Het IER werkproces als motor voorbetrouwbare fabrieken
Rob de Heus
Maintenance Manager
DSM Sitech Manufacturing Geleen
Sitech Manufacturing Services
Optimaliseert processen van haar klanten in de procesindustrie en verbetertdaarmee de plantperformance en business opportunities
Neemt haar partners de zorg voor het onderhoud van hun installaties uit handen,bij waarborging van integriteit en beschikbaarheid van de installaties
Presteert op basis van partnership met haar klant op gebied vanprocestechnologie, onderhoud, turnarounds en projecten.
Inhoud
• Reliability, bouwsteen in DSM ‘Focus on Value’
• Reliability, het workproces in 6 stappen
• Reliability, resultaten van wereldwijde aanpak
DSM Vision 2010,focus on value & reliability
• Uniforme werkprocessen• Global Platforms• Uniforme best practices/tools• Uniforme KPI benchmark
structuur
Operational &Manufacturing
Excellence
OperateFacility
MaintainFacility
Build &ModifyFacility
Manage &Transfer
Technology
Supply BaseManagement
To Produce
MANUFACTURINGEXCELLENCE
-Operate Plant
-Improve Plant
- Asset Utilization
- Maintenance- Turnaround
- Improve EquipmentReliability
- Small Projects- Large Capital
Projects- Equipment
Justification &Minimization
- Define & ApplyTechnology
- Discipline Teams- Instrumentation- Mechanical & Piping- Electrical- Systems
- SuppliersManagement
- Purchaseto Pay
- MaterialsManagement
Vision 2010, Uniforme werkprocessen
Work Processes(“Best Practices”)
Technology(“Equipment Standardization”)
Purchasing
Order To Cash,etc.
To Sell
CoordinatedSourcing
To Source
IntegratedManufacturingInformationSystems (IMIS)
- EDM- MES
DEP
Vision 2010, Global platformsManufacturing Council
DPP
ResinsDNR/DRS/DNR+
DAI/DFS
SiTech GeleenRegional
FEMInternal / External
CO & RC
MaRSGroup
DNP
USRegionalChina
RegionalDyneema
Vision 2010, Best practices/tools
‘Value adding change’ Mentality
Uniforme SAP PM implementatie
Maintenance Cost Control & definitions
VDM Control Panel, balans AU en Kosten
SAPPM
Vision 2010, KPI’s & benchmark structuur
Eén standaard KPI set 13 KPI’sgeselecteerd uit ca. 100 BenchmarkKPI’s
Standaard Maintenance Control Panelvoor alle plants Worldwide
Plant Sites doen mee ininterne/externe benchmarking enVDM analyse via DSM IntranetWebsite
Maintenance costs / RAB (Incl. andExcl. TA)
% of PPM plans executed within duedate/ total PPM plans
Value of MRO inventory/ RAB# of equipment (A+B critical) with PPM
plan/ # of equipment (A+Bcritical)
% of SHE & Regulatory PPM plansrealized within due date(MAT 21) /total SHE &Regulatory PPM plans
# LOPC’s incl. leaks and spills due tomaintenance
% production losses due toMaintenance/ MaximumProven Capacit
Priority 0,1 maintenance costs/ totalmaintenance costs
% Planned maintenance costs / totalmaintenance costs
Total maintenance cost/ unitproduction
Inhoud
• Reliability, bouwsteen in DSM ‘Focus on Value’
• Reliability, het workproces in 6 stappen
• Reliability, resultaten van wereldwijde aanpak
Prevent
PPM
WerkprocesImprove Equipment Reliability
Doelstelling
Optimalisatie van de integriteit en integrale kosten van de plants.
• Prevent Problems: ontwikkel en optimaliseer het Predictive / PreventiveMaintenance Program (PPM)
• Solve Problems: monitor en evalueer reliability performance, analyseer derelevante equipment reliability problemen en verbeter het PPM plan
RCA = Root Cause Analysis
FMEA = Failure Mode & Effect Analysis
ImprovePlantME-75
ImprovePlantME-75
Other workprocessesImprove
Equipment
Reliability SolveMonitor &evaluate
FMEA
RCA
IER, define optimum PPM program
CriticalityRanking ofEquipment
Analyze andImprove
PPM Program
Define OptimumPPM Program
(FMEA)
ImplementPPM
Program
Execute(ME-04
Maintenance)
Monitorreliability
performanceand improve
PPM plans
Work Processes: Improve Equipment Reliability Corporate SHE&MJune 2004 - 7 - Manufacturing
Define business goals andthresholds
Agree about criticalitymatrix
Divide plant in sectionsaccording to plant break-down
structure
Flowchart Criticality Ranking
SHE (e.g. integrity, environment)
Determine critical sectionsby using criticality matrix
Define specific tools persection
Costs (e.g. availability, maintenance)
Determine critical sections byusing criticality matrix
Define specific tools persection
Rank critical and less-criticalsections / systems
Step 1: Criticality Ranking
Work Processes: Improve Equipment Reliability Corporate SHE&MJune 2004 - 9 - Manufacturing
Determine critical sections
Rank sections by using the criticality matrix.• Do this in multidisciplinary team of experts• If available, use data (e.g: incident lists, lists of cost-drivers and
performance killers, etc.)• When you don’t have this data, use the belly feeling of experts.• If necessary the team must decide to a further breakdown in
systems for certain (critical) sectionsA C N
A C 1 AC 2 Z A VAC H V e r la din g B C H D A B N A C T V I
W in n ing
R e ac tie
Z uiv e r in g
Af g a ss ys t e e m
T an k e np a r k
U t i l i tie s
W in nin g
R e a c tie
Z u iv er in g
A f g as sy s t ee m
T a n ke n p a r k
U t i li t ie s
B e r e id ing
V e r la d in g /O p s la g
U ti l i t ie s
Ve r la d in g /O ps la g
U ti l i t ies
B e r eid in g
V e r la d in g /O p s lag
U ti l i tie s
B e re id in g
S N se c tie
Z uiv e r in g
A f g a ssy s t e em
V e r la d ing /O p s la g
U t i l i tie s
B e r e id in g
V e r lad in g /O p s la g
U t i li t ie s
V e rla d in g /O ps la g
K r is t al l is a tie
In d a m p in g /a a nv o er
v o ed in g e n
E in d ve r w e rk .
A fg a ss ys te e m
Ve r la d in g /O p s la g
U ti l i tie s
H C Nd es ti l la t ie/r in g le idin g
L T O
Work Processes: Improve Equipment Reliability Corporate SHE&MJune 2004 - 7 - Manufacturing
Agree about criticality matrix
Safety Health Environment
Product ionlosses due
tomaintenance
Maintenancecosts
(kEUR)
< 1x per50 year
< 1x per5 year
< 1x peryear
< 1x permonth
< 1x perday
Heavy workingconditions
Emission not exceedingPermit (A1) 1 hour 3 1 2 3 4 5
First AidEmission exceedingpermit, inside facility
boundary1 shift 25 2 4 6 8 10
MedicalTreatment
Outside Healthregulat ions
1 day 75 3 6 9 12 15
Restricted WorkDay case
Emission exceedingpermit, non severe,
outside facility boundary3 days 225 4 8 12 16 20
Lost WorkdayCase
Emission exceedingpermit , severe, outside
facilit y boundary1 week 525 5 10 15 20 25
Pote
ntia
l Con
sequ
ence
SHE Category Cost Category Probability
1
2
3
4
5
1 2 3 4 5
Probability
Pote
ntia
l Con
sequ
ence Low
High
Risk Reliability Engineer facilitates,Management Team approves
Note: Production must takepart in the decision of Criticalversus Non Critical!
1: Criticality Ranking, flowchart
Work Processes: Improve Equipment Reliability Corporate SHE&MJune 2004 - 7 - Manufacturing
Define business goals andthresholds
Agree about criticalitymatrix
Divide plant in sectionsaccording to plant break-down
structure
Flowchart Criticality Ranking
SHE (e.g. integrity, environment)
Determine critical sectionsby using criticality matrix
Define specific tools persection
Costs (e.g. availability, maintenance)
Determine critical sections byusing criticality matrix
Define specific tools persection
Rank critical and less-criticalsections / systems
1: Criticality Ranking, Matrix(example)
Criticality Matrix
Quality
Safety Health Environment Maintenancecosts (kEUR)
Productionlosses
Qualityproblems
< 1x per15 year
< 1x per5 year
< 1x peryear
< 1x permonth
< 1x perday
Near miss Nuisance,> 5 h. extra work 1 1 hour
Processdeviation without
quality loss1 2 3 4 5
First Aid Healthcomplaints
Light local emission to becleaned up immediately 5 1 shift
Processdeviation withquality loss
2 4 6 8 10
MT & RWExceeding
occupationalhealth limits
Exceeding permit limits 5-10 1 day
Customercomplaint
without anyfinancial
consequence
3 6 9 12 15
Lost Work Daycase Illness Serious emission leading
to damage on the site 10-50 3 days
Customercomplaint with
financialconsequence
4 8 12 16 20
Invalidity Occupationalillness
Serious emission leadingto damage of the site >50 1 month
Seriouscomplaint withbusiness loss
5 10 15 20 25
1 - 2
3 - 4
5 - 6
7 - 10
11 - 16
20 - 25
= Moderate critical
= Critical
Probability
C
B
A
Compliance Profitibility
Pote
ntia
l Con
sequ
ence
= More critical
= High critical
SHE Category Cost Category
= Non Critical
= Less Critical
1: Determine Critical Sections
Work Processes: Improve Equipment Reliability Corporate SHE&MJune 2004 - 9 - Manufacturing
Determine critical sections
Rank sections by using the criticality matrix.• Do this in multidisciplinary team of experts• If available, use data (e.g: incident lists, lists of cost-drivers and
performance killers, etc.)• When you don’t have this data, use the belly feeling of experts.• If necessary the team must decide to a further breakdown in
systems for certain (critical) sectionsA C N
A C 1 A C 2 Z A VA C H V e rla d in g B C H D A B N A C T V I
W in n in g
R e a c t ie
Z u iv e rin g
A fg a s s y s te e m
T a n k e n p a r k
U t i l i t ie s
W in n in g
R e a c t ie
Z u iv e rin g
A fg a s s y s te e m
T a n k e n p a r k
U t i l i t ie s
B e re id in g
V e r la d in g /O p s la g
U t i l i t ie s
V e rla d in g /O p s la g
U t i l i t ie s
B e re id in g
V e rla d in g /O p s la g
U t i l i t ie s
B e re id in g
S N s e c t ie
Z u iv e rin g
A fg a s s y s te e m
V e rla d in g /O p s la g
U t i l i t ie s
B e r e id in g
V e rla d in g /O p s la g
U t i l i t ie s
V e rla d in g /O p s la g
K r is ta ll is a tie
In d a m p in g /a a n v o e r
v o e d in g e n
E in d v e rw e r k .
A fg a s s y s te e m
V e rla d in g /O p s la g
U t i l i tie s
H C Nd e s t i l la t ie /rin g le id in g
L T O
Non Critical EquipmentEquipment dat na ranking is ingedeeld in Low Risk
Alleen basis onderhoud uitvoeren, verder breakdown strategie.
Medium Critical EquipmentEquipment dat beoordeeld wordt als CriticalBehalve basisonderhoud worden nu ook preventieve en predictieve strategieën
toegepast. Zorg dat een probleem tijdig ontdekt wordt en plan tijdigreparaties in om vervolgschade te minimaliseren.
High Critical EquipmentStel via Failure Mode & Effect Analysis vast welke faalmechanismen het risico
bepalen, maar gebruik ervaring en gezond verstand om Criticality toe tekennen.
Zet reëel beschikbare alternatieven, als aanpassing operating of maintenanceprocedures, preventief maintenance, predictief maintenance, breakdown ofredesign naast elkaar.
Selecteer het meest geschikte alternatief, rekening houdend met kosten.Check nogmaals of de optimale oplossing t.a.v. integriteit en integrale kosten
gekozen is.
Step 2: Define optimum PPM
Step 3: Implementatie PPM plan
• Neem alle noodzakelijke activiteiten voor de uitvoering op in het nieuwe PPM plan• Zorg voor goede afstemming met Operations / Gatekeeper• Zorg dat nieuwe/gewijzigde PPM taken, frequentie en startdata juist in SAP
opgenomen zijn.
Aandachtspunten om PPM plannen kosteneffectief te maken:– Spare Parts beschikbaar op de juiste plaats en leverancier/magazijn ?– Plannen zijn goed voorbereid en logisch geplanned ?– PPM plannen zijn effectief en uitvoerbaar geclusterd ?– Uitvoerende expertise is beschikbaar en gedefinieerd ?– Idem voor productie personeel ?– Is overwogen of TPM / FIY mogelijk is ?
Stap 4: Uitvoering van het PPM plan middels SAP maakt deel uit van hetwerkproces Maintenance en wordt hier niet behandeld.
Step 5: Evalueer de effectiviteit vanPPM plannen (KT)
Beoordeel regelmatig, in korte termijn cyclus, of het IER plan nog aande maat is:
• Door input uit L(eer) & V(erbeter) Team– Terugkoppeling uit de uitvoering in SAP en mondeling– Technische bevindingen uit preventieve inspecties– Incidenten, LOPC’s via RCA’s– Onbekende faalmechanismen
• Door analyse van Reliability Engineers en andere Specialisten– Performance killers&Cost drivers– Nieuwe faalmechanismen uit bv. PID (Plant Integrity Database)
Step 6: Analyseer & verbeter hettotale PPM programma (LT)
• Review het IER proces en effectiviteit iedere 5 jaar (CorporateRequirement)
• Check of het totale programma in lijn ligt met de Manufacturing plannenvan de plants en beoordeel of het nog steeds de juiste waarde toevoegtaan de business.
• Stel zonodig de Criticality Ranking criteria bij aan de actuelemanufacturing doelstellingen en review zonodig de ranking.
• Loop alle PPM plannen na op effectiviteit, andere alternatieven kunneninmiddels effectiever zijn.
• Voldoen/voldeden de PPM plannen eigenlijk wel aan de doelstelling ?• Worden nog steeds de juiste performance KPI’s gebruikt ?• Verwerk alle wijzigingen en updates in SAP en verder.
Inhoud
• Reliability, bouwsteen in DSM ‘Focus on Value’
• Reliability, het workproces in 6 stappen
• Reliability, resultaten van wereldwijde aanpak
Standard KPI set DSM Maintenance
DSM requirements– Maintenance costs / RAB (Incl. and Excl. TA)– % of PPM plans executed within due date/ total PPM plans– Value of MRO inventory/ RAB– # of equipment (A+B critical) with PPM plan/ # of equipment (A+B critical)– % of SHE & Regulatory PPM plans realized within due date (MAT 21) /total
SHE & Regulatory PPM plans– # LOPC’s incl. leaks and spills due to maintenance– % production losses due to Maintenance/ Maximum Proven Capacity
MaRS group extra’s– Priority 0,1 maintenance costs/ total maintenance costs– % Planned maintenance costs / total maintenance costs– Total maintenance cost/ unit production
Maintenance costs / RAB incl TA
2009A
2009A
Resultaten DSM 2008/2009
Production loss due to maintenance
2009
2009
2008
2008
0.0% 2.0% 4.0% 6.0% 8.0% 10.0% 12.0% 14.0% 16.0%
2009 2008 SHE & Regulatory PPM on time/total PPM
2009
2009
2008
2008
0% 20% 40% 60% 80% 100% 120%
2009 2008
Total Maint costs/RAB
2009
2009
2008
2008
0.0% 1.0% 2.0% 3.0% 4.0% 5.0% 6.0%
2009 2008
Average: 3.44 3,79
Average: 2.1 1,76
Tgv crisis zijn kosten gedaald enderving gestegen, maar:= bewust tbv benutting lage margesvoor maintenance werk+ Compliance en integriteit zijn verderverbeterd !!!
Average: 92.9 96.2W
B
W
B
W
BB = Best performer
W = Worst performer
Resultaten DSM 2008/2009PPM on time/total PPM
2009
2009
2008
2008
0% 20% 40% 60% 80% 100% 120%
2009 2008 A + B critical with PPM plan/total A + B critical
2009
2009
2008
2008
0% 20% 40% 60% 80% 100% 120%
2009 2008
MRO value/RAB
2009
2009
2008
2008
0.0% 0.5% 1.0% 1.5% 2.0% 2.5% 3.0%
2009 2008
Average: 1.03 0,87
Average: 77.7 84.4 Average: 81.2 91.0
Crisis leidt bij Best performers niet totterugval in Compliance IER, worstperformers hebben het moeilijk.Het gemiddelde blijft stevig de goedekant op gaan !!
B
W W
B
W
B
B = Best performer
W = Worst performer
Sitech Plants in Geleen in 2009
KPI Maintenance TARGET BU 2009 2009 plant 1 Geleen 2009 plant 2 Geleen
Maintenancegerelateerde LOPC’s 30 4 1
ComplianceSHE/Wettelijk 100 % 98 % 98 %
Technischebeschikbaarheid 92,7 % 96,3 % 98,8 %
Realisatie op targetcrisis budget < 100% 121 % 102 %
Maintenancekosten /RAB (excl. TA) 1,5 % 1,2 % 1,2 %
MRO spare parts 1 % 0,6 % 0,9 %
Aandeel Urgenties(€’s) 20 % 16 % 8 %
Aandeel PPM (€’s) 35 % 36 % 48 %
Ontwikkelde PPM’svoor M&H CriticalEquipment
100 % 95 % 95 %
Compliance PPM 90 % 97 % 91 %
DE KRACHT VAN BETROUWBAARHEID !
“When Reliability increases, incidentsdecrease and maintenance costs godown”