Rwanda
-
Acknowledgments
The (I)NDC Content Briefs were produced by the Climate Policy
Team of the World Bank Climate Change Group. The team was led
by Sebastian Wienges and Ana Bucher under the supervision of
Stephen Alan Hammer. Detail analysis of country (I)NDC was
provided by Tom Witt, Jiawei Song, Karan Chouksey (mitigation
components), Yin Qiu, Yunziyi Lang, and Prajwal Baral (adaptation
components). The team is grateful for all comments and
suggestions received from regional and sector specialists
regarding the presentation and synthesis of relevant information.
© 2016 International Bank for Reconstruction and Development/The World Bank 1818 H Street NW Washington DC 20433, U.S.A. Internet: www.worldbank.org
Climate Policy Team | World Bank Group
-
SUB-SAHARAN AFRICA | Rwanda | (Intended) Nationally Determined Contribution
Introduction In response to a growing interest in understanding (Intended) Nationally DeterminedContributions ((I)NDCs) and with regard to the ultimate goal of supporting countries'implementation of their national climate targets, the World Bank Climate Policy Team (WBCPT) has
reviewed all developing countries (I)NDCs' submitted to the UNFCCC. The (I)NDC Content Brief
aims to provide a summary analysis of existing and instead country mitigation and adaptation
policies and plans, commitments and targets, implementation strategies and sector priorities,
associated costs and conditionalities, and stated gaps and needs, among other issues.
The (I)NDC content briefs are created solely on the basis of information from submitted(I)NDCs and makes no inferences about robustness, quality, or viability of intended policiesor actions.
The (I)NDCs review will help implementing organizations like the World Bank Group (WBG) identify
and familiarize with a range of country priorities in terms of sectoral engagement, and needs in
terms of capacity building, technology transfer, and financing. Based on this comprehensive
mapping exercise, the WBG will develop a useful, easytouse, and interactive database and briefs
of all (I)NDCs to inform a wide range of WBG initiatives and client engagement processes, including
the development of Systematic Country Diagnostics (SCDs) and Country Partnership Frameworks
(CPFs), and at a later stage respond to the more specific requests from all WBG Global Practices
(GPs), regions, and country units for the identification of potential development opportunities,
analytical studies and technical assistance to support countries' implementation of planned policies
and actions. Indepth summaries of (I)NDCs by sectors and regions will be prepared at a later stage.
In regards to Adaptation, although no global adaptation mechanism is established, the ParisAgreement parties are required to engage in adaptation planning and implementation of actions
which include preparation of adaptation plans. The Adaptation section of a large number of
submitted (I)NDCs, aims to increase development planning and scale the ability of countries to
adapt to the adverse impacts of climate change and foster climate resilience and low greenhouse
gas emissions development, in a manner that does not threaten sustainable development. In
addition to requested finance, the implementation of country commitments is largely tied to
significant amounts of external assistance to support development and execution of adaptation
plans. Although subsequent (I)NDCs are not explicitly required to have an adaptation component,
the process will ensure increased resilience is recognized under the UNFCCC and climate finance
mobilization is enhanced with an aim to achieve a balance between adaptation and mitigation flows.
Climate Policy Team | World Bank Group
-
SUB-SAHARAN AFRICA | Rwanda | (Intended) Nationally Determined Contribution
Table of Contents
I Overall Planning and Preparation Process
II Mitigation
Economywide Targets
Economywide Policies
Mitigation Actions and Policies
III Adaptation
Adaptation Targets
Adaptation Context
Adaptation Actions and Policies
Acronyms
BAU Business as Usual NAMA Nationally Appropriate MitigationActions
CIFPPCR Climate Investment Funds PilotProgram for Climate Resilience
NAP National Adaptation Plan
DRM Disaster Risk Management NAPA National Adaptation Programmesof Action
INDC Intended Nationally DeterminedContributions
REDD+ Reducing emissions fromdeforestation and forestdegradation and the role ofconservation, sustainablemanagement of forests andenhancement of forest carbonstocks in developing countries
LEDS Low Emission DevelopmentStrategy
LULUCF Land Use and Land Use Changeand Forestry
|
|
|
Climate Policy Team | World Bank Group
-
SUB-SAHARAN AFRICA | Rwanda | (Intended) Nationally Determined Contribution
Overall Planning and Preparation Process
How reliable is the prioritization of the (I)NDC? How serious is thegovernment about implementing policies and actions to achieve the (I)NDCtargets?
Political decision of adoption of INDC at:Head of state level
Interministerial level
Parliament
Ministry LevelMINISTRY OF NATURALRESOURCES (MINIRENA)
Technical development of INDC through a participatory processStakeholder involvement YES
Multisector commision YES
Have development benefits been assessed and considered in the planningprocess?
YES
Are there climate policies and actions already in place/under development?
LEDS YES
NAMAS
NAPA YES
Climate Policy Team | World Bank Group
$24.15 (in Billion USD) TOTAL COST OF IMPLEMENTATION (mitigation and adaptation)
-
SUB-SAHARAN AFRICA | Rwanda | (Intended) Nationally Determined Contribution
Existing policies:Vision 2020
Economic Development and Poverty Reduction Strategy
Green Growth and Climate Resilience Strategy (2011)
National Strategy for Climate Change and Low Carbon Development Strategy
National Adaptation Programmes of Action for Climate Change (NAPA)
Has the INDC development been supported by a development partner?Technical support
Financial support GEF THROUGH UNEP
Implementation Plans and Needs
Specific requests for international provision of means of implementation:Technology Transfer YES
Financial support YES
Capacity Building YES
Does the INDC intend the private sector to be involved in theimplementation of the NDC?
YES
Are carbon pricing/international market mechanisms intended?YES
Are there any barriers identified?
Link list:• Rwanda INDC Factsheet (projected per capita emissions): http://www.climateenergycollege.net/files/site1/factsheets/Rwanda_INDCFactsheet_UoMPRIMAP_GWPAR4.pdf
Climate Policy Team | World Bank Group
http://www.climate-energy-college.net/files/site1/factsheets/Rwanda_INDCFactsheet_UoM-PRIMAP_GWPAR4.pdf
-
n/a
n/a
n/a
n/a
SUB-SAHARAN AFRICA | Rwanda | (Intended) Nationally Determined Contribution
Mitigation
ECONOMY-WIDE TARGETS
Conditionality: INDC page link
Unconditional part of mitigation target:Estimated costs for implementation:
Conditional part of mitigation target:Estimated costs for implementation:
Coverage of Gases: CO , N O, CH
Other Targets:
POLICIES:Set emission standards for vehicles and enforce them with inspections
Targeted subsidies for retrofits
Tax reduction on imports of Liquefied Petroleum Gas (LPG)
TARGET YEAR
2030TARGET TYPE
N/AN/A
(in Billion USD)
COST OFIMPLEMENTATION
2 2 4
Climate Policy Team | World Bank Group
-
SUB-SAHARAN AFRICA | Rwanda | (Intended) Nationally Determined Contribution
MITIGATION ACTIONS AND POLICIESENERGY Plans:
Energy: General P. 14
Renewable Energy P. 5
Renewable Energy: Solar P. 14
Renewable Energy: Hydro P. 14
Gas-to-Power P. 5
Energy Efficiency P. 15
Demand-Side Efficiency: Industries P. 19
Demand-Side Efficiency P. 15
Supply-Side Efficiency: Grid/Energy Loss Reduction P. 15
Clean Cooking and Heating: Cleaner Household Fuels P. 16
Mini-Grids
Renewable Energy: Biofuels
Gas
Clean Cooking and Heating: Efficient Cookstoves
Climate Policy Team | World Bank Group
http://www4.unfccc.int/submissions/INDC/Published%20Documents/Rwanda/1/INDC_Rwanda_Nov.2015.pdf#page=14http://www4.unfccc.int/submissions/INDC/Published%20Documents/Rwanda/1/INDC_Rwanda_Nov.2015.pdf#page=5http://www4.unfccc.int/submissions/INDC/Published%20Documents/Rwanda/1/INDC_Rwanda_Nov.2015.pdf#page=14http://www4.unfccc.int/submissions/INDC/Published%20Documents/Rwanda/1/INDC_Rwanda_Nov.2015.pdf#page=14http://www4.unfccc.int/submissions/INDC/Published%20Documents/Rwanda/1/INDC_Rwanda_Nov.2015.pdf#page=5http://www4.unfccc.int/submissions/INDC/Published%20Documents/Rwanda/1/INDC_Rwanda_Nov.2015.pdf#page=15http://www4.unfccc.int/submissions/INDC/Published%20Documents/Rwanda/1/INDC_Rwanda_Nov.2015.pdf#page=19http://www4.unfccc.int/submissions/INDC/Published%20Documents/Rwanda/1/INDC_Rwanda_Nov.2015.pdf#page=15http://www4.unfccc.int/submissions/INDC/Published%20Documents/Rwanda/1/INDC_Rwanda_Nov.2015.pdf#page=15http://www4.unfccc.int/submissions/INDC/Published%20Documents/Rwanda/1/INDC_Rwanda_Nov.2015.pdf#page=16
-
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
SUB-SAHARAN AFRICA | Rwanda | (Intended) Nationally Determined Contribution
MITIGATION ACTIONS AND POLICIES
RENEWABLE
ENERGYPlans: INDC page link
Increase share of renewable energy in power generation P. 5
Estimated total costs for implementation:
Capacity building needs:
Technology needs:
Unconditional part of mitigation target:
Estimated costs for implementation:
Conditional part of mitigation target:
Estimated costs for implementation:
Emission reduction potential:
Climate Policy Team | World Bank Group
http://www4.unfccc.int/submissions/INDC/Published%20Documents/Rwanda/1/INDC_Rwanda_Nov.2015.pdf#page=5
-
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
SUB-SAHARAN AFRICA | Rwanda | (Intended) Nationally Determined Contribution
MITIGATION ACTIONS AND POLICIES
RENEWABLE
ENERGY: SOLARPlans: INDC page link
Construction of plants P. 14
Estimated total costs for implementation:
Capacity building needs:
Technology needs:
Unconditional part of mitigation target:
Estimated costs for implementation:
Conditional part of mitigation target:
Estimated costs for implementation:
Emission reduction potential:
Climate Policy Team | World Bank Group
http://www4.unfccc.int/submissions/INDC/Published%20Documents/Rwanda/1/INDC_Rwanda_Nov.2015.pdf#page=14
-
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
SUB-SAHARAN AFRICA | Rwanda | (Intended) Nationally Determined Contribution
MITIGATION ACTIONS AND POLICIES
RENEWABLE
ENERGY: HYDROPlans: INDC page link
Construction of plants P. 14
Estimated total costs for implementation:
Capacity building needs:
Technology needs:
Unconditional part of mitigation target:
Estimated costs for implementation:
Conditional part of mitigation target:
Estimated costs for implementation:
Emission reduction potential:
Climate Policy Team | World Bank Group
http://www4.unfccc.int/submissions/INDC/Published%20Documents/Rwanda/1/INDC_Rwanda_Nov.2015.pdf#page=14
-
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
SUB-SAHARAN AFRICA | Rwanda | (Intended) Nationally Determined Contribution
MITIGATION ACTIONS AND POLICIES
ENERGY
EFFICIENCYPlans: INDC page link
Demand side management: efficiency programs to clip electrical peakdemand
P. 15
Estimated total costs for implementation:
Capacity building needs:
Technology needs:
Unconditional part of mitigation target:
Estimated costs for implementation:
Conditional part of mitigation target:
Estimated costs for implementation:
Emission reduction potential:
Climate Policy Team | World Bank Group
http://www4.unfccc.int/submissions/INDC/Published%20Documents/Rwanda/1/INDC_Rwanda_Nov.2015.pdf#page=15
-
n/a
n/a
n/a
n/a
n/a
n/a
n/a
146 ktCO2e
SUB-SAHARAN AFRICA | Rwanda | (Intended) Nationally Determined Contribution
MITIGATION ACTIONS AND POLICIES
DEMAND-SIDE
EFFICIENCY:
INDUSTRIES
Plans: INDC page link
Energy efficient tea and coffee industry by 2030 P. 19
Estimated total costs for implementation:
Capacity building needs:
Technology needs:
Unconditional part of mitigation target:
Estimated costs for implementation:
Conditional part of mitigation target:
Estimated costs for implementation:
Emission reduction potential:
Climate Policy Team | World Bank Group
http://www4.unfccc.int/submissions/INDC/Published%20Documents/Rwanda/1/INDC_Rwanda_Nov.2015.pdf#page=19
-
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
SUB-SAHARAN AFRICA | Rwanda | (Intended) Nationally Determined Contribution
MITIGATION ACTIONS AND POLICIES
DEMAND-SIDE
EFFICIENCYPolicies: INDC page link
Targeted subsidies for retrofits P. 17
Estimated total costs for implementation:
Capacity building needs:
Technology needs:
Unconditional part of mitigation target:
Estimated costs for implementation:
Conditional part of mitigation target:
Estimated costs for implementation:
Emission reduction potential:
Plans: INDC page link
Distribution of compact flourescent lights P. 15
Estimated total costs for implementation:
Capacity building needs:
Technology needs:
Unconditional part of mitigation target:
Estimated costs for implementation:
Conditional part of mitigation target:
Estimated costs for implementation:
Emission reduction potential:
Climate Policy Team | World Bank Group
http://www4.unfccc.int/submissions/INDC/Published%20Documents/Rwanda/1/INDC_Rwanda_Nov.2015.pdf#page=17http://www4.unfccc.int/submissions/INDC/Published%20Documents/Rwanda/1/INDC_Rwanda_Nov.2015.pdf#page=15
-
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
SUB-SAHARAN AFRICA | Rwanda | (Intended) Nationally Determined Contribution
MITIGATION ACTIONS AND POLICIES
SUPPLY-SIDE
EFFICIENCY:
GRID/ENERGY LOSS
REDUCTION
Targets: INDC page link
Reduce grid losses from 23% to 7.8% by 2030 P. 16
Estimated total costs for implementation:
Capacity building needs:
Technology needs:
Unconditional part of mitigation target:
Estimated costs for implementation:
Conditional part of mitigation target:
Estimated costs for implementation:
Emission reduction potential:
Plans: INDC page link
Construction of new transmission lines P. 15
Estimated total costs for implementation:
Capacity building needs:
Technology needs:
Unconditional part of mitigation target:
Estimated costs for implementation:
Conditional part of mitigation target:
Estimated costs for implementation:
Emission reduction potential:
Climate Policy Team | World Bank Group
http://www4.unfccc.int/submissions/INDC/Published%20Documents/Rwanda/1/INDC_Rwanda_Nov.2015.pdf#page=16http://www4.unfccc.int/submissions/INDC/Published%20Documents/Rwanda/1/INDC_Rwanda_Nov.2015.pdf#page=15
-
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
SUB-SAHARAN AFRICA | Rwanda | (Intended) Nationally Determined Contribution
MITIGATION ACTIONS AND POLICIES
MINI-GRIDSTargets: INDC page link
100 solar PV mini-grids in rural areas (capacity of up to 9.4 MWp) P. 14
Estimated total costs for implementation:
Capacity building needs:
Technology needs:
Unconditional part of mitigation target:
Estimated costs for implementation:
Conditional part of mitigation target:
Estimated costs for implementation:
Emission reduction potential:
Climate Policy Team | World Bank Group
http://www4.unfccc.int/submissions/INDC/Published%20Documents/Rwanda/1/INDC_Rwanda_Nov.2015.pdf#page=14
-
n/a
n/a
n/a
n/a
n/a
35,000 installation of domestic biogasdigesters by 2030; 50% increase in charcoalproduction by 2030
n/a
n/a
SUB-SAHARAN AFRICA | Rwanda | (Intended) Nationally Determined Contribution
MITIGATION ACTIONS AND POLICIES
RENEWABLE
ENERGY: BIOFUELSTargets: INDC page link
35,000 installation of domestic biogas digesters by 2030; 50% increase incharcoal production by 2030
P. 17
Estimated total costs for implementation:
Capacity building needs:
Technology needs:
Unconditional part of mitigation target:
Estimated costs for implementation:
Conditional part of mitigation target:
Estimated costs for implementation:
Emission reduction potential:
Climate Policy Team | World Bank Group
http://www4.unfccc.int/submissions/INDC/Published%20Documents/Rwanda/1/INDC_Rwanda_Nov.2015.pdf#page=17
-
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
SUB-SAHARAN AFRICA | Rwanda | (Intended) Nationally Determined Contribution
MITIGATION ACTIONS AND POLICIES
GASPolicies: INDC page link
Tax reduction on imports of Liquefied Petroleum Gas (LPG) P. 17
Estimated total costs for implementation:
Capacity building needs:
Technology needs:
Unconditional part of mitigation target:
Estimated costs for implementation:
Conditional part of mitigation target:
Estimated costs for implementation:
Emission reduction potential:
Climate Policy Team | World Bank Group
http://www4.unfccc.int/submissions/INDC/Published%20Documents/Rwanda/1/INDC_Rwanda_Nov.2015.pdf#page=17
-
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
SUB-SAHARAN AFRICA | Rwanda | (Intended) Nationally Determined Contribution
MITIGATION ACTIONS AND POLICIES
CLEAN COOKING
AND HEATING:
EFFICIENT
COOKSTOVES
Targets: INDC page link
100% improved cook stoves in all households by 2030
Estimated total costs for implementation:
Capacity building needs:
Technology needs:
Unconditional part of mitigation target:
Estimated costs for implementation:
Conditional part of mitigation target:
Estimated costs for implementation:
Emission reduction potential:
Climate Policy Team | World Bank Group
-
SUB-SAHARAN AFRICA | Rwanda | (Intended) Nationally Determined Contribution
MITIGATION ACTIONS AND POLICIESTRANSPORT Plans:
Public Transport P. 18
Transportation Infrastructure P. 18
Transportation Planning P. 18
Transportation Fuels P. 19
Aviation P. 19
Vehicle Fleet P. 18,19
BRT
Transport: General
Climate Policy Team | World Bank Group
http://www4.unfccc.int/submissions/INDC/Published%20Documents/Rwanda/1/INDC_Rwanda_Nov.2015.pdf#page=18http://www4.unfccc.int/submissions/INDC/Published%20Documents/Rwanda/1/INDC_Rwanda_Nov.2015.pdf#page=18http://www4.unfccc.int/submissions/INDC/Published%20Documents/Rwanda/1/INDC_Rwanda_Nov.2015.pdf#page=18http://www4.unfccc.int/submissions/INDC/Published%20Documents/Rwanda/1/INDC_Rwanda_Nov.2015.pdf#page=19http://www4.unfccc.int/submissions/INDC/Published%20Documents/Rwanda/1/INDC_Rwanda_Nov.2015.pdf#page=19http://www4.unfccc.int/submissions/INDC/Published%20Documents/Rwanda/1/INDC_Rwanda_Nov.2015.pdf#page=18,19
-
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
SUB-SAHARAN AFRICA | Rwanda | (Intended) Nationally Determined Contribution
MITIGATION ACTIONS AND POLICIES
VEHICLE FLEETPolicies: INDC page link
Set emission standards for vehicles and enforce them with inspections P. 17
Estimated total costs for implementation:
Capacity building needs:
Technology needs:
Unconditional part of mitigation target:
Estimated costs for implementation:
Conditional part of mitigation target:
Estimated costs for implementation:
Emission reduction potential:
Plans: INDC page link
Renewal of fleet P. 18,19
Estimated total costs for implementation:
Capacity building needs:
Technology needs:
Unconditional part of mitigation target:
Estimated costs for implementation:
Conditional part of mitigation target:
Estimated costs for implementation:
Emission reduction potential:
Climate Policy Team | World Bank Group
http://www4.unfccc.int/submissions/INDC/Published%20Documents/Rwanda/1/INDC_Rwanda_Nov.2015.pdf#page=17http://www4.unfccc.int/submissions/INDC/Published%20Documents/Rwanda/1/INDC_Rwanda_Nov.2015.pdf#page=18,19
-
n/a
n/a
n/a
n/a
n/a
n/a
n/a
1.26 MtCO2e
SUB-SAHARAN AFRICA | Rwanda | (Intended) Nationally Determined Contribution
MITIGATION ACTIONS AND POLICIES
BRTTargets: INDC page link
17 km BRT main corridor construction and 6 modern interchanges P. 18
Estimated total costs for implementation:
Capacity building needs:
Technology needs:
Unconditional part of mitigation target:
Estimated costs for implementation:
Conditional part of mitigation target:
Estimated costs for implementation:
Emission reduction potential:
Climate Policy Team | World Bank Group
http://www4.unfccc.int/submissions/INDC/Published%20Documents/Rwanda/1/INDC_Rwanda_Nov.2015.pdf#page=18
-
SUB-SAHARAN AFRICA | Rwanda | (Intended) Nationally Determined Contribution
MITIGATION ACTIONS AND POLICIESWASTE Plans:
Waste-to-Energy P. 21
Waste: General
Climate Policy Team | World Bank Group
http://www4.unfccc.int/submissions/INDC/Published%20Documents/Rwanda/1/INDC_Rwanda_Nov.2015.pdf#page=21
-
n/a
n/a
n/a
n/a
n/a
n/a
n/a
586 ktCO2e
SUB-SAHARAN AFRICA | Rwanda | (Intended) Nationally Determined Contribution
MITIGATION ACTIONS AND POLICIES
WASTE-TO-ENERGYPlans: INDC page link
Urban waste management, utilization of Landfill Gas (LFG) P. 21
Estimated total costs for implementation:
Capacity building needs:
Technology needs:
Unconditional part of mitigation target:
Estimated costs for implementation:
Conditional part of mitigation target:
Estimated costs for implementation:
Emission reduction potential:
Climate Policy Team | World Bank Group
http://www4.unfccc.int/submissions/INDC/Published%20Documents/Rwanda/1/INDC_Rwanda_Nov.2015.pdf#page=21
-
SUB-SAHARAN AFRICA | Rwanda | (Intended) Nationally Determined Contribution
MITIGATION ACTIONS AND POLICIESINDUSTRIES Plans:
Industries: General P. 19
Climate Policy Team | World Bank Group
http://www4.unfccc.int/submissions/INDC/Published%20Documents/Rwanda/1/INDC_Rwanda_Nov.2015.pdf#page=19
-
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
SUB-SAHARAN AFRICA | Rwanda | (Intended) Nationally Determined Contribution
MITIGATION ACTIONS AND POLICIES
SUSTAINABLE
FOREST
MANAGEMENT
Targets: INDC page link
Reduction in wood use resulting in 5.77 MtCO2e less emissions by 2030 P. 22
Estimated total costs for implementation:
Capacity building needs:
Technology needs:
Unconditional part of mitigation target:
Estimated costs for implementation:
Conditional part of mitigation target:
Estimated costs for implementation:
Emission reduction potential:
Climate Policy Team | World Bank Group
http://www4.unfccc.int/submissions/INDC/Published%20Documents/Rwanda/1/INDC_Rwanda_Nov.2015.pdf#page=22
-
N/A
N/A
SUB-SAHARAN AFRICA | Rwanda | (Intended) Nationally Determined Contribution
Adaptation
ADAPTATION TARGETS
ADAPTATION CONTEXT
Existing National Development/Resilience Policies and Plans
National Communications
NAPs
NAPAS YES
CIF-PPCRsGREEN GROWTH AND CLIMATE RESILIENCE STRATEGY(2011)
Sectoral Strategies
Cross-cutting
NATIONAL STRATEGY FORCLIMATE CHANGE AND LOWCARBON DEVELOPMENTSTRATEGYECONOMIC DEVELOPMENT ANDPOVERTY REDUCTION STRATEGYVISION 2020
Conditionality:
Unconditional part of adaptation implementation
Conditional part of adaptation implementation
Conditional upon international provision of meansof implementation
YES
TARGET YEAR
2030N/A
(in Billion USD)
COST OFIMPLEMENTATION
Climate Policy Team | World Bank Group
-
n/a
n/a
Total Implementation Cost for UnconditionalActions: n/a
Total Implementation Cost for ConditionalActions: n/a
Technology Transfer: technology needs assessment (tna)
Capacity Building: n/a
SUB-SAHARAN AFRICA | Rwanda | (Intended) Nationally Determined Contribution
ADAPTATION ACTIONS AND POLICIES
AGRICULTURE
AGROECOLOGY
Target: INDC page link
100% of the households involved in agriculture production will beimplementing agro forestry sustainable food production by 2030Development and implementation of an intensive agroforestryprogramme with a target of covering 100% of arable land by 2030
Actions:
CONDITIONAL ACTIONS: INDC page link
Mainstreaming agro ecology techniques using spatial plant stacking as inagro forestry, kitchen gardens, nutrient recycling, and water conservation tomaximise sustainable food production
Funder
Implementing Agency
Cost Estimation
Total Implementation Cost per Subsector:
Implementation Needs:
Climate Policy Team | World Bank Group
-
n/a
n/a
Total Implementation Cost for UnconditionalActions: n/a
Total Implementation Cost for ConditionalActions: n/a
Technology Transfer:
Capacity Building: n/a
SUB-SAHARAN AFRICA | Rwanda | (Intended) Nationally Determined Contribution
ADAPTATION ACTIONS AND POLICIES
FOOD SECURITYTarget: INDC page link
Group based organizations involved in agriculture production andrunning agro processing facilities reach 90% of the total operating groupbased organizations in 2030Installed capacity of agro processing installations is to reach 1,200,000MT by 2030 from 400,000 MT12 in 2014100% of farmers with access to services for post harvest treatment andstorage of food cropsReduce post harvest losses to at least 1% by 2030 from 10.4%, 27.4% and8.3% in 2014 for maize, beans and rice respectively
Actions:
CONDITIONAL ACTIONS: INDC page link
Add value to agricultural products through processing to meet its ownmarket demand for food stuffs
Funder
Implementing Agency
Cost Estimation
Total Implementation Cost per Subsector:
Implementation Needs:
Climate Policy Team | World Bank Group
-
n/a
n/a
Total Implementation Cost for UnconditionalActions: n/a
Total Implementation Cost for ConditionalActions: n/a
Technology Transfer:
Capacity Building: n/a
SUB-SAHARAN AFRICA | Rwanda | (Intended) Nationally Determined Contribution
ADAPTATION ACTIONS AND POLICIES
IRRIGATIONTarget: INDC page link
The overall target of the new irrigation programme is to reach 11% by 2030
Actions:
CONDITIONAL ACTIONS: INDC page link
Irrigation and water management
Funder
Implementing Agency
Cost Estimation
Total Implementation Cost per Subsector:
Implementation Needs:
Climate Policy Team | World Bank Group
-
n/a
n/a
Total Implementation Cost for UnconditionalActions: n/a
Total Implementation Cost for ConditionalActions: n/a
Technology Transfer:
Capacity Building: n/a
SUB-SAHARAN AFRICA | Rwanda | (Intended) Nationally Determined Contribution
ADAPTATION ACTIONS AND POLICIES
LAND AND SOIL
MANAGEMENTTarget: INDC page link
Organic waste use through composting, currently used at a small scale, willbe implemented to reach 100% of the households involved in agricultureproduction countrywide by 2030
Actions:
CONDITIONAL ACTIONS: INDC page link
Soil conservation and land husbandryUsing fertiliser enriched compostUtilising resource recovery and reuse through organic waste compostingand wastewater irrigation
Funder
Implementing Agency
Cost Estimation
Total Implementation Cost per Subsector:
Implementation Needs:
Climate Policy Team | World Bank Group
-
n/a
n/a
Total Implementation Cost for UnconditionalActions: n/a
Total Implementation Cost for ConditionalActions: n/a
Technology Transfer:
Capacity Building: n/a
SUB-SAHARAN AFRICA | Rwanda | (Intended) Nationally Determined Contribution
ADAPTATION ACTIONS AND POLICIES
CROPSActions:
CONDITIONAL ACTIONS: INDC page link
Mainstreaming sustainable pest management techniques to control plantparasites and pathogens
Funder
Implementing Agency
Cost Estimation
Total Implementation Cost per Subsector:
Implementation Needs:
Climate Policy Team | World Bank Group
-
n/a
n/a
Total Implementation Cost for UnconditionalActions: n/a
Total Implementation Cost for ConditionalActions: n/a
Technology Transfer:
Capacity Building: n/a
SUB-SAHARAN AFRICA | Rwanda | (Intended) Nationally Determined Contribution
ADAPTATION ACTIONS AND POLICIES
LULUCF/FORESTRY
SUSTAINABLE
FOREST
MANAGEMENT
Target: INDC page link
Achieve an overall 30% sustained forest cover of the total national landsurface by 2030 from 28.8% in 2013
Actions:
CONDITIONAL ACTIONS: INDC page link
Promote afforestation/refore station of designated areas throughenhanced germplasm and technical practices in planting and post-planting processesEmploy Improved Forest Management for degraded forest resources
Funder
Implementing Agency
Cost Estimation
Total Implementation Cost per Subsector:
Implementation Needs:
Climate Policy Team | World Bank Group
-
n/a
n/a
Total Implementation Cost for UnconditionalActions: n/a
Total Implementation Cost for ConditionalActions: n/a
Technology Transfer:
Capacity Building: n/a
SUB-SAHARAN AFRICA | Rwanda | (Intended) Nationally Determined Contribution
ADAPTATION ACTIONS AND POLICIES
SUSTAINABLE
LAND
MANAGEMENT
Target: INDC page link
Reduce the plot size for single family houses from current 600 m2 to 300m2 by 2016 and to 225 m2 by 2030
Actions:
CONDITIONAL ACTIONS: INDC page link
Employ an integrated approach to planning and sustainable land usemanagementDevelop National Spatial Data Infrastructure (SDI) to manage the nation’sland information resources and to identify the fundamentaldatasetsrequired to manage land and water resources
Funder
Implementing Agency
Cost Estimation
Total Implementation Cost per Subsector:
Implementation Needs:
Climate Policy Team | World Bank Group
-
n/a
n/a
Total Implementation Cost for UnconditionalActions: n/a
Total Implementation Cost for ConditionalActions: n/a
Technology Transfer:
Capacity Building: n/a
SUB-SAHARAN AFRICA | Rwanda | (Intended) Nationally Determined Contribution
ADAPTATION ACTIONS AND POLICIES
TOURISM
TOURISM:
GENERAL
Target: INDC page link
Business and leisure tourists to increase from 545,000 people in 2012 to1,262,000 people in 2030
Actions:
CONDITIONAL ACTIONS: INDC page link
Maximise business tourism (the largest source of export revenues) throughstrategic conference management in order maximise the distribution andvolume of business travellers thoughout the year
Funder
Implementing Agency
Cost Estimation
Total Implementation Cost per Subsector:
Implementation Needs:
Climate Policy Team | World Bank Group
-
n/a
n/a
Total Implementation Cost for UnconditionalActions: n/a
Total Implementation Cost for ConditionalActions: n/a
Technology Transfer:
Capacity Building: n/a
SUB-SAHARAN AFRICA | Rwanda | (Intended) Nationally Determined Contribution
ADAPTATION ACTIONS AND POLICIES
DISASTER RISK
MANAGEMENT (DRM)
DISASTER
PREPAREDNESS
Target: INDC page link
Relocate additional 30 000 households from high risk zones by 2030
Actions:
CONDITIONAL ACTIONS: INDC page link
Employ community-based disaster risk reduction (DRR) programmesdesigned around local environmental and economic conditions, to mobiliselocal capacity in emergency response, and to reduce locallyspecific hazards
Funder
Implementing Agency
Cost Estimation
Total Implementation Cost per Subsector:
Implementation Needs:
Climate Policy Team | World Bank Group
-
n/a
n/a
Total Implementation Cost for UnconditionalActions: n/a
Total Implementation Cost for ConditionalActions: n/a
Technology Transfer:
Capacity Building: n/a
SUB-SAHARAN AFRICA | Rwanda | (Intended) Nationally Determined Contribution
ADAPTATION ACTIONS AND POLICIES
MONITORING AND
EVALUATION
SYSTEM
Actions:
CONDITIONAL ACTIONS: INDC page link
Conduct risk assessments and vulnerability mapping
Funder
Implementing Agency
Cost Estimation
Total Implementation Cost per Subsector:
Implementation Needs:
Climate Policy Team | World Bank Group
-
n/a
n/a
Total Implementation Cost for UnconditionalActions: n/a
Total Implementation Cost for ConditionalActions: n/a
Technology Transfer:
Capacity Building: n/a
SUB-SAHARAN AFRICA | Rwanda | (Intended) Nationally Determined Contribution
ADAPTATION ACTIONS AND POLICIES
EARLY WARNING
SYSTEMActions:
CONDITIONAL ACTIONS: INDC page link
Establish an integrated earlywarning system, and disaster response plans
Funder
Implementing Agency
Cost Estimation
Total Implementation Cost per Subsector:
Implementation Needs:
Climate Policy Team | World Bank Group
-
n/a
n/a
Total Implementation Cost for UnconditionalActions: n/a
Total Implementation Cost for ConditionalActions: n/a
Technology Transfer:
Capacity Building: n/a
SUB-SAHARAN AFRICA | Rwanda | (Intended) Nationally Determined Contribution
ADAPTATION ACTIONS AND POLICIES
CROSS-CUTTING AREA
CLIMATE SERVICES
Target: INDC page link
All the existing 53 gauging stations will be upgraded to automated realtime data stations by 2030
Actions:
CONDITIONAL ACTIONS: INDC page link
Develop water resource models, improved meteorological services, waterquality testing, and improved hydrorelated information managementImprove observation facilities to provide all climate information necessaryfor future monitoring, climate trend detection, management of climatevariability, early warning and disaster management
Funder
Implementing Agency
Cost Estimation
Total Implementation Cost per Subsector:
Implementation Needs:
Climate Policy Team | World Bank Group
-
n/a
n/a
Total Implementation Cost for UnconditionalActions: n/a
Total Implementation Cost for ConditionalActions: n/a
Technology Transfer:
Capacity Building: n/a
SUB-SAHARAN AFRICA | Rwanda | (Intended) Nationally Determined Contribution
ADAPTATION ACTIONS AND POLICIES
WATER
WATER
MANAGEMENT
Actions:
CONDITIONAL ACTIONS: INDC page link
Establish a national integrated water resource management frameworkthat incorporates district and communitybased catchment managementDevelop a National Water Security Plan to employ water storage and rainwater harvesting, water conservation practices, efficient irrigation, andother water efficient technologies
Funder
Implementing Agency
Cost Estimation
Total Implementation Cost per Subsector:
Implementation Needs:
Climate Policy Team | World Bank Group