Christina Toroc, Parker Harding, Caitlin McHugh, Hunter Hughes.

13
Christina Toroc, Parker Harding, Caitlin McHugh, Hunter Hughes

Transcript of Christina Toroc, Parker Harding, Caitlin McHugh, Hunter Hughes.

Page 1: Christina Toroc, Parker Harding, Caitlin McHugh, Hunter Hughes.

Christina Toroc, Parker Harding, Caitlin McHugh, Hunter Hughes

Page 2: Christina Toroc, Parker Harding, Caitlin McHugh, Hunter Hughes.

Design Concepts

Static Rack

- No moving parts

- 4-Cell design

-  Sturdy, simple construction

-  Bolted connections for easy disassembly

-  Some welding required

Page 3: Christina Toroc, Parker Harding, Caitlin McHugh, Hunter Hughes.

Design Concepts Dynamic Rack

- Moving Parts

- More involved construction

- Bolted and welded connections

- Damper mechanism

Page 4: Christina Toroc, Parker Harding, Caitlin McHugh, Hunter Hughes.

Design Direction Static Design

-  Cheaper to construct

- Negligible maintenance

- Easy to repair

- Safer

- Approximately the same spool capacity as the Dynamic Rack

Page 5: Christina Toroc, Parker Harding, Caitlin McHugh, Hunter Hughes.

Design Conditions Increase Accessibility Increase Capacity Reduce exposure to the elements

Page 6: Christina Toroc, Parker Harding, Caitlin McHugh, Hunter Hughes.

Connections Both welded and bolted connections End plate to distribute loads applied to HSS

Column I-beams are bolted for easy assembly and

disassembly

Page 7: Christina Toroc, Parker Harding, Caitlin McHugh, Hunter Hughes.

PATRAN Analysis

Maximum displacement: 0.0575”

Page 8: Christina Toroc, Parker Harding, Caitlin McHugh, Hunter Hughes.

PATRAN Analysis

Bending Stress: 6710 psi

Page 9: Christina Toroc, Parker Harding, Caitlin McHugh, Hunter Hughes.

PATRAN Analysis

Axial Stress: 1270 psi

Page 10: Christina Toroc, Parker Harding, Caitlin McHugh, Hunter Hughes.

SolidWorks Model

Page 11: Christina Toroc, Parker Harding, Caitlin McHugh, Hunter Hughes.

Remaining Goals

Consult Shipyard Finish design Cost and Labor Analysis CAD blueprints

Page 12: Christina Toroc, Parker Harding, Caitlin McHugh, Hunter Hughes.

Gantt ChartID Task Name

1 Initiate Project

2 Contact Consultant

3 Acquire Identification Badges

4 Safety & Security Briefing

5 Visit Norfolk Naval Shipyard

6 Acquire Rough Estimates for Space

7

8 Preliminary Design Ideas

9 Brainstorm Ideas for Design

10 Design 1

11 Design 2

12 Gather data for materials and equipment

13 Draw designs in CAD software

14 Meeting

15 Presentation of designs

16

17 Team Meetings - Spring 2011

32

33 Advisor Meetings

46

47 Design Phase

48 Materials Research

49 Hand Calculations for Material Selection

50 FEA testing for Material Selection

51 Structural Design

52

53 Cost Analysis

54 Material Cost Analysis

55 Labor Cost Analysis

56

57

58 Final Design Phase

59 1st Status Report Due

60 Mid Term Report Due

61 2nd Status Report Due

62 Final Status Report Due

Parker,Caitlin

Parker

Hunter

Caitlin

Parker,Caitlin

Parker

Caitlin,Christina

Parker

Hunter,Parker,Caitlin,Christina

Jan 2 Jan 9 Jan 16 Jan 23 Jan 30 Feb 6 Feb 13 Feb 20 Feb 27 Mar 6 Mar 13 Mar 20 Mar 27 Apr 3 Apr 10 Apr 17 Apr 24 May 1 May 8 May 15 May 22 May 29 Jun 5 Jun 12 Jun 19 Jun 26

Page 13: Christina Toroc, Parker Harding, Caitlin McHugh, Hunter Hughes.

Questions?