     Accelerated Bridge Construct ionResearch, Design and Practice 

    University of Buffalo

     Apr il 2011

    Presented by:

    Carmen Swanwick, SE

    UDOT Chief Structural Engineer 

    Presentation Outline

    Research –  Accelerated Bridge Construction (ABC) initial efforts

    esgn – Program implementation

    Practice – Projects

    ResearchOutline 

    Perform scanning tours

    Conduct pilot project

    Identify a program of projects

    Get involved nationally

    ResearchScanning Tours 

    Market internally and externally

    Conduct workshops

      ngage n us ry

    ResearchPilot Project 

    Obtain senior leadership involvement

    Promote marketing and media planDevelop messaging

    Prepare visual animation

    Evaluate project risks

    Define scope, schedule and budget

    Identify procurement method

    ResearchMessaging 

  • 8/20/2019 handout Carmen Swanwick 6pp.pdf

    2/10

    1/16/20

    ResearchVisual Animation 

    ResearchVisual Animation 

    ResearchProgram of Projects 

    Prescriptive projects –gain experience –  Design-Bid-Build

      –   

    Performance projects – innovations led

    by contractor  –  Design-Build

    ResearchGet Involved National ly 

    Coordinate with FHWA

    Participate in AASHTO Subcommittees

     

    Share lessons

    learned and

    best practices

    DesignOutline 

    Educate and communicate with industry

    Evaluate projectsImplement standardization

    Improve based on lessons learned

    DesignEducate and Communicate With Industry 

     ABC goals –  Relentlessly pursue reducing traffic congestion during

     –  Add value by furthering Department themes and

    meeting project goals

     –  Improve worker safety and safety to the traveling

    public

     –  Improve quality

  • 8/20/2019 handout Carmen Swanwick 6pp.pdf

    3/10

    1/16/20

    DesignEvaluate Projects 

    ScopeSchedule

    Budget

    Quality

    Risk

    Communications

    Procurement

    DesignEvaluate Projects 

    TotalProjectCost

    DesignEvaluate Projects 

    DesignImplement Standardization 

    Develop guidelines for ABC project

    inclusion

    Develop typical details and manuals

    Include user costs in analysis

    Encourage innovation

    Provide training and obtain feedback

    DesignImplement Standardization 

    DesignImplement Standardization 

  • 8/20/2019 handout Carmen Swanwick 6pp.pdf

    4/10

    1/16/20

    DesignImplement Standardization 

     ABC Manual and Standard Drawings

    DesignLessons Learned 

    Perform program reviewFind program deficiencies

    Repair deficiencies

    Review design decisions

    Measure design assumptions vs. reality

    PracticeOutline 

    Innovative elements and methods

    Timeline and history

    Project highlights

    Upcoming projects

    Program evaluation

    PracticeABC Components 

    Foundation &

    Wall Elements

    RapidEmbankmentConstruction

    Prefabricated

    Bridge Elements

    & Systems

    Structural

    Placement

    Methods

    FastTrackContracting

     

     Acceler ated Br idge Const ruct ion Com ponent s

    Continuous Flight

     Auger Piles

    Geosynthetic

    Reinforced Soil(GRS) Integrated

    Bridge System

      Prefabricated

    Elements- Superstructure

    - Substructure

    PrefabricatedSystems- Superstructure- Substructure- Total Bridge

    Self-Propelled

    ModularTransporters

    (SPMTs)

    Longitudinal

    launching

    Horizontal slidingor skidding

    Other heavy

    lifting equipment &methods

    Conventional liftingequipment &

    methods

    Innovative

    Contracting- Best Value

    - CMGC method

    - Design-Build

    -  A+B

    -  A+B+C

    - Warranties

    PracticeDefiniti on of PBES 

    PBES consists of bridge structural

    elements & systems that are built off the

    r ge a gnmen o acceerae on-s e

    construction time relative to conventional

    practice.

    PracticeBenefits of PBES 

    Significant advantages –  Reduced on-site construction time

     – Minimized traffic disru tion months to da s 

     –  Reduced environmental impact

     –  Improved work zone & worker safety

     –  Provides positive cost-benefit ratios when user costs

    are considered

     –  Improved product quality – controlled environment,

    cure times, easier access, etc.

  • 8/20/2019 handout Carmen Swanwick 6pp.pdf

    5/10

    1/16/20

    PracticeInnovativeElements andMethods 

    PracticeInnovativeElements andMethods 

    Precast Concrete Elements; I-80; Wanship Bridge

    PracticeInnovativeElements andMethods 

    Modular Construction; I-215 over 3670 South

    PracticeInnovativeElements andMethods 

    Structure Placement Methods

    PracticeInnovativeElements andMethods 

     Accelerated Geotechnical; Geofoam Embankment

    PracticeTimeline and History 

  • 8/20/2019 handout Carmen Swanwick 6pp.pdf

    6/10

    1/16/20

    PracticeTimeline and History 

    PracticeProject Highlights 

    800North over I-15; Precast DeckPanels; CMGC

    PracticeProject Highlights 

    RiverdaleRoad overI-84 ; LegoBridge; CMGC

    PracticeProject Highlights 

    4500 South overI-215; SPMT; CMGC

    PracticeProject Highlights 

    I-80; Lambs Canyon Bridge; SPMT; Design-Build

    PracticeProject Highlights 

    I-80; StateStreet to1300 East; SPMT; CMGC

  • 8/20/2019 handout Carmen Swanwick 6pp.pdf

    7/10

    1/16/20

    PracticeProject Highlights 

    I-70; EagleCanyon Bridge; Precast DeckPanels; CMGC

    PracticeProject Highlights 

    SR-66Over Weber River ; Slide-in; Design-Bid-Build

    PracticeProject Highlights 

    I-80; TwoBridges NearEcho Junction; Slide-in; Design-Build

    PracticeProject Highlights 

    I-80 over 2300 East; Slide-in; Design-Build

    PracticeProject Highlights 

    South Layton Interchange; Launch; Design-Build

    PracticeProject Highlights 

    U.S. 89over I-15; SPMT; Design-Build

  • 8/20/2019 handout Carmen Swanwick 6pp.pdf

    8/10

    1/16/20

    PracticeProject Highlights 

    I-15 CORE Proctor Lane over I-15; SPMT; Design-Build

    PracticeProject Highlights 

    I-15CORE 200 Southover I-15; SPMT; Design-Build

    PracticeProject Highlights 

    I-15CORE Sam White Laneover I-15; SPMT; Design-Build

    PracticeUpcoming Projects 

    SPMT bridge move –  I-15 CORE Provo Center Street; April 7

    e-n –  I-80 over Weber River; Spring 2011

     –  I-80 at Atkinson; Summer 2011

     –  I-80 at Summit Park; Summer 2011

    Prefabricated bridge elements

     – SR-193 over UPRR and UTA; Spring 2012

    Program EvaluationUtah ABC Costs; SPMT 

    $25,000,000 

    $30,000,000 

    Valued Added (includes user cost savings)

    $0 

    $5,000,000 

    $10,000,000 

    $15,000,000 

    $20,000,000 

    I‐215; 4500 South I‐80; StateSt. to 

    1300 East

    I‐80; Mt. Delleto 

    Lambs Canyon

    3300 South over 

    I‐215

    I‐15; Widening, 

    500 North to I‐

    215

    Pioneer Crossing

    Program EvaluationUtah ABC Costs; Slide-In 

    $2,000,000 

    $2,500,000 

    Valued Added (includes user cost savings)

    $0 

    $500,000 

    $1,000,000 

    $1,500,000 

    , ,

    SR‐66 Over Weber Ri ver I‐80; 2 Bridges near Echo J un ct io n I‐80; 2300 East Bridge

  • 8/20/2019 handout Carmen Swanwick 6pp.pdf

    9/10

    1/16/20

    Program EvaluationABC Because… 

    Value added to the public

    Societal costs minimized

    Public support for innovation

    Political capital

    List 3 important aspects ofimplementing program change.

    Review

    1. Research the innovation

    2. Educate and engage the industry

    3. Have a plan

    What are key elements for

    communicating with the public?

    Review

    1. Outreach programs

    2. Messaging

    3. Visual animation (Simplify the concepts)

    What are three major c ategories of

    accelerated bridge constructi on

    Review

    1. Foundation and wall elements

    2. Rapid embankment construction

    3. Prefabricated bridge elements and systems

    4. Structural placement methods

    5. Fast track contracting

    What are the benefits of using ABC

    and PBES?

    1. Reduced on-site construction time

    Review

     2. Minimized traffic disruption – months to days

    3. Reduced environmental impact

    4. Improved work zone & worker safety5. Provides positive cost-benefit ratios when user

    costs are considered

    6. Improved product quality – controlledenvironment, cure times, easier access, etc.

    Why does innovative contracting

    support ABC?

    Review

    Innovative contracting compliments ABC by

    allowing the contractor to work directly with the

    designer on constructibility and risk sharing.

  • 8/20/2019 handout Carmen Swanwick 6pp.pdf

    10/10

    1/16/20

    What is the major reason owners arechoosing ABC?

    Review

    Minimize impacts to the traveling public.

    Thank you…Questions?