Threaded Case Study JULI 2004. Threaded Case Study 2004 Haesen Davy Janssen Luc 2 Introductie.

31
Threaded Case Study JULI 2004

Transcript of Threaded Case Study JULI 2004. Threaded Case Study 2004 Haesen Davy Janssen Luc 2 Introductie.

Page 1: Threaded Case Study JULI 2004. Threaded Case Study 2004 Haesen Davy Janssen Luc 2 Introductie.

Threaded Case Study

JULI 2004

Page 2: Threaded Case Study JULI 2004. Threaded Case Study 2004 Haesen Davy Janssen Luc 2 Introductie.

2004 Haesen DavyJanssen Luc

2

Threaded Case Study

Introductie

Page 3: Threaded Case Study JULI 2004. Threaded Case Study 2004 Haesen Davy Janssen Luc 2 Introductie.

2004 Haesen DavyJanssen Luc

3

Threaded Case Study

Software firma

60 werknemers

2 vestigingen

Antwerpen (hoofdkantoor)

Hasselt

Page 4: Threaded Case Study JULI 2004. Threaded Case Study 2004 Haesen Davy Janssen Luc 2 Introductie.

2004 Haesen DavyJanssen Luc

4

Threaded Case Study

Design Goals

Page 5: Threaded Case Study JULI 2004. Threaded Case Study 2004 Haesen Davy Janssen Luc 2 Introductie.

2004 Haesen DavyJanssen Luc

5

Threaded Case Study

Directe groeimogelijkheden tot 100 werknemers(50%)

Veiligheid door middel van firewall en ACL

Gebruik van VLAN’s

Indirecte groeimogelijkheden tot 14 netwerken

Page 6: Threaded Case Study JULI 2004. Threaded Case Study 2004 Haesen Davy Janssen Luc 2 Introductie.

2004 Haesen DavyJanssen Luc

6

Threaded Case Study

WAN Lay-out

Page 7: Threaded Case Study JULI 2004. Threaded Case Study 2004 Haesen Davy Janssen Luc 2 Introductie.

2004 Haesen DavyJanssen Luc

7

Threaded Case Study

Antwerpen

Hasselt

Leased line2 Mbit

Internet

SDSL2 Mbit

ADSL

Page 8: Threaded Case Study JULI 2004. Threaded Case Study 2004 Haesen Davy Janssen Luc 2 Introductie.

2004 Haesen DavyJanssen Luc

8

Threaded Case Study

LAN Lay-out

Page 9: Threaded Case Study JULI 2004. Threaded Case Study 2004 Haesen Davy Janssen Luc 2 Introductie.

2004 Haesen DavyJanssen Luc

9

Threaded Case Study

Internet

Antwerpen

Hasselt

160.28.2.0

160.28.3.0160.28.4.0

198.64.27.15 (mailserver)

198.64.27.14

160.28.2.5 (ftp-server)

160.28.2.7 (file-server)

160.28.3.2 160.28.3.3 …

160.28.3.1

160.28.4.1 160.28.4.2 …

160.28.1.0

160.28.2.6 (dns-server)

160.28.2.8 (file-server) …

Page 10: Threaded Case Study JULI 2004. Threaded Case Study 2004 Haesen Davy Janssen Luc 2 Introductie.

2004 Haesen DavyJanssen Luc

10

Threaded Case Study

Hasselt

Antwerpen

160.28.5.5 (ftp-server)

160.28.5.7 (file-server)

160.28.5.6 (dns-server) …

160.28.5.0

160.28.6.0

160.28.1.0

160.28.6.1 160.28.6.2 160.28.6.3 …

Page 11: Threaded Case Study JULI 2004. Threaded Case Study 2004 Haesen Davy Janssen Luc 2 Introductie.

2004 Haesen DavyJanssen Luc

11

Threaded Case Study

Kabelplan

Page 12: Threaded Case Study JULI 2004. Threaded Case Study 2004 Haesen Davy Janssen Luc 2 Introductie.

2004 Haesen DavyJanssen Luc

12

Threaded Case Study

Legende : Hasselt

MDF en POP

15 m

25 m

Cat 5

Page 13: Threaded Case Study JULI 2004. Threaded Case Study 2004 Haesen Davy Janssen Luc 2 Introductie.

2004 Haesen DavyJanssen Luc

13

Threaded Case Study

Legende : Antwerpen (1° verdieping)

MDF en POP

30 m

20 m

Cat 5

Page 14: Threaded Case Study JULI 2004. Threaded Case Study 2004 Haesen Davy Janssen Luc 2 Introductie.

2004 Haesen DavyJanssen Luc

14

Threaded Case Study

Legende : Antwerpen (2° verdieping)

IDF

30 m

20 m

Cat 5

Page 15: Threaded Case Study JULI 2004. Threaded Case Study 2004 Haesen Davy Janssen Luc 2 Introductie.

2004 Haesen DavyJanssen Luc

15

Threaded Case Study

VLAN’s

Page 16: Threaded Case Study JULI 2004. Threaded Case Study 2004 Haesen Davy Janssen Luc 2 Introductie.

2004 Haesen DavyJanssen Luc

16

Threaded Case Study

VLAN 1: programmeurs VLAN 2: administratieVLAN 3: technische dienstVLAN 4: commerciële afdelingVLAN 5: managementVLAN 6: serverpark

Router config VLAN

VLAN 1 name VLANPinterface Ethernet 0/1

vlan-membership static 1

Page 17: Threaded Case Study JULI 2004. Threaded Case Study 2004 Haesen Davy Janssen Luc 2 Introductie.

2004 Haesen DavyJanssen Luc

17

Threaded Case Study

VLAN configuratie switch

Switch#delete flash:/config.text Switch#delete flash:/vlan.dat . Switch#config tSwitch(config)#int fa0/1Switch(config-if)#switchport access vlan 1 Switch(config-if)#exitSwitch(config)#int fa0/2 Switch(config-if)#switchport access vlan 2 … Switch(config-if)#exit

VLAN trunking

Switch(config)#int fa0/10 Switch(config-if)#switchport mode trunk Switch(config-if)#exit

Page 18: Threaded Case Study JULI 2004. Threaded Case Study 2004 Haesen Davy Janssen Luc 2 Introductie.

2004 Haesen DavyJanssen Luc

18

Threaded Case Study

ACL

Page 19: Threaded Case Study JULI 2004. Threaded Case Study 2004 Haesen Davy Janssen Luc 2 Introductie.

2004 Haesen DavyJanssen Luc

19

Threaded Case Study

Antwerpen(config)#access-list 101 deny tcp any any eq 21

Antwerpen(config)#access-list 101 deny tcp any any eq 20

Antwerpen(config)#access-list 101 permit any any

Antwerpen#configure terminal

Page 20: Threaded Case Study JULI 2004. Threaded Case Study 2004 Haesen Davy Janssen Luc 2 Introductie.

2004 Haesen DavyJanssen Luc

20

Threaded Case Study

Router configuratie

Page 21: Threaded Case Study JULI 2004. Threaded Case Study 2004 Haesen Davy Janssen Luc 2 Introductie.

2004 Haesen DavyJanssen Luc

21

Threaded Case Study

LAN

Antwerpen#configure terminal

Antwerpen(config)#router igrp 120

Antwerpen(config-router)#network 160.28.1.0

Antwerpen(config-router)#network 160.28.2.0

Antwerpen(config-router)#network 160.28.3.0

Antwerpen(config-router)#network 160.28.4.0

Antwerpen(config-router)#timers basic 120 360 370 850

Page 22: Threaded Case Study JULI 2004. Threaded Case Study 2004 Haesen Davy Janssen Luc 2 Introductie.

2004 Haesen DavyJanssen Luc

22

Threaded Case Study

LAN

Hasselt#configure terminal

Hasselt(config)#router igrp 120

Hasselt(config-router)#network 160.28.1.0

Hasselt(config-router)#network 160.28.5.0

Hasselt(config-router)#network 160.28.6.0

Hasselt(config-router)#timers basic 120 360 370 850

Page 23: Threaded Case Study JULI 2004. Threaded Case Study 2004 Haesen Davy Janssen Luc 2 Introductie.

2004 Haesen DavyJanssen Luc

23

Threaded Case Study

WAN

Antwerpen#configure terminal

Antwerpen(config)#username admin password admin

Antwerpen(config)#interface S0

Antwerpen(config)#encapsulation PPP

Antwerpen(config)#PPP authentication CHAP

Page 24: Threaded Case Study JULI 2004. Threaded Case Study 2004 Haesen Davy Janssen Luc 2 Introductie.

2004 Haesen DavyJanssen Luc

24

Threaded Case Study

WAN

Hasselt#configure terminal

Hasselt(config)#username admin password admin

Hasselt(config)#interface S0

Hasselt(config)#encapsulation PPP

Hasselt(config)#PPP authentication CHAP

Page 25: Threaded Case Study JULI 2004. Threaded Case Study 2004 Haesen Davy Janssen Luc 2 Introductie.

2004 Haesen DavyJanssen Luc

25

Threaded Case Study

Bekabeling

Page 26: Threaded Case Study JULI 2004. Threaded Case Study 2004 Haesen Davy Janssen Luc 2 Introductie.

2004 Haesen DavyJanssen Luc

26

Threaded Case Study

100 BASE-TX CAT 5 twisted pair cable (100 Mbps)

• Gebruikt voor de HCC

100 BASE-FX Multimode fiber(100 Mbps)

• Gebruikt voor de VCC

Page 27: Threaded Case Study JULI 2004. Threaded Case Study 2004 Haesen Davy Janssen Luc 2 Introductie.

2004 Haesen DavyJanssen Luc

27

Threaded Case Study

Gebruikte hardware

Page 28: Threaded Case Study JULI 2004. Threaded Case Study 2004 Haesen Davy Janssen Luc 2 Introductie.

2004 Haesen DavyJanssen Luc

28

Threaded Case Study

24 10/100/1000BaseT ports

Rack-mountable, standalone, managed switch

Prijs / kwaliteit de beste keuze voor een kleine onderneming die toch veel netwerkresources nodig heeft.

Advanced intelligent services

Cisco Catalyst 2970 Switch

Page 29: Threaded Case Study JULI 2004. Threaded Case Study 2004 Haesen Davy Janssen Luc 2 Introductie.

2004 Haesen DavyJanssen Luc

29

Threaded Case Study

Internet en intranet access met firewall security

Analoog en digital dial access services

VPN access

Inter-VLAN routing

Cisco 2612XM Multiservice Router

Page 30: Threaded Case Study JULI 2004. Threaded Case Study 2004 Haesen Davy Janssen Luc 2 Introductie.

2004 Haesen DavyJanssen Luc

30

Threaded Case Study

Prijslijst

Page 31: Threaded Case Study JULI 2004. Threaded Case Study 2004 Haesen Davy Janssen Luc 2 Introductie.

2004 Haesen DavyJanssen Luc

31

Threaded Case Study

5 x Cisco Catalyst 2970 Switch

2 x Cisco 2612XM Multiservice Router

SDSL Line + setup kosten

Leased line

ADSL Line

3 x 100BASE-TX CAT5 UTP 304.8 m

100BASE-FX Duplex Fibre Optic Cable 304.8 m

Totaal :

5 x € 2654,62

2 x € 2472,10

€ 199

€ 2204,62

€ 34

3 x € 213

€ 527,52

€ 23821,44