STAGE 32 STAGE 31 STAGE 30 STAGE 29 STAGE 25 · kos kos kos kos kos kos 6.0 14.0 01/09 sl 54.26...
Transcript of STAGE 32 STAGE 31 STAGE 30 STAGE 29 STAGE 25 · kos kos kos kos kos kos 6.0 14.0 01/09 sl 54.26...
ST
AG
E 32
ST
AG
E 32
ST
AG
E 29
STAGE 31
STAGE 30
STAGE 25
IL33
.68
IL35.06
IL32.38IL32.33
IL49.82
IL49.11
IL48.00
IL48
.05
IL50.14
IL47.47IL47.70
IL40
.16
IL36.71
IL33.8
7
IL32.86
IL32.66
IL32.72
IL42.41
IL47.64
IL48.05
IL50.22
IL47.34
IL38.21
IL38
.55
IL32.98
IL33.2
7
IL32.70
IL49.17
IL48
.57
IL34.99
IL36.30
IL36.34IL36.62
IL33.72
IL26.46 IL26.42
IL27.82
IL27.57IL27.55
IL27.16IL27.10
IL26.57
IL26.69
IL34
.94
IL52.15
1302
1303
1304
1305
1306
1307
1308
1309
1310
1311
1312
1313
131413151316131713181319
1326
1325
1324
1323
1322
1321
1320
1276
1277
1278
1279
1280
1281
12891288128712861285
1282
1283
1284
129012911292
1294
1293
1301
1300
1299
1298
1297
1296
12951181
1182
1183
1252
1253
1254
1255
1256
1257
1258
1259
1260
1261
1262
1263
1264
1265
1266
1267
1268
1269
1270
1271
1272
1273
1274
1275
1327
1328
1329
1330
1331
1332
1333
1334
1335
1336
1337
1340
1341
1342
1343
1344
1345
90061338
1339
IL32.11
IL32.09
IL32.17IL32.32
IL30.16IL28.83
IL48.16 IL48.08
IL47.88 IL47.86
IL46.53 IL46.50
IL47.42
IL44.19
IL41.59 IL39.90
IL41.38
IL37.72IL36.24
IL34.02IL33.78
IL34.01
IL28.07 IL27.58
IL30.93
IL31.90
IL27.22
IL44.48
01/37SL 28.60
19/01SL 29.60
18/01SL 31.70
17/01SL 34.02
16/01SL 34.24
15/01SL 35.48
14/01SL 39.46
13/01SL 42.90
12/01SL 46.36
10/01SL 49.72
52.6
27.1
36.4
29.4
29.3
31.0
5.614.3
600Ø(2)
600Ø(2)
600Ø(2)
600Ø(2)
600Ø(2)
600Ø(2)
675Ø(2)
750Ø(2)
750Ø(2)750Ø(2)
McMONAGLE
CRESCENT
IL26.30 IL26.27IL26.38
IL26.07IL26.05
IL26.21
IL26.24
IL26.02 05/28SL 27.93
04/28SL 28.43
03/28SL 29.29
01/28ASL 28.45
02/28SL 29.03
01/28SL 29.05
12.5
5.929.8
5.9
750Ø(2)
1500Ø(2)
1500Ø(2)1500Ø(2)
IL26.32IL27.30
IL29.43
10/20SL 31.95
36.4900Ø
(2)
IL27.38IL27.63
02/37SL 28.45
750Ø
(2)
IL27.48
IL27.48
IL27.47
IL27.32
IL27.32
IL27.32
30.030.030.1
1200x450 RCBC
1200x450 RCBC
1200x450 RCBC
5.4
1122
1121
1120
1117
1118
1119
11771178
1179
1180
1206
1205
1204
1203
1202
1201
1200
1199
1198
1197
119611951194
1192
1193
11911190
1184
1185
1186
1187
1188
1189
1218
1219
1251
1250
1249
Existing 600Ø
IL33.37
IL34.87
IL33.50
IL36.30
IL30.66 IL30.36
IL33.41IL30.82
IL34.95
IL35.10
IL36.44
IL36.57
07/19SL 33.99
06/19SL 35.58
05/19SL 36.85
04/19SL 38.28
15.1
15.8
18.6
150Ø(U)
225Ø(U)
225Ø(U)
375Ø(2)
1x100Ø
2x100Ø
2x100Ø
12.4
IL32.35 09/20SL 35.36
40.0
900Ø(2)
IL32.4
4
IL33.09IL3
2.86IL33.47
IL34.48
08/20SL 34.95
24.9
24.9
825Ø(2)
1050
Ø(2)
01/26SL 38.33
02/26SL 38.07
03/26SL 36.52
375Ø(2)15.6
32.7
375Ø(2)
375Ø
(2)
21.4
12.5375Ø(2)
01/25SL 35.02
01/27SL 29.15
07/20SL 36.74
02/27SL 28.91
03/27SL 28.52
04/27SL 28.22
05/27SL 28.21
375Ø(2)
375Ø(2)
450Ø(2)
675Ø(2)
600Ø(2)
25.0
40.1
32.0
12.1
30.9
KOs
KOs
KOs
KOs
KOs
KOs
6.0
14.0
01/09SL 54.26
02/09SL 52.23
03/09SL 50.06
01/10SL 50.53
02/11SL 50.48
01/11SL 51.17
01/13SL 43.77
01/14SL 37.45
01/15SL 34.03
01/16SL 48.96
02/16SL 48.93
03/16SL 39.92
04/16SL 34.54
05/16SL 34.38
06/16SL 34.08
375Ø(2)
375Ø(2)
375Ø(2)
375Ø
(2)
375Ø(2)
375Ø(2)
375Ø(2)
375Ø(2)
375Ø(2)
375Ø(2)
375Ø(2)
525Ø(2)
525Ø(2)
525Ø(2)
375Ø(2)
375Ø(2)
21.1
11.9
14.3
13.2
43.5
40.3
8.5
66.2
14.8
01/17SL 41.55
375Ø
(2)
56.427.8
01/18SL 35.17
375Ø
(2)
18.3
58.5
17.416.0
17.3
12.7
8.7
KOs
KOs
KOs
KOs
KOs
KOs
ALESANA
D
RIVE
RA
NIG
A D
RIV
E
McMONAGLE
CRESCENT
IL53.711x100Ø
IL49.611x100Ø
IL50.051x100Ø
IL50.701x100Ø
IL48.141x100Ø
IL48.251x100Ø
11/01SL 48.72
01/12SL 48.73
IL45.711x100Ø
IL42.361x100Ø
IL43.141x100Ø
IL38.691x100Ø
IL36.821x100Ø
IL35.98
IL35.001x100Ø
IL33.541x100Ø
IL33.991x100Ø
IL34.611x100Ø
IL39.291x100Ø
IL40.891x100Ø
IL48.291x100Ø
IL48.391x100Ø
IL49.931x100Ø
IL28.771x100Ø
IL28.511x100Ø
IL28.031x100Ø
IL27.781x100Ø
IL36.131x100Ø
KOs
KOs
KO
KOs
KOs
KOs
KOs
KOs
KOs KO
s
KOs
KOs
KOs KO
s
KO
KO KOs
KOs
KOs KO
s
KOs
KOs
KOs
KOs
KO
KO
KOs
KOsKOs
KOs
KOs
KOs
KOs
KOs
KOs
KOs
KOs
KOs
KOs
KOs
KOs
KOs
KOs
KOs
KOs
KOs
KOs
KOs
KO
KOsKOs
KOs
KOs
KOs
KOs
KOs
KOs
KOs
KOs
KOs
KO
KOs
KOs
KO
KO
KOs
KOs
KO
IL37.681x100Ø
IL33.241x100Ø
Drawing No Issue
C
AS-CONSTRUCTEDDRAINAGE
For
BRENTWOOD FORESTSTAGES 29-32
Issue Revisions DrawnDate
THESE DESIGNS AND DRAWINGS ARE COPYRIGHTAND ARE NOT TO BE USED OR REPRODUCED
WITHOUT THE WRITTEN PERMISSION OF VERIS
31.10.2017A EJMOriginal
30226-AD02
01 Feb, 2018
30226 AD02(C) MGA.dwg
BELLBIRD PARKICCMGA56AHD DOPM44903 RL56.6921:500 @ A1MJTARCADISEJMEJM
Data Sources30226 LC25-32(E).dwg
Brentwood_Stage_25_to_26_Construction.projectArcadis
025m
50 mm 150 mm SCALE BAR100 mm50m 75m
Cadastral Boundaries
As-constructed survey
Engineering Design
Locality:Local Authority:Horizontal Meridian:Vertical Level Datum:Level Origin:Scale:Surveyed:Designed:Drawn:Checked:Plot Date:Computer File Ref:
I, ............................................................ being a cadastral surveyor and dulyauthorised representative of Queensland Surveying Pty Ltd hereby:· certify the information contained in this drawing is an accurate asconstructed representation of the works· accept responsibility for the as constructed information contained inthis drawing· acknowledge the as constructed information contained in the drawingmay be relied on by council and others
Certification by ........................................ on .................. (Signature) (Date)for Queensland Surveying Pty Ltd
Peter Sippel
31/01/2018
IMPORTANT NOTES:
(These notes are an integral part of this plan)This Plan has been prepared for AVID PROPERTY GROUP to ICCstandards, for the purpose of recording the As Constructed details of anew service constructed under a specific Council Approval and should notbe used for any other purpose.
No report is made on any other service/s, nor any service/s that may existbefore or be constructed after, the time of survey, or constructed underany other approval.
The property boundaries, easements and lot numbers shown hereon maybe proposed only and subject to registration by the Department of NaturalResources. All property information should be determined from theregistered Survey Plans.
All dimensions should be verified and confirmed against the latestinformation prior to commencement by any person using this plan forbuilding purposes.
Queensland Surveying Pty Ltd accepts no responsibility for any changesmade to construction or otherwise, after the date of this plan. Anydiscrepancies should be clarified in writing with the relevant Authority priorto commencement of the work.
Copyright © Queensland Surveying Pty Ltd a Veris Company 31/01/2018.
veris.com.au
ACN 604 671 374Queensland Surveying Pty Ltd, a Veris Company
BRISBANE(07) 3666 4700
MACKAY(07) 4951 2911
WHITSUNDAYS(07) 4945 1722
CAIRNS(07) 4051 6722
17.01.2018B MJTUpdate construction
31.01.2018C MJTConstruction completion