RAJKOT JAMNAGAR VADINAR ROAD PROJECT
LARSEN & TOUBRO LIMITED - ECC DIVISION
BLENDING OF AGGREGATE FOR BITUMINOUS CONCRETE(As per MS-2;Table 2.1)
18mm Aggregate 25%
10mm Aggregate 21%
6mm Aggregate 10%
Stone Dust 44%
Individual percentage Blending percentage
18MM 10MM 6MM 18MM 10MM 6MM
mm 100% 100% 100% 100% 25% 21% 10% 44% 100%
Lower Upper
25.0 100.00 100.00 100.00 100.00 25.0 21.0 10.0 44.0 100.0 100 100
19.0 100.00 100.00 100.00 100.00 25.0 21.0 10.0 44.0 100.0 90 100
16.0 86.90 100.00 100.00 100.00 21.7 21.0 10.0 44.0 96.7
13.2 48.80 100.00 100.00 100.00 12.2 21.0 10.0 44.0 87.2
9.5 3.20 89.30 100.00 100.00 0.8 18.8 10.0 44.0 73.6 56 80
4.75 1.00 1.60 77.20 98.50 0.3 0.3 7.7 43.3 51.6 35 65
2.36 0.00 0.70 23.80 79.70 0.0 0.1 2.4 35.1 37.6 23 49
0.30 0.00 0.00 3.90 28.10 0.0 0.0 0.4 12.4 12.8 5 19
Type of aggregate
I.S. SieveSize
Combinedgradation
of Aggregate
Specified Limit(Table-500-10grading-1 of
MORTH )STONEDUST
STONEDUST
8/8/2019 BC.xls - Copy
http://slidepdf.com/reader/full/bcxls-copy 2/20
8/8/2019 BC.xls - Copy
http://slidepdf.com/reader/full/bcxls-copy 3/20
RAJKOT JAMNAGAR VADINAR ROAD PROJECT
LARSEN & TOUBRO LIMITED - ECC DIVISION
GRADATION OF INDIVIDUAL AGGREGATE COLLECTED FROM HMP (Hot Bin
FOR BC Grade-II
Hot Bin 4 : (-24mm+ 18 mm )
12/2/20
mm Sample 1 Sample 2 Sample 3 Sample 4 Sample 5 Sample
37.5 100.00 100.00 100.00 100.00 100.00 100.0
26.5 100.00 100.00 100.00 100.00 100.00 100.0
19.0 93.70 95.70 93.50 93.60 95.10 94.30
13.2 10.20 10.20 7.70 7.30 5.80 5.80
9.5 1.50 2.80 2.10 0.90 0.30 0.40
4.75 0.30 0.70 0.90 0.30 0.00 0.00
2.36 0.00 0.00 0.00 0.00 0.00 0.00
1.18 0.00 0.00 0.00 0.00 0.00 0.00
0.60 0.00 0.00 0.00 0.00 0.00 0.00
0.300 0.00 0.00 0.00 0.00 0.00 0.00
0.150 0.00 0.00 0.00 0.00 0.00 0.00
0.075 0.00 0.00 0.00 0.00 0.00 0.00Hot Bin 3 : (- 18mm+ 12 mm )
mm Sample 1 Sample 2 Sample 3 Sample 4 Sample 5 Sample
37.5 100.00 100.00 100.00 100.00 100.00 100.0
26.5 100.00 100.00 100.00 100.00 100.00 100.0
19.0 100.00 100.00 100.00 100.00 100.00 100.0
13.2 55.20 52.40 61.90 64.20 58.20 57.509.5 4.80 4.80 8.60 10.50 6.00 6.30
4.75 0.30 0.30 0.30 0.60 0.80 0.80
2.36 0.00 0.00 0.00 0.00 0.00 0.00
1.18 0.00 0.00 0.00 0.00 0.00 0.00
0.60 0.00 0.00 0.00 0.00 0.00 0.00
0.300 0.00 0.00 0.00 0.00 0.00 0.00
I.S. SieveSize
I.S. SieveSize
8/8/2019 BC.xls - Copy
http://slidepdf.com/reader/full/bcxls-copy 4/20
RAJKOT JAMNAGAR VADINAR ROAD PROJECT
LARSEN & TOUBRO LIMITED - ECC DIVISION
BLENDING OF AGGREGATE FOR BITUMINOUS CONCRETE
(BC -GRADING 2)
Hot Bin 4 : (-24mm+ 18 mm )
Hot Bin 3 : (- 18mm+ 12 mm )
Hot Bin 2 :( -12mm + 6 mm )
Hot Bin 1 : ( 6 mm down )
Bag Filter Material
Individual percentage Blending percentage
Hot Bin 4 Hot Bin 3 Hot Bin 2 Hot Bin 1 Lime Hot Bin 4 Hot Bin 3 Hot Bin 2 Hot Bin 1 Lime
mm 100% 100% 100% 100% 100% 100% 2% 18% 19% 57% 2% 2% 100% Lower
26.5 100.0 100.0 100.0 100.0 100.0 100 2.0 18.0 19.0 57.0 2.0 2.0 100.0 100
19.0 100.0 100.0 100.0 100.0 100.0 100 2.0 18.0 19.0 57.0 2.0 2.0 100.0 100
13.2 7.8 58.2 100.0 100.0 100.0 100 0.2 10.5 19.0 57.0 2.0 2.0 90.6 79
9.5 1.3 6.8 87.3 100.0 100.0 100 0.0 1.2 16.6 57.0 2.0 2.0 78.8 70
4.75 0.4 0.5 8.3 96.3 100.0 100 0.0 0.1 1.6 54.9 2.0 2.0 60.6 53
2.36 0.0 0.0 5.2 77.1 100.0 100 0.0 0.0 1.0 43.9 2.0 2.0 48.9 42
1.18 0.0 0.0 2.9 53.3 100.0 100 0.0 0.0 0.6 30.4 2.0 2.0 34.9 34
0.60 0.0 0.0 0.0 40.0 100.0 100 0.0 0.0 0.0 22.8 2.0 2.0 26.8 26
0.30 0.0 0.0 0.0 26.0 98.2 95.3 0.0 0.0 0.0 14.8 2.0 1.9 18.7 18
0.150 0.0 0.0 0.0 18.8 92.9 90.3 0.0 0.0 0.0 10.7 1.9 1.8 14.4 12
0.075 0.0 0.0 0.0 6.5 84.3 85.0 0.0 0.0 0.0 3.7 1.7 1.7 7.1 4
Type of aggregate
I.S. SieveSize
Combinedgradation of Aggregate
Spec(Tab
grading-Bag Filter Material
Bag Filter Material
8/8/2019 BC.xls - Copy
http://slidepdf.com/reader/full/bcxls-copy 5/20
RAJKOT JAMNAGAR VADINAR ROAD PROJECT, (PROJECT I)
DBM MIX DESIGN WITH BIRAJA AGGREGATE & ESSAR BITUMEN, VADINAR (60/70)
Plant : 120 TPH, Marini Make
Location : 38.700 Km, 0.5 Km LHS
Hot Mix Plant (Hot Bin Sample)
INDEX
Sr. No Description Page No.
1 Summary of Mix Design 1
2 Marshal Testing Data at Various Binder Content 2
3 Marshall Test Property Curves 3
4 All Passing Criteria Graph 4
5 Maximum Specific Gravity of Asphalt Mix 5
6 Blending Of Material 6 - 7
7 Marshal Testing Data ( At 4.9 % Bitumen Content) 8
8 Marshal Testing Data ( At 4.6 % Bitumen Content) 9
9 Marshal Testing Data ( At 4.3 % Bitumen Content) 10
10 Marshal Testing Data ( For Refusal Density at 4.6 % Bitumen content) 11
11 Sieve Analysis Report (Hot Bin Material ) 12 - 28
12 Specific Gravity & Water Absorption Report 29 - 33
14 Flakiness & Elongation Index 34
Aggregate Collection
From
8/8/2019 BC.xls - Copy
http://slidepdf.com/reader/full/bcxls-copy 6/20
Date of Sampling : 11/02/2010
Type of Material : Bitumen( 60/70) Date of testing : 12/02/2010
Collected From : HMP at 38.700 Km Material Tested For : DBM II
SPECIFIC GRAVITY OF BITUMEN
Description/Trail No: Test - 1 Test - 2 MEAN
1. Wt.of Pygnometer gm 42.95
2. Wt.of Pygnometre + filled with water gm. 95.4
3. Wt.of Pygnometer + Bitumen gm 63.82
4. Wt.of Pygnometer + Bitumen + Water gm 95.99
5. Specific Gravity 1.03 1.03
Tested by: Approved by
Name RVTPL
Designation:…………………
Sign : Sign :
LARSEN & TOUBRO LIMITEDINFRASTRUCTURER OPERATING COMPANY
RAJKOT JAMNAGAR VADINAR ROAD PROJECT
QUALITYMANAGEMENT
SYSTEM
Remarks:
8/8/2019 BC.xls - Copy
http://slidepdf.com/reader/full/bcxls-copy 7/20
Date of Sampling : 11/02/2010
Type of Material : Recycle Filler Date of testing : 12/02/2010
Collected From : HMP at 38.700 Km Material Tested For : DBM II
SPECIFIC GRAVITY TEST FOR RECYCLE FILLER
Description/Trail No: Test - 1 Test - 2 MEAN
1. Wt.of Pycnometer (gm ) 21.83
2. Wt.of Pycnometer+ Kerosene(gm ) 63.05
3. Wt.of Pycnometre + Lime (gm ) 35.82
4. Wt.of Pycnometre + Lime + Kerosene (gm ) 72.92
5. Specific Gravity 2.65
Specfic Gravityof Kerosene -0.78
Tested by: Approved byName RVTPL
Designation:…………………
Sign.: …… Sign.: ……………………
Date: … Date: ………………………
LARSEN & TOUBRO LIMITED
INFRASTRUCTURER OPERATING COMPANYRAJKOT JAMNAGAR VADINAR ROAD PROJECT
QUALITY
MANAGEMENTSYSTEM
8/8/2019 BC.xls - Copy
http://slidepdf.com/reader/full/bcxls-copy 8/20
MIX DESIGN FOR DBM WITH CRUSHED AGGREGATE (HOT BIN - P1)
NOMINAL SIZE OF AGGREGATE : 25 MM (Grade II)Source of Aggregare Beraja Cruhser located at 63.500 Km, 3.5 Km RHS
Source of Bitumen ESSAR OIL LIMITED, VADINAR
Grade of Bitumen 60/70
Hot Mix Plant Location Km 38.700, 0.5 Km LHS
PROPORTION OF HOT BIN AGGREGATE & BINDER
1) Hot Bin - 1 : (6 mm down) - 38 % 2) Hot Bin -2 : (-12mm + 6 mm) - 17 %
3) Hot Bin- 3 : (- 18mm + 12 mm) - 26 % 4) Hot Bin- 4 : (-24mm + 18 mm) - 15 %
5) Bag Filter Material: 4.0% 6) Bitumen : 4.6 % (By Wt. of Total Mix)
GRADING
Sieve Size %Passing throogh IS sieves
37.5mm 100 100 0
26.5mm 100 90 - 100
19.0mm 92.7 71 - 95
13.2mm 68.5 56 - 80
4.75mm 44.8 38 - 54
2.36mm 32.2 28 - 42
0.300mm 12.8 7 - 21
0.075mm 5.3 2 - 8
PHYSICAL TEST OF AGGREGATES ( Table 500-8 )
Description Result Limit
1. Cleanliness of corse aggregate (passing 75 micron ) 0.70% Max. 5%
2. Flakiness & Elongation Index 24.8% Max.30%
3. Los Angles Abrasion 12% Max.35%
4. Aggregate Impact value 8.40% Max.27%
5. Soundness by Sodium Sulphate 2.55% Max.12%
6. Sand Equivalent test 77.90% Min.50%
7. Stripping test (Retained Coating ) 100% 95% Min.
8. Water Absorption (Corse Aggregate ) 0.77% Max. 2%
9. Plasticity Index Non plastic Max. 4%
MARSHALL TEST DATA AT VARIOUS BINDER CONTENT
LARSEN & TOUBRO LIMITEDINFRASTRUCTURER OPERATING
COMPANYRAJKOT JAMNAGAR VADINAR ROAD
PROJECT
QUALITY MANAGEMENTSYSTEM
Limit as Per Tableno. 500 -10 (Gr -2) of
MORT& H
Tolerance as per Table 500-13
+ 8
+ 8
+ 7
+ 6
+ 5
+ 4
+ 2
8/8/2019 BC.xls - Copy
http://slidepdf.com/reader/full/bcxls-copy 9/20
MAXIMUM SPECIFIC GRAVITY OF ASPHALT MIX
Material : DBM MIX Date of Sampling : 9/02/2010
Location : LAB Trial Date of Testing- 15/2/2010
Bitumen Content : 4.5%
DESCRIPTION Sample No - 1
1. Weight of Empty flask (gm) = (A) 869
2. Weight of Flask + Mix (gm) = (B) 1674
3. Weight of Flask + Mix + Water (gm) = (C) 3650
4. Weight of Flask + Water (gm) = (D) 3148
5. GMM = (B - A) / (B - A) - (C - D) 2.657
Aggregate - 95.5%
Bitumen - 4.5%
Specfic Gravity of Bitumen -1.022
Effected Specfic Gravity of Aggregate (Gse ) - 2.874
Tested by: Approved by
Name:………………… RVTPL
Designation:……………… Designation:………………
Sign.: ……………… Sign.: ……………………….....
LARSEN & TOUBRO LIMITEDINFRASTRUCTURE OPERATING COMPANY
RAJKOT JAMNAGAR VADINAR ROAD PROJECT
QUALITY MANAGEMENTSYSTEM
8/8/2019 BC.xls - Copy
http://slidepdf.com/reader/full/bcxls-copy 10/20
8/8/2019 BC.xls - Copy
http://slidepdf.com/reader/full/bcxls-copy 11/20
MARSHAL TESTING DATA OF REFUSAL DENSITY OF DBM ( AT 4.6% Bitumen CLocation: Q/C Lab @ km 38.000 Effective Sp. Gr. of Agg.(Gse): 2.867 Date of Cas
Bitumen Type: (60/70), Essar Oil Limited , Vadinar Bulk Sp. Gr. of Agg.(Gsb): 2.856 Date of testi
Nos. of compaction blows: 75 blows on each side Sp. Gr. of Bitumen: 1.029
Proportion (Hot Bin)
1) Hot Bin 1 : ( 6 mm down ) - 38 % 2) Hot Bin 2 : (-12mm + 6 mm ) - 17 %
3) Hot Bin 3 :( - 18mm+ 12 mm ) - 26 % 4) Hot Bin 4 : ( -24mm+ 18 mm ) - 15 %
5) Bag Filter Material: 4.0% 6) Bitumen : 4.6 % (By Wt. of Total Mix ) Proving Rin
SlNo. No of Blows
% Wt in gms Wt in gms Wt in Volume
Bitumen ( Air Dry ) ( Air Sat ) Water ( C.C ) GM
1
75 Nos. 4.6
1265 1266 765 501 2.5
2 1268 1269 767 502 2.5
3 1272 1273 767 506 2.5
2.5
4
100 Nos. 4.6
1269 1270 769 501 2.5
5 1274 1275 770 505 2.5
6 1276 1283 779 504 2.5
2.5
7
200 Nos 4.6
1268 1269 768 501 2.5
8 1276 1277 772 505 2.5
9 1275 1276 774 502 2.5
2.5
10
300 Nos. 4.6
1274 1275 773 502 2.5
11 1276 1277 775 502 2.5
12 1262 1263 769 494 2.5
2.5
13
400 Nos. 4.6
1277 1278 779 499 2.5
14 1276 1277 778 499 2.5
15 1262 1263 770 493 2.5
2.5
16 1269 1270 776 494 2.5
LARSEN & TOUBRO LIMITEDINFRASTRUCTURER OPERATING COMPANY
RAJKOT JAMNAGAR VADINAR ROAD PROJECT
Mixing temp
Compaction
8/8/2019 BC.xls - Copy
http://slidepdf.com/reader/full/bcxls-copy 12/20
MARSHAL TESTING DATA ( AT 4.6% Bitumen Content )
Location: Q/C Lab @ km 38.000 Effective Sp. Gr. of Agg.(Gse): 2.867 Date of Casting: 24/02/2010Bitumen Type: (60/70), Essar Oil Limited, Vadinar Bulk Sp. Gr. of Agg.(Gsb): 2.856 Date of testing: 25/02/2010
Nos. of compaction blows: 75 blows on each side Sp. Gr. of Bitumen: 1.029
Proportion (Hot Bin)
1) Hot Bin 1 : ( 6 mm down ) - 38 % 2) Hot Bin 2 : (-12mm + 6 mm ) - 17 %
3) Hot Bin 3 :( - 18mm+ 12 mm ) - 26 % 4) Hot Bin 4 : ( -24mm+ 18 mm ) - 15 %
5) Bag Filter Material: 4.0% 6) Bitumen : 4.6 % (By Wt. of Total Mix ) Proving Ring Correction factor:
SlNo.% Wt in gms Wt in gms Wt in Volume A.S.T.M Correction Corrected
Bitumen ( Air Dry ) ( Air Sat ) Water ( C.C ) GMB GMM VA VG VMA VFB Factor Stability(kg)
1
4.6
1262 1263 762 501 2.519 260 1.04 1682
2 1259 1260 761 499 2.523 255 1.04 1650
3 1258 1259 762 497 2.531 270 1.04 1747
2.524 2.65 4.70 84.32 15.7 70.0 1693
44.6
1269 1270 768 502 2.528 225 1.04 14565 1270 1271 767 504 2.520 240 1.04 1553
6 1273 1274 770 504 2.526 250 1.04 1618
2.525 2.65 4.70 84.3 15.7 70.0 1542
Retained Stability = =1542
x 100 = 91.0 %1693
FOR L & T ECCD
LARSEN & TOUBRO LIMITEDINFRASTRUCTURER OPERATING COMPANY
RAJKOT JAMNAGAR VADINAR ROAD PROJECT
QUAMANAG
SYS
Mixing temperature: 160 - 165oC
Compaction temperature: 146 - 150oC
Proving ringreading
Stability Test Data at 600C After 30 Minute (Sl no 1 - 3 )
Stability Test Data at 600C After 24 Hours (Sl no 4 - 6 )
Stability at 60 oC after 24 Hrs.
Stability at 60 oC after 30 Minutes
8/8/2019 BC.xls - Copy
http://slidepdf.com/reader/full/bcxls-copy 13/20
MARSHAL TESTING DATA ( AT 4.3% Bitumen Content )
Location: Q/C Lab @ km 38.000 Effective Sp. Gr. of Agg.(Gse): 2.867 Date of Casting: 24/02/2010Bitumen Type: (60/70), Essar Oil Limited,Vadinar Bulk Sp. Gr. of Agg.(Gsb): 2.856 Date of testing: 25/02/2010
Nos. of compaction blows: 75 blows on each side Sp. Gr. of Bitumen: 1.029
Proportion (Hot Bin)
1) Hot Bin 1 : ( 6 mm down ) - 38 % 2) Hot Bin 2 : (-12mm + 6 mm ) - 17 %
3) Hot Bin 3 :( - 18mm+ 12 mm ) - 26 % 4) Hot Bin 4 : ( -24mm+ 18 mm ) - 15 %
5) Bag Filter Material: 4.0% 6) Bitumen : 4.3 % (By Wt. of Total Mix ) Proving Ring Correction factor: 6
SlNo.
% Wt in gms Wt in gms Wt in Volume A.S.T.M Correction Corre
Bitumen ( Air Dry ) ( Air Sat ) Water ( C.C ) GMB GMM VA VG VMA VFB Factor Stabili
1
4.3
1248 1249 755 494 2.526 240 1.04 155
2 1251 1251 754 497 2.517 245 1.04 158
3 1246 1247 756 491 2.538 260 1.04 168
2.527 2.66 5.07 84.7 15.32 66.91 160
44.3
1279 1246 740 506 2.528 230 1.04 1485 1281 1257 750 507 2.527 205 1 127
6 1276 1258 752 506 2.522 220 1.04 142
2.525 2.66 5.13 84.6 15.4 66.62 139
Retained Stability = =1396
x 100 = 86.861607
LARSEN & TOUBRO LIMITEDINFRASTRUCTURER OPERATING COMPANY
RAJKOT JAMNAGAR VADINAR ROAD PROJECTMA
Mixing temperature: 160 - 165oC
Compaction temperature: 146 - 1
Proving ringreading
Stability Test Data at 600C After 30 Minute (Sl no 1 - 3 )
Stability Test Data at 600C After 24 Hours (Sl no 4 - 6 )
Stability at 60 oC after 24 Hrs.
Stability at 60 oC after 30 Minutes
FOR L & T ECCD
8/8/2019 BC.xls - Copy
http://slidepdf.com/reader/full/bcxls-copy 14/20
)
8/8/2019 BC.xls - Copy
http://slidepdf.com/reader/full/bcxls-copy 15/20
MARSHAL TESTING DATA ( AT 4.9% Bitumen Content )
Location: Q/C Lab @ km 38.000 Effective Sp. Gr. of Agg.(Gse): 2.867 Date of Casting: 24/02/2010Bitumen Type: (60/70), Essar Oil Limited, Vadinar Bulk Sp. Gr. of Agg.(Gsb): 2.856 Date of testing: 25/02/2010
Nos. of compaction blows: 75 blows on each side Sp. Gr. of Bitumen: 1.029
Proportion (Hot Bin)
1) Hot Bin 1 : ( 6 mm down ) - 38 % 2) Hot Bin 2 : (-12mm + 6 mm ) - 17 %
3) Hot Bin 3 :( - 18mm+ 12 mm ) - 26 % 4) Hot Bin 4 : ( -24mm+ 18 mm ) - 15 %
5) Bag Filter Material: 4.0% 6) Bitumen : 4.9 % (By Wt. of Total Mix ) Proving Ring Correction factor: 6.222
SlNo.
% Wt in gms Wt in gms Wt in Volume A.S.T.M Correction Corrected
Bitumen ( Air Dry ) ( Air Sat ) Water ( C.C ) GMB GMM VA VG VMA VFB Factor Stability(kg)
1
4.9
1258 1259 761 498 2.526 240 1.04 1553
2 1256 1257 758 499 2.517 255 1.04 1650
3 1248 1248 759 489 2.552 255 1.09 1729
2.532 2.64 4.0 84.3 15.7 74.8 1644
44.9
1260 1261 765 496 2.540 225 1.04 14565 1255 1256 763 493 2.546 220 1.09 1492
6 1262 1263 758 505 2.499 235 1.04 1521
2.528 2.64 4.1 84.2 15.8 74.2 1490
Retained Stability = =1490
x 100 90.63%1644
LARSEN & TOUBRO LIMITEDINFRASTRUCTURER OPERATING COMPANY
RAJKOT JAMNAGAR VADINAR ROAD PROJECT
QUMANA
SY
Mixing temperature: 160 - 165oC
Compaction temperature: 146 - 150oC
Proving ringreading
Stability Test Data at 600C After 30 Minute (Sl no 1 - 3 )
Stability Test Data at 600C After 24 Hours (Sl no 4 - 6 )
Stability at 60 oC after 24 Hrs.
Stability at 60 oC after 30 Minutes
FOR L & T ECCD
8/8/2019 BC.xls - Copy
http://slidepdf.com/reader/full/bcxls-copy 16/20
RAJKOT JAMNAGAR VADINAR ROAD PROJECT
LARSEN & TOUBRO LIMITED - ECC DIVISION
BLENDING OF AGGREGATE FOR BITUMINOUS CONCRETE
(BC -GRADING 2)
Hot Bin 4 : (-24mm+ 18 mm )
Hot Bin 3 : (- 18mm+ 12 mm )
Hot Bin 2 :( -12mm + 6 mm )
Hot Bin 1 : ( 6 mm down )
Bag Filter Material
Individual percentage Blending percentage
Hot Bin 4 Hot Bin 3 Hot Bin 2 Hot Bin 1 Lime Hot Bin 4 Hot Bin 3 Hot Bin 2 Hot Bin 1 Lime
mm 100% 100% 100% 100% 100% 100% 10% 10% 30% 44% 2% 0% 96% Lower
19.0 100.00 100.00 100.00 100.00 100.0 100 10.0 10.0 30.0 44.0 2.0 0.0 96.0 100
12.5 5.40 43.23 100.00 100.00 100.0 100 0.5 4.3 30.0 44.0 2.0 0.0 80.9 90
4.75 0.68 0.92 7.75 96.53 100.0 100 0.1 0.1 2.3 42.5 2.0 0.0 47.0 44
2.36 0.00 0.00 4.87 79.35 100.0 100 0.0 0.0 1.5 34.9 2.0 0.0 38.4 28
0.30 0.00 0.00 0.00 23.95 100.0 96.9 0.0 0.0 0.0 10.5 2.0 0.0 12.5 5
0.075 0.00 0.00 0.00 6.57 61.2 88.4 0.0 0.0 0.0 2.9 1.2 0.0 4.1 2
Type of aggregate
I.S. SieveSize
Combinedgradation of Aggregate
Spec(Tab
grading-Bag Filter Material
Bag Filter Material
90
100
Combined Gradation for DBM II
Column R
Column Q
Column N
8/8/2019 BC.xls - Copy
http://slidepdf.com/reader/full/bcxls-copy 17/20
RAJKOT JAMNAGAR VADINAR ROAD PROJECT
LARSEN & TOUBRO LIMITED - ECC DIVISION
BLENDING OF AGGREGATE FOR BITUMINOUS CONCRETE
(BC -GRADING 2)
Hot Bin 4 : (-24mm+ 18 mm )
Hot Bin 3 : (- 18mm+ 12 mm )
Hot Bin 2 :( -12mm + 6 mm )
Hot Bin 1 : ( 6 mm down )
Bag Filter Material
Individual percentage Blending percentage
Hot Bin 4 Hot Bin 3 Hot Bin 2 Hot Bin 1 Lime Hot Bin 4 Hot Bin 3 Hot Bin 2 Hot Bin 1 Lime
mm 100% 100% 100% 100% 100% 100% 4% 13% 19% 62% 0% 2% 100% Lower
26.5 100.00 100.00 100.00 100.00 100.0 100 4.0 13.0 19.0 62.0 0.0 2.0 100.0 100
19.0 100.00 100.00 100.00 100.00 100.0 100 4.0 13.0 19.0 62.0 0.0 2.0 100.0 100
13.2 10.12 59.63 100.00 100.00 100 100 0.4 7.8 19.0 62.0 0.0 2.0 91.2 100
12.5 5.40 43.23 100.00 100.00 100.0 100 0.2 5.6 19.0 62.0 0.0 2.0 88.8 90
9.5 1.45 7.78 86.87 100.00 100.0 100 0.1 1.0 16.5 62.0 0.0 2.0 81.6 70
4.75 0.68 0.92 7.75 96.53 100.0 100 0.0 0.1 1.5 59.9 0.0 2.0 63.5 44
2.36 0.00 0.00 4.87 79.35 100.0 100 0.0 0.0 0.9 49.2 0.0 2.0 52.1 28
1.18 0.00 0.00 2.72 54.80 100.0 100 0.0 0.0 0.5 34.0 0.0 2.0 36.5 34
0.60 0.00 0.00 0.00 41.52 100.0 100 0.0 0.0 0.0 25.7 0.0 2.0 27.7 26
0.30 0.00 0.00 0.00 23.95 100.0 96.9 0.0 0.0 0.0 14.8 0.0 1.9 16.8 5
0.150 0.00 0.00 0.00 18.23 91.8 90.3 0.0 0.0 0.0 11.3 0.0 1.8 13.1 12
Type of aggregate
I.S. SieveSize
Combinedgradation of Aggregate
Spec(Tab
grading-Bag Filter Material
Bag Filter Material
8/8/2019 BC.xls - Copy
http://slidepdf.com/reader/full/bcxls-copy 18/20
RAJKOT JAMNAGAR VADINAR ROAD PROJECT
LARSEN & TOUBRO LIMITED - ECC DIVISION
GRADATION OF INDIVIDUAL AGGREGATE COLLECTED F
FOR BC Grade-II
Hot Bin 4 : (-24mm+ 18 mm )
mm Sample 1 Sample 2 Sample 3 Sample 4 Sample 5 Sample 6
37.5 100.00 100.00 100.00 100.00 100.00 100.00
26.5 100.00 100.00 100.00 100.00 100.00 100.00
19.0 100.00 100.00 100.00 100.00 100.00 100.00
13.2 10.20 10.20 8.90 9.30 8.40 7.30
12.5
9.5 1.50 2.80 2.10 2.60 1.20 0.90
4.75 0.30 0.70 0.90 1.00 0.90 0.30
2.36 0.00 0.00 0.00 0.00 0.00 0.00
1.18 0.00 0.00 0.00 0.00 0.00 0.00
0.60 0.00 0.00 0.00 0.00 0.00 0.00
0.300 0.00 0.00 0.00 0.00 0.00 0.00
0.150 0.00 0.00 0.00 0.00 0.00 0.00
0.075 0.00 0.00 0.00 0.00 0.00 0.00
Hot Bin 3 : (- 18mm+ 12 mm )
mm Sample 1 Sample 2 Sample 3 Sample 4 Sample 5 Sample 6
37.5 100.00 100.00 100.00 100.00 100.00 100.00
26.5 100.00 100.00 100.00 100.00 100.00 100.00
19.0 100.00 100.00 100.00 100.00 100.00 100.00
13.2 55.20 52.40 61.90 64.20 54.60 57.50
12.5
9.5 4.80 4.80 8.60 10.50 5.90 6.30
4.75 0.30 0.30 0.30 0.60 0.50 0.80
2.36 0.00 0.00 0.00 0.00 0.00 0.00
1 18 0 00 0 00 0 00 0 00 0 00 0 00
I.S. SieveSize
I.S. SieveSize
L&T RAJKOT JAMNAGAR VADINAR ROAD PROJECT
8/8/2019 BC.xls - Copy
http://slidepdf.com/reader/full/bcxls-copy 19/20
L&T RAJKOT JAMNAGAR VADINAR ROAD PROJECT
LARSEN & TOUBRO LIMITED - ECC DIVISION
MARSHALL TEST DATA AT VARIOUS BITUMEN CONTENT FOR DBM GRADE-II
Location: Q/C Lab @ km 38.000 Effective Sp. Gr. of Agg.(Gse): 2.867 Date of sampli
Bitumen Type: (60/70), Essar Oil Limited Bulk Sp. Gr. of Agg.(Gsb): 2.856 Date of testing
Nos. of compaction blows: 75 blows on each side Sp. Gr. of Bitumen: 1.029
Proportion (Hot Bin)
1) Hot Bin 1 : ( 6 mm down ) - 38 % 2) Hot Bin 2 : (-12mm + 6 mm ) - 17 %
3) Hot Bin 3 :( - 18mm+ 12 mm ) - 26 % 4) Hot Bin 4 : ( -24mm+ 18 mm ) - 15 %
5) Bag Filter Material: 4.0% Proving Ring
Sample %Bitumen %Agg by Wt. of specimen (gm) Bulk Density of
Gmm
Air voids VMA VFB
No. by total wt. total wt. of In Air In Water SSD compacted mix (%) (%) (%)
of mix mix
1
3.5 96.5
1221.0 737 1223 486.0 2.512 230.0
2 1219.0 736 1220.0 484.0 2.519 235.0
3 1220 736 1221 485.0 2.515 240.0
Average 2.515 2.698 6.8 15.0 54.9
4
4.0 96.0
1223.0 735.0 1224.0 489.0 2.501 240.0
5 1220.0 740.0 1222.0 482.0 2.531 245.0
6 1221.0 739.0 1223.0 484.0 2.523 260.0
Average 2.518 2.676 5.9 15.4 61.6
7
4.5 95.5
1228.0 743.0 1229.0 486.0 2.527 250.00
8 1232.0 746.0 1233.0 487.0 2.530 255.00
9 1229.0 745.0 1230.0 485.0 2.534 250.00
Average 2.530 2.654 4.7 15.4 69.7
10
5.0 95.0
1233.0 745.0 1234.0 489 2.521 240.00
11 1234.0 747.0 1234.0 487 2.534 245.00
12 1231.0 744.0 1232.0 488 2.523 240.00
Mixing tempe
Compaction te
Volume of Specimen Dial Gauge
Reading
8/8/2019 BC.xls - Copy
http://slidepdf.com/reader/full/bcxls-copy 20/20
0.0 0.1 1.0 10.0 100.0
0
10
20
30
40
50
60
70
80
90
100 100.0100.0
73.6
51.6
37.6
12.8
7.5
Combind Grading of aggregate
Column J
Column N
Column M
Sieve Size, mm
%P
assing