160615 Quickscan JLG (Stijn Verputten)
-
Upload
sintas -
Category
Technology
-
view
44 -
download
5
Transcript of 160615 Quickscan JLG (Stijn Verputten)
Logistical impactof
Additive Manufacturing on
after-sales service supply chains
A Quick scan at JLG Ground Support
Stijn Verputten, TU/e
JLG Industries
• JLG is a $3 Billion global Company• Part of $9 Billion Oshkosh Corporation
• Distributer of access equipment • Work platforms • Tele-handlers
• JLG Ground Support• Aftermarket
• Operating all around the world• Project done in Maasmechelen, Belgium
Benefits of Additive Manufacturing
Benefits1 for JLG Ground Support
• Simpler supply chain• Shorter lead times Lower inventories
• Small production batches
Company goal: Reduce inventory while maintaining a fill rate of 98%
Company goal in combination with AM benefits• In our project we investigate how we can use AM to meet this goal
• We need to know which parts are eligible and what criteria they must meet
[1] Holmström, J., Partanen, J., Tuomi, J., & Walter, M. (2010). Rapid manufacturing in the spare parts supply chain: alternative approaches
to capacity deployment. Journal of Manufacturing Technology Management,21(6), 687-697.
Ranking method
• We follow Knofius’ framework as conducted at Fokker and Royal Netherlands Army
• Ranking method made in 3 phases
Data FilteringSpare Part attributes
assortmentData Scoring
OverallScore
Phase 1 Phase 2 Phase 3 Result
Data Filtering
• Start with 74 882 parts
• Go/No-Go attributes
• Data unavailability
• 803 promising parts
ID Field Restriction Remaining parts
1 All parts JLG Ground
Support
74,882 parts
2 Superseded/obsolete =’(Blanks)’ 71,805 parts
3 Buy level =’buy level’ 17,064 parts
4 Sales 2007/2016
Yes/No
=’Yes’ 5,284 parts
5 Std price > 20€ 2,600 parts
6 Commodity code Min {irrelevant
keywords}
883 parts
7 Printable Material
type
Min {irrelevant
keywords}
868 parts
8 Total Size printable =1 853 parts
9 Printable Weight < 22 pounds 803 parts
Spare part attributes
• Determine spare part attributes• Demand
• Lead time
• Cost
• Batch size/sales
• Inventory Turnover Rate(ITR)
Spare part attribute weight
19%
22%
19%
18%
22%
Demand Leadtime Batchsize
ITR Cost
• Analytical Hierarchy Process
• 5 Decision makers
• Pair-wise comparison
Data scoring
• All candidate parts receive a score from ‘0’ to ‘1’ for every spare part attribute
• Normalize scores based on extreme values
• Linear scoring:• Lead time• Batch size/sale• ITR
• Logarithmic scoring:• cost
• Other scoring:• Demand
Final results
Very promising parts:
• Parts with score >0.6
• 122 parts
0
50
100
150
200
250
0-0.1 0.1-0.2 0.2-0.3 0.3-0.4 0.4-0.5 0.5-0.6 0.6-0.7 0.7-0.8
1
34
88
177
220
161
89
33
Nu
mb
er o
f p
arts
total scores
Total scores
Promising parts
• Manual check for the 50 best parts
• 4 parts are selected in collaboration with the company.
• Based on: - Suitability to manufacture with AM- Favorable for AM- Kind of part
Stop, Lift cylinder
Specification:• Material: Metal • Size:• Weight: 0,700 kg
• Lead time: 25 days • Cost: € 30,63• Demand: 2 a year• Batch size/sales: 12.50• ITR: 0.08
0,190
0,049 0,190
0,174
0,026
Total score:0.629301
Score demand
score leadtime
score batchsize
score ITR
score Cost
Mount, Rear window latch
Specification:• Material: A36 Steel• Size: 52 mm• Weight: 0,067 kg
• Lead time: 77 days • Cost: € 34,04• Demand: 1 a year• Batch size/sales: 1• ITR: 0,14
Pin, Kingpin (1001130160)
Specification:• Material: Metal (4150101).• Size: 150 mm
• Weight: 0,400 kg
• Lead time: 59 days • Cost: € 95,36• Demand: 2 a year• Batch size/sales: 0,5• ITR: 0,15
Valve, Heater water
Specification:• Material: Metal • Size: 106,0 mm• Weight: 0,450 kg
• Lead time: 81 days • Cost: € 106,41• Demand: 0 a year• Batch size/sales: 1• ITR: 0
Future steps
• Next steps with these parts are, with Westerweel’s model:
• Determine minimum Quality of the AM parts
• Determine maximum cost of the AM parts
• To determine definit Go/No-go for the selected parts
Pin, Axle Pivot
Specification:• Material: Metal (4150101)• Size: 222,5 mm
• Lead time: 79 days • Cost: € 21,72• Demand: 2 a year• Batch size/sales: 5• ITR: 1
Valve, Fly boom
Specification:• Material: • Size: 153,7 mm
• Lead time: 59 days • Cost: € 150,60• Demand: 0 a year• Batch size/sales: 5• ITR: 0