Showcase Milan Seegers

download Showcase Milan Seegers

of 36

Transcript of Showcase Milan Seegers

  • 8/10/2019 Showcase Milan Seegers

    1/36

    sheet #1, property of ing. Milan Seegers, architectural concept and design

    visit: linkedin.com/milanseegers

    ing. Milan Seegers

    visit me on the web:

    milanseegers.blogger.com

    facebook.com/milanseegers

    linkedin.com/milanseegers

    twitter.com/milanseegers

    or view documents in my own

    creative cloud:

    goo.gl/vV6Gy

    mail. [email protected]

    tel. +31 6 48 07 8353

    Booklet version 29th november 2012

    complete version

    showcase booklet

    Specialized in strong expression of architec-

    tural designs and ideas.

    Combining both conceptal and practical

    knowledge about building informationtechnology: my discipline covers the entire

    architectural design process from sketch to

    final design.

    Innovation, creativity, technology, simplicity,

    freethinking, knowledge, passion and profes-

    sionalism is my device.

    drive

    Milan Seegers

    naar het originele succes verhaal

    BIGBIMlittle bim

    Een boek van Finith E. Jernigan & Joost Wijnen

    depraktischebenaderingvanBouwInformatieManagement

    k eten in teg r a t ie op d e ju i s te m a n ier !

    Pre-release deel 1aangeboden door

    w w w . b i g b i m l i t t l e b i m . n l

    oadisopenbim adviseurs

    i -

    i

    .

    k

    k -

    l

    i

    k k

    -

    i i

    n i m vi u r

    Order the book, where I have worked on:

    BIG BIM little bimnow online at

    www.bigbimlittlebim.nl and read about

    integrated practice done right!

    BIG BIM little bim:The practical approatch to Building Informa-

    tion Management.

  • 8/10/2019 Showcase Milan Seegers

    2/36

  • 8/10/2019 Showcase Milan Seegers

    3/36

    section of a design proposal part of the DEP building design proposal showcase for cepezed projects

  • 8/10/2019 Showcase Milan Seegers

    4/36

  • 8/10/2019 Showcase Milan Seegers

    5/36

    inspiration, imagination and facination

  • 8/10/2019 Showcase Milan Seegers

    6/36

    sheet #6, property of ing. Milan Seegers, architectural concept and design

    visit: milanseegers.blogger.com

    renovation pascal collegeDesign assistance at the Pascal college in the city of Zaandam by makingdesign decisions comprehensible.

    date

    November 2012

    addres

    Zaandam

    client

    Pascal College

    SummaryThe assignment involved the design assis-

    tance at the renovation of the Pascal college

    in Zaandam by maintaining a 3D BIM model

    to ensure usability, insight and design decisi-ons during the design proces.

    ResultThe eventual result was a 3D model, a budget model and 3 artist

    impressions ready for presentation.

  • 8/10/2019 Showcase Milan Seegers

    7/36

    sheet #7, property of ing. Milan Seegers, architectural concept and design

    visit: milanseegers.blogger.com

  • 8/10/2019 Showcase Milan Seegers

    8/36

    sheet #8, property of ing. Milan Seegers, architectural concept and design

    visit: milanseegers.blogger.com

    touchdown highriseLarge urban programThe assignment involved the analysis of

    several existing urban programs on the

    basis of a conceptual layers at the location

    Zeeburgerpad projecting. A fragment of theurban scheme was the starting point for

    the architectural challenge and quest. The

    assignment specifically asked for multiple

    intensive spatial use.

    Floor space indexThe quest for quality was naturally focu-

    sed on the quality and consistency of the

    different places, but more particularly on

    the value and appreciation of all living and

    working environment. So it was for us a

    challenge to the Floor Space required high

    index (FSI = 2.0) combined with the highestpossible Open Space Ratio (OSR).

    ConceptThis thematic approach of optimizing land

    use has led to solutions who have their

    own urban interpretation and matching

    architectural appearance. The area, having

    the potential to develop its own image and

    physical space to hook to the city.

    Our architectural appearance is not random

    but a result and supports the principles

    formulated in urban planning.

    The model is not based on existing urban

    land development typologies. It is a structure

    that repects the desired urbanization of the

    place but based on its own spatial pattern. A

    structure that literally creates space.

    Urban design and architectural development at the zeeburgerpad,Amsterdam. Including dwellings, offices and recreation.

    date

    june 2011

    address

    zeeburgerpadAmsterdam

    the Netherlands

    client

    City of Amsterdam &

    University of applied

    Sciences Amsterdam

    gfa

    25.000 m2

    prizes

    nominated for Vitae

    bouw award 2011

    this graduation project

    for my Bachelor of Build

    Environment is assessed

    a 9 out of 10

    made in collabora-

    tion with Job van den

    Heuvel

    a corresponding movie

    can be seen at my

    website:

    tiny.cc/iby36

    project touchdown highrise

  • 8/10/2019 Showcase Milan Seegers

    9/36

    sheet #9, property of ing. Milan Seegers, architectural concept and design

    visit: linkedin.com/milanseegers

    The special developed spatial concept is

    fully integrathed within the placing of the

    housing typologies which are directed by a

    generic system and zoning within the hull.

    A decentralized installation system for air

    treatment is being utilized and can adapt to

    any change made in that zoning system is

    what makes this building unique.

    the decentralized installation system for air treatment called NEXT active facadesis here being utilized in the In the balcony of a dwelling or an office.

    project touchdown highrise

  • 8/10/2019 Showcase Milan Seegers

    10/36

    sheet #10, property of ing. Milan Seegers, architectural concept and design

    visit: milanseegers.blogger.com

    project touchdown highrise

  • 8/10/2019 Showcase Milan Seegers

    11/36

    sheet #11, property of ing. Milan Seegers, architectural concept and design

    visit: linkedin.com/milanseegers

    the decentralized installation system for air treatment called NEXT active facadesis here being utilized in the In the balcony of a dwelling or an office.

    project touchdown highrise

    1. The concept starts off from the double

    layered construction in order to meet

    the requiered FSI of 2.0.

    2. Next, this huge density needed a pu-

    blic space for access, quality, daylighting,

    transportation, etc. Conventionally, this

    is done by multi-storey buildings to re-

    turn some of the volume removed. Herewe have chosen a different approach,

    namely literally lifting the top layer of FSI.

    This creates a raised surface, and thus a

    public space the size of the entire plot.

    1

    2

    3

    4

    5

    6

    3. To further define the superstructures volume and quality to the

    outdoor space, we narrow the upper volume to the north, creating a

    space in the form of a p, on the south side.

    4. Then arises the accent, retreived from the RGBG cards, as an incre-

    ase in the superstructure. This volume is created by forming the latter

    part of superstructure.

    5. The connection to the water is reflected by lowering the waterlevel to the plinth.

    6. The connection to the green / blue zone east of the Zeeburgerpad

    in the form of a green bicycle and pedestrian bridge.

  • 8/10/2019 Showcase Milan Seegers

    12/36

    sheet #12, property of ing. Milan Seegers, architectural concept and design

    visit: milanseegers.blogger.com

    regulatory and gaugeThe assignment involved renovating two

    remaining structures on the grounds of Am-

    sterdams former socalled zuidergasfabriek.

    Adopting the structures in a new urban planrecruiered a change of function to fit in pro-

    perly. Integrating functions such as a small

    medical center and a workshop supplying

    the new neighbourhood in it s main needs.

    The vision on which the design is based

    consists of the following points.

    1 the spatial perception that the monuments

    from a history point of view own should not

    or as little as possible be affected.

    2 the quality of the immediate environment

    should be adapted to the future context.

    The following concept respecting that vision

    is then formed

    1 box-in-box. The facades of the monuments

    act as a hat. Under these hats forms a consis-

    tency of the new air conditioned boxes and

    functions.

    2 below surface. The architecture of the

    exterior must be preserved and an it below

    street level approach to the construction is

    inevitable.

    3 public space. The quality of the new

    building can only come into its own by

    connecting it to the immediate surrounding

    area.

    renovation and redevelopment into a new context at the Zuidergasfa-briek, Amsterdam. Including offices and workshops.

    datemai 2010

    addressde OmvalZuidergasfabriek

    Amsterdam

    the Netherlands

    52.338525, 4.914140

    clientCity of Amsterdam &

    University of applied

    Sciences Amsterdam

    gfa

    2000 m2

    made in collabora-

    tion with Job van

    den Heuvel

    project regulatory and gauge

  • 8/10/2019 Showcase Milan Seegers

    13/36

    sheet #13, property of ing. Milan Seegers, architectural concept and design

    visit: linkedin.com/milanseegers

    The experience of the monumental space

    created gos beyond displaying the architec-

    ture to the user, the public. Creating of sight-

    lines and transparency is a keyword here.

    From level one, there are great sight lines

    through space to the monumental facades

    (including the roof). These internal sight lines

    give the value, next to the monu-

    total value, to behold the perception of size

    and scale of the composition of the whole

    (old and new).

    Besides providing the opportunity to expe-

    rience the historic value, there are sight lines

    that fulfill other goals.

    The facilityarea provides through its sight li-

    nes for the perception of the entire building.

    The public using this area, will experience

    the spaces linked by this area as a special

    perception.

    In order not compromising the spatial

    experience of the monument, the air hand-

    ling unit is located outside the monuments.

    Fresh air is then delivered at floor levels.

    The exhaust from the boxes goes through

    the ceiling (hot air rises) Then the air moves

    into a vertical shaft and is blown out again

    (without filtration or purification) from the

    basement floor in the raw climate space.

    the facilityareawhich is the buildings both route-logical as technical connector

    underneath is illustrated the process fresh air goes through. Green means fresh and purple means used.

    project regulatory and gauge

  • 8/10/2019 Showcase Milan Seegers

    14/36

    sheet #14, property of ing. Milan Seegers, architectural concept and design

    visit: milanseegers.blogger.com

    project regulatory and gauge

  • 8/10/2019 Showcase Milan Seegers

    15/36

    sheet #15, property of ing. Milan Seegers, architectural concept and design

    visit: milanseegers.blogger.com

    linear modelThe assignment involved making artistic

    conceptual images of a design proposal

    for a renovation of a villa in the rural area of

    Limburg, a dutch provence.

    A series of 3 images were needed to explain

    the exterior design of the villa, and were

    used to complement the architects own

    drawings

    Conceptual artistic images made for a design of a villa in the rural area ofLimburg, a dutch provence.

    date

    april 2011

    address

    Limburgthe Netherlands

    client

    Architectenbureau

    Van den Heuvel de

    Wilde

    gfa

    450 m2

    project lineair model

  • 8/10/2019 Showcase Milan Seegers

    16/36

    sheet #16, property of ing. Milan Seegers, architectural concept and design

    visit: milanseegers.blogger.com

    The assignment involved the making of a

    series of conceptual artistic images involving

    the design of a communityschool in de

    Jordaan area in the city of Amsterdam.

    Conceptual artistic images made for a design of a community school inthe Jordaan area in Amsterdam.

    date

    december 2010

    address

    ElandsstraatAmsterdam

    the Netherlands

    client

    City of Amsterdam

    & Delft University of

    Technology

    gfa

    8000 m2

    prizes

    first prize at the Delft

    University of Techno-

    logy Architecture,

    Urbanism and Buil-

    ding sciences master

    briging semester.

    Ook te zien in:

    De transformatie

    van het schoolge-

    bouw

    ISBN:

    978 90 6868 581 7

    a corresponding

    movie can be seen

    at my website:

    tiny.cc/u9vmh

    project community school, de jordaan

    Community school

  • 8/10/2019 Showcase Milan Seegers

    17/36

    sheet #17, property of ing. Milan Seegers, architectural concept and design

    visit: linkedin.com/milanseegers

    project community school, de jordaan

  • 8/10/2019 Showcase Milan Seegers

    18/36

    sheet #18, property of ing. Milan Seegers, architectural concept and design

    visit: milanseegers.blogger.com

    fortified town dwellingThe assignment involved renovating an old

    monumental dwelling at the centre of the

    pitoresque city of Naarden-vesting.

    This private comminioned assignment whichI conducted on my own was my first real re-

    novation assignment. The old inhabitant left

    the house in a smudgy dark state. The new

    inhabitants had the wish to make a light and

    spacious dwelling out of it.

    I guided them through the whole process

    from an inspecion of the old structure, which

    was more than 100 years olf, sketchdesign

    and a building permit for the semi-monu-

    mental building.

    The result was a suprising light and spacious

    dwelling wich was relativily cheap to build

    thanks to good design and preperation.

    Underneath are some photographs of the

    building not being renovated yet.

    A small dwelling in the pitoresque city of Naarden-Vesting needed a re-novation. The new owners wanted a light and spacious dwelling.

    design date

    november 2010

    conducted on

    mai 2011

    photographs of the

    conducted design

    are on their way

    address

    marktstraat

    Naarden (vesting)

    the Netherlands

    client

    private commissio-

    ning

    gfa

    150m2

    project marktstraat naarden-vesting

  • 8/10/2019 Showcase Milan Seegers

    19/36

    sheet #19, property of ing. Milan Seegers, architectural concept and design

    visit: linkedin.com/milanseegers

    The assignment involved renovating the old

    neighbourhood of Kattenburg located in

    Amsterdam in the eastern docklands.

    Starting points were 1. better connectingwith water and surrounding islands 2.

    better connection between the sub areas

    inside Kattenburg. and 3. better correlation

    between public and private realm

    We started of creating an adjusted urban

    scheme based on the original building pla-

    cement as shown at the bottom of this page.

    We revitilized the buildings giving them a

    new facade system as shown at the right.

    Renovating an old decayed neighbourhood on a A+ location and return it its glory.

    date

    march 2011

    address

    kattenburgamsterdam

    the Netherlands

    client

    city of Amsterdam

    prizes

    2nd price on the

    IP project at the

    University of Applied

    Sciences Amsterdam

    project 2nd life of kattenburg

  • 8/10/2019 Showcase Milan Seegers

    20/36

    sheet #20, property of ing. Milan Seegers, architectural concept and design

    visit: milanseegers.blogger.com

    DEPDEP is located in Science Port Holland.

    Science Port Holland is the location and

    habitat of companies, knowledge and public

    institutions, which strive to achieve one

    common goal: open innovation networksin leading technologies, with the aim to

    turn technology innovations into business.

    Bringing together knowledge institutions

    and businesses, which clearly contribute to

    addressing the key challenges in our society,

    with spearheads in climate and health.

    With DEP they offer a multi-tenant building

    for high- tech companies.

    This assignment wanted me to show diffe-

    rent possibilities of a building adapting itself

    to several different high tech users.

    Showing a manufacturing facility, a labora-

    tory and a modern office.

    DEP stands for Delft Engineering and Production. Realistic computerimages made for a design of a officebuilding designed by architectenbu-

    date

    january 2011

    address

    Technopolis / sci-ence port holland

    Delft

    the Netherlands

    client

    architectenbureau

    CEPEZED

    gfa

    -

    prizes

    first prize at minor

    Visualisation 2010

    at the University of

    Applied scriences

    Amsterdam

    a corresponding

    movie can be seen

    at my website:

    tiny.cc/u9vmh

    more info at

    cepezedprojects.nl/

    projects-dep.htm

    project delft engineering and production

  • 8/10/2019 Showcase Milan Seegers

    21/36

    sheet #21, property of ing. Milan Seegers, architectural concept and design

    visit: milanseegers.blogger.comproject delft engineering and production

    This project is a modern office building with an open, light, and pavilion-like atmosphere.

    The office floors allow a flexible layout and can be mutually connected by large vides and representative staircases.

    Each floor can equip 810 square meters of laboratory. The laboratory module is the key unit in any lab facility. The lab module will fully coordinate all the archi-

    tectural and engineering systems.

    Flexibility in production planning and control, plus the ability to switch f rom one production model to a replacement, can often mean the difference between

    success and failure.

  • 8/10/2019 Showcase Milan Seegers

    22/36

  • 8/10/2019 Showcase Milan Seegers

    23/36

    sheet #23, property of ing. Milan Seegers, architectural concept and design

    visit: linkedin.com/milanseegers

    HM architectenDuring my internship at HM architecten in

    Amsterdam the emphasis lay on the widest

    possible formation throughout the entire

    field.

    Because of that I worked on a variety of pro-

    jects from sketch phase to definitive design

    phase.

    The Vogelbuurt is a new development in

    Baarn. The project consists exclusively of so-

    cial housing. The illustrations for this project

    on the photorealistic renders from my hand.

    I have also worked on technical drawings of

    faade drawings to detailed drawings

    In the picturesque village of Leimuiden, half-

    way in the Dorpstraat was a modern house

    being built in the same style as the surroun-

    ding buildings. The surrounding buildings

    were characterized by many typical early

    20th century Dutch architectural styles. We

    chose a house with 2 floors. The depth of the

    plot to accentuate the shape of the stone

    construction volume in this direction and

    stretched on the ground floor on two sides

    by a building that both the barn and the

    living houses.

    Hoboken is a study of sustainable urban

    development and architectural re-evaluation

    of a garden village for social housing Woon-haven in Antwerp. I Accompanied architect

    Jeroen Gerads to support his efforts making

    this design sustainable, by using for example

    the BREAM scoring.

    My first professional internship was at HM architecten in Amsterdam. Mysupervisor was Maarten van Noord.

    date

    august 2009 until

    february 2010

    addressgrasweg 49

    1031HX

    Amsterdam

    The Netherlands

    Projects

    participated

    - Vogelbuurt Baarn

    - factor IJ

    - Dorpstraat Leimui-

    den

    - Hoboken Antwer-

    pen

    - Achtstaten

    - HAVAS almere

    - vakantiewoningen

    Marken

    - Rietvelden

    - Rijsenhout

    here I organised a

    classes computer de-

    sign for architects

    this internship for

    my Bachelor of Build

    Environment is as-sessed a 9 out of 10

    internship at HM architecten

  • 8/10/2019 Showcase Milan Seegers

    24/36

    sheet #24, property of ing. Milan Seegers, architectural concept and design

    visit: milanseegers.blogger.com

    BIMbuzz design contestAs for the 2012 BIMbuzz competition in

    Singapore the connexxion design Team was

    born: Students and teaching professionals

    passionate about BIM united.

    Their aim: To win the 2011 international BIM-

    buzz Singapore design competition.

    The Rules were simple: to design a hotel in

    48 hours using BIM according to a provided

    functional program. The competition was

    tense: teams from universities al over the

    world were competing each other.

    The verdict of the singapore jury was clear: It

    was the most comprehensive and com-

    plete Building Information Model they had

    received. While meeting al the functional re-

    quirements, the design was, with no doubt,

    the overall winner of the 2011 Singapore

    BIMbuzz design contest.

    Designing a sustainable hotel in the city of Singapore revolving BIM prin-ciples in an international design contest

    date

    September 2011

    client

    BIMbuzz singapore

    gfa

    10.000+

    prizes

    1st prize (overall

    winner)

    Singapore design contest

    a final render of the project, as designed in the

  • 8/10/2019 Showcase Milan Seegers

    25/36

    sheet #25, property of ing. Milan Seegers, architectural concept and design

    visit: linkedin.com/milanseegers

    BIM experience at OadisAt Oadis OpenBIM consultants the top-notch

    in BIM knowledge in Holland is available.

    Delivering open and independant consul-

    tancy Oadis secured its own region in the

    dutch BIM-market.

    We develop and implement management

    information systems in organizations, prima-

    rily for construction. These systems provide

    real-time insight into all phases of construc-

    tion, from feasibility studies to demolition.

    Information is centralized and tested before

    reuse. Thus the right decisions based on the

    correct data can be made.

    Our state-of-the-art knowledge enables

    us to link and merge system information

    already available, including external parties.

    This gives Oadis a unique position; to offer

    professionals within the industry a significant

    advantage.

    BIM-consultant and account manager at an innovative & young com-pany.

    date

    October 2011 until

    now

    addressH.J.E. Wenckenbach-

    weg 49 Amsterdam

    Burg. Buskensstraat,

    Uden

    Clients

    - Erasmus MC Rot-

    terdam

    - UMC Utrecht

    - Rijkswaterstaat

    - University of

    applied sciences

    Amsterdam

    -

    BIM experience at Oadis

    naar het originele succes verhaal

    BIG

    BIMlittle bim

    Een boek van Finith E. Jernigan & Joost Wijnen

    de praktische benadering van Bouw Informatie Management

    k e t e n i n t e g r a t i e o p d e j u i s t e m a n i e r !

    Pre-release deel 1aangeboden door

    w w w . b i g b i m l i t t l e b i m . n l

    oadisopenbim adviseurs

    BIG BIM little bim leert je:

    Vernieuwende manieren om vooruitstre-

    vend te worden in de technologie van

    morgen.

    Hoe je op een duurzame manier waarde

    toevoegt aan je projecten.

    Hoe je Bouw informatie Management

    kunt toepassen in je werk. Vandaag nog.

    De kennis die nodig is om je te kunnen

    focussen op je krachten, je werk en pro-

    bleem oplossing.

    Manieren om meer en beter te leveren

    met minder, terwijl je zekerheid creert

    over de resultaten.

    De geheimen die leiden naar meer winst

    en tevredenere klanten, gebruikmakend

    van BIM.

    En, een door de praktijk geteste benade-

    ring die kan worden toegepast in ieder

    project.

    ISBN 978-94-6190-946-6

    oadisopenbim adviseurs

    bestel het complete boek nu op www.bigbimlittlebim.nl

    building lifecycle managementCadvisual

    Bezoek de BIG

    BIM little bim

    website, bestel

    het boek en

    ervaar de vele

    extras die BIG

    BIM little bim te

    bieden heeft!

    Pre-release deel 1aangeboden door

    cadvisual@

    bigbimlittlebim.nl

    tel. 0413-216300

    Order the book, where I have worked on: BIG BIM little bimnow online at www.bigbimlittlebim.nl and read about

    integrated practice done right! BIG BIM little bim: The practical approatch to Building Information Management.

  • 8/10/2019 Showcase Milan Seegers

    26/36

    sheet #26, property of ing. Milan Seegers, architectural concept and design

    visit: milanseegers.blogger.com

    OpenBIMlabThe Open BIM Lab is aimed at offering a le-

    arning- and research environment to come,

    via chain collaboration, to a more sustainable

    built environment.

    Because society is becoming increasingly

    complex while demands and expectations of

    our living environment rise, solutions must

    be found and realised. Here, information and

    knowledge management will be playing a

    crucial role, because only if the sourceinfor-

    mation of stakeholders can be unlocked can

    insight be offered into the consequences of

    desisions. This calls for a change in culture

    in the building sector, which can be realised

    significantly by proving that new coopera-

    tion is technically feasible and returns are

    sufficient.

    OPEN

    Open uitwisselstandaarden for files and

    information play an important role in the

    chain. The software tools, object libraries

    and protocols that will examine OpenBIM-

    lab bets, will therefore be minimal based

    on open standards and / or open source

    software can be selected. OpenBIM enables

    supply chain partners to enrich each other s

    information and portability. This unam-

    biguous and faster communication. The

    disclosure of project information is brought

    together again possible for information tovalidate and analyze. This leads to a better

    quality of information, greater transparency

    and better understanding of the possibilities

    or consequences of decisions for all supply

    chain partners at every level: from client

    to contractor. The OpenBIMlab will play

    BIMlab, an inspiring laboritory for Building Information Management.The design and implementation of systems, software and workflows.

    clients

    University of applied

    Sciences Amsterdam

    Hogeschool Utrecht

    Hogeschool Zeeland

    Avans hogeschool

    gfa

    approx. 40m2

    prizes

    contributed iin

    the 2011 BIMbuzz

    Singapore contest

    (1st prize)

    BIMlab

  • 8/10/2019 Showcase Milan Seegers

    27/36

    sheet #27, property of ing. Milan Seegers, architectural concept and design

    visit: linkedin.com/milanseegers

    a variety of research objectives focus, ranging from logistics, cost,

    durability, etc. Another advantage is that the open standards relevant

    project information in a sustainable way to archive, because the

    information is as independent of (the version) software products. The

    digital information just as long as the property!

    BIM

    BIM stands for Building Information Model, where the Dutch trans-

    lation has several variants such as building information model, buil-

    ding information management etc. Partly because there are different

    interpretations in the market about what BIM is and what it can do

    for clients and the production chain. and while the goal of BIM is to

    promote clear communication in the chain ... There is therefore a

    clear need in the market to know what BIM can be expected.

    LAB

    A lab experiment represents a sterile environment, with high quality

    resources to do research to open BIM. The OpenBIMlab of HvA con-

    ducted by practice-oriented research to improve the employability

    and profitability of ketendigitalisatie to show. The studies may be due

    to internal training programs, research projects or issues from the

    market. This will not only students of the University can access the

    OpenBIMlab, the Academy will also project-based cooperation with

    other government agencies and industry.

    Some specs: 5 work-spaces, 1 administrator-space, 48 processor

    cores, 96GB ram, 1440GB ssd drives in RAID-0 configuration, 4TB

    storage, Gigabit Ethernet, 50 presentation display, 12 22inch Full HD

    displays.

    BIMlab

  • 8/10/2019 Showcase Milan Seegers

    28/36

    sheet #28, property of ing. Milan Seegers, architectural concept and design

    visit: milanseegers.blogger.com

    School dwellingsThe need for a school and the need for

    dwellings in the neighbourhood of Zee-

    burg, Amsterdam, is changing throughout

    the years. As inhabitant structures change

    through time, the need for a transformingbuilding arose.

    Thus designed was a building that first could

    serve for several years as a combination of

    a medium sized school and dwellings. Later

    A transforming building in a transforming neighbourhood: The need fora school and the need for dwellings.

    date

    june 2010

    address

    Zeeburg, Amster-dam

    client

    University of Applied

    Sciences Amsterdam

    partner

    Anne Smulders

    School dwellings

    1111098

    H

    I

    J

    71

    16x0,200

    =3,200m

    19x0

    ,168=

    3,200m

    W

    W

    W

    W

    W

    W

    W

    W

    W

    W

    W

    W

    W

    WW

    WW

    WW

    WW

    DS-02

    DS-02

    -

    -

    -

    -

    woning 114m2

    woning 76m2

    woning 70m2

    woning 74m2

    woning 84m2

    o n in g 1 mn i o

    woning 74m2

    woning 94m2

    woning 94m2

    woning 69m2

    woning 116m2

    uitb

    op

    oudenooduitgangschool nu normaal

    toegankelijktbvontsluiting

    T

    1098

    I

    J

    K

    7

    16x0,200

    =3,200m

    19x0

    ,168=

    3,200

    m

    W

    W

    W

    W

    W

    W

    W

    W

    W

    W

    W

    DS-02

    DS-0

    r l

    l

    l

    -

    -

    -

    woning 114m2

    woning 76m2

    woning 70m2

    woning 74m2

    woning

    woning 1n i o

    woning 74m2

    g lij rui tklaslokaal

    klaslokaal l lo l

    l l o l

    personeelsruimte

    zelfst. werkruimte

    managementruimte

    pantry

    opslag

    flexwerkplek

    opslag

    T

    7

    x,

    =,

    x,

    =,

    -

    -

    l

    l

    woning

    woning

    woning 1

    woning 11

    woning

    woning

    -

  • 8/10/2019 Showcase Milan Seegers

    29/36

    sheet #29, property of ing. Milan Seegers, architectural concept and design

    visit: linkedin.com/milanseegers

    School dwellings

    the school would transform to more dwel-

    lings.

    The architectural concept is based on the

    shape of the lot and has a 2 meter clearanceof the western road, as being asked in the ur-

    ban masterplan. Added is a 6 story building

    in the shape a wedge placed in the north-

    west side of the lot, creating a solid barrier

    against the noise generated by the freeway.

    The shape is then cut on the south to create

    room for a arban sightline. A green passage

    is being added to comply with the green-

    zone north of the building. On the east an

    indoor sports arena is created and ontop

    there is room for a playground. A green slope

    creates a playfull run-up towards the above

    surface indoor sports arena.

    The facades are equipped with a modular

    facade system. Making it easy to create a

    flexible transparent / solid appearance.

    The project as entirely designed in BIM using

    ArchiCAD. Also the transformational capabi-

    litys were carefully designed and analysed

    making use of the information in the BIM.

  • 8/10/2019 Showcase Milan Seegers

    30/36

  • 8/10/2019 Showcase Milan Seegers

    31/36

    sheet #31, property of ing. Milan Seegers, architectural concept and design

    visit: linkedin.com/milanseegers

    levels. This way reducing the risk of errors each time the information

    is passed on.

    The UMC Utrecht BIM platform brought a solution, connecting both

    existing systems and new systems; forming an efficient and ade-

    cuate combination of technologies whereupon, in the near future,

    can be build upon. In other words, is future proof.

    The UMC Utrecht BIM platform was build revolving openBIM princi-

    ples and complies with the RGD BIM norm: creating a comprehen-

    sive information workflow while maintaining flexibility for future

    development, reducing system legacy and adding sustanability.

    Facility management using BIM

    The UMC Utrecht BIM

    platform was build revolvingopenBIM principles and com-

    plies with the RGD BIM norm

    A system that could both comprehend and

    sustain on a policy level, a strategic level, and

    on an operational level.

  • 8/10/2019 Showcase Milan Seegers

    32/36

    sheet #32, property of ing. Milan Seegers, architectural concept and design

    visit: milanseegers.blogger.com

    Intervention HamburgThe design proposes an intervention that

    acts on both urban scale and architectural.

    The site is located on the south side of the

    main trainstation of Hamburg (GER) and has

    the opportunity to enhance the con- necti-vity and accessibility for pedestrians.

    What we propose is conflict free connec-

    tions:

    - between the city centre and the outer city

    on the east side of the station;

    - with the station (and thereby making an

    extension of the station);

    -to the office district to generate a better

    accessibility towards this area.

    The urban space is strongly defined by the

    contrast between the empty space and

    the four big surrounding public buildingand auto ways. The intervention tries to act

    without interfering with the existing, well

    functioning, car traffic and train traffic.

    This results in a design on three levels:

    - the train level which is seven meters below

    street level; - the second level is the same as

    the exis- ting street level; -the third level is

    a new introduced level which is six meters

    higher.

    This last level, the so called fly-over is

    designed, detailed and materialised on a

    contemporary way, while the street slab

    makes by his materialization a connection to

    the existing urban surrounding.

    the intermediate level between architecture and urbanism. Completelydesigned in a BIM environment..

    date

    june 2012

    address

    HauptbahnhoffHamburg

    client

    TU Delft

    gfa

    10.000m2+

    special

    Visit, for a 360 view

    of the project;

    http://www.jvdhar-

    chitecture.nl/ham-

    burg.html

    Intervention Hamburg

  • 8/10/2019 Showcase Milan Seegers

    33/36

    sheet #33, property of ing. Milan Seegers, architectural concept and design

    visit: linkedin.com/milanseegers

    Intervention Hamburg

    Where the fly-over touches the ground surf-

    ace it continues for a while in the pavement

    by which it attracts visitors and attaches

    more strongly to the city.

    To enhance the vitality of the area we

    introduce a hotel, which is located just a bit

    below the busy traffic lines near the station

    and offers 17 levels of hotel rooms of about

    30m2. The connection with the two slabs is

    transformed into a cafe, while the upper two

    levels contain a restaurant and a conference

    centre.

    On the fly-over near the station, a little shop is designed where small

    functions related to the station can be. By doing so the interaction

    with the station itself is enhanced.

    We see that our design aims on an attrac- tive and conflict free rou-

    ting for the pe- destrian and acts on both urban (making connecti-

    ons between areas and districts) and architectural scale (generation

    func- tions, making connection on smaller scale and introducing a

    recognizable object next to the second most large trainstation of

    Germany.

    Completely designed in a BIM environmentusing the BIM-information not only as an

    3d model but also extracting analysis data

    about traffic and routing. A truely remarka-ble piece of implenting and actually using

    advanced information in an engineering

  • 8/10/2019 Showcase Milan Seegers

    34/36

    a view through the redeveloped part of the Pascal College, Zaandam

  • 8/10/2019 Showcase Milan Seegers

    35/36

  • 8/10/2019 Showcase Milan Seegers

    36/36