Specification and Procurement of

Network Equipment

Page 2: Trevor LUCY – IE – S1 – 1118

Frankfurt (Germany), 6-9 June 2011

Trevor LUCY – IE – S1 – 1118

Treatment of Quality in Utility Specification and Procurement of

Network Equipment Background Specifications References Factory Inspections Post Tender Quality Control Summary

Page 3: Trevor LUCY – IE – S1 – 1118

Frankfurt (Germany), 6-9 June 2011

Many problems in the past Operational and financial

impact Appointment of

Specifications Manager in ESBN

Works with Asset Managers to drive quality improvement

Trevor LUCY – IE – S1 – 1118

Background

Page 4: Trevor LUCY – IE – S1 – 1118

Frankfurt (Germany), 6-9 June 2011

Quality criteria in the Tender Specification Quality Management Systems Routine and Type Tests Track Record

Production experience At least X years…

Service experience Installation in at least S EU Utilities With a service experience of Y years… of at least Z units

Trevor LUCY – IE – S1 – 1118

Specifications

Page 5: Trevor LUCY – IE – S1 – 1118

Frankfurt (Germany), 6-9 June 2011

Essential to request in specification Obtain named individual Verify volumes and experience Difficulties when sold through agents

They won’t help you pick the best but will help you avoid the worst!

Trevor LUCY – IE – S1 – 1118

References

Page 6: Trevor LUCY – IE – S1 – 1118

Frankfurt (Germany), 6-9 June 2011

Audit Template Raw material through to end

product Factory Internal QC Procedures Review recommendations in

last Quality audit Capability & experience of

Test Area Test equipment calibration Any future plans for the factory?

Trevor LUCY – IE – S1 – 1118

Factory Inspections

Page 7: Trevor LUCY – IE – S1 – 1118

Frankfurt (Germany), 6-9 June 2011

Compliance with Type & Routine Tests Monitor initial deliveries QA Groups – internal and external Change notification from supplier to ESBN Contingency Plans

Alternative suppliers Supplier minimum stock holding

Trevor LUCY – IE – S1 – 1118

Post Tender Quality Control

Page 8: Trevor LUCY – IE – S1 – 1118

Frankfurt (Germany), 6-9 June 2011

Need to ensure continuous high quality product Drive for quality improvement is ongoing in ESBN Considering future options re financial penalties! Value of Quality to a Utility

Quality Assurance in ESBN is not a replacement for supplier’s internal Quality Control but is a

focussed way of dealing with suppliers to ensure acceptable standards exist in all plants in the

Supply Chain.Trevor LUCY – IE – S1 – 1118

Summary