    EXPANSION OF MINEOPERATIONS IN

    HINDUSTAN ZINC LIMITED

    MINE, INDIA

    By Armando DiazHindustan Zinc Ltd

    Rajpura Dariba Complex

    Udaipur - India

  • 8/22/2019 Armando Diaz

    2/24

  • 8/22/2019 Armando Diaz

    3/24

  • 8/22/2019 Armando Diaz

    4/24

  • 8/22/2019 Armando Diaz

    5/24

  • 8/22/2019 Armando Diaz

    6/24

    SINDESAR KHURD MINE LOCATION

    Location: 82 km NNE ofUdaipur, 6 km NE of

    Rajpura Dariba mine.

    Nearest Rly Station:Fatehnagar 18km. Nathdwara

    Kankroli

    Dariba

    Sindesar Khurd

    MatrikundiaDam

    B A NA S

    RIVER

    Chittorgarh

    Ajmer

    Jaipur

    UdaipurDariba

    Rajasthan

    240-54

    LocationMap

    Bamnia Kalan

    Nearest Airport: Udaipur(Dabok) 62km.

    District HQ: Rajsamand(Raj).

    UdaipurDabok Airport

    Mavli

    Ahmed

    ab

    ad

    Vallabh Nagar

    Fatehnagar

    Jaisamand

    Chittor

    garhDistrict

    Bhupal Sagar

    Chittorga

    rhBa

    rech

    Rive

    r

    0 4 8 16 24 km8

    Scale

    240-34

    73

    0-

    40

    74

    0-

    00

    74

    0-

    20

    Road River, Nalah RailPlaces

    240-14Zawar Group

  • 8/22/2019 Armando Diaz

    7/24

  • 8/22/2019 Armando Diaz

    8/24

  • 8/22/2019 Armando Diaz

    9/24

    SK Mine

  • 8/22/2019 Armando Diaz

    10/24

    SK Mine

  • 8/22/2019 Armando Diaz

    11/24

    Salient Features- Geology

    Structure Eastern limb of regional fold

    Strike N150E-S150W, 2.3 km

    Dip Moderate to Steep Westerly/Easterly

    Host Rock Calc-silicate dolomite and Graphite Mica

    Schist

    Hang wall Rock Quartzite/Quartz Mica Schist

    Typical Geological TransverseSection

    Salient Features- Geology

    Footwall Rock Dolomite/Calc Biotite Schist

    Main Ore Minerals Sphalerite & Galena

    Width of Lenses 2 to 55m

    Explored Depth 1.1 km from surface

    Structure Eastern limb of regional fold

  • 8/22/2019 Armando Diaz

    12/24

    Geotechnical Characteristics of Rock Mass

    Rock mass at SKM is of high strength, has good rock mass quality

    & few joints.

    There is little difference in rock mass conditions between footwall,

    orebody & hangwall.

    SK rock mass is classified as good to very good.

    There are no major or regional structural features .

    There are no significant ground water issues.

  • 8/22/2019 Armando Diaz

    13/24

    Typical Ore body Section

  • 8/22/2019 Armando Diaz

    14/24

    LVS of SK Mine

  • 8/22/2019 Armando Diaz

    15/24

    MINING METHODThe mining method is Blasthole Open Stoping (BHS)DrillingFor Uper level blocks, stope development is carried out at 315,350 and 400 mRL. 315 mRL is haulage level.

    For creating the slot down.In the slot crosscuts, parallel holes of 165 mm diameter aredrilled by ITH drill machine at burden and spacing of 2.75mX3m

    respectively.For making trough at 315 mRL drill holes of 57 mm diameter aredrilled in ring fashion by Simba - Solo drill machine at 1.2m ringburden and 1.5m spacing.

    Production blast holes of 115 mm diameter are drilled by ITHdrill machine in ring pattern from drill drive at 350mRL and 400mRL at ring spacing and tow burden of 2.85m/2.75m and

    3.25m/3m respectively.

  • 8/22/2019 Armando Diaz

    16/24

    11

    10

    1 11 1

    10 2

    W

    E

    BLASTHOLE DRILL PATTERN

    0m 20m

    F /W7

    H /W

    4 6

    56

    57

    8

    31

    13

    15

    315

    1

    13975 11 11975

    93

    38

    4

  • 8/22/2019 Armando Diaz

    17/24

    Blast hole Drilling Pattern

    350mRL

    SECTION AT 7190N(SLOT)

    400mRL1100E

    Blasting Limit

    340mRL

    350mRL

    1150E

    315mRL

    1200E

    Stope boundary

    SECTION AT 7187.5N(R1-R3)

    1100E

    1150E

    400mRL

    327mRL

    315mRL

    1200E

    Ore boundary

    400mRL1100E

    400mRL 1150E

    1200E

    1150E

    Stope boundary

    1100E

    1200E

    Slot X-cut

    400 - 350 mRL

    Slot X-cut

    350 - 315mRLR6R7R5

    R3

    R4

    R10R9

    R8

    400mRL-PLAN

    1100E

    1200E

    PILLAR

    Stoping

    Boundary

    BH-4

    R3 R2 R1 7192.5

    N

    MP

    350/400

    R3R10R11 R6R7R9 R8 R4R5 R2 R1

    Stress

    Meter

    PILLAR

    7120N

    StopingBoundary

    7

    152.5

    N

    R3

    MPBE

    R10R11 R6R9 R8 R7 R5 R4 R2 R1

    7192.5

    N

    7200N

    SECTION AT 7175N (R4-R6) SECTION 7162.5N (R7-R10)

    Stope boundary Ore boundary

    350mRL

    MPBE

    Ore boundary

    Stope boundary

    327mRL

    315mRL

    327mRL

    Ore boundary

    Stope boundary

    350mRL

    315mRL

    315 mRL-PLAN7120N

    1150E

    StopingBoundary

    PILLAR

    1100 E

    PIL

    LARTrough Drive 3.5x3

    7200N

    Trough Drive 3.5x3

    350mRL-PLAN

    PILLAR

    1150E

    R10 R9

    R5R6R8 R7

    R3R4

    R2

    R2

    R1

    R1

    PILLAR

  • 8/22/2019 Armando Diaz

    18/24

    Work Place Drill Machine Diam (mm) B x E

    Slot Cx ITH 165 2.75 x 3.0

    Macking trough Simba-Solo 57 1.2 x 1.5

    Production Ring ITH 115 2.75 x 2.85

    3.0 x 3.25

    Drilling

    Work Place Explosive

    Diam

    (mm) Explosive Make

    ITH VOD of

    Explosive

    Slot Cx Powergel-3 125M-s IEL,Orica

    Pvt 4880 ms-5004 ms

    Macking

    trough Powergel 40

    M-s IEL,Orica

    Pvt 4422 ms

    Prod. Ring Powergel-2 83M-s IEL,Orica

    Pvt 4113 ms-4385 ms

    Blasting

  • 8/22/2019 Armando Diaz

    19/24

    Rock Fragmentation Analyses

  • 8/22/2019 Armando Diaz

    20/24

    No Machine Capacity Power (H.P.) Number of Units

    1 LPDT-EJC-522 (Sandvik Make) 20MT 315 3

    2 LPDT-TH320 (Sandvik Make) 20MT 315 4

    3 LPDT -MT 2010 (Atlas Copco Make) 20MT 300 3

    4 LHD ST1030 ( Atlas Copco Make) 10MT 250 2

    5 LHD -LH410 (Sandvik Make) 10MT 295 4

    6 LHD ST:3.5 (Atlas Copco Make) 6MT 183 1

    Equipment Fleet - Before Expansion Plan

    - an v a e .

    8 MPV-TH205L (M/s Sandvik Make) 16 PERSON 99 1

    9 MPV-TH205L (M/s Normat Make) 16 PERSON 99 2

    10 DRILL:QUASAR-1F (Sandvik Make) -N.A- 2X40 1

    11 DRILL: DD310 (Sandvik Make) -N.A- 1X75 1

    12 DRILL:RB-282 (Atlas Copco Make) -N.A- 2X55 2

    13 DRILL: DD320 (Sandvik Make) -N.A- 2X55 2

    14 HOIST 1.2MT 100 1

    15 GRADER: Cat 12 H NA 101 1

  • 8/22/2019 Armando Diaz

    21/24

    No Machine Capacity Power (H.P.) Number of Units

    1 LPDT-Toro50 (sandvik make) 50MT 575 6

    2 LHD-LH517 (Sandvik Make) 17MT 400 3

    3 LHD-410 (Sandvik make) 10MT 295 1

    4 Drill: DL310-7 (Sandvik Make) Na 98 3

    *

    Equipment Fleet - After Expansion Plan

    -

    6 Drill Jumbo Single boom Na 75 1

    7 Remote control system for LHD Na - 2

    8 Passenger vehicle 16 99 3

    9 Multmec carrier for explosive, etc Na 100 2

    10 Front end loader Na - 1

    11 Cavity monitoring system Na - 1

    12 HSE Underground refuge chamber Na - 1

  • 8/22/2019 Armando Diaz

    22/24

  • 8/22/2019 Armando Diaz

    23/24

    0

    10000

    20000

    30000

    40000

    50000

    60000

    70000

    80000

    90000

    100000

    Apr-10 May-10 Jun-10 Jul-10 Aug-10 Sep-10 Oct-10 Nov-10 Dec-10 Jan-11 Feb-11 Mar-11 Apr-11 May-11 Jun-11 Jul-11

    Tonnes

    SK Mine Actual Production

    0

    100

    200

    300

    400

    500

    600

    Apr-10 May-10 Jun-10 Jul-10 Aug-10 Sep-10 Oct-10 Nov-10 Dec-10 Jan-11 Feb-11 Mar-11 Apr-11 May-11 Jun-11 Jul-11

    Meters

    SK Mine Actual Development

  • 8/22/2019 Armando Diaz

    24/24

    Sindesar Khurd MineRajastan, Udaipur

    India 2011