Accelerated Bridge Construct ionResearch, Design and Practice
University of Buffalo
Apr il 2011
Presented by:
Carmen Swanwick, SE
UDOT Chief Structural Engineer
Presentation Outline
Research – Accelerated Bridge Construction (ABC) initial efforts
esgn – Program implementation
Practice – Projects
ResearchOutline
Perform scanning tours
Conduct pilot project
Identify a program of projects
Get involved nationally
ResearchScanning Tours
Market internally and externally
Conduct workshops
ngage n us ry
ResearchPilot Project
Obtain senior leadership involvement
Promote marketing and media planDevelop messaging
Prepare visual animation
Evaluate project risks
Define scope, schedule and budget
Identify procurement method
ResearchMessaging
-
8/20/2019 handout Carmen Swanwick 6pp.pdf
2/10
1/16/20
ResearchVisual Animation
ResearchVisual Animation
ResearchProgram of Projects
Prescriptive projects –gain experience – Design-Bid-Build
–
Performance projects – innovations led
by contractor – Design-Build
ResearchGet Involved National ly
Coordinate with FHWA
Participate in AASHTO Subcommittees
Share lessons
learned and
best practices
DesignOutline
Educate and communicate with industry
Evaluate projectsImplement standardization
Improve based on lessons learned
DesignEducate and Communicate With Industry
ABC goals – Relentlessly pursue reducing traffic congestion during
– Add value by furthering Department themes and
meeting project goals
– Improve worker safety and safety to the traveling
public
– Improve quality
-
8/20/2019 handout Carmen Swanwick 6pp.pdf
3/10
1/16/20
DesignEvaluate Projects
ScopeSchedule
Budget
Quality
Risk
Communications
Procurement
DesignEvaluate Projects
TotalProjectCost
DesignEvaluate Projects
DesignImplement Standardization
Develop guidelines for ABC project
inclusion
Develop typical details and manuals
Include user costs in analysis
Encourage innovation
Provide training and obtain feedback
DesignImplement Standardization
DesignImplement Standardization
-
8/20/2019 handout Carmen Swanwick 6pp.pdf
4/10
1/16/20
DesignImplement Standardization
ABC Manual and Standard Drawings
DesignLessons Learned
Perform program reviewFind program deficiencies
Repair deficiencies
Review design decisions
Measure design assumptions vs. reality
PracticeOutline
Innovative elements and methods
Timeline and history
Project highlights
Upcoming projects
Program evaluation
PracticeABC Components
Foundation &
Wall Elements
RapidEmbankmentConstruction
Prefabricated
Bridge Elements
& Systems
Structural
Placement
Methods
FastTrackContracting
Acceler ated Br idge Const ruct ion Com ponent s
Continuous Flight
Auger Piles
Geosynthetic
Reinforced Soil(GRS) Integrated
Bridge System
Prefabricated
Elements- Superstructure
- Substructure
PrefabricatedSystems- Superstructure- Substructure- Total Bridge
Self-Propelled
ModularTransporters
(SPMTs)
Longitudinal
launching
Horizontal slidingor skidding
Other heavy
lifting equipment &methods
Conventional liftingequipment &
methods
Innovative
Contracting- Best Value
- CMGC method
- Design-Build
- A+B
- A+B+C
- Warranties
PracticeDefiniti on of PBES
PBES consists of bridge structural
elements & systems that are built off the
r ge a gnmen o acceerae on-s e
construction time relative to conventional
practice.
PracticeBenefits of PBES
Significant advantages – Reduced on-site construction time
– Minimized traffic disru tion months to da s
– Reduced environmental impact
– Improved work zone & worker safety
– Provides positive cost-benefit ratios when user costs
are considered
– Improved product quality – controlled environment,
cure times, easier access, etc.
-
8/20/2019 handout Carmen Swanwick 6pp.pdf
5/10
1/16/20
PracticeInnovativeElements andMethods
PracticeInnovativeElements andMethods
Precast Concrete Elements; I-80; Wanship Bridge
PracticeInnovativeElements andMethods
Modular Construction; I-215 over 3670 South
PracticeInnovativeElements andMethods
Structure Placement Methods
PracticeInnovativeElements andMethods
Accelerated Geotechnical; Geofoam Embankment
PracticeTimeline and History
-
8/20/2019 handout Carmen Swanwick 6pp.pdf
6/10
1/16/20
PracticeTimeline and History
PracticeProject Highlights
800North over I-15; Precast DeckPanels; CMGC
PracticeProject Highlights
RiverdaleRoad overI-84 ; LegoBridge; CMGC
PracticeProject Highlights
4500 South overI-215; SPMT; CMGC
PracticeProject Highlights
I-80; Lambs Canyon Bridge; SPMT; Design-Build
PracticeProject Highlights
I-80; StateStreet to1300 East; SPMT; CMGC
-
8/20/2019 handout Carmen Swanwick 6pp.pdf
7/10
1/16/20
PracticeProject Highlights
I-70; EagleCanyon Bridge; Precast DeckPanels; CMGC
PracticeProject Highlights
SR-66Over Weber River ; Slide-in; Design-Bid-Build
PracticeProject Highlights
I-80; TwoBridges NearEcho Junction; Slide-in; Design-Build
PracticeProject Highlights
I-80 over 2300 East; Slide-in; Design-Build
PracticeProject Highlights
South Layton Interchange; Launch; Design-Build
PracticeProject Highlights
U.S. 89over I-15; SPMT; Design-Build
-
8/20/2019 handout Carmen Swanwick 6pp.pdf
8/10
1/16/20
PracticeProject Highlights
I-15 CORE Proctor Lane over I-15; SPMT; Design-Build
PracticeProject Highlights
I-15CORE 200 Southover I-15; SPMT; Design-Build
PracticeProject Highlights
I-15CORE Sam White Laneover I-15; SPMT; Design-Build
PracticeUpcoming Projects
SPMT bridge move – I-15 CORE Provo Center Street; April 7
e-n – I-80 over Weber River; Spring 2011
– I-80 at Atkinson; Summer 2011
– I-80 at Summit Park; Summer 2011
Prefabricated bridge elements
– SR-193 over UPRR and UTA; Spring 2012
Program EvaluationUtah ABC Costs; SPMT
$25,000,000
$30,000,000
Valued Added (includes user cost savings)
$0
$5,000,000
$10,000,000
$15,000,000
$20,000,000
I‐215; 4500 South I‐80; StateSt. to
1300 East
I‐80; Mt. Delleto
Lambs Canyon
3300 South over
I‐215
I‐15; Widening,
500 North to I‐
215
Pioneer Crossing
Program EvaluationUtah ABC Costs; Slide-In
$2,000,000
$2,500,000
Valued Added (includes user cost savings)
$0
$500,000
$1,000,000
$1,500,000
, ,
SR‐66 Over Weber Ri ver I‐80; 2 Bridges near Echo J un ct io n I‐80; 2300 East Bridge
-
8/20/2019 handout Carmen Swanwick 6pp.pdf
9/10
1/16/20
Program EvaluationABC Because…
Value added to the public
Societal costs minimized
Public support for innovation
Political capital
List 3 important aspects ofimplementing program change.
Review
1. Research the innovation
2. Educate and engage the industry
3. Have a plan
What are key elements for
communicating with the public?
Review
1. Outreach programs
2. Messaging
3. Visual animation (Simplify the concepts)
What are three major c ategories of
accelerated bridge constructi on
Review
1. Foundation and wall elements
2. Rapid embankment construction
3. Prefabricated bridge elements and systems
4. Structural placement methods
5. Fast track contracting
What are the benefits of using ABC
and PBES?
1. Reduced on-site construction time
Review
2. Minimized traffic disruption – months to days
3. Reduced environmental impact
4. Improved work zone & worker safety5. Provides positive cost-benefit ratios when user
costs are considered
6. Improved product quality – controlledenvironment, cure times, easier access, etc.
Why does innovative contracting
support ABC?
Review
Innovative contracting compliments ABC by
allowing the contractor to work directly with the
designer on constructibility and risk sharing.
-
8/20/2019 handout Carmen Swanwick 6pp.pdf
10/10
1/16/20
What is the major reason owners arechoosing ABC?
Review
Minimize impacts to the traveling public.
Thank you…Questions?